Edge computing-based building elevator group intelligent dispatching control system

CN122646710APending Publication Date: 2026-08-28SICHUAN QINGZI CONSTRUCTION ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610703233.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-05-21
Publication Date
2026-08-28

AI Technical Summary

Technical Problem

[0007]因此,本发明的目的是提供基于边缘计算建筑电梯群智能调度控制系统,通过对现有的建筑电梯群调度控制系统进行改进,能够解决上述提出现有技术中现有的建筑电梯群调度控制系统使用时,电梯在空闲状态下多随机停靠或返回首层,无法根据楼层总数与电梯数量进行均匀分布待命,易出现呼梯楼层与电梯位置过远、候梯时间过长的情况,传统调度方式难以实现多电梯间的直接协同,常出现重复响应、扎堆停靠、空载运行等现象,不仅降低运输效率,还增加能耗与设备损耗的问题

Benefits of technology

[0029] 1. In this invention, the stop optimization scheduling module enables elevators to automatically and evenly distribute their waiting time after 30 seconds of idle time. The average number of floors to stop at is calculated based on the total number of floors and the number of elevators. Adaptive scheduling is performed using the minimum travel priority algorithm, which completely solves the problems of random stops or only returning to the first floor, excessive distance when calling the elevator, and excessively long waiting time in traditional elevators. This significantly shortens the waiting time and improves the user's elevator experience. The elevator direct connection interaction module enables multiple elevators to synchronize their status directly with the cloud without going through the central control, effectively avoiding repeated responses, clustered stops, and empty runs, improving the overall transportation efficiency of the elevator group, and reducing equipment wear and operating energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122646710A_ABST
    Figure CN122646710A_ABST
Patent Text Reader

Abstract

The application discloses to the elevator dispatching technical field, specifically is based on edge computing building elevator group intelligent dispatching control system, including edge computing gateway module, group control collaborative scheduling module, local real-time decision module, elevator direct connection interaction module, cloud closed loop iteration module, multi-source perception fusion module, stop optimization scheduling module, network outage autonomous operation module, the application has the beneficial effect: according to total floor and elevator quantity average stop floor is calculated, and minimum mobile journey priority algorithm is adopted adaptive scheduling, completely solve the traditional elevator random stop or only return to the first floor, the distance is too far when calling elevator, the problem of long waiting time, significantly shorten the waiting time, improve user experience, effectively avoid repeated response, bunch up and stop and idle running, improve the overall transport efficiency of elevator group, reduce equipment wear and tear and operating energy consumption.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of elevator scheduling technology, specifically to an intelligent scheduling and control system for building elevator groups based on edge computing. Background Technology

[0002] Edge computing is a technology that performs computation, analysis, and processing near the source of data generation. It eliminates the need to transmit large amounts of data to remote cloud servers, enabling devices to respond quickly locally. It features low latency, high efficiency, low network pressure, and the ability to operate even when the network is down, making it particularly suitable for scenarios requiring real-time control, such as elevators, industrial equipment, and smart homes.

[0003] An elevator group refers to a combination of multiple elevators within the same building space that are managed collaboratively by a unified dispatch system. It typically consists of three or more elevators arranged adjacent to each other and serving the same or similar floors. Through centralized control, unified elevator call response, operation scheduling, and status coordination are achieved. The purpose is to reduce passenger waiting time, improve transportation efficiency, balance elevator load, and avoid repeated stops and congestion. It is widely used in high-rise residential buildings, office buildings, shopping malls, hospitals, and other high-passenger-flow building scenarios.

[0004] However, when existing building elevator group dispatch control systems are in use, elevators often randomly stop or return to the first floor when idle, and cannot be evenly distributed according to the total number of floors and elevators. This can easily lead to situations where the floor to be called is too far from the elevator location and the waiting time is too long. Traditional dispatch methods are difficult to achieve direct coordination between multiple elevators, and often result in repeated responses, clustered stops, and empty operation, which not only reduces transportation efficiency but also increases energy consumption and equipment wear and tear.

[0005] To address this, we propose an intelligent scheduling and control system for building elevator groups based on edge computing. Summary of the Invention

[0006] In view of the problems existing in the above and / or existing intelligent scheduling and control systems for building elevator groups based on edge computing, this invention is proposed.

[0007] Therefore, the purpose of this invention is to provide an intelligent scheduling and control system for building elevator groups based on edge computing. By improving the existing building elevator group scheduling and control system, it can solve the problems mentioned above. In the existing building elevator group scheduling and control system, when the elevators are idle, they often randomly stop or return to the first floor. They cannot be evenly distributed according to the total number of floors and the number of elevators. This can easily lead to situations where the floor to be called is too far from the elevator location and the waiting time is too long. Traditional scheduling methods are difficult to achieve direct coordination between multiple elevators, and phenomena such as repeated responses, clustered stops, and empty operation often occur. This not only reduces transportation efficiency but also increases energy consumption and equipment wear and tear.

[0008] To address the aforementioned technical problems, according to one aspect of the present invention, the present invention provides the following technical solution:

[0009] The intelligent scheduling and control system for building elevator groups based on edge computing includes an edge computing gateway module, a group control collaborative scheduling module, a local real-time decision-making module, an elevator direct connection interaction module, a cloud closed-loop iteration module, a multi-source perception fusion module, a stop optimization scheduling module, and a network outage autonomous operation module.

[0010] The edge computing gateway module accesses elevator operation data, floor call data, people flow monitoring data, load detection data and waiting time data nearby, and independently completes data processing, feature fusion and scheduling instruction generation at the edge, without relying on the cloud and central control cabinet;

[0011] The group control and collaborative scheduling module performs global optimal allocation based on real-time pedestrian density, target floor distribution, elevator load rate, waiting time and running mileage to avoid multiple elevators responding repeatedly and stopping in clusters.

[0012] The local real-time decision-making module has a built-in lightweight edge model, which can quickly complete elevator call prediction, passenger diversion, empty-load recall and peak adaptive adjustment.

[0013] The elevator direct connection interaction module enables each elevator in the group to achieve status synchronization and collaborative scheduling directly through the edge gateway without going through the central main control and the cloud.

[0014] The cloud-based closed-loop iterative module receives edge scheduling data to optimize the strategy and sends the updated scheduling model to the edge computing gateway.

[0015] The multi-source perception fusion module integrates video pedestrian statistics, access control linkage information, laser load detection, and elevator waiting time monitoring data to provide accurate basis for scheduling.

[0016] The station stop optimization scheduling module is used to merge same-direction calls and calls from nearby floors to reduce the number of stops and running time.

[0017] The autonomous operation module ensures that even when the cloud is offline, the main control is offline, or there are network fluctuations, the edge computing gateway can still independently complete full-function intelligent scheduling to ensure the stable operation of the elevator group.

[0018] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, the stop optimization scheduling module automatically enters the idle averaging scheduling process when there are no new elevator calls or riding behaviors for 30 seconds after the elevator stops. It calculates the average distribution of stopping floors based on the total number of floors in the building and the number of elevator groups, and performs adaptive path planning based on the current floor of each elevator. It prioritizes scheduling the elevator with the shortest travel distance to complete the position adjustment, so that all elevators stop evenly on different average floors, forming an evenly spaced standby distribution. When an elevator call request is generated on any floor, the nearest standby elevator responds first, avoiding excessively long waiting times due to excessive distance between the elevator and the calling floor.

[0019] When performing idle averaging scheduling, the station optimization scheduling module adopts the minimum travel distance priority algorithm. It first calculates the travel distance required for each elevator to reach each average floor, and then selects the elevator with the shortest travel distance, the lowest energy consumption, and the least time for scheduling. This allows the elevator group to be evenly distributed and ready to go at the lowest cost when there are no passengers, further improving the response speed and reducing the energy consumption of elevator operation.

[0020] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, the stop optimization scheduling module performs dynamic weighted calculations based on the total number of building floors, the number of elevator groups, the number of underground floors, and the location of refuge floors to generate the optimal average stopping floor that adapts to the actual building structure, making the elevator standby position more in line with the actual elevator usage needs.

[0021] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, the stop optimization scheduling module determines whether the elevator has entered an idle state by comprehensively detecting four conditions: no elevator call request, no door opening / closing action, no load change, and no passengers entering or exiting. The average scheduling is only initiated after these conditions are met for 30 seconds to avoid false triggering and frequent movement.

[0022] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, the elevator direct-connection interaction module broadcasts the current floor, operating status, and schedulable status of each elevator to all elevators in the group in real time during the idle averaging scheduling process, enabling the edge computing gateway to quickly complete the global optimal allocation and avoid multiple elevators moving to the same floor.

[0023] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, when an elevator call request is generated on any floor, the group control and collaborative scheduling module immediately calculates the distance between each uniformly waiting elevator and the calling floor, selects the nearest, empty, and immediately responsive elevator to go there first, so as to achieve the shortest waiting time.

[0024] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, the multi-source sensing fusion module inputs real-time pedestrian flow heat, access control entry and exit frequency, and peak time period labels to the stop optimization scheduling module, so that the idle average stopping floors can be adaptively adjusted according to changes in pedestrian flow, further improving intelligence.

[0025] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, the local real-time decision-making module completes floor calculation, path planning, elevator allocation, and instruction issuance entirely at the edge during the idle averaging scheduling process, with the entire process taking no more than 100 milliseconds, achieving extremely fast response.

[0026] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, even when disconnected from the cloud and offline from the central control, the autonomous operation module can still support the stop optimization scheduling module to fully execute idle average scheduling, keeping elevators on standby evenly and responding quickly.

[0027] As a preferred embodiment of the intelligent scheduling and control system for building elevator groups based on edge computing described in this invention, the cloud-based closed-loop iterative module continuously optimizes the averaged scheduling strategy based on the idle scheduling records, waiting time, response speed, and elevator movement distance uploaded from the edge terminal, making the elevator group increasingly intelligent and faster in response over time.

[0028] Compared with the prior art, the beneficial effects achieved by the present invention are:

[0029] 1. In this invention, the stop optimization scheduling module enables elevators to automatically and evenly distribute their waiting time after 30 seconds of idle time. The average number of floors to stop at is calculated based on the total number of floors and the number of elevators. Adaptive scheduling is performed using the minimum travel priority algorithm, which completely solves the problems of random stops or only returning to the first floor, excessive distance when calling the elevator, and excessively long waiting time in traditional elevators. This significantly shortens the waiting time and improves the user's elevator experience. The elevator direct connection interaction module enables multiple elevators to synchronize their status directly with the cloud without going through the central control, effectively avoiding repeated responses, clustered stops, and empty runs, improving the overall transportation efficiency of the elevator group, and reducing equipment wear and operating energy consumption.

[0030] 2. In this invention, an edge computing gateway module is used to collect and process data locally, generating scheduling instructions locally without relying on a cloud server. This results in faster response times, lower latency, reduced network transmission pressure, and addresses the slow response of traditional centralized scheduling. Through the autonomous operation module, even when the cloud is disconnected, the central control is offline, or the network fluctuates, it can still independently complete all intelligent scheduling and idle average allocation, ensuring uninterrupted service, no congestion, and no efficiency degradation of the elevator group. Stability and reliability are greatly improved. The multi-source perception fusion module gathers data such as video pedestrian flow, access control, load, and waiting time, and combines it with the group control collaborative scheduling module to achieve global optimal allocation. It can automatically adjust the scheduling strategy according to changes in passenger flow and time period characteristics, adapting to different scenarios such as peak and off-peak periods, making it more practical.

[0031] 3. In this invention, the local real-time decision-making module enables millisecond-level rapid calculation and instruction issuance at the edge, resulting in more precise scheduling and smoother operation. At the same time, combined with the cloud-based closed-loop iterative module, the system continuously optimizes strategies, making it smarter with use and maintaining optimal operating status in the long term. The overall architecture is modular and highly collaborative, with high installation and adaptability. It can be widely applied to elevator groups in various high-rise buildings such as residential buildings, office buildings, shopping malls, and hospitals, and has a wide range of applications and strong promotion potential. Attached Figure Description

[0032] Figure 1 This is a schematic diagram of the process of the present invention;

[0033] Figure 2 This is a schematic diagram of the edge computing gateway module of the present invention;

[0034] Figure 3 This is a schematic diagram of the group control and collaborative scheduling of the present invention;

[0035] Figure 4 This is a schematic diagram of the optimized stop scheduling of the present invention;

[0036] Figure 5 This is a schematic diagram of the autonomous operation of the present invention when the network is disconnected. Detailed Implementation

[0037] To make the objectives, technical solutions, and advantages of the present invention clearer, the embodiments of the present invention will be described in further detail below with reference to the accompanying drawings.

[0038] This invention provides an intelligent scheduling and control system for building elevator groups based on edge computing. It features an optimized scheduling module that automatically and evenly distributes elevators to standby after 30 seconds of idle time. The system calculates the average number of floors to stop at based on the total number of floors and elevators, and uses a minimum travel distance priority algorithm for adaptive scheduling. This completely solves the problems of random elevator stops or only returning to the first floor, excessive distance for callers, and long waiting times associated with traditional elevators. It significantly shortens waiting time and improves the user experience. Furthermore, the elevator direct-connection interaction module enables multiple elevators to synchronize their status directly with the cloud without going through a central control unit, effectively avoiding duplicate responses, clustered stops, and empty runs. This improves the overall transportation efficiency of the elevator group and reduces equipment wear and energy consumption.

[0039] Please see Figure 1-5 The intelligent scheduling and control system for building elevator groups based on edge computing includes an edge computing gateway module, a group control collaborative scheduling module, a local real-time decision-making module, an elevator direct connection interaction module, a cloud closed-loop iteration module, a multi-source perception fusion module, a stop optimization scheduling module, and an offline autonomous operation module.

[0040] The edge computing gateway module accesses elevator operation data, floor call data, passenger flow monitoring data, load detection data, and waiting time data locally, independently completing data processing, feature fusion, and scheduling command generation at the edge, without relying on the cloud or central control cabinet. The group control and collaborative scheduling module performs global optimal allocation based on real-time passenger flow density, target floor distribution, elevator load rate, waiting time, and operating mileage, avoiding multiple elevators responding repeatedly and stopping in clusters. The local real-time decision-making module has a built-in lightweight edge model, which can quickly complete elevator call prediction, passenger diversion, empty-load recall, and peak-hour adaptive adjustment. The elevator direct connection interaction module enables elevators in the group to achieve status synchronization and collaborative scheduling directly through the edge gateway without going through the central control and cloud. The cloud closed-loop iteration module receives edge scheduling data, optimizes strategies, and sends the updated scheduling model to the edge computing gateway.

[0041] The multi-source perception fusion module unifies and aggregates data from video pedestrian statistics, access control linkage information, laser load detection, and elevator waiting time monitoring, providing accurate basis for scheduling. The stop optimization scheduling module merges same-direction calls and calls to nearby floors, reducing the number of stops and operating time. The offline autonomous operation module ensures that even when the cloud is offline, the main control is offline, or the network fluctuates, the edge computing gateway can still independently complete full-function intelligent scheduling, ensuring the stable operation of the elevator group. The stop optimization scheduling module enables elevators to automatically and evenly distribute themselves for standby after 30 seconds of idle time, calculates the average number of floors to stop based on the total number of floors and elevators, and adopts the minimum travel distance priority algorithm for adaptive scheduling, completely solving the problems of random stops or only returning to the first floor, excessive distance when calling, and long waiting time of traditional elevators, significantly shortening waiting time and improving the user's elevator experience. The elevator direct connection interaction module enables multiple elevators to directly synchronize their status with the cloud without going through the central main control, effectively avoiding repeated responses, clustered stops, and empty operation, improving the overall transportation efficiency of the elevator group, and reducing equipment wear and operating energy consumption.

[0042] The stop optimization scheduling module automatically enters the idle averaging scheduling process when there are no new elevator calls or passenger actions for 30 seconds after an elevator stops. It calculates the average number of floors to be stopped based on the total number of floors in the building and the number of elevators in the group. It then performs adaptive path planning based on the current floor of each elevator, prioritizing the elevator with the shortest travel distance to complete its position adjustment. This ensures that all elevators are evenly stopped at different average floors, forming a equidistant standby distribution. When an elevator call is made on any floor, the nearest standby elevator responds first, avoiding excessively long waiting times due to large distances between elevators and calling floors. When performing idle averaging scheduling, the stop optimization scheduling module uses a minimum travel distance priority algorithm. It first calculates the travel distance required for each elevator to reach each average floor, then selects the elevator with the shortest travel distance, lowest energy consumption, and least time for scheduling. This allows the elevator group to achieve an even distribution of standby at the lowest cost when there are no passengers, further improving response speed and reducing elevator operating energy consumption.

[0043] The stop optimization scheduling module dynamically weights and calculates based on the total number of floors in the building, the number of elevator groups, the number of underground floors, and the location of refuge floors to generate the optimal average stopping floor that fits the actual structure of the building, making the elevator standby position more in line with the actual elevator usage needs. When determining whether an elevator has entered an idle state, the stop optimization scheduling module comprehensively detects four conditions: no elevator call requests, no door opening or closing actions, no load changes, and no passengers entering or exiting. It only starts the average scheduling after these conditions are met for 30 seconds to avoid false triggering and frequent movement.

[0044] During idle and evenly distributed scheduling, the elevator direct-connection interaction module broadcasts the current floor, operating status, and scheduling status of each elevator to all elevators in the group in real time. This enables the edge computing gateway to quickly complete the global optimal allocation and prevent multiple elevators from moving to the same floor. When an elevator call request is generated on any floor, the group control and collaborative scheduling module immediately calculates the distance between each evenly available elevator and the calling floor, and selects the nearest, empty, and immediately responsive elevator to go there first, thus achieving the shortest waiting time.

[0045] The multi-source sensing fusion module inputs real-time pedestrian flow heat map, access control frequency, and peak time period labels into the stop optimization scheduling module, enabling the idle average stopping floor to be adaptively adjusted according to changes in pedestrian flow, further improving intelligence; the local real-time decision-making module completes floor calculation, path planning, elevator allocation, and instruction issuance at the edge during the idle average scheduling process, with the entire process taking no more than 100 milliseconds, achieving ultra-fast response.

[0046] Even when disconnected from the cloud and the central control is offline, the autonomous operation module can still support the station stop optimization scheduling module to fully execute idle average scheduling, keeping elevators on standby evenly and responding quickly. The cloud closed-loop iteration module continuously optimizes the average scheduling strategy based on idle scheduling records, waiting time, response speed, and elevator movement distance uploaded from the edge terminal, making the elevator group smarter and faster with use.

[0047] The workflow of this invention is as follows: After the system starts up, the multi-source perception fusion module gathers various types of data in real time, such as video pedestrian flow statistics, access control linkage information, laser load detection, and elevator waiting time monitoring, and uploads them to the edge computing gateway module. The edge computing gateway module performs data cleaning, feature fusion, and status analysis locally, and distributes the processed accurate data to various functional modules to provide a basis for scheduling.

[0048] In daily operation, the group control and collaborative scheduling module allocates multiple elevators globally based on real-time passenger flow density, target floor distribution, elevator load rate, waiting time, and operating mileage, avoiding duplicate responses and cluster stops. The local real-time decision-making module quickly completes elevator call prediction, passenger diversion, empty-load recall, and peak mode switching through a built-in lightweight model, ensuring efficient operation in both peak and off-peak conditions. The elevator direct connection and interaction module enables each elevator in the group to directly broadcast its current floor, operating status, and dispatchable status, achieving real-time collaboration without a central control or cloud, further improving the smoothness of scheduling.

[0049] When an elevator stops and there are no new calls, no door opening / closing actions, no load changes, and no passengers entering or exiting for 30 seconds, the stop optimization scheduling module immediately initiates idle average scheduling. Based on the total number of floors in the building and the number of elevators, the module calculates the average number of floors the elevator stops at and plans a path for each elevator based on its current position. Using the minimum travel distance priority algorithm, the module prioritizes scheduling the elevator with the shortest travel distance and lowest energy consumption to adjust its position. This ensures that all elevators are evenly distributed across different floors, forming a standby state with equal intervals, guaranteeing that any call from any floor can be quickly responded to by the nearest elevator.

[0050] The entire dispatching command is calculated, planned and issued by the local real-time decision-making module at the edge, with a response time of no more than 100 milliseconds, achieving ultra-fast control. In the event of cloud network outage, main control offline or network fluctuation, the network outage autonomous operation module immediately activates the protection mechanism to maintain the independent operation of all functions at the edge, ensuring that the elevator group does not stop, does not congest, and does not reduce efficiency.

[0051] During operation, the cloud-based closed-loop iterative module continuously receives scheduling records, waiting times, response speeds, and travel distance data uploaded from the edge terminal. It periodically optimizes the scheduling model and strategies and sends the updated parameters to the edge gateway, enabling the system to continuously iterate and upgrade. This system combines edge computing, local collaboration, idle uniform scheduling, and offline autonomy to achieve low-latency, high-efficiency, low-energy-consumption, and highly stable intelligent operation of elevator groups, completely solving the problems of high latency, slow response, easy paralysis, and long waiting times in traditional scheduling.

[0052] Although the present invention has been described above with reference to embodiments, various modifications can be made and components can be replaced with equivalents without departing from the scope of the invention. In particular, as long as there is no structural conflict, the features in the disclosed embodiments can be combined with each other in any manner. The lack of an exhaustive description of these combinations in this specification is merely for the sake of brevity and resource conservation. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. An intelligent scheduling and control system for building elevator groups based on edge computing, characterized in that, It includes an edge computing gateway module, a group control and collaborative scheduling module, a local real-time decision-making module, an elevator direct connection and interaction module, a cloud closed-loop iteration module, a multi-source perception fusion module, a stop optimization scheduling module, and a network outage autonomous operation module; The edge computing gateway module accesses elevator operation data, floor call data, people flow monitoring data, load detection data and waiting time data nearby, and independently completes data processing, feature fusion and scheduling instruction generation at the edge, without relying on the cloud and central control cabinet; The group control and collaborative scheduling module performs global optimal allocation based on real-time pedestrian density, target floor distribution, elevator load rate, waiting time and running mileage to avoid multiple elevators responding repeatedly and stopping in clusters. The local real-time decision-making module has a built-in lightweight edge model, which can quickly complete elevator call prediction, passenger diversion, empty-load recall and peak adaptive adjustment. The elevator direct connection interaction module enables each elevator in the group to achieve status synchronization and collaborative scheduling directly through the edge gateway without going through the central main control and the cloud. The cloud-based closed-loop iterative module receives edge scheduling data to optimize the strategy and sends the updated scheduling model to the edge computing gateway. The multi-source perception fusion module integrates video pedestrian statistics, access control linkage information, laser load detection, and elevator waiting time monitoring data to provide accurate basis for scheduling. The station stop optimization scheduling module is used to merge same-direction calls and calls from nearby floors to reduce the number of stops and running time. The autonomous operation module ensures that even when the cloud is offline, the main control is offline, or there are network fluctuations, the edge computing gateway can still independently complete full-function intelligent scheduling to ensure the stable operation of the elevator group.

2. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 1, characterized in that, When there are no new elevator calls or passenger actions for 30 seconds after an elevator stops, the station optimization scheduling module automatically enters the idle averaging scheduling process. It calculates the average distribution of stopping floors based on the total number of floors in the building and the number of elevator groups. It performs adaptive path planning based on the current floor of each elevator and prioritizes scheduling the elevator with the shortest travel distance to complete the position adjustment, so that all elevators stop evenly on different average floors and form an evenly spaced standby distribution. When an elevator call is generated on any floor, the nearest standby elevator responds first, avoiding excessively long waiting times due to excessive distance between the elevator and the calling floor. When performing idle averaging scheduling, the station optimization scheduling module adopts the minimum travel distance priority algorithm. It first calculates the travel distance required for each elevator to reach each average floor, and then selects the elevator with the shortest travel distance, the lowest energy consumption, and the least time for scheduling. This allows the elevator group to be evenly distributed and ready to go at the lowest cost when there are no passengers, further improving the response speed and reducing the energy consumption of elevator operation.

3. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 2, characterized in that, The station optimization scheduling module performs dynamic weighted calculations based on the total number of building floors, the number of elevator groups, the number of underground floors, and the location of refuge floors to generate the optimal average stopping floor that adapts to the actual building structure, making the elevator standby position more in line with the actual elevator usage needs.

4. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 3, characterized in that, When the station optimization scheduling module determines whether the elevator has entered an idle state, it comprehensively detects four conditions: no elevator call request, no door opening / closing action, no load change, and no passengers entering or exiting. It only starts the average scheduling after these conditions are met for 30 seconds to avoid false triggering and frequent movement.

5. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 4, characterized in that, During the idle averaging scheduling process, the elevator direct connection interaction module broadcasts the current floor, operating status, and schedulable status of each elevator to all elevators in the group in real time, enabling the edge computing gateway to quickly complete the global optimal allocation and avoid multiple elevators moving to the same floor.

6. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 5, characterized in that, When an elevator call request is generated on any floor, the group control and collaborative scheduling module immediately calculates the distance between each uniformly waiting elevator and the calling floor, selects the nearest, empty, and immediately responsive elevator to go there first, so as to achieve the shortest waiting time.

7. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 6, characterized in that, The multi-source sensing fusion module inputs real-time pedestrian flow heat map, access control entry and exit frequency, and peak time period labels into the stop optimization and scheduling module, so that the idle average stopping floor can be adaptively adjusted according to changes in pedestrian flow, further improving intelligence.

8. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 7, characterized in that, During the idle averaging scheduling process, the local real-time decision-making module completes floor calculation, path planning, elevator allocation, and instruction issuance entirely at the edge, with the entire process taking no more than 100 milliseconds, achieving extremely fast response.

9. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 8, characterized in that, Even when disconnected from the cloud and the central control is offline, the autonomous operation module can still support the stop optimization scheduling module to fully execute idle average scheduling, keeping elevators on standby evenly and responding quickly.

10. The intelligent scheduling and control system for building elevator groups based on edge computing according to claim 9, characterized in that, The cloud-based closed-loop iterative module continuously optimizes the averaged scheduling strategy based on idle scheduling records, waiting time, response speed, and elevator travel distance uploaded from the edge terminal, making the elevator group increasingly intelligent and responsive over time.