Reinforcing structure for half-cut and half-cut roadbed of mountain road

By using a combination of structures such as concave support plates, retaining walls, grouting rods, and drainage outlets in the semi-filled and semi-cut subgrade of mountain roads, the problem of uneven settlement in the semi-filled and semi-cut subgrade of mountain roads was solved, and the stability and settlement resistance of the subgrade were improved.

CN222008512UActive Publication Date: 2024-11-15HENAN HIGHWAY ENG GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420428803.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-11-15
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

In mountainous areas, the semi-fill and semi-cut roadbed is prone to uneven settlement during construction, which can lead to roadbed instability. In particular, the uneven settlement between the fill and cut sections can cause problems such as slippage and subsidence.

Method used

A combination of concave support plates, retaining walls, grouting rods, anchor rods, and drainage outlets is used to reinforce the fill and cut sections. Grouting and drainage measures are used to improve the stability of the roadbed and reduce settlement.

Benefits of technology

It effectively improves the stability and compaction of the embankment section subgrade, reduces the impact of groundwater and surface water on the subgrade, prevents water immersion and erosion, and reduces subgrade settlement and slippage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008512U_ABST
    Figure CN222008512U_ABST
Patent Text Reader

Abstract

The utility model discloses a reinforcing structure of a half-cut and half-cut roadbed of a mountainous road, which belongs to the technical field of roadbed reinforcement and comprises a cut section roadbed and a fill section roadbed, a retaining wall is arranged at the lower end of the fill section roadbed and pre-buried in a soil layer, a concave support plate with an upward opening is laid on the fill section roadbed, and the concave support plate is connected with the cut section roadbed and the fill section roadbed. The concave supporting plates are transversely spliced according to the width of a fill section roadbed, a plurality of grouting rods are welded and fixed to the surfaces of the concave supporting plates at equal intervals, through grouting holes are machined in rod bodies of the grouting rods, the upper ends of the grouting rods are sleeved with detachable extending sleeves, and the lower ends of the grouting rods are sleeved with the detachable extending sleeves. A plurality of reinforcing ribs are arranged on the outer side of the grouting rod body. The reinforcing structure is arranged at the position of a half-filling and half-digging filling section roadbed area of the mountain road, the stability and safety of the filling section roadbed can be improved while the filling section roadbed is protected, and the problem of settlement or slippage of the half-filling and half-digging roadbed is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of roadbed reinforcement, and more specifically to a reinforcement structure for a half-filled and half-excavated roadbed of a mountain road. Background Art

[0002] For roadbeds with heights on both sides of one side greater than the design elevation and the other side less than the design elevation, a half-fill and half-excavation construction method is generally adopted during the construction process. This type of roadbed is particularly common in mountainous roads. There are many potential factors for the generation of diseases in the half-fill and half-excavation roadbed. Due to inadequate design considerations and inadequate construction, uneven settlement is prone to occur, causing roadbed slippage, roadbed subsidence, early road surface damage and other diseases. Specifically, the roadbed in the excavation section has a long existence time and has been subjected to repeated vehicle loads for a long time. The density of the roadbed soil layer is very high, and it is not easy to have a large settlement. However, the newly constructed fill section roadbed has loose particles between the soil bodies. Under the action of repeated vehicle loads, it is easy to have a large settlement. Due to the different settlements in the fill section and the excavation section, this will cause uneven settlement of the roadbed, thereby causing roadbed instability. Utility Model Content

[0003] The purpose of the utility model is to provide a reinforcement structure for a half-filled and half-excavated roadbed in a mountainous area. The reinforcement structure is arranged at the roadbed area of ​​a half-filled and half-excavated filling section of the mountainous area. While protecting the roadbed of the excavated section, the stability and safety of the roadbed of the filling section can be improved, and the problem of settlement or slippage of the half-filled and half-excavated roadbed can be reduced.

[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:

[0005] A reinforcement structure for a half-filled and half-excavated roadbed of a mountain road, comprising an excavated section roadbed and an filled section roadbed, a retaining wall being provided at the lower end of the filled section roadbed, the retaining wall being pre-buried in the soil layer, a concave support plate opening upward being laid on the filled section roadbed, the concave support plate being horizontally spliced ​​according to the width of the filled section roadbed, a plurality of grouting rods being welded and fixed at equal intervals on the surface of the concave support plate, a grouting hole penetrating therein being machined in a rod body of the grouting rod, a detachable extension sleeve being provided at the upper end of the grouting rod, a plurality of reinforcing ribs being provided on the outer side of the rod body of the grouting rod, a rubber sleeve being provided on the rod body of the grouting rod located in the inner area of ​​the filled section roadbed, a one-way grouting port being provided on the rubber sleeve, and the extension sleeve extending above the designed elevation surface of the roadbed and being removed after the grouting is completed.

[0006] As a further optimization of the solution of the present application, a number of earth grids are arranged between the vertical sections on both sides of the concave support plate from top to bottom, the grouting rod passes through the gap between the earth grids, a number of anchor rods pass between the retaining wall and the concave support plate, the upper ends of the anchor rods penetrate into the roadbed of the excavation section and the lower ends of the anchor rods penetrate into the soil layer.

[0007] As a further optimization of the solution of the present application, the reinforcement ribs are centrally symmetrically distributed with the center of the grouting rod as the center, and the grouting rod is inclined and perpendicular to the inner side of the concave support plate.

[0008] As a further optimization of the present application, a drain port is processed on one side of the concave support plate near the retaining wall and a drain port is also provided at a position corresponding to the retaining wall and a filter grille is filled and installed inside the drain port.

[0009] As a further optimization of the solution of the present application, a pre-tightening baffle is screwed into the outer side of the retaining wall through the anchor position.

[0010] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0011] The utility model adopts a concave support plate structure, combined with a retaining wall structure, which can support the lower part of the upper excavation section roadbed on the one hand, and wrap the lower part of the filling section roadbed on the other hand, pressurize and reinforce the lower part of the filling section roadbed, and improve the stability of the filling section roadbed;

[0012] The utility model designs a grouting rod and a drainage structure, which cooperate with relevant components. On the one hand, the grouting rod set obliquely remains inside the casting area after the grouting is completed, and cooperates with its own reinforcement ribs and the surrounding earth grid structure to reinforce the casting area, reduce the vertical and vertical settlement, and further improve the compaction and stability of the fill section roadbed. On the other hand, by setting the drain outlet structure, the influence of groundwater and surface water on the roadbed is effectively reduced to prevent flooding and scouring. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the reinforcement structure of the utility model;

[0014] Figure 2 This is a schematic diagram of the installation structure of the grouting rod of the utility model;

[0015] Figure 3 This is a schematic diagram of the outer side structure of the retaining wall of the utility model;

[0016] In the figure: 1. Excavation section roadbed; 2. Filling section roadbed; 3. Retaining wall; 4. Concave support plate; 5. Grouting rod; 6. Extension sleeve; 7. Grouting hole; 8. Reinforcement rib; 9. Rubber sleeve; 10. Grouting port; 11. Earthwork grid; 12. Drain port; 13. Anchor rod; 14. Pre-tightening baffle. DETAILED DESCRIPTION

[0017] In order to make the technical means, creative features, objectives and effects achieved by the utility model easy to understand, the utility model is further explained below with reference to specific diagrams.

[0018] In order to solve the problem that the existing newly constructed fill section roadbed is prone to large settlement under repeated vehicle loads, thus causing the roadbed to become unstable, such as Figure 1 and Figure 2 As shown, the present application comprises an excavation section roadbed 1 and an filling section roadbed 2, a retaining wall 3 is provided at the lower end of the filling section roadbed 2, the retaining wall 3 is pre-buried in the soil layer, a concave support plate 4 with an opening upward is laid on the filling section roadbed 2, the concave support plate 4 is horizontally spliced ​​according to the width of the filling section roadbed 2, a plurality of grouting rods 5 are welded and fixed at equal intervals on the surface of the concave support plate 4, a through grouting hole 7 is processed in the rod body of the grouting rod 5, a detachable extension sleeve 6 is provided on the upper end of the grouting rod 5, a plurality of reinforcing ribs 8 are provided on the outer side of the rod body of the grouting rod 5, a rubber sleeve 9 is provided on the rod body of the grouting rod 5 located in the inner area of ​​the filling section roadbed 2, a one-way grouting port 10 is opened on the rubber sleeve 9, the extension sleeve 6 extends above the design elevation surface of the roadbed and is removed after the grouting is completed, a plurality of earthwork grids 11 are arranged from top to bottom between the vertical sections on both sides of the concave support plate 4, and the grouting rod 5 passes through the gap position of the earthwork grid 11;

[0019] like Figure 3 As shown, a number of anchor rods 13 pass through the retaining wall 3 and the concave support plate 4, the upper ends of the anchor rods 13 penetrate into the interior of the excavation section roadbed 1 and the lower ends of the anchor rods 13 penetrate into the interior of the soil layer, a drain port 12 is processed on one side of the concave support plate 4 near the retaining wall 3 and a drain port 12 is also provided at a position corresponding to the retaining wall 3 and a filter grid is filled and installed inside the drain port 12, and a pre-tightening baffle 14 is screwed into the outer side of the retaining wall 3 through the anchor position.

[0020] Specifically, the entire excavation section roadbed 1, the filling section roadbed 2 and the concave support plate 4 are reinforced by anchor rods 13. After all the concave support plates 4 are arranged, fillers such as crushed stone, gravel, etc. are filled in the earthwork grid 11, and are fully stirred and mixed to improve the uniformity and stability of the filler. Then, the filler area is grouted by a plurality of grouting rods 5. The grouting hole 7 is led out by an extension sleeve 6 for high-pressure grouting. The slurry pushes open the one-way grouting port 10 opened on the rubber sleeve 9 and enters the gap in the filler area. During the process, the ribs 8 and the surrounding earthwork grid 11 structure are reinforced to reinforce the casting area and reduce the vertical and vertical settlement. After the grouting is completed, the extension sleeve 6 is removed and the grouting rod 5 is placed inside the filler layer. The inclined grouting rod 5 further improves the reinforcement effect. By setting the drain port 12 structure, the influence of groundwater and surface water on the roadbed is effectively reduced to prevent flooding and scouring.

[0021] The standard parts used in the utility model can all be purchased from the market, and special-shaped parts can be customized according to the instructions and the drawings. The specific connection methods of each part adopt the conventional means such as mature bolts, rivets, welding, etc. in the existing technology. The machinery, parts and equipment all adopt the conventional models in the existing technology, and the circuit connection adopts the conventional connection method in the existing technology, which will not be described in detail here.

[0022] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A reinforcement structure for a semi-filled and semi-excavated roadbed in a mountainous area, comprising an excavated section roadbed and a filled section roadbed, characterized in that: A retaining wall is provided at the lower end of the fill section roadbed, and the retaining wall is pre-buried in the soil layer. A concave support plate with an opening upward is laid on the fill section roadbed, and the concave support plate is horizontally spliced ​​according to the width of the fill section roadbed. A plurality of grouting rods are welded and fixed at equal intervals on the surface of the concave support plate, and a through grouting hole is processed in the rod body of the grouting rod. A detachable extension sleeve is provided on the upper end of the grouting rod, and a plurality of reinforcing ribs are provided on the outer side of the rod body of the grouting rod. A rubber sleeve is provided on the rod body of the grouting rod located in the inner area of ​​the fill section roadbed, and a one-way grouting port is opened on the rubber sleeve. The extension sleeve extends above the designed elevation surface of the roadbed and is removed after the grouting is completed.

2. The reinforcement structure of a half-filled and half-excavated roadbed in a mountainous area according to claim 1 is characterized in that: A plurality of earth grids are arranged between the vertical sections on both sides of the concave support plate from top to bottom, the grouting rod passes through the gap between the earth grids, a plurality of anchor rods pass between the retaining wall and the concave support plate, the upper ends of the anchor rods penetrate into the roadbed of the excavation section and the lower ends of the anchor rods penetrate into the soil layer.

3. The reinforcement structure of a half-filled and half-excavated roadbed in a mountainous area according to claim 2 is characterized in that: The reinforcement ribs are centrally symmetrically distributed with the center of the grouting rod as the center, and the grouting rod is inclined and perpendicular to the inner side surface of the concave support plate.

4. The reinforcement structure of a semi-filled and semi-excavated roadbed in a mountainous area according to claim 3 is characterized in that: A drain hole is processed on one side of the concave support plate near the retaining wall, and a drain hole is also arranged at a position corresponding to the retaining wall and the drain hole, and a filter grid is filled and installed inside the drain hole.

5. The reinforcement structure of a half-filled and half-excavated roadbed in a mountainous area according to claim 4 is characterized in that: The outer side surface of the retaining wall passes through the anchor rod position and is screwed into the pre-tightening baffle.