Device for assisting in pouring concrete into pile core of prefabricated tubular pile
By designing an auxiliary prefabricated pipe pile core infusion device including a funnel and a return spring, the material waste problem caused by the leakage of concrete in the traditional method is solved, and the stability and efficiency of watering are improved.
Patent Information
- Application Number
- CN202323535106.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-25
AI Technical Summary
The existing concrete devices for auxiliary prefabricated pipe pile core pouring are likely to lead to waste of concrete materials and economic losses during the pouring process.
A device including a funnel, a fixing block, an upper leg, a lower leg, a moving rod and a return spring is designed. The upper and lower leg is connected through the leg fixing pin hole, and the connecting block is pulled to drive the clamp to clamp the discharge of the concrete pump truck. The pipe uses a return spring to achieve rapid reciprocating movement of the fixture to prevent concrete from overflowing.
Effectively prevent concrete waste, improve watering stability and work efficiency, and reduce material losses.
Smart Images

Figure CN222044204U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering pile foundation construction, in particular to a device for assisting the pouring of concrete into the core of a prefabricated pipe pile. Background Art
[0002] Concrete pipe piles are mainly used in the foundation construction of construction projects. Pile holes are formed in the foundation soil through mechanical drilling and steel pipe squeezing, and steel bars are placed and concrete is poured inside. When pouring concrete in the core of the pipe piles, auxiliary pouring devices are required to help workers perform the operation.
[0003] Based on the above search results:
[0004] The existing device for assisting the core pouring of concrete of prefabricated pipe piles uses a traditional method of directly pouring concrete using a pump truck, which is prone to concrete leakage, resulting in a large amount of concrete material waste and unnecessary economic losses to the company. Utility Model Content
[0005] In order to solve the above technical problems, the utility model proposes a device for assisting the pouring of concrete into the core of prefabricated pipe piles. The upper leg and the lower leg are connected through the leg fixing pin holes, and the connecting block is pulled to drive the clamp to clamp and fix the discharge pipe of the concrete pump truck.
[0006] The technical solution to achieve the purpose of the utility model is: a device for assisting the pouring of concrete into the core of a prefabricated pipe pile, comprising a funnel, the top of the funnel is fixedly connected to a fixed block, the bottom of the fixed block is fixedly connected to three upper legs, the cylindrical outer walls of the three upper legs are all sleeved with lower legs, and the three upper legs and the three lower legs are connected through leg fixing pin holes.
[0007] In some embodiments, the funnel is provided with two sliding holes, each of the two sliding holes is slidably connected to a moving rod, and one end of each of the two moving rods is fixedly connected to a clamp.
[0008] In some embodiments, the other ends of the two moving rods are fixedly connected to a connecting block.
[0009] In some embodiments, a return spring is fixedly connected to the inner wall of the funnel and the side where the two clamps are close to each other.
[0010] Compared with the prior art, the present invention has the following significant advantages:
[0011] When the utility model is used, the upper support leg and the lower support leg are connected through the support leg fixing pin holes. The device needs to be installed in advance on the pile core to be poured with concrete, the funnel mouth is aligned with the pile core, and the connecting block is pulled to drive the moving rod to move, thereby driving the clamp to clamp and fix the discharge pipe of the concrete pump truck. The setting of the reset spring can make the clamp move back and forth quickly, thereby realizing the concrete pouring on the pile core, facilitating the improvement of the stability during the pouring, avoiding the waste of concrete, and also improving the working efficiency of the concrete pouring.
[0012] It solves the problem that the existing traditional method of directly using a pump truck for pouring concrete easily leaks, resulting in a large amount of concrete material waste and unnecessary economic losses to the company. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The present invention will be further explained below with reference to the accompanying drawings and embodiments:
[0014] Figure 1 This is a schematic diagram of the overall three-dimensional structure provided in one embodiment of the present invention;
[0015] Figure 2 This is a schematic diagram of a three-dimensional structure of an overall installation cross-sectional view provided in one embodiment of the present invention;
[0016] Figure 3 It is a schematic diagram of the three-dimensional structure of the material delivery pipe of the fixed pump truck provided in one embodiment of the utility model.
[0017] Description of reference numerals:
[0018] 1. Funnel; 2. Fixing block; 3. Upper leg; 4. Lower leg; 5. Leg fixing pin hole; 6. Moving rod; 7. Clamp; 8. Connecting block; 9. Return spring. DETAILED DESCRIPTION
[0019] The following is a detailed description of the present invention, clearly and completely describing the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only a part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0020] The utility model provides an improved device for assisting the pouring of concrete into the core of a prefabricated pipe pile. The technical solution of the utility model is:
[0021] Example 1:
[0022] like Figure 1-Figure 2As shown, a device for assisting the pouring of concrete into the core of a prefabricated pipe pile comprises a funnel 1. A fixing block 2 is fixedly connected to the top of the funnel 1. In order to improve the structural stability between the fixing block 2 and the upper legs 3, the two are fixed by welding. Three upper legs 3 are fixedly connected to the bottom of the fixing block 2. Lower legs 4 are sleeved on the outer cylindrical walls of the three upper legs 3. The three upper legs 3 and the three lower legs 4 are connected by leg fixing pin holes 5. Through the arrangement of the funnel 1, it is achieved to prevent concrete from overflowing during pouring and avoid waste.
[0023] Example 2:
[0024] like Figure 3 As shown, in one embodiment, two sliding holes are provided on the funnel 1, and a moving rod 6 is slidably connected in each of the two sliding holes. The moving rod 6 and the clamp 7 are preferably fixed by welding to improve stability. One end of the two moving rods 6 is fixedly connected to the clamp 7; through the setting of the clamp 7, the discharge pipe of the concrete pump truck is clamped and fixed, which is convenient for improving the stability of the discharge pipe when discharging.
[0025] like Figure 3 As shown, in one embodiment, the moving rod 6 and the connecting block 8 are preferably fixed by welding to facilitate improving stability during movement, and the other ends of the two moving rods 6 are fixedly connected to the connecting block 8; through the setting of the connecting block 8, it is possible to facilitate pulling and pulling the moving rod 6.
[0026] like Figure 3 As shown, in one embodiment, the inner wall of the funnel 1 and the side where the two clamps 7 are close to each other are fixedly connected with a reset spring 9; through the setting of the reset spring 9, the reciprocating motion of the clamps 7 is achieved, which is convenient for quick operation.
[0027] The specific working method is: when in use, the upper leg 3 and the lower leg 4 are connected through the leg fixing pin hole 5. The device needs to be installed in advance on the pile core that needs to be poured with concrete, and the funnel 1 is aligned with the pile core. Pull the connecting block 8 to drive the moving rod 6 to move, and drive the clamp 7 to clamp and fix the discharge pipe of the concrete pump truck. Through the setting of the reset spring 9, the clamp 7 can be made to move back and forth quickly, thereby realizing the concrete pouring of the pile core, facilitating the improvement of stability during pouring, avoiding concrete waste, and also improving the working efficiency of concrete pouring.
[0028] The technical means disclosed in the present invention are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacements of the above technical features. Matters not covered in the present invention belong to the common knowledge of those skilled in the art.
Claims
1. A device for assisting the pouring of concrete into the core of a prefabricated pipe pile, comprising a funnel (1), characterized in that: The top of the funnel (1) is fixedly connected to a fixing block (2), the bottom of the fixing block (2) is fixedly connected to three upper legs (3), the cylindrical outer walls of the three upper legs (3) are all sleeved with lower legs (4), and the three upper legs (3) and the three lower legs (4) are connected via leg fixing pin holes (5).
2. The device for assisting the core pouring of concrete of a prefabricated pipe pile according to claim 1, characterized in that: The funnel (1) is provided with two sliding holes, and moving rods (6) are slidably connected in the two sliding holes, and one end of the two moving rods (6) is fixedly connected to a clamp (7).
3. The device for assisting the core pouring of concrete of a prefabricated pipe pile according to claim 2, characterized in that: The other ends of the two moving rods (6) are fixedly connected with a connecting block (8).
4. The device for assisting the core pouring of concrete of a prefabricated pipe pile according to claim 2, characterized in that: The inner wall of the funnel (1) and the side where the two clamps (7) are close to each other are both fixedly connected with a return spring (9).