By using a multimodal fusion-based cross-sea bridge settlement deformation observation system, and utilizing BeiDou/GNSS, tilt measurement, and static leveling technologies, a full-line settlement deformation monitoring and control network was constructed. This solved the problems of lack of reference points and low accuracy in settlement observation of bridges in ultra-wide waterways, and enabled multi-dimensional settlement deformation monitoring.
Patent Information
- Application Number
- CN202512029547.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-30
- Publication Date
- 2026-02-27
AI Technical Summary
In existing technologies, the observation of bridge settlement deformation in ultra-wide waters suffers from problems such as the lack of measurement benchmarks, limited measurement environment, and low observation accuracy. Especially under the condition of long baselines spanning tens of kilometers across the sea, the accuracy of GNSS measurement methods is difficult to meet the requirements of settlement observation.
A multimodal fusion-based settlement deformation monitoring system for cross-sea bridges is adopted, including a BeiDou/GNSS monitoring subsystem, an tilt measurement subsystem, and a hydrostatic leveling subsystem. This system constructs a settlement deformation monitoring and control network for the entire line. By obtaining the geodetic height variation through BeiDou/GNSS technology and combining tilt measurement and hydrostatic leveling technologies, the system enables settlement monitoring of approach bridge piers and main tower piers.
It enables multi-dimensional observation of bridge settlement in ultra-wide waters, eliminates the fitting error of the elevation anomaly model, improves the observation accuracy, solves the problem of no measurement benchmark, reduces the requirements for the observation platform, and realizes full-cycle settlement deformation monitoring.
Smart Images

Figure CN121576991A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of bridge monitoring technology, specifically to a multimodal fusion-based system and method for observing settlement and deformation of cross-sea bridges. Background Technology
[0002] To meet the safety and comfort requirements of high-speed railways and ensure high track smoothness and stability, systematic monitoring of bridge pier and abutment settlement and deformation must be conducted before track laying in high-speed railway projects to confirm whether post-construction settlement meets the requirements. Settlement monitoring methods include conventional leveling, photoelectric distance measurement trigonometric leveling, and GNSS measurement.
[0003] For ultra-wide waterways, such as long-distance cross-river / sea railway bridges, it is necessary to select appropriate observation methods based on the measurement environment, geological conditions, structural characteristics, and measurement accuracy. Conventional leveling is suitable for land-based bridge piers, while photoelectric distance measurement trigonometric leveling is suitable for mountainous bridge piers. However, these two methods are unsuitable for ultra-wide waterways due to factors such as the lack of instrument placement and reference points at sea, limitations on line-of-sight due to bridge span, low operational efficiency, and the instability of the measurement platform due to environmental influences. GNSS measurement methods are limited by the accuracy of GNSS geodetic observations, especially under long baseline conditions spanning tens of kilometers across the sea, where there are no measurement reference points. Error accumulation during the measurement process can easily occur, making it difficult to meet the accuracy requirements for settlement observation. Summary of the Invention
[0004] This application provides a multimodal fusion-based system and method for observing the settlement and deformation of cross-sea bridges, aiming to solve the technical problems in related technologies, such as the lack of measurement reference points, limited measurement environment, and low observation accuracy, for observing the settlement and deformation of bridges in ultra-wide waters.
[0005] This application provides a multimodal fusion-based system for monitoring the settlement and deformation of a cross-sea bridge, comprising: The BeiDou / GNSS monitoring subsystem is used to construct a settlement deformation monitoring and control network for the entire line, using the change in geodetic height as the settlement value. It includes: BeiDou / GNSS operation reference stations established in the land bedrock foundation area of the cross-sea bridge and on the top of the sea-embedded rock pile foundation piers as monitoring reference points; working reference points set at intervals on the piers; and monitoring points set on the piers between adjacent working reference points. The monitoring reference points constitute a reference network, and the working reference points and monitoring points constitute a monitoring network. The reference network and the monitoring network form the monitoring and control network. Inclination measurement subsystem: It includes tilt sensors installed on the approach bridge piers of the cross-sea bridge for measuring the uneven settlement value of the approach bridge piers; The static leveling measurement subsystem includes several static level instruments installed on the main tower piers and side piers of the cross-sea bridge. The static level instruments on the side piers serve as static leveling reference points, while the others serve as static leveling monitoring points. The subsystem is used to measure the relative settlement of the main tower piers and side piers, as well as the uneven settlement value of the main tower piers. Data processing subsystem: Connected to the BeiDou / GNSS monitoring subsystem, tilt measurement subsystem, and hydrostatic leveling subsystem respectively, for data reception, storage, and calculation.
[0006] In one embodiment, the monitoring reference point, working reference point, and monitoring point are each equipped with a BeiDou / GNSS receiver.
[0007] This application also provides a method for observing the settlement deformation of a cross-sea bridge based on multimodal fusion, using the cross-sea bridge settlement deformation observation system based on multimodal fusion as described in any of the above claims. The method includes the following steps: A settlement deformation monitoring and control network for the entire line is constructed based on the Beidou / GNSS monitoring subsystem. The reference network and the monitoring network are solved separately to obtain the Beidou geodetic height of the working base point and the monitoring point. The change in geodetic height is used as the settlement value. The uneven settlement value of the approach bridge piers of the cross-sea bridge was measured based on the tilt measurement subsystem. The relative settlement values of the main tower pier and the side piers of the cross-sea bridge and the uneven settlement value of the main tower pier are measured based on the static leveling subsystem, and the settlement value of the main tower pier is calculated based on the change in the ground height of the side piers.
[0008] In one implementation, the construction of a full-line settlement deformation monitoring and control network based on the BeiDou / GNSS monitoring subsystem involves solving the reference network and the monitoring network separately to obtain the BeiDou geodetic height of the working base point and the monitoring point, using the change in geodetic height as the settlement value, including: Obtain the spatial coordinates of the reference point Among them, the benchmark i The reference point number is used to extract the geodetic height of the reference point as the elevation benchmark for settlement observation along the entire line. ; The baseline network and monitoring network are solved separately to extract the geodetic height of the working base point. and the ground height of the monitoring point Among them, the base point i The working baseline point number is used for monitoring. i To monitor the point number, t For observation time; Calculate the settlement value of the working benchmark. and settlement values at monitoring points ; The calculation formula is: ; .
[0009] In one implementation, the step of calculating the reference network and the monitoring network separately to extract the geodetic height of the working base point and the monitoring point includes: The baseline of the benchmark network and the baseline of the monitoring network are calculated separately. Using the reference point spatial coordinates Using the baseline of the reference network as the starting point, network adjustment is performed based on the baseline of the reference network to obtain the spatial coordinates of the working base point. Extract the geodetic height of the working base point ; Using the spatial coordinates of two adjacent working base points as starting points, network adjustment is performed based on the monitoring network baseline to obtain the spatial coordinates of the monitoring points. Extract the geodetic height of the monitoring points .
[0010] In one implementation, the geodetic height of the working base point is extracted by calculation through multi-time period observations; The calculation formula is: , n =1,2......, n Represents the number of days; The settlement value of the working benchmark .
[0011] In one embodiment, the measurement of uneven settlement values of the approach bridge piers of the cross-sea bridge based on the tilt measurement subsystem includes: Timed acquisition of angle data measured by tilt sensor ; Calculate the uneven settlement value of the approach bridge piers ; The calculation formula is: ; in, W The width of the approach bridge pier. m This corresponds to the pier number.
[0012] In one embodiment, the hydrostatic leveling subsystem measures the relative settlement of the main tower pier and the side piers of the cross-sea bridge, as well as the uneven settlement of the main tower pier, and calculates the settlement of the main tower pier based on the change in ground height of the side piers, including: Set the initial values for the hydrostatic level. Among them, static force i This is the point number for the static leveling monitoring point; Calculate the settlement value of the main tower pier. ; The calculation formula is: ; in, t For observation time, This represents the relative settlement values between the main tower piers and the side piers of a cross-sea bridge. This indicates the change in ground height of the pier; Calculate the uneven settlement value of the main tower pier. ; The calculation formula is: , us Indicates upstream. ds Indicates downstream.
[0013] In one embodiment, the method further includes: When the steel trestle bridge used for laying static leveling pipelines in the static leveling measurement subsystem is dismantled, making the static leveling benchmark point and the static leveling monitoring point disconnected, cross-river leveling measurement is carried out using the distance trigonometric leveling method.
[0014] In one embodiment, after the steel trestle bridge is dismantled, the uneven settlement value of the main tower pier is observed by geometric leveling.
[0015] The beneficial effects of the technical solutions provided in this application include: This application provides a multimodal fusion-based system and method for monitoring settlement and deformation of cross-sea bridges. A BeiDou / GNSS monitoring subsystem is used to construct a full-line settlement and deformation monitoring and control network, solving the problem of lacking measurement benchmarks in ultra-wide waterways. Different technical approaches are implemented for settlement monitoring of approach bridge piers and main tower piers based on structural characteristics. For approach bridge piers, BeiDou / GNSS technology and tilt measurement technology are integrated, directly replacing traditional leveling height changes with geodetic height changes, eliminating fitting errors in the elevation anomaly model. For main tower piers, BeiDou / GNSS technology and static leveling measurement technology are integrated. Using the side piers of the waterway bridge as working benchmarks, the absolute settlement of the side piers is obtained through BeiDou / GNSS, and the relative settlement between the main tower pier and the side piers is measured using static leveling. This allows for the calculation of the absolute and uneven settlement values of the main tower pier. The static leveling measurement subsystem is unaffected by the obstruction caused by the main tower construction, reducing the requirements for the observation platform. This embodiment integrates multiple technologies, including the BeiDou / GNSS monitoring subsystem, the tilt measurement subsystem, and the static leveling measurement subsystem, to form multimodal data, enabling multi-dimensional settlement and deformation monitoring throughout the entire construction cycle of cross-sea railway bridges in ultra-wide waterways. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a schematic diagram of a cross-sea bridge based on a multimodal fusion-based cross-sea bridge settlement and deformation monitoring system, according to an embodiment of the present invention.
[0018] Figure 2 This is a schematic diagram of a cross-sea bridge settlement and deformation monitoring system based on multimodal fusion in one embodiment of the present invention.
[0019] Figure 3 This is a flowchart of a method for observing the settlement and deformation of a cross-sea bridge based on multimodal fusion in one embodiment of the present invention.
[0020] In the diagram: 1. BeiDou / GNSS monitoring subsystem; 11. Monitoring reference point; 12. Working reference point; 13. Monitoring point; 2. Inclination measurement subsystem; 3. Static leveling measurement subsystem; 4. Data processing subsystem. Detailed Implementation
[0021] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present application.
[0022] This application provides a multimodal fusion-based system and method for monitoring the settlement and deformation of cross-sea bridges, which is particularly suitable for cross-sea high-speed railway bridges in ultra-wide waters. The aim is to solve the technical problems in related technologies, such as the lack of measurement reference points, limited measurement environment, and low observation accuracy, for bridge deformation monitoring in ultra-wide waters.
[0023] like Figure 1 and Figure 2 As shown, where, Figure 1 This is a schematic diagram of a cross-sea bridge based on a multimodal fusion-based cross-sea bridge settlement and deformation monitoring system, according to an embodiment of the present invention. Figure 2 This is a schematic diagram of a cross-sea bridge settlement and deformation monitoring system based on multimodal fusion in one embodiment of the present invention.
[0024] This embodiment provides a multimodal fusion-based system for monitoring the settlement and deformation of cross-sea bridges, which includes: The Beidou / GNSS monitoring subsystem 1 is used to construct a full-line settlement deformation monitoring and control network, using the change in geodetic height as the settlement value. It includes: Beidou / GNSS operation reference stations established in the land bedrock foundation area of the cross-sea bridge and on the top of the sea-embedded rock pile piers as monitoring reference points 11; working reference points 12 set at intervals of a set distance on the piers; and monitoring points 13 set between adjacent working reference points 12 on the piers. The monitoring reference points 11 constitute the reference network, and the working reference points 12 and monitoring points 13 constitute the monitoring network. The reference network and the monitoring network form the monitoring and control network. Inclination Measurement Subsystem 2: It includes tilt sensors installed on the approach bridge piers of the cross-sea bridge to measure the uneven settlement value of the approach bridge piers; Static leveling measurement subsystem 3: It includes several static level instruments installed on the main tower piers and side piers of the cross-sea bridge. The static level instruments on the side piers are used as static leveling reference points, and the rest are static leveling monitoring points. It is used to measure the relative settlement value of the main tower piers and side piers and the uneven settlement value of the main tower piers. Data processing subsystem 4: It is connected to Beidou / GNSS monitoring subsystem 1, tilt measurement subsystem 2 and static leveling subsystem 3 respectively, and is used for data reception, storage and calculation.
[0025] This embodiment provides a multimodal fusion-based settlement deformation monitoring system for cross-sea bridges. A BeiDou / GNSS monitoring subsystem is used to construct a full-line settlement deformation monitoring and control network, solving the problem of lacking measurement benchmarks in ultra-wide waterways. Different technical approaches are implemented for settlement monitoring of approach bridge piers and main tower piers based on structural characteristics. For approach bridge piers, BeiDou / GNSS technology and tilt measurement technology are integrated, directly replacing traditional leveling height changes with geodetic height changes, eliminating fitting errors in the elevation anomaly model. For main tower piers, BeiDou / GNSS technology and static leveling measurement technology are integrated. Using the side piers of the waterway bridge as working benchmarks, the absolute settlement of the side piers is obtained through BeiDou / GNSS, and the relative settlement between the main tower pier and the side piers is measured using static leveling. This allows for the calculation of the absolute and uneven settlement values of the main tower pier. The static leveling measurement subsystem is unaffected by the obstruction caused by the main tower construction, reducing the requirements for the observation platform. This embodiment integrates multiple technologies, including the BeiDou / GNSS monitoring subsystem, the tilt measurement subsystem, and the static leveling measurement subsystem, to form multimodal data, enabling multi-dimensional settlement and deformation monitoring throughout the entire construction cycle of cross-sea railway bridges in ultra-wide waterways.
[0026] Among them, the main tower pier is the pier that supports the main tower (cable tower) in a cable-stayed or suspension bridge. It is usually located in the main span or a key stress position and bears the vertical component and horizontal force of the cables / suspension cables. The side pier is the pier located in the transition area between the main bridge and the approach bridge. It is close to the main tower but not directly affected by the cables. It shares the load at the end of the main beam and prevents stress concentration in the main tower pier. The approach bridge pier is the pier of the approach bridge section. It connects the main bridge to the roadbed (or other bridges) and ensures a smooth connection between the main bridge and the road section.
[0027] Settlement refers to the total vertical downward displacement of a foundation or structure under load (unit: mm / mm). Settlement is the difference in elevation between two periods. Differential settlement refers to the difference in settlement at different locations within the same structure or foundation, reflecting the spatial unevenness of settlement distribution. Differential settlement is a relative quantity, representing the difference in settlement between two points or areas (unit: mm / mm or ratio).
[0028] like Figure 1 As shown, the BeiDou / GNSS monitoring subsystem 1 comprises three parts: First, BeiDou / GNSS operational reference stations are established at the land bedrock foundation areas at both ends of the cross-sea bridge and on the tops of the sea-embedded rock pile foundation piers as monitoring reference points 11. The land bedrock foundation area refers to the area in land engineering (such as bridges) where natural bedrock is directly used as the bearing layer of the building foundation. Bedrock typically refers to a hard, intact, unweathered rock layer below the earth's surface (such as granite and limestone), possessing extremely high bearing capacity and stability. Sea-embedded rock piles are a type of deep foundation where the pile body is embedded in the seabed bedrock. The pile-rock joint bears the load of the superstructure through the lateral friction and end bearing capacity between the pile and the rock, and is widely used in cross-sea bridges, offshore wind power, wharves, and other projects. BeiDou / GNSS operational reference stations are established based on the cross-sea bridge route and the distance between the bridge and the sea. Second, at intervals set at intervals (e.g., 0.8... km -1.4 km The working reference points 12 are set up on the top of the bridge piers (including the side piers of the waterway bridge). The monitoring points 13 are set up between the bridge piers to be monitored between adjacent working reference points. The monitoring reference points 11 form a reference network. The adjacent working reference points 12 and the monitoring points 13 between the working reference points 12 form a measurement segment. All measurement segments form a monitoring network. The reference network and the monitoring network form a monitoring control network.
[0029] In one embodiment, BeiDou / GNSS receivers are respectively deployed at monitoring reference point 11, working reference point 12, and monitoring point 13. Further, as... Figure 1As shown, separate BeiDou receivers (i.e., separate BDS receivers) are deployed at monitoring reference point 11 and working reference point 12, while an integrated BeiDou receiver (i.e., an integrated BDS receiver) is deployed at monitoring point 13. The BeiDou / GNSS receivers transmit the real-time (per second) BeiDou / GNSS satellite observation data to the data processing subsystem for storage via wireless communication technology (such as GPRS / 4G communication modules).
[0030] Specifically, every 0.8 kilometers along the entire line... km ~1.4 km Select one of the completed approach bridge piers (including the channel bridge side piers) as working benchmark point 12, and the remaining piers as monitoring points 13. When the pier is constructed to the top, pre-embed settlement observation marker bases, compatible with various connecting rods such as BeiDou / GNSS rods, leveling rods, and prism rods. After the pier construction is completed, according to the monitoring type of the pier, install the corresponding BeiDou / GNSS receiver on the top of the pier, and install tilt sensors on the pier body.
[0031] Furthermore, since the settlement observation base is a universal base that is compatible with various connecting rods, the connecting rods can be replaced according to measurement needs to adapt to different measuring instruments. Appropriate measurement methods can be used for observation at different construction stages, thus achieving effective connection of observations.
[0032] In tilt measurement subsystem 2, the tilt sensor is installed transversely on the top of the approach bridge piers of the cross-sea bridge; specifically, it is a dual-axis tilt sensor. Figure 1 As shown, the inclinometer (2) represents two dual-axis inclinometers. The inclinometers collect a set of data every hour and transmit it to the data processing subsystem 4 via wireless communication technology.
[0033] In the static leveling subsystem 3, the static leveling instruments are installed at the four corners of the side piers of the waterway bridge and the main tower pier walls, and the static leveling pipeline is laid on the steel trestle bridge. More specifically, such as... Figure 1 As shown, the static level (4) refers to four static level instruments. Four static level instruments are installed at the four corners of the tower wall at the same height as the steel trestle bridge on each main tower pier, respectively installed on both sides of the upstream and downstream (longitudinal bridge direction) and transverse bridge direction of the line; the static level instruments are specifically pressure differential static level instruments. The static level instruments collect a set of data every hour and transmit it to the data processing subsystem 4 through wireless communication technology. The static level measurement subsystem 3 is susceptible to temperature influence, and external vibrations will cause fluctuations in the liquid in the connecting pipe, which will also lead to increased errors. Therefore, the static level measurement subsystem 3 only collects the observation values after the temperature is constant in the early morning (such as 0-6 o'clock) and the influence of external vibrations is eliminated.
[0034] Data processing subsystem 4 integrates the BeiDou satellite navigation and positioning system, modern measurement technology, Internet of Things (IoT) technology, sensing technology, mobile communication technology, computer network technology, and cloud computing. It collects, stores, analyzes, and manages monitoring data in real time, and presents the monitoring data and early warning information in real time via the Internet, achieving automation, intelligence, informatization, and integration. The system's automated operation greatly improves the timeliness and accuracy of settlement observation, reduces labor costs, and lowers the safety risks of marine surveying operations.
[0035] like Figure 3 As shown, Figure 3 This is a flowchart of a method for observing the settlement and deformation of a cross-sea bridge based on multimodal fusion in one embodiment of the present invention.
[0036] This embodiment also provides a method for observing the settlement and deformation of cross-sea bridges based on multimodal fusion. The method, which applies the above system, includes the following steps: Step S1: Construct a full-line settlement deformation monitoring and control network based on the BeiDou / GNSS monitoring subsystem, and calculate the reference network and monitoring network respectively to obtain the BeiDou geodetic height of the working base point and the monitoring point, and use the change in geodetic height as the settlement value. Step S2: Measure the uneven settlement value of the approach bridge piers of the cross-sea bridge based on the tilt measurement subsystem; Step S3: Measure the relative settlement values of the main tower pier and the side piers of the cross-sea bridge and the uneven settlement value of the main tower pier based on the static leveling subsystem, and calculate the settlement value of the main tower pier based on the change in ground height of the side piers.
[0037] Through the above scheme, a settlement deformation monitoring and control network for the entire line is constructed based on the Beidou / GNSS monitoring subsystem, thereby establishing a unified coordinate framework and providing absolute geodetic height as the benchmark control for the entire network. This eliminates the cumulative error of relative measurements and solves the problem of no measurement benchmark points in ultra-wide waterways. Different technical routes are implemented for settlement observation of approach bridge piers and main tower piers according to structural characteristics. For approach bridge piers, Beidou / GNSS technology and tilt measurement technology are integrated to directly replace the traditional leveling height change with the geodetic height change, eliminating the fitting error of the elevation anomaly model. For main tower pier observation, Beidou / GNSS technology and static leveling measurement technology are integrated. Using the side piers of the waterway bridge as working benchmarks, the absolute settlement of the side piers is obtained through Beidou / GNSS, and the relative settlement of the main tower pier and the side piers is measured by static leveling. The absolute settlement and uneven settlement value of the main tower pier can then be calculated. The static leveling measurement subsystem is not affected by the obstruction of the main tower construction, reducing the requirements for the observation platform and solving the problem of settlement observation of high-speed railway bridges under limited measurement conditions. The system provides blind-spot-free monitoring from the main tower piers (critical load-bearing structures) to the approach bridge piers (transition zones), achieving full spatial coverage. From the construction phase to the operation phase, multi-source data fusion (such as tilt measurement and comparison with BeiDou / GNSS settlement values) improves reliability and overall observation accuracy, facilitating full-cycle management.
[0038] In one embodiment, step S1, constructing a full-line settlement deformation monitoring and control network based on the BeiDou / GNSS monitoring subsystem, and calculating the reference network and monitoring network respectively to obtain the BeiDou geodetic height of the working base point and monitoring point, using the change in geodetic height as the settlement value, includes: Step S11: Obtain the spatial coordinates of the reference point Among them, the benchmark i The reference point number is used to extract the geodetic height of the reference point as the elevation benchmark for settlement observation along the entire line. ; Step S12: Solve the baseline network and monitoring network separately to extract the geodetic height of the working base point. and the ground height of the monitoring point Among them, the base point i The working baseline point number is used for monitoring. i To monitor the point number, t For observation time; Step S13: Calculate the settlement value of the working benchmark. and settlement values at monitoring points ; The calculation formula is: ; .
[0039] In step S11, the monitoring reference points are observed according to the accuracy of Class B networks in the "Global Navigation Satellite System (GNSS) Measurement Specifications". Precise ephemeris is used for baseline calculation. The spatial coordinates of any reference point are used as the starting point to perform baseline network adjustment and obtain the spatial coordinates of the reference points. The geodetic height of the reference point was extracted through coordinate transformation and used as the elevation benchmark for settlement observation along the entire line. .
[0040] The coordinate transformation formula is as follows: Longitude L of the reference point is The initial latitude and longitude B is Iterative calculation of latitude is performed. ,in, ; a For the semi-major axis of the ellipsoid, e This is the first eccentricity. Until the latitude converges, then... .
[0041] In one embodiment, step S12, calculating the reference network and monitoring network respectively to extract the geodetic height of the working base point and the monitoring point, includes: Step S121: Solve the reference network and the monitoring network respectively to obtain the baseline of the reference network and the baseline of the monitoring network.
[0042] Specifically, during baseline calculation, the baseline of the reference network is calculated uniformly, while the baseline of the monitoring network is calculated segment by segment. Different data processing baseline strategies are used for long and short baselines. For short baselines, ionospheric delay error is ignored, while for long baselines, an LC-based ionospheric-free combination is used to eliminate the influence of ionospheric delay. The baseline calculation cycle is 24 hours. By adopting different baseline calculation strategies for the reference network and the monitoring network, the measurement accuracy of long baselines in ultra-wide water areas is improved.
[0043] Step S122: Using the spatial coordinates of the reference point Using the baseline of the benchmark network as the starting point, network adjustment is performed to obtain the spatial coordinates of the working base point. Extracting the geodetic height of the working base point .
[0044] Step S123: Using the spatial coordinates of two adjacent working base points as the starting point, perform network adjustment based on the baseline segments of the monitoring network to obtain the spatial coordinates of the monitoring points. Extract the geodetic height of the monitoring points .
[0045] In one embodiment, the geodetic height of the working base point is calculated through observations over multiple time periods; The calculation formula is: , n =1,2......,n Represents the number of days; The settlement value of the working benchmark .
[0046] The above scheme improves the accuracy of geodetic height measurement by employing multi-period observation methods, since the baselines between the benchmark and working benchmarks in ultra-wide water areas generally exceed 10km. For example, observations are conducted for 10 days, and the average value of the 10 days is taken as the observation result. Furthermore, the data analysis cycle of the monitoring network is 1 day, and the data processing of the monitoring network is dynamically adjusted to 4-8 hours during the bridge erection process.
[0047] In one embodiment, step S2, measuring the uneven settlement value of the approach bridge piers of the cross-sea bridge based on the tilt measurement subsystem, includes: Step S21: Periodically collect angle data measured by the tilt sensor. ; Step S22: Calculate the uneven settlement value of the approach bridge piers. ; The calculation formula is: ; in, W The width of the approach bridge pier. m This corresponds to the pier number.
[0048] Furthermore, to eliminate the influence of the harsh marine temperature environment during the day on the instruments and equipment, the uneven settlement value of the pier body was taken from the measurement value at the time when the temperature was constant in the early morning (0:00-6:00).
[0049] In one embodiment, step S3, measuring the relative settlement values of the main tower piers and side piers of the cross-sea bridge and the uneven settlement value of the main tower piers based on the hydrostatic leveling subsystem, and calculating the settlement value of the main tower piers based on the ground height change of the side piers, includes: Step S31: Set the initial values of the hydrostatic level. Among them, static force i This is the point number for the static leveling monitoring point; Step S32: Calculate the settlement value of the main tower pier. ; The calculation formula is: ; in, t For observation time, This represents the relative settlement values between the main tower piers and the side piers of a cross-sea bridge. This indicates the change in ground height of the pier; Step S33: Calculate the uneven settlement value of the main tower pier. ; The calculation formula is: , us Indicates upstream. dsIndicates downstream.
[0050] Specifically, the static leveling benchmark is set at the side pier, and its elevation is monitored by a Beidou / GNSS receiver at the top of the side pier, which serves as the working benchmark. The uneven settlement value of the main tower pier is obtained by the measurement difference of the static leveling instruments arranged at the four corners of the main tower pier.
[0051] us , ds The inclination between two points is expressed as , W ud This represents the distance between two points, upstream and downstream.
[0052] In one embodiment, the method further includes: Step S4: When the steel trestle bridge used for laying static leveling pipelines in the static leveling measurement subsystem is dismantled, making the static leveling benchmark point and the static leveling monitoring point disconnected, cross-river leveling measurement is carried out using the distance trigonometric leveling method.
[0053] When changes in on-site construction cause an interruption between static leveling benchmarks and monitoring points, such as after the steel trestle bridge is demolished and the connection between the static leveling benchmarks and monitoring points is lost, cross-sea leveling measurements will be used instead at the top of the side piers and the lower crossbeam of the main tower. Cross-sea leveling will be conducted using the distance-measuring trigonometric leveling method, forming a closed leveling loop using a 6-point method. The technical requirements for cross-sea leveling will be implemented according to the requirements of the "National First and Second Order Leveling Measurement Specifications." The elevation difference between the cross-sea point and the working benchmark at the top of the pier will be measured using geometric leveling. Once the main span steel beam is closed and connectivity is restored, the static level instrument that was removed due to the demolition of the steel trestle bridge will be restored at the closure point on the steel beam.
[0054] By further integrating cross-sea leveling technology through the above scheme, when the construction of the superstructure begins and the main channel steel trestle bridge is dismantled, i.e. when the static leveling subsystem is not connected, cross-river leveling is used as a substitute at the crossbeam under the main tower pier to observe the settlement changes of the main tower pier relative to the working benchmark of the side pier; static leveling is restored after the main beam is closed, forming an observation closed loop.
[0055] In one embodiment, after the steel trestle bridge is dismantled, the uneven settlement of the main tower piers is observed using geometric leveling.
[0056] Once the beam erection begins, remove the BeiDou / GNSS receiver from the pier top, replace the connecting rod in the settlement observation marker base with a leveling rod, and move the pier top settlement observation point to the beam surface using leveling measurements. Beam surface measuring points are then set up on the beam surface corresponding to the pier top, and the removed pier top BeiDou / GNSS receiver is installed on the beam surface measuring points.
[0057] In the description of this application, it should be noted that the terms "upper," "lower," etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application. Unless otherwise expressly specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication between two elements. For those skilled in the art, the specific meaning of the above terms in this application can be understood according to the specific circumstances.
[0058] It should be noted that in this application, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0059] In the description of the embodiments of this application, unless otherwise stated, " / " means "or". For example, A / B can mean A or B. The "and / or" in the text is merely a description of the relationship between related objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, A and B exist simultaneously, and B exists alone. In addition, in the description of the embodiments of this application, "multiple" means two or more.
[0060] The above are merely specific embodiments of this application, enabling those skilled in the art to understand or implement this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features claimed herein.
Claims
1. A multimodal fusion-based system for monitoring the settlement and deformation of a cross-sea bridge, characterized in that, It includes: The Beidou / GNSS monitoring subsystem (1) is used to construct a full-line settlement deformation monitoring and control network, with the change in geodetic height as the settlement value. It includes: a Beidou / GNSS operation reference station established in the land bedrock foundation area of the cross-sea bridge and the top of the sea-embedded rock pile foundation piers as a monitoring reference point (11); working reference points (12) set at intervals of a set distance between piers; and monitoring points (13) set between adjacent working reference points (12). The monitoring reference points (11) constitute a reference network, and the working reference points (12) and monitoring points (13) constitute a monitoring network. The reference network and the monitoring network form the monitoring and control network. Inclination measurement subsystem (2): It includes an inclination sensor installed on the approach bridge piers of the cross-sea bridge for measuring the uneven settlement value of the approach bridge piers; The static leveling measurement subsystem (3) includes several static level instruments installed on the main tower piers and side piers of the cross-sea bridge. The static level instruments on the side piers are used as static leveling reference points, and the rest are static leveling monitoring points. The subsystem is used to measure the relative settlement value of the main tower piers and side piers and the uneven settlement value of the main tower piers. Data processing subsystem (4): It is connected to the Beidou / GNSS monitoring subsystem (1), tilt measurement subsystem (2) and static leveling subsystem (3) respectively, and is used for data reception, storage and calculation.
2. The multimodal fusion-based settlement deformation monitoring system for cross-sea bridges as described in claim 1, characterized in that, The monitoring reference point (11), working reference point (12), and monitoring point (13) are respectively equipped with Beidou / GNSS receivers.
3. A method for observing settlement and deformation of cross-sea bridges based on multimodal fusion, characterized in that, The method of using the multimodal fusion-based settlement deformation monitoring system for cross-sea bridges as described in any one of claims 1 to 2 includes the following steps: A settlement deformation monitoring and control network for the entire line is constructed based on the Beidou / GNSS monitoring subsystem. The reference network and the monitoring network are solved separately to obtain the Beidou geodetic height of the working base point and the monitoring point. The change in geodetic height is used as the settlement value. The uneven settlement value of the approach bridge piers of the cross-sea bridge was measured based on the tilt measurement subsystem. The relative settlement values of the main tower pier and the side piers of the cross-sea bridge and the uneven settlement value of the main tower pier are measured based on the static leveling subsystem, and the settlement value of the main tower pier is calculated based on the change in the ground height of the side piers.
4. The method for monitoring settlement and deformation of cross-sea bridges based on multimodal fusion as described in claim 3, characterized in that, The aforementioned settlement deformation monitoring and control network, constructed based on the BeiDou / GNSS monitoring subsystem, calculates the BeiDou geodetic heights of the working base points and monitoring points, using the geodetic height change as the settlement value, including: Obtain the spatial coordinates of the reference point Among them, the benchmark i The reference point number is used to extract the geodetic height of the reference point as the elevation benchmark for settlement observation along the entire line. ; The baseline network and monitoring network are solved separately to extract the geodetic height of the working base point. and the ground height of the monitoring point Among them, the base point i The working baseline point number is used for monitoring. i To monitor the point number, t For observation time; Calculate the settlement value of the working benchmark. and settlement values at monitoring points ; The calculation formula is: ; .
5. The method for monitoring settlement and deformation of cross-sea bridges based on multimodal fusion as described in claim 4, characterized in that, The process of separately solving the baseline network and the monitoring network to extract the geodetic height of the working base point and the monitoring point includes: The baseline of the benchmark network and the baseline of the monitoring network are calculated separately. Using the reference point spatial coordinates Using the baseline of the reference network as the starting point, network adjustment is performed based on the baseline of the reference network to obtain the spatial coordinates of the working base point. Extract the geodetic height of the working base point ; Using the spatial coordinates of two adjacent working base points as starting points, network adjustment is performed based on the monitoring network baseline to obtain the spatial coordinates of the monitoring points. Extract the geodetic height of the monitoring points .
6. The method for observing settlement and deformation of cross-sea bridges based on multimodal fusion as described in claim 5, characterized in that, When extracting the geodetic height of the working base point, calculations are performed using observations over multiple time periods; The calculation formula is: , n =1,2......, n Represents the number of days; The settlement value of the working benchmark .
7. The method for observing settlement and deformation of cross-sea bridges based on multimodal fusion as described in claim 3, characterized in that, The measurement of uneven settlement values of approach bridge piers of cross-sea bridges based on the tilt measurement subsystem includes: Timed acquisition of angle data measured by tilt sensor ; Calculate the uneven settlement value of the approach bridge piers ; The calculation formula is: ; in, W The width of the approach bridge pier. m This corresponds to the pier number.
8. The method for monitoring settlement and deformation of cross-sea bridges based on multimodal fusion as described in claim 3, characterized in that, The hydrostatic leveling subsystem measures the relative settlement of the main tower pier and the side piers of the cross-sea bridge, as well as the uneven settlement of the main tower pier. The calculation of the settlement of the main tower pier based on the change in ground height of the side piers includes: Set the initial values for the hydrostatic level. Among them, static force i This is the point number for the static leveling monitoring point; Calculate the settlement value of the main tower pier. ; The calculation formula is: ; in, t For observation time, This represents the relative settlement values between the main tower piers and the side piers of a cross-sea bridge. This indicates the change in ground height of the pier; Calculate the uneven settlement value of the main tower pier. ; The calculation formula is: , us Indicates upstream. ds Indicates downstream.
9. The method for monitoring settlement and deformation of cross-sea bridges based on multimodal fusion as described in claim 3, characterized in that, The method further includes: When the steel trestle bridge used for laying static leveling pipelines in the static leveling measurement subsystem is dismantled, making the static leveling benchmark point and the static leveling monitoring point disconnected, cross-river leveling measurement is carried out using the distance trigonometric leveling method.
10. The method for observing settlement and deformation of cross-sea bridges based on multimodal fusion as described in claim 9, characterized in that, After the steel trestle bridge was dismantled, the uneven settlement value of the main tower pier was observed using geometric leveling.
Citation Information
Patent Citations
Method and system for measuring absolute subsidence amounts of bridge piers of sea-crossing long bridge
CN110260840A
On-line monitoring system and method for settlement of power transmission tower
CN111854687A
Viaduct deformation detection system, detection method and device
CN113155092A
Device and method for monitoring embankment settlement
CN113483734A
Method and system for monitoring settlement displacement of transformer substation in combination with Beidou and hydrostatic level
CN114877864A