A riverbank protection structure for water conservancy and hydropower engineering construction
By combining a multi-layered structure of basic brick walls and gabion walls with an ecological planting layer, the problems of water purification, stability, and landscape coordination in traditional riverbank protection structures have been solved, achieving ecological restoration of the riverbank and simplifying construction.
Patent Information
- Application Number
- CN202522722480.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-23
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-23
AI Technical Summary
Traditional riverbank protection structures cannot purify water, have uncoordinated landscape effects, are complex and costly to construct, lack structural stability, and have low plant survival rates.
The slope protection structure adopts a combination of basic brick wall and gabion wall components, and utilizes multi-level filter stone layers and ecological planting layers, combined with reinforced anchor frames to form a multi-layer structure, including a basic stone layer, filter stone layer, absorbent stone layer and ecological planting layer, which is fixed with geotextile and planted with purifying plants.
It achieved water purification, enhanced structural stability, simplified construction, reduced maintenance costs, and restored the riverbank ecosystem.
Smart Images

Figure CN224982108U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of riverbank protection technology, and in particular to a riverbank protection structure for water conservancy and hydropower engineering construction. Background Technology
[0002] Traditional riverbank protection structures are mostly constructed using hard materials such as masonry and concrete. While these structures are sturdy and durable and can effectively resist water erosion, they also have obvious drawbacks: the structures themselves do not have the function of purifying water quality and cannot cope with the increasingly serious water pollution problem; secondly, the landscape effect is harsh and does not match the surrounding natural environment; and finally, the construction is complex, the cost is high, and the later maintenance or renovation is difficult.
[0003] With the popularization of ecological concepts, some ecological slope protection technologies have emerged, such as the use of ecological bags and grass pavers. However, these technologies often suffer from problems such as insufficient structural stability, weak erosion resistance, limited ecological functions, or low plant survival rates. To address these issues, we propose a riverbank protection structure for water conservancy and hydropower engineering construction. Utility Model Content
[0004] The purpose of this utility model is to address the shortcomings of existing technologies by proposing a riverbank protection structure for water conservancy and hydropower engineering construction.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: A riverbank protection structure for water conservancy and hydropower engineering construction includes a foundation brick wall. The inner side of the foundation brick wall is connected to a gabion wall assembly through multiple sets of reinforcing anchor frames. Between the foundation brick wall and the gabion wall assembly, a foundation stone layer, a filter stone layer, an absorbent stone layer and an ecological planting layer are stacked sequentially from bottom to top.
[0006] Preferably, the gabion wall assembly includes a gabion frame, the end of the reinforcing anchor frame is fixedly connected to the surface of the gabion frame, and the gabion frame is filled with filling stones.
[0007] Preferably, the filling stones and the base stone layer are made of the same material, namely coarse gravel.
[0008] Preferably, the filter stone layer is made of fine gravel, and the adsorption stone layer is made of zeolite.
[0009] Preferably, aquatic and wetland plants are planted above the ecological planting layer, and the aquatic and wetland plants are purification plants with well-developed root systems.
[0010] Preferably, geotextile is laid at the intervals between each of the base stone layer, filter stone layer, adsorbent stone layer and ecological planting layer.
[0011] Preferably, the reinforced anchor frame is a crisscrossing grid structure, and the reinforced anchor frame is made of threaded steel.
[0012] Compared with the prior art, the beneficial effects of this utility model are as follows: 1. This device effectively resists water erosion and soil slippage through gabion wall components stacked near the river and multiple reinforced anchor frames connecting the gabion wall components and the foundation brick wall. It also rapidly forms green coverage through ecological planting within the ecological planting layer, restoring the riverbank ecosystem. Simultaneously, through multi-stage filtration of the foundation stone layer, filter stone layer, and adsorption stone layer, it effectively adsorbs and filters suspended solids, nitrogen, phosphorus, and other pollutants in the water. At the same time, the plant roots can also absorb nutrients from the water, achieving biological purification and thus improving the river water quality.
[0013] 2. The device effectively prevents soil erosion by laying geotextile between each layer of foundation stone, filter stone, adsorption stone, and ecological planting layer. At the same time, since most of the materials of the foundation stone, filter stone, adsorption stone, ecological planting layer, and gabion wall components are natural or prefabricated, the construction process is simple, easy to promote, and the later maintenance cost is low. Attached Figure Description
[0014] Figure 1 This is a three-dimensional schematic diagram of a riverbank protection structure for water conservancy and hydropower engineering construction proposed in this utility model. Figure 2 This is a three-dimensional schematic diagram of a riverbank protection structure for water conservancy and hydropower engineering construction proposed in this utility model. Figure 3 for Figure 1 A three-dimensional exploded view of the basic stone layer, filter stone layer, adsorption stone layer, and ecological planting layer structure in the middle. Figure 4 for Figure 1 A three-dimensional schematic diagram of the reinforced anchor frame structure; Figure 5 for Figure 1 A three-dimensional cross-sectional diagram of the gabion frame and filling stone structure.
[0015] In the diagram: 1. Foundation brick wall; 2. Gabion wall components; 21. Gabion frame; 22. Filling stones; 3. Basic stone layer; 4. Filter stone layer; 5. Adsorbent stone layer; 6. Ecological planting layer; 7. Reinforced anchor frame; 8. Geotextile. Detailed Implementation
[0016] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.
[0017] Reference Figure 1-5 A riverbank protection structure for water conservancy and hydropower engineering construction includes a foundation brick wall 1. The inner side of the foundation brick wall 1 is connected to a gabion wall component 2 by multiple sets of reinforcing anchor rods 7. The height of the foundation brick wall 1 and the gabion wall component 2 can be determined according to the height of the river. Between the foundation brick wall 1 and the gabion wall component 2, a foundation stone layer 3, a filter stone layer 4, an adsorption stone layer 5 and an ecological planting layer 6 are stacked sequentially from bottom to top.
[0018] Furthermore, refer to Figure 1 and Figure 5 It can be seen that the gabion wall component 2 includes a gabion frame 21, the end of the reinforcing anchor frame 7 is fixedly connected to the surface of the gabion frame 21, and the gabion frame 21 is filled with filling stones 22. The gabion frame 21 and the filling stones 22 can facilitate the river water to enter the foundation brick wall 1 and the gabion frame 21 for filtration and purification.
[0019] Furthermore, refer to Figure 1 and Figure 5 It can be seen that the filling stones 22 and the base stone layer 3 are made of the same material, coarse gravel. By making the filling stones 22 and the base stone layer 3 the same material, it is convenient for the initial action of the river water to separate and block the garbage and fish.
[0020] Furthermore, refer to Figure 3 and Figure 4 It can be seen that the filter stone layer 4 is made of fine gravel, and the adsorption stone layer 5 is made of zeolite. Multiple fine adsorption and filtration processes can be carried out through the filter stone layer 4 and the adsorption stone layer 5, which can facilitate the purification of river water.
[0021] Furthermore, refer to Figure 3 and Figure 4 It can be seen that aquatic and wetland plants are planted above the ecological planting layer 6. These aquatic and wetland plants are purification plants with well-developed root systems. The ecological planting layer 6 is composed of a mixture of loam, humus and water-retaining agent, which can increase fertility and improve the survival rate of plants. At the same time, the purification plants with well-developed root systems can play a role in survival and assist in purifying water quality.
[0022] Furthermore, refer to Figure 3 and Figure 4 It can be seen that geotextile 8 is laid at the intervals of each of the base stone layer 3, filter stone layer 4, adsorption stone layer 5 and ecological planting layer 6. The geotextile 8 laid at the intervals of each layer can prevent particle mixing and reduce soil erosion.
[0023] Furthermore, refer to Figure 3 and Figure 4 It can be seen that the reinforcing anchor frame 7 is a crisscrossing grid structure, and the material of the reinforcing anchor frame 7 is threaded steel. By reinforcing the anchor frame 7, the firmness and stability between the foundation brick wall 1 and the gabion frame 21 can be increased.
[0024] Working principle: When using this utility model, during the construction of the slope protection, a foundation brick wall 1 is built, and one end of the reinforcing anchor frame 7 is buried in the foundation brick wall 1. Then, the gabion frame 21 is installed, and the filling stones 22 are filled into the gabion frame 21. The other end of the reinforcing anchor frame 7 is connected and tied to the inside of the gabion frame 21. At this time, a foundation stone layer 3, a filter stone layer 4, an absorbent stone layer 5, and an ecological planting layer 6 are laid in sequence between the foundation brick wall 1 and the gabion frame 21. Geotextile 8 is placed between each layer to strengthen the fixation and prevent soil erosion. After the final ecological planting layer 6 is laid, it can be planted uniformly in the later stage. The above is the complete working principle of this utility model.
[0025] In this utility model, the installation, connection or setting methods of all the components mentioned above are common mechanical methods, and the specific structure, model and coefficient index of all the components are their own technologies. As long as they can achieve their beneficial effects, they can be implemented, so they will not be described in detail.
[0026] The above embodiments are preferred embodiments of the present utility model, but the embodiments of the present utility model are not limited to the above embodiments. Any changes, modifications, substitutions, combinations, or simplifications made without departing from the spirit and principle of the present utility model shall be considered equivalent substitutions and shall be included within the protection scope of the present utility model.
[0027] In this utility model, unless otherwise stated, directional terms such as "up, down, left, right, front, back, inside, outside, and vertical and horizontal" in the terminology only represent the orientation of the term in its conventional use or are common names understood by those skilled in the art, and should not be regarded as limitations on the term. At the same time, numerals such as "first," "second," and "third" do not represent specific quantities or orders, but are only used to distinguish names. Moreover, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a series of elements includes not only those elements, but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
Claims
1. A riverbank protection structure for water conservancy and hydropower engineering construction, comprising a foundation brick wall (1), characterized in that: The inner side of the foundation brick wall (1) is connected to a gabion wall assembly (2) by multiple sets of reinforced anchor rods (7). Between the foundation brick wall (1) and the gabion wall assembly (2), a foundation stone layer (3), a filter stone layer (4), an adsorption stone layer (5), and an ecological planting layer (6) are stacked sequentially from bottom to top.
2. The riverbank protection structure for water conservancy and hydropower engineering construction according to claim 1, characterized in that, The gabion wall assembly (2) includes a gabion frame (21), the end of the reinforcing anchor frame (7) is fixedly connected to the surface of the gabion frame (21), and the gabion frame (21) is filled with filling stones (22).
3. A riverbank protection structure for water conservancy and hydropower engineering construction according to claim 2, characterized in that, The filling stones (22) and the base stone layer (3) are made of the same material, coarse gravel.
4. A riverbank protection structure for water conservancy and hydropower engineering construction according to claim 1, characterized in that, The filter stone layer (4) is made of fine gravel, and the adsorption stone layer (5) is made of zeolite.
5. A riverbank protection structure for water conservancy and hydropower engineering construction according to claim 1, characterized in that, The ecological planting layer (6) is planted with aquatic and wetland plants, and the aquatic and wetland plants are purification plants with well-developed root systems.
6. A riverbank protection structure for water conservancy and hydropower engineering construction according to claim 1, characterized in that, Geotextile (8) is laid at the intervals between each of the base stone layer (3), filter stone layer (4), adsorption stone layer (5) and ecological planting layer (6).
7. A riverbank protection structure for water conservancy and hydropower engineering construction according to claim 1, characterized in that, The reinforced anchor frame (7) is a grid-like structure with intersecting lines, and the material of the reinforced anchor frame (7) is threaded steel.