一种固体钾盐矿斜井突水堵水方法

By combining graded drilling and graded aggregate filling with grouting reinforcement, the problems of high grout consumption and inadequate sealing in the treatment of water inrush in inclined shafts of potash mines were solved, achieving precise sealing of water inrush channels and stable water blocking effect.

CN122407273APending Publication Date: 2026-07-17ZHENGZHOU INSTITUTE OF ADVANCED STUDIES HENAN UNIVERSITY OF TECHNOLOGY +2
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
ZHENGZHOU INSTITUTE OF ADVANCED STUDIES HENAN UNIVERSITY OF TECHNOLOGY
Filing Date
2026-05-22
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the treatment of water inrush in inclined shafts of solid potash mines, the existing technology of direct grouting cannot achieve precise sealing. The aggregate filling is not dense, resulting in high grout consumption, poor sealing effect, and easy grout loss. It is difficult to adapt to the complex geological conditions of inclined shafts of potash mines.

Method used

The method of graded drilling construction and graded aggregate filling combined with grouting reinforcement is adopted. First, the dissolution space is accurately explored through through-tunnel filling boreholes and exploration and treatment boreholes. Coarse and fine aggregates are thrown in stages to form a dense skeleton. Then, the surrounding rock fissures are filled by grouting to form a stable water-blocking structure.

Benefits of technology

It achieves precise sealing of water inflow channels in inclined shafts of potash mines, reduces slurry consumption, improves the stability and durability of the water-blocking structure, avoids long-term expansion of water inflow channels, and ensures high construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122407273A_ABST
    Figure CN122407273A_ABST
Patent Text Reader

Abstract

本发明涉及固体钾盐矿开采治水技术领域,具体公开了一种固体钾盐矿斜井突水堵水方法,针对钾盐矿斜井围岩盐层溶蚀、上部泥岩含水层强度低导致的突水堵水难度大的问题,通过在斜井井筒突水点以下、斜井变平段附近地面施工钻孔,先向井筒内分级投掷沙石骨料,粗骨料先行堆积形成骨架、再逐级减小骨料粒度密实空隙,最后采用注浆工艺进行加固封堵,实现了对斜井涌水通道的物理充填,从源头切断涌水水源;本方法适配钾盐矿斜井复杂的地质条件,能有效防止水泥浆液无效流失,提升堵水结构的稳定性和密实度,堵水效果持久,施工操作便捷,适用于固体钾盐矿主斜井等巷道的突水封堵治理。