A sewage pump rotary welding apparatus and method thereof

By designing a rotary welding equipment for sewage pumps, the end plates and clamping plates are driven to rotate synchronously by a motor, and the internal support mechanism supports the sewage pump body. This solves the problems of insufficient support for irregular shells and double-sided welding, and improves welding efficiency and precision.

CN121245373BActive Publication Date: 2026-05-05ZHEJIANG LULIN PUMP CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202511580861.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-10-31
Publication Date
2026-05-05
Estimated Expiration
2045-10-31

AI Technical Summary

Technical Problem

In existing technologies, the welding of sewage pumps is not sufficiently supported for irregular shells, making it difficult to achieve double-sided welding. Furthermore, manual operation is inefficient and lacks precision.

Method used

A rotary welding device for sewage pumps was designed, including a worktable, a rotating seat, a positioning mechanism, and welding components. The end plate and clamping plate are driven to rotate synchronously by a motor, and the internal support mechanism supports the sewage pump body, thereby achieving stable positioning and double-sided welding of the sewage pump body and the flange.

Benefits of technology

It improves welding efficiency, avoids misalignment between the sewage pump body and the flange, ensures welding accuracy and strength, and simplifies the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121245373B_ABST
    Figure CN121245373B_ABST
Patent Text Reader

Abstract

This invention discloses a rotary welding device and method for sewage pumps, relating to the field of sewage pump welding technology. It includes a worktable, a rotating base, a positioning mechanism for fixing the sewage pump body and flange, and a welding assembly with a welding head. The rotating base is rotatably positioned above the worktable, the positioning mechanism is mounted on the rotating base, and the welding assembly is mounted on the worktable. Two sets of positioning mechanisms are symmetrically arranged and slidably positioned above the rotating base. Each positioning mechanism includes a lifting base, a clamping plate, and an end plate. The lower end of the lifting base is slidably positioned above the rotating base, and the end plate is rotatably positioned at the upper end of the lifting base. This invention achieves initial overall fixation of the sewage pump body and flange by using the positioning mechanism to position and spot weld them. Then, the welding position is flipped upwards, facilitating double-sided welding of the sewage pump body and flange by the welding assembly. This eliminates the need to reposition the sewage pump body and flange after welding one side, thus improving welding efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of sewage pump welding technology, and in particular to a rotary welding device and method for sewage pumps. Background Technology

[0002] Sewage pumps are a type of centrifugal impurity pump. They are mainly used to transport urban sewage. Sewage pumps are generally composed of components such as motors and impellers. These components are assembled together through the pump body casing. When assembling a sewage pump, flanges are required. These flanges are generally arc-shaped and are usually composed of bends and flanges welded together.

[0003] For example, CN113042965A describes a rotary welding device and method for a sewage pump, which includes an automatic flange feeding device for feeding flanges in a sewage pump. The flange feeding device includes a top feeding mechanism and a push feeding mechanism. A fixed worktable is set in the direction in which the push feeding mechanism moves the flange. A feed plate is set on one side of the fixed worktable, and a positioning hole is set in the center. A positioning and fixing mechanism for fixing the flange for welding is set below the positioning hole. The working end of the rotating device can contact the flange and drive the flange to rotate in the axial direction. The welding device is used to weld the joint between the flange and the bend. The unloading device is used to grab the welded flange and bend on the fixed worktable and move them. This technical solution effectively realizes the purpose of automatic welding at the joint between the flange and the bend, and solves the technical problem of time-consuming and labor-intensive manual operation.

[0004] However, in the existing technology, most of the assembly is done manually. The elbow and flange are fixed with clamps and then welded. This method is inefficient and cannot ensure the accuracy of the assembled pipe, which affects the use of the flange. In addition, when welding the flange, the direction needs to be adjusted manually, which is not conducive to the processing of the flange.

[0005] In addition, as shown in the aforementioned patent, the irregular sewage pump housing lacks necessary support. During the rotational welding process, the sewage pump and the flange are prone to misalignment or tilting. Furthermore, the above welding method can only achieve welding on one side. If welding is required on the other side of the flange, workers need to remove the sewage pump and flange together after welding one side, and then manually weld the other side, which is quite inconvenient. Summary of the Invention

[0006] In view of the aforementioned existing problems, the present invention is proposed.

[0007] The purpose of this invention is to solve the problems in the prior art where there is insufficient support for irregular sewage pump housings during welding and it is difficult to achieve double-sided welding.

[0008] To solve the above-mentioned technical problems, the present invention provides the following technical solution:

[0009] On one hand, the present invention provides a rotary welding device for a sewage pump, which includes a workbench, a rotating seat, a positioning mechanism for fixing the sewage pump body and a flange, and a welding assembly with a welding head. The rotating seat is rotatably disposed above the workbench, the positioning mechanism is disposed on the rotating seat, and the welding assembly is disposed on the workbench. Two sets of positioning mechanisms are symmetrically arranged and slidably disposed above the rotating seat. The positioning mechanism includes a lifting seat, a clamping plate, and an end plate. The lower end of the lifting seat is slidably disposed above the rotating seat, and the end plate is rotatably disposed on the upper end of the lifting seat. Two clamping plates are provided and are adjustablely slidably disposed on the end plates. The end face of the sewage pump body is located between the two clamping plates. An inner support mechanism is provided at the center of the rotating seat, and the end face of the sewage pump body for connecting the flange is sleeved on the outside of the inner support mechanism.

[0010] Furthermore, the lower end of the lifting seat is provided with a first slider, and the upper part of the rotating seat is provided with a first slide groove that is adapted to slide with the first slider. One end of the first slide groove is provided with a first cylinder, and the output end of the first cylinder is assembled and connected to the first slider. The lifting seat includes a fixed seat, an inner seat and a lifting assembly. The first slider is disposed at the lower end of the fixed seat, and the lower end of the inner seat is slidably disposed inside the fixed seat. Both sets of lifting seats are synchronously driven to lift and lower through the lifting assembly. The two sets of end plates are linked together through a linkage shaft. A first motor is provided at the upper end of one inner seat, and the corresponding end plate is driven to rotate by the first motor.

[0011] By driving the first motor to rotate the two sets of end plates synchronously, the two ends of the sewage pump body clamped in the clamping plate will rotate synchronously. When the lifting seat is driven to rise and fall, since the two sets of lifting seats are driven to rise and fall synchronously through the lifting assembly, the two ends of the sewage pump body can be driven to rise and fall synchronously, avoiding tilting.

[0012] Furthermore, the lifting assembly includes a main gear, a connecting shaft, and a telescopic shaft. A central groove is provided at the center of the inner seat, and a rack is provided on one side of the central groove. The main gear is located in the central groove and its two ends are rotatably connected to the inner wall of the fixed seat. A rotating shaft is rotatably provided inside the first slider. The end face of the main gear is linked to the end face of the rotating shaft through a first belt. The connecting shaft is rotatably disposed inside one side of the rotating seat. A first pulley is rotatably provided on the end face of the first slide groove. Second pulleys are respectively provided at both ends of the connecting shaft. The first pulley and the second pulley are linked through a second belt. The end face of the first pulley is linked to the rotating shaft through a telescopic shaft. A second motor is provided inside the rotating seat, and the end face of the connecting shaft is driven to rotate by the second motor.

[0013] By driving the second motor, the connecting shaft rotates, which in turn drives the first pulleys at both ends to rotate, which in turn drives the telescopic shaft and the rotating shaft to rotate, thus realizing the rotation of the main gear. The main gear meshes with the rack, which can drive the inner seat to move up and down within the fixed seat.

[0014] Furthermore, the end plate has symmetrical slots at both ends, and the end face of the clamping plate is slidably connected to the slots via sliding blocks. The end plate is rotatably provided with a bidirectional lead screw on the side near the lifting seat, and the sliding blocks are threaded onto both ends of the bidirectional lead screw. A third motor is provided on the end plate, and the bidirectional lead screw is driven to rotate by the third motor.

[0015] The third motor drives the bidirectional lead screw to rotate, which in turn drives the two sliding blocks to move synchronously in opposite directions to clamp the end face of the sewage pump body.

[0016] Furthermore, the clamping plate is arranged in an arc shape, and the inner arc surface of the clamping plate is provided with a buffer pad and an anti-slip pad. The two sides of the buffer pad are respectively assembled and connected to the clamping plate and the anti-slip pad.

[0017] By adding buffer pads and anti-slip pads, the connection between the clamp and the sewage pump body port is strengthened, while avoiding damage to the sewage pump body port caused by clamping.

[0018] Furthermore, the internal support mechanism includes support bars, a second slider, a rotating ring, and a fourth motor. Multiple support bars are arranged in a ring at the center position above the rotating seat. The lower end of the support bar is assembled and connected to the second slider. A second sliding groove adapted to slide with the second slider is opened above the rotating seat. The rotating ring is rotatably disposed at the center position inside the rotating seat. The outer wall of the rotating ring is hinged to the second slider through a connecting bar. The rotating ring is driven to rotate by the fourth motor.

[0019] By driving the fourth motor, the rotating ring rotates, which in turn drives the connecting bar to push or pull the second slider to slide in the second groove, so that multiple support bars can be expanded or contracted simultaneously to support the inner wall of the sewage pump body.

[0020] Furthermore, the outer wall of the rotating ring is provided with a first gear for meshing and rotating, and the fourth motor is disposed inside the rotating seat, with the output end of the fourth motor being linked with the first gear;

[0021] By driving the fourth motor, the first gear is rotated, thereby causing the rotating ring to rotate at a certain angle.

[0022] Furthermore, the lower center of the rotary seat is rotatably connected to the upper part of the worktable via a central shaft. A fifth motor is provided on the upper part of the worktable, and a second gear is provided at the output end of the fifth motor. The second gear meshes with the outer wall of the rotary seat.

[0023] By driving the fifth motor, the second gear is rotated, which in turn drives the rotating seat to rotate.

[0024] On the other hand, the present invention provides a method for rotary welding of a sewage pump, comprising the following steps:

[0025] Step S1: The worker pre-fits the flange onto the end of the sewage pump body that is to be welded, and then fits the end face onto the outside of the inner support mechanism from top to bottom. The end face of the sewage pump body and the surface of the flange are both in contact with the upper surface of the rotating seat.

[0026] Step S2: Drive the fourth motor to rotate the rotating ring, which in turn drives the connecting bar to push or pull the second slider to slide in the second slide groove, so that multiple support bars can be deployed simultaneously to support the inner wall of the sewage pump body.

[0027] Step S3: Drive the two positioning mechanisms so that the clamps on each positioning mechanism wrap around the corresponding end of the sewage pump body. Adjust the height of the lifting seat and drive the clamps to tightly clamp the end face of the sewage pump body using the clamps.

[0028] Step S4: The rotating seat is intermittently driven on the workbench, while the welding assembly is driven at the same time, so that the welding head is directed toward the connection between the sewage pump body and the flange to perform spot welding. After the welding is completed, the driving of the rotating seat is paused, leaving multiple uniform weld points between the sewage pump body and the flange.

[0029] Step S5: Drive the internal support mechanism to retract and adjust the height of the lifting seat so that the end of the sewage pump body with the flange is completely separated from the internal support mechanism.

[0030] Step S6: Drive the first motor to make the end plate and the sewage pump body rotate 180 degrees, with the flange welded to one end facing upwards.

[0031] Step S7: Adjust the height of the welding assembly so that the welding head is close to the welding position, drive the rotating seat to rotate at a constant speed, and use the welding assembly to perform double-sided welding on the front and back connections of the flange respectively.

[0032] Step S8: After the double-sided welding is completed, loosen the positioning mechanism to fix the sewage pump body and remove the sewage pump body.

[0033] The beneficial effects of this invention are:

[0034] 1. This invention utilizes a positioning mechanism to position the sewage pump body and flange, followed by spot welding, to achieve initial overall fixation of the sewage pump body and flange. Then, the welding position is flipped upwards, facilitating double-sided welding of the sewage pump body and flange by the welding assembly. This eliminates the need to reposition the sewage pump body and flange for re-welding after welding one side, thus improving welding efficiency.

[0035] 2. The present invention drives the two sets of end plates to rotate synchronously by driving the first motor, thereby driving the two ends of the sewage pump body clamped in the clamping plate to rotate synchronously. When the lifting seat is driven to rise and fall, since the two sets of lifting seats are driven to rise and fall synchronously through the lifting assembly, the two ends of the sewage pump body can be driven to rise and fall synchronously, avoiding skewness and causing misalignment between the sewage pump body port and the flange during the adjustment process. By driving the first cylinder, the first slider can be driven to move in the first slide groove, thereby realizing the movement of the lifting seat on the rotating seat.

[0036] 3. By driving the second motor, the connecting shaft rotates, which in turn drives the first pulleys at both ends to rotate, which in turn drives the telescopic shaft and the rotating shaft to rotate, thus realizing the rotation of the main gear. The main gear meshes with the rack, which can drive the inner seat to move up and down within the fixed seat. Attached Figure Description

[0037] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the following description of the embodiments will be briefly introduced. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0038] Figure 1 A perspective view of a rotary welding device and method for a sewage pump provided by the present invention;

[0039] Figure 2 A schematic diagram of the workbench and rotating seat assembly structure of a wastewater pump rotary welding equipment and method provided by the present invention;

[0040] Figure 3 A schematic diagram of the rotating seat structure of a wastewater pump rotary welding equipment and method provided by the present invention;

[0041] Figure 4 A schematic diagram of the positioning mechanism and the assembly structure of the sewage pump body for a rotary welding equipment and method for a sewage pump provided by the present invention;

[0042] Figure 5 A schematic diagram of the lifting seat structure of a rotary welding device and method for a sewage pump provided by the present invention;

[0043] Figure 6 A schematic diagram of the clamping plate and end plate structure of a rotary welding device and method for a sewage pump provided by the present invention;

[0044] Figure 7 A schematic diagram of the clamping plate structure of a rotary welding device and method for a sewage pump provided by the present invention;

[0045] Figure 8This is a schematic diagram of the internal support mechanism of a rotary welding device and method for a sewage pump provided by the present invention.

[0046] Legend:

[0047] 1. Workbench; 2. Rotary seat; 3. Sewage pump body; 4. Flange; 5. Welding head; 6. Welding assembly; 711. Lifting seat; 712. Clamping plate; 713. End plate; 721. First slider; 722. First slide groove; 723. First cylinder; 7111. Fixed seat; 7112. Inner seat; 731. Linkage shaft; 732. First motor; 741. Main gear; 742. Connecting shaft; 743. Telescopic shaft; 744. Center groove; 745. Rack; 7 46. ​​Rotating shaft; 751. First pulley; 752. Second pulley; 753. Second motor; 761. Strip groove; 762. Sliding block; 763. Double-acting lead screw; 764. Third motor; 771. Buffer pad; 772. Anti-slip pad; 811. Support bar; 812. Second slider; 813. Rotating ring; 814. Fourth motor; 815. Second slide groove; 816. Connecting bar; 821. First gear; 911. Fifth motor; 912. Second gear. Detailed Implementation

[0048] To make the above-mentioned objects, features and advantages of the present invention more apparent and understandable, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

[0049] Many specific details are set forth in the following description in order to provide a full understanding of the invention. However, the invention may also be practiced in other ways different from those described herein, and those skilled in the art can make similar extensions without departing from the spirit of the invention. Therefore, the invention is not limited to the specific embodiments disclosed below.

[0050] Secondly, as used herein, "an embodiment" or "embodiment" refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The phrase "in one embodiment" appearing in different places in this specification does not necessarily refer to the same embodiment, nor is it a single or selective embodiment that is mutually exclusive with other embodiments.

[0051] Please see Figures 1-8This invention provides a technical solution: a sewage pump rotary welding device, comprising a workbench 1, a rotating seat 2, a positioning mechanism for fixing a sewage pump body 3 and a flange 4, and a welding assembly 6 with a welding head 5. The rotating seat 2 is rotatably disposed above the workbench 1, the positioning mechanism is disposed on the rotating seat 2, and the welding assembly 6 is disposed on the workbench 1. Two sets of positioning mechanisms are symmetrically arranged and slidably disposed above the rotating seat 2, and the positioning mechanism includes a lifting seat 711, a clamping plate 712, and an end plate 713. The lower end of the lifting seat 711 is slidably disposed above the rotating seat 2, and the end plate 713 is rotatably disposed on the upper end of the lifting seat 711. Two clamping plates 712 are provided and are adjustablely slidably disposed on the end plate 713. The end face of the sewage pump body 3 is located between the two clamping plates 712. An inner support mechanism is provided at the center of the rotating seat 2, and the end face of the sewage pump body 3 for connecting the flange 4 is sleeved on the outside of the inner support mechanism.

[0052] like Figures 1-8 As shown, the lower end of the lifting seat 711 is provided with a first slider 721, and the upper part of the rotating seat 2 is provided with a first sliding groove 722 that is slidably adapted to the first slider 721. One end of the first sliding groove 722 is provided with a first cylinder 723. The output end of the first cylinder 723 is assembled and connected to the first slider 721. The lifting seat 711 includes a fixed seat 7111, an inner seat 7112 and a lifting assembly. The first slider 721 is disposed at the lower end of the fixed seat 7111, and the lower end of the inner seat 7112 is slidably disposed inside the fixed seat 7111. Both sets of lifting seats 711 are synchronously driven to lift and lower through the lifting assembly. The two sets of end plates 713 are linked together by a linkage shaft 731. The upper end of one inner seat 7112 is provided with a first motor 732, and the corresponding end plate 713 is driven to rotate by the first motor 732.

[0053] By driving the first motor 732 to drive the two sets of end plates 713 to rotate synchronously, the sewage pump body 3 clamped in the clamping plate 712 will rotate synchronously at both ends. When the lifting seat 711 is driven to rise and fall, since the two sets of lifting seats 711 are driven to rise and fall synchronously through the lifting assembly, the two ends of the sewage pump body 3 can be driven to rise and fall synchronously, avoiding tilting and causing misalignment between the sewage pump body 3 port and the flange 4 during the adjustment process. By driving the first cylinder 723, the first slider 721 can be driven to move in the first slide groove 722, thereby realizing the movement of the lifting seat 711 on the rotating seat 2.

[0054] The lifting assembly includes a main gear 741, a connecting shaft 742, and a telescopic shaft 743. A central groove 744 is provided at the center of the inner seat 7112. A rack 745 is provided on one side of the central groove 744. The main gear 741 is located in the central groove 744 and its two ends are rotatably connected to the inner wall of the fixed seat 7111. A rotating shaft 746 is rotatably provided inside the first slider 721. The end face of the main gear 741 is linked to the end face of the rotating shaft 746 through a first belt. The connecting shaft 742 is rotatably disposed on one side inside the rotating seat 2. A first pulley 751 is rotatably provided on the end face of the first groove 722. Second pulleys 752 are respectively provided at both ends of the connecting shaft 742. The first pulley 751 and the second pulley 752 are linked through a second belt. The end face of the first pulley 751 is linked to the rotating shaft 746 through a telescopic shaft 743. A second motor 753 is provided inside the rotating seat 2. The end face of the connecting shaft 742 is driven to rotate by the second motor 753.

[0055] By driving the second motor 753, the connecting shaft 746 is rotated, which in turn drives the first pulleys 751 at both ends to rotate, which in turn drives the telescopic shaft 743 and the rotating shaft 746 to rotate, thereby realizing the rotation of the main gear 741. The main gear 741 meshes with the rack 745, which can drive the inner seat 7112 to move up and down within the fixed seat 7111.

[0056] The end plate 713 has symmetrically formed slots 761 at both ends. The end face of the clamping plate 712 is slidably connected to the slots 761 through a sliding block 762. The end plate 713 is rotatably provided with a bidirectional lead screw 763 on the side near the lifting seat 711. The sliding block 762 is threaded onto both ends of the bidirectional lead screw 763. The end plate 713 is provided with a third motor 764, and the bidirectional lead screw 763 is driven to rotate by the third motor 764.

[0057] By driving the third motor 764, the bidirectional lead screw 763 is rotated, thereby causing the two sliding blocks 762 to move synchronously in opposite directions, which is used to clamp the end face of the sewage pump body 3.

[0058] The clamping plate 712 is arranged in an arc shape. The inner arc surface of the clamping plate 712 is provided with a buffer pad 771 and an anti-slip pad 772. The two sides of the buffer pad 771 are respectively assembled and connected to the clamping plate 712 and the anti-slip pad 772.

[0059] By setting the buffer pad 771 and the anti-slip pad 772, the tightness of the connection between the clamping plate 712 and the sewage pump body 3 port is increased, while avoiding the problem of damage to the sewage pump body 3 port caused by clamping.

[0060] The internal support mechanism includes support bars 811, a second slider 812, a rotating ring 813, and a fourth motor 814. Multiple support bars 811 are arranged in a ring at the center of the upper part of the rotating seat 2. The lower end of each support bar 811 is connected to the second slider 812. A second sliding groove 815 is provided on the upper part of the rotating seat 2 to slide and adapt to the second slider 812. The rotating ring 813 is rotatably disposed at the center of the interior of the rotating seat 2. The outer wall of the rotating ring 813 is hinged to the second slider 812 via a connecting bar 816. The rotating ring 813 is driven to rotate by the fourth motor 814.

[0061] By driving the fourth motor 814, the rotating ring 813 is rotated, which in turn drives the connecting bar 816 to push or pull the second slider 812 to slide in the second slide groove 815, so that multiple support bars 811 can be expanded or contracted simultaneously to support the inner wall of the sewage pump body 3.

[0062] The outer wall of the rotating ring 813 is provided with a first gear 821 for meshing and rotation, and the fourth motor 814 is disposed inside the rotating seat 2. The output end of the fourth motor 814 is linked with the first gear 821.

[0063] By driving the fourth motor 814, the first gear 821 is rotated, thereby causing the rotating ring 813 to rotate at a certain angle.

[0064] The lower center of the rotating seat 2 is rotatably connected to the upper part of the worktable 1 via a central shaft. A fifth motor 911 is provided on the upper part of the worktable 1. A second gear 912 is provided at the output end of the fifth motor 911. The second gear 912 meshes with the outer wall of the rotating seat 2.

[0065] By driving the fifth motor 911, the second gear 912 is rotated, which in turn drives the rotating seat 2 to rotate.

[0066] Working principle: The operator pre-fits the flange 4 onto the welding end of the sewage pump body 3, and then fits this end face onto the outside of the inner support mechanism from top to bottom, ensuring that both the end face of the sewage pump body 3 and the surface of the flange 4 are in contact with the upper surface of the rotating seat 2. The inner support mechanism is then driven to unfold, supporting the inner wall of the end face of the sewage pump body 3 to prevent it from tilting and creating gaps with the flange 4, which would affect the subsequent welding quality. Next, the two positioning mechanisms are driven, so that the clamping plates 712 on each positioning mechanism enclose the corresponding end of the sewage pump body 3. The height of the lifting seat 711 is adjusted, and the clamping plates 712 are driven, tightly clamping the end face of the sewage pump body 3 to ensure its stability on the rotating seat 2. After positioning the sewage pump body 3 and flange 4, the rotating seat 2 is intermittently driven on the worktable 1, while the welding assembly 6 is driven... Move the welding head 5 towards the connection between the sewage pump body 3 and the flange 4 to perform spot welding. After welding, pause the drive of the rotating seat 2. Multiple evenly spaced weld points remain between the sewage pump body 3 and the flange 4. At this time, the connection between the sewage pump body 3 and the flange 4 is relatively stable. Drive the internal support mechanism to retract and raise the height of the lifting seat 711 so that the end of the sewage pump body 3 with the flange 4 is completely separated from the internal support mechanism. Then rotate the end plate 713 180 degrees on the lifting seat 711. The end with the flange 4 is spot welded facing upward. At this time, adjust the height of the welding assembly 6 so that the welding head 5 is close to the welding position. Drive the rotating seat 2 to rotate at a uniform speed. Use the welding assembly 6 to perform double-sided welding on the front and back connections of the flange 4 to ensure the strength of the welding. After the double-sided welding is completed, release the positioning mechanism to fix the sewage pump body 3 and remove the sewage pump body 3.

[0067] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.

Claims

1. A rotary welding device for a sewage pump, comprising a workbench (1), a rotating seat (2), a positioning mechanism for fixing a sewage pump body (3) and a flange (4), and a welding assembly (6) having a welding head (5), wherein the rotating seat (2) is rotatably disposed above the workbench (1), the positioning mechanism is disposed on the rotating seat (2), and the welding assembly (6) is disposed on the workbench (1), characterized in that: The positioning mechanism is symmetrically provided in two sets and is slidably disposed above the rotating seat (2). The positioning mechanism includes a lifting seat (711), a clamping plate (712) and an end plate (713). The lower end of the lifting seat (711) is slidably disposed above the rotating seat (2). The end plate (713) is rotatably disposed on the upper end of the lifting seat (711). There are two clamping plates (712) and they are adjustable and slidably disposed on the end plate (713). The end face of the sewage pump body (3) is located between the two clamping plates (712). An inner support mechanism is provided at the center of the rotating seat (2). The end face of the sewage pump body (3) used to connect the flange (4) is sleeved on the outside of the inner support mechanism. The lower end of the lifting seat (711) is provided with a first slider (721), and the upper part of the rotating seat (2) is provided with a first slide groove (722) that is slidably adapted to the first slider (721). One end of the first slide groove (722) is provided with a first cylinder (723), and the output end of the first cylinder (723) is assembled and connected to the first slider (721). The lifting seat (711) includes a fixed seat (7111), an inner seat (7112) and a lifting assembly. The first slider (721) is provided at the lower end of the fixed seat (7111), and the lower end of the inner seat (7112) is slidably provided inside the fixed seat (7111). Both sets of lifting seats (711) are driven to lift synchronously through the lifting assembly. The two sets of end plates (713) are linked together through a linkage shaft (731). The upper end of one inner seat (7112) is provided with a first motor (732), and the corresponding end plate (713) is driven to rotate by the first motor (732). The lifting assembly includes a main gear (741), a connecting shaft (742), and a telescopic shaft (743). A central groove (744) is provided at the center of the inner seat (7112). A rack (745) is provided on one side of the central groove (744). The main gear (741) is located in the central groove (744) and its two ends are rotatably connected to the inner wall of the fixed seat (7111). A rotating shaft (746) is rotatably provided inside the first slider (721). The end face of the main gear (741) is linked to the end face of the rotating shaft (746) through a first belt. The connecting shaft (743) is... 42) Rotary setting inside one side of the rotating seat (2), the end face of the first slide groove (722) is rotatably provided with a first pulley (751), the two ends of the connecting shaft (742) are respectively provided with second pulleys (752), the first pulley (751) and the second pulley (752) are linked by a second belt, the end face of the first pulley (751) is linked with the rotating shaft (746) by a telescopic shaft (743), the rotating seat (2) is provided with a second motor (753), and the end face of the connecting shaft (742) is driven to rotate by the second motor (753).

2. The rotary welding equipment for a sewage pump according to claim 1, characterized in that, The end plate (713) has symmetrically provided strip grooves (761) at both ends. The end face of the clamping plate (712) is slidably connected to the strip grooves (761) through a sliding block (762). The end plate (713) is provided with a bidirectional lead screw (763) on the side near the lifting seat (711). The sliding block (762) is threaded onto both ends of the bidirectional lead screw (763). The end plate (713) is provided with a third motor (764). The bidirectional lead screw (763) is driven to rotate by the third motor (764).

3. The rotary welding equipment for a sewage pump according to claim 2, characterized in that, The clamping plate (712) is arranged in an arc shape. The inner arc surface of the clamping plate (712) is provided with a buffer pad (771) and an anti-slip pad (772). The buffer pad (771) is assembled and connected to the clamping plate (712) and the anti-slip pad (772) on both sides respectively.

4. The rotary welding equipment for a sewage pump according to claim 3, characterized in that, The internal support mechanism includes a support bar (811), a second slider (812), a rotating ring (813), and a fourth motor (814). The support bar (811) is provided in multiple and arranged in a ring at the center position above the rotating seat (2). The lower end of the support bar (811) is assembled and connected to the second slider (812). A second sliding groove (815) is provided above the rotating seat (2) to slide and adapt to the second slider (812). The rotating ring (813) is rotatably arranged at the center position inside the rotating seat (2). The outer wall of the rotating ring (813) is hinged to the second slider (812) through a connecting bar (816). The rotating ring (813) is driven to rotate by the fourth motor (814).

5. The rotary welding equipment for a sewage pump according to claim 4, characterized in that, The outer wall of the rotating ring (813) is provided with a first gear (821) for meshing and rotation. The fourth motor (814) is located inside the rotating seat (2). The output end of the fourth motor (814) is linked with the first gear (821).

6. The rotary welding equipment for a sewage pump according to claim 5, characterized in that, The lower center of the rotating seat (2) is rotatably connected to the upper part of the worktable (1) via a central shaft. A fifth motor (911) is provided on the upper part of the worktable (1). A second gear (912) is provided at the output end of the fifth motor (911). The second gear (912) meshes with the outer wall of the rotating seat (2).

7. A method for rotary welding of a sewage pump, characterized in that, A rotary welding device for a sewage pump according to any one of claims 4 to 6 includes the following steps: Step S1: The staff puts the flange (4) on the end of the sewage pump body (3) for welding in advance, and puts the end face on the outside of the inner support mechanism from top to bottom. The end face of the sewage pump body (3) and the surface of the flange (4) are both in contact with the upper surface of the rotating seat (2). Step S2: Drive the fourth motor (814) to rotate the rotating ring (813), which in turn drives the connecting bar (816) to push or pull the second slider (812) to slide in the second groove (815), so that multiple support bars (811) can be deployed simultaneously to support the inner wall of the sewage pump body (3). Step S3: Drive the two positioning mechanisms so that the clamps (712) on each positioning mechanism wrap around the corresponding end of the sewage pump body (3), adjust the height of the lifting seat (711) and drive the clamps (712), and use the clamps (712) to tightly clamp the end face of the sewage pump body (3). Step S4: The rotating seat (2) is driven intermittently on the workbench (1), and the welding assembly (6) is driven at the same time, so that the welding head (5) is directed toward the connection between the sewage pump body (3) and the flange (4) for spot welding. After the welding is completed, the driving of the rotating seat (2) is paused, and multiple uniform weld points are left between the sewage pump body (3) and the flange (4). Step S5: Drive the internal support mechanism to retract and raise the height of the lifting seat (711) so that the end of the sewage pump body (3) with flange (4) is completely separated from the internal support mechanism. Step S6: Drive the first motor (732) to make the end plate (713) and the sewage pump body (3) rotate 180 degrees as a whole, with the flange (4) spot-welded and one end facing upward; Step S7: Adjust the height of the welding assembly (6) so that the welding head (5) is close to the welding position. Drive the rotating seat (2) to rotate at a constant speed and use the welding assembly (6) to perform double-sided welding on the front and back connection points of the flange (4). Step S8: After the double-sided welding is completed, loosen the positioning mechanism to fix the sewage pump body (3) and remove the sewage pump body (3).

Citation Information

Patent Citations

  • Sewage pump spin welding equipment and method thereof

    CN113042965A

  • Multi-station simplified assembly overturning tool and control method

    CN113183102A

  • Stainless steel flange welding machine

    CN216990642U