Earthquake occurrence situation grasping method and earthquake occurrence situation management system
By utilizing temporary ground vibration measurements and centralized data management, the method accurately grasps earthquake occurrence situations at construction sites, facilitating prompt and targeted responses.
Patent Information
- Application Number
- JP2023090772
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-06-01
- Publication Date
- 2024-12-12
AI Technical Summary
Public seismometers installed at intervals of several tens of kilometers often result in discrepancies between estimated and actual seismic intensity at construction sites, leading to inaccurate understanding of earthquake occurrence situations and potential delays in initial response.
Grasping the earthquake occurrence situation at construction sites from outside based on temporary ground vibration measurements using vibration measuring devices and imaging devices, with data transmission to a cloud server for centralized management and visualization on user terminals.
Enables quick and accurate assessment of earthquake occurrence situations at construction sites, allowing for timely and prioritized responses and reducing delays.
Smart Images

Figure 2024172799000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for grasping an earthquake occurrence situation and a system for managing an earthquake occurrence situation. [Background technology]
[0002] At construction sites, such as building construction sites and civil engineering sites, vibrations and noises caused by the construction are usually monitored using measuring equipment (see, for example, Patent Document 1). When an earthquake occurs, the seismic intensity at the construction site is estimated from the seismic intensity measured by an official seismograph located near the construction site. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2003-83803 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, public seismometers are often installed at intervals of several tens of kilometers. For this reason, the seismic intensity estimated by the seismometers may differ (diverge) from the actual seismic intensity, making it impossible to accurately grasp the earthquake occurrence situation, and there is a risk of initial responses being delayed. The earthquake occurrence situation refers to the magnitude of the shaking such as the seismic intensity and the state of damage, etc.
[0005] The present invention has been made in view of the above problems, and an object of the present invention is to grasp the occurrence situation of an earthquake early and accurately. [Means for solving the problem]
[0006] The main invention for achieving the above-mentioned objective is a method for grasping the earthquake occurrence situation at a construction site from outside the construction site based on measurement data of ground vibrations temporarily measured at the construction site.
[0007] Other features of the present invention will become apparent from the following detailed description of the present invention and the accompanying drawings. Effect of the Invention
[0008] According to the present invention, it is possible to grasp the occurrence situation of an earthquake early and accurately. [Brief description of the drawings]
[0009] [Figure 1] This is a diagram showing an example of the placement of seismometers ps and the position of a construction site pc. [Diagram 2] FIG. 13 is a diagram showing an example of seismic intensity estimation for a construction site PC (comparison example). [Diagram 3] FIG. 1 is a diagram showing an actual earthquake occurrence situation. [Figure 4] FIG. 1 is a schematic diagram showing an example of a construction site PC. [Diagram 5] FIG. 1 is an explanatory diagram of an earthquake occurrence status management system according to an embodiment of the present invention. [Figure 6] FIG. 2 is a flow chart showing a method for grasping an earthquake occurrence situation according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] At least the following points will become apparent from the description of this specification and the accompanying drawings.
[0011] (Aspect 1) A method for grasping an earthquake occurrence situation, comprising grasping an earthquake occurrence situation at a construction site from outside the construction site based on measurement data of ground vibrations temporarily measured at the construction site.
[0012] According to the earthquake occurrence status grasping method of the first aspect, the earthquake occurrence status (seismic intensity, etc.) at the construction site can be grasped early and accurately.
[0013] (Aspect 2) In the method for grasping an earthquake occurrence status according to aspect 1, it is preferable that there are a plurality of the construction sites, and that an order of priority for earthquake response is determined based on the earthquake occurrence status at each of the construction sites.
[0014] According to the method for grasping an earthquake occurrence situation of aspect 2, when there are multiple construction sites, it is possible to determine which one should be given priority for response, thereby suppressing delays in the initial response.
[0015] (Aspect 3) In the method for grasping the earthquake occurrence status described in aspect 1, it is desirable to grasp the earthquake occurrence status around the construction site based on the measurement data and the seismic intensity measurement results by a seismometer installed at a specified observation point.
[0016] According to the method for grasping the occurrence status of an earthquake of the third aspect, the occurrence status of an earthquake in the vicinity of a construction site can be grasped early and accurately.
[0017] (Aspect 4) In the method for grasping the earthquake occurrence situation described in aspect 1, it is desirable that there are multiple construction sites, and that the earthquake occurrence situation around the target construction site is grasped based on the measurement data at the target construction site and the measurement data at other construction sites.
[0018] According to the method for grasping an earthquake occurrence situation of the fourth aspect, it is possible to estimate the earthquake occurrence situation around a construction site early and accurately.
[0019] (Aspect 5) In the method for grasping an earthquake occurrence situation according to any one of aspects 1 to 4, it is preferable that an image of the earthquake occurrence situation at the construction site is captured by an imaging device installed at the construction site.
[0020] According to the earthquake occurrence situation grasping method of the fifth aspect, the state of the construction site (the damage situation) can be grasped.
[0021] (Aspect 6) In the method for grasping an earthquake occurrence condition according to any one of aspects 1 to 5, it is preferable that the measurement of the ground vibration is carried out continuously.
[0022] According to the method for grasping an earthquake occurrence situation of the sixth aspect, the situation can be grasped even if an earthquake occurs suddenly.
[0023] (Aspect 7) In the earthquake occurrence situation grasping method according to any one of aspects 1 to 6, it is preferable that the measurement data is transmitted to a server outside the construction site.
[0024] According to the method for grasping the occurrence status of an earthquake of the seventh aspect, even if one is not at the construction site, the situation can be grasped by accessing the server.
[0025] (Aspect 8) In the method for grasping an earthquake occurrence status according to any one of aspects 1 to 7, it is preferable that information indicating a position of the construction site and the earthquake occurrence status corresponding to the construction site is displayed on a map.
[0026] According to the method for grasping the occurrence status of an earthquake of aspect 8, the occurrence status of an earthquake at a construction site can be visually understood.
[0027] (Aspect 9) An earthquake occurrence status management system comprising: a vibration measuring device that is installed at a construction site and temporarily measures ground vibrations; and a server outside the construction site for grasping the earthquake occurrence status at the construction site, wherein the measurement data of the ground vibrations measured by the vibration measuring device is transmitted to the server.
[0028] According to the earthquake occurrence status management system of aspect 9, even if one is not at the construction site, the earthquake occurrence status can be grasped early and accurately by accessing the server.
[0029] === Implementation form === <<Estimating earthquake intensity (comparison example)>> Fig. 1 is a diagram showing an example of the arrangement of seismometers PS and the position of a construction site PC. Fig. 2 is a diagram showing an estimation of seismic intensity at a construction site PC (comparative example). Fig. 3 is a diagram showing an actual earthquake occurrence situation. Note that Figs. 1 to 3 show maps of the same location.
[0030] Seismometers PS are devices that measure and record seismic motion (ground movement) caused by earthquakes, and are installed throughout the country by public institutions (such as the Japan Meteorological Agency and local governments). As shown in Figure 1, seismometers PS are installed at designated observation points (four observation points in this case) spaced several kilometers apart (actually several tens of kilometers apart). Measurements are taken by the seismometers PS at all times, and when an earthquake occurs, the seismic intensity is calculated based on the measured seismic motion. The Japan Meteorological Agency collects information from the seismometers PS installed throughout the country in real time, and releases it as seismic intensity information.
[0031] A construction site pc is a site where construction work is taking place on structures such as buildings, bridges, and roads. In Figure 1, there are multiple construction site pcs, and their number is greater than the number of seismometers ps. Additionally, multiple construction site pcs are scattered around the area, with the distances between each construction site pc varying. Furthermore, construction site pcs are not permanent, but only exist while construction work is taking place (construction period) (they will no longer exist when construction is completed).
[0032] Here, when an earthquake occurs, it is necessary to understand the situation at the construction site PC. Generally, the seismic intensity at the site is estimated using the seismic intensity (seismic intensity announced by the Japan Meteorological Agency) of the seismograph PS close to the construction site PC. For example, in Figure 2, the seismic intensity of each seismograph PS announced by the Japan Meteorological Agency after the earthquake is "seismic intensity 4." In this case, it can be estimated that the seismic intensity at the construction site PC within the area surrounded by the dashed line in the figure is also "seismic intensity 4."
[0033] However, depending on the location, the seismic intensity estimated from the seismometer PS may differ from the actual seismic intensity.
[0034] For example, area R (hatched area) shown in Figure 3 is an area that used to be a river. The ground in this area R is weak and prone to shaking. In the case of Figure 3, the construction site pc located in area R (the construction site pc surrounded by a circle) actually experienced a seismic intensity of 6 lower.
[0035] In this way, there may be a discrepancy between the seismic intensity estimated from the seismometer PS and the actual seismic intensity, which may delay the initial response at the construction site PC when an earthquake occurs.
[0036] Therefore, in this embodiment, it is possible to grasp the occurrence status of an earthquake (seismic intensity, etc.) early and accurately.
[0037] <<About construction site PC>> Fig. 4 is a schematic diagram showing an example of a construction site pc. The construction site pc shown in Fig. 4 is provided with a temporary enclosure 1, a monitor 2, and a monitoring system 10 (a vibration measuring device 11 and a camera 12).
[0038] In addition, the vibrations generated at construction sites have a large impact on neighboring residents, and standards regarding vibrations are set by laws and ordinances. Therefore, as shown in Figure 4, vibration measuring devices 11 are often installed at construction sites to monitor the vibrations generated by construction work.
[0039] The temporary fence 1 is a member that separates the construction site pc from the outside during the construction period of the construction site pc, and is set up to surround the perimeter of the construction site pc. This temporary fence 1 is set up to prohibit entry by anyone other than those involved in the construction, to reduce noise, to prevent injury from falling objects, to prevent theft, etc.
[0040] The monitor 2 is installed in the temporary enclosure 1, and displays the measured value (vibration value) measured by the vibration measuring device 11. The monitor 2 may be installed in a location other than the temporary enclosure 1.
[0041] The monitoring system 10 is a system for monitoring vibrations, noise, and the like during construction at a construction site PC. Figure 4 shows a vibration measuring device 11 and a camera 12 of the monitoring system 10 (see Figure 5 for the entire monitoring system 10).
[0042] The vibration measuring instrument 11 is installed within the construction site pc (on the ground surface in the figure) in order to temporarily measure ground vibrations at the construction site pc. Any known vibration measuring instrument can be used as the vibration measuring instrument 11. The vibration measuring instrument 11 of this embodiment is equipped with a sensor 11A (see FIG. 5) that detects vibrations (ground vibrations). The vibration measuring instrument 11 measures ground vibrations using the sensor 11A and obtains measurement data such as vibration waveforms and vibration values.
[0043] Here, "temporarily" means at least a part of the period from when the vibration measuring device 11 is installed at the target construction site PC until the construction is completed. The vibration measuring device 11 performs measurements continuously during that period (for example, 24 hours per day). In this way, it is possible to monitor vibrations at the construction site PC. Furthermore, in this embodiment, the earthquake occurrence situation can be grasped even when an earthquake suddenly occurs.
[0044] Specific examples of methods for monitoring vibration include displaying the vibration values measured by the vibration measuring instrument 11 on the monitor 2 in real time, sounding an alarm when the measured values of the vibration measuring instrument 11 exceed a preset threshold, and allowing construction personnel to obtain the measured values of the vibration measuring instrument 11 from a terminal such as a smartphone (user terminal 30 described below). By monitoring vibration in this way, construction work can be carried out so that the vibrations generated by the construction work do not exceed the standard value.
[0045] In particular, as shown in Figure 4, by displaying the vibration values measured by a vibration measuring device 11 on a monitor 2 installed on a temporary fence 1, and displaying the vibration values so that they can be seen from outside the construction site PC, it is possible to reduce anxiety among nearby residents and gain their trust.
[0046] In addition, a sound level meter (not shown) may be provided on the construction site PC, and the noise level may be displayed on the monitor 2 together with the vibration level.
[0047] The camera 12 (corresponding to an imaging device) captures an image (or video) showing the situation of the construction site PC. In Fig. 4, the camera 12 is fixed to the temporary fence 1 of the construction site PC. However, this is not limited to this, and the camera 12 may be placed (fixed) at a location other than the temporary fence 1.
[0048] The monitoring system 10 of this embodiment also includes a storage unit 13, a control unit 14, and a communication unit 15 (see FIG. 5), which will be described later.
[0049] <<Earthquake occurrence status management system>> 5 is an explanatory diagram of the earthquake occurrence status management system of this embodiment. The earthquake occurrence status management system shown in FIG. 5 includes a monitoring system 10 provided in each construction site PC, a cloud server 20, and a user terminal 30.
[0050] <Surveillance System 10> As shown in FIG. 5, a monitoring system 10 of this embodiment includes a vibration measuring device 11, a camera 12, a storage unit 13, a control unit 14, and a communication unit 15.
[0051] The monitoring system 10 is provided on each construction site PC. The communication unit 15 of the monitoring system 10 is connected to the cloud server 20 via a network N. The monitoring system 10 (communication unit 15) is connected to the network N by wire or wirelessly (for example, Wi-Fi (registered trademark), etc.). The communication unit 15 is also connected to a monitor 2 attached to the temporary fence 1 by wire or wirelessly (for example, Wi-Fi (registered trademark), mobile phone line, Bluetooth (registered trademark), etc.).
[0052] The storage unit 13 stores various data and programs (for example, a program for executing monitoring).
[0053] The control unit 14 controls each unit of the monitoring system 10. For example, the control unit 14 controls the communication unit 15 to transmit vibration values (measurement data) measured by the vibration measuring instrument 11 to the monitor 2 and the cloud server 20. Note that a control unit and a communication unit may be provided in the vibration measuring instrument 11 so that the measurement data is transmitted directly to the monitor 2 and the cloud server 20.
[0054] Furthermore, the control unit 14 controls the communication unit 15 to transmit image data captured by the camera 12 to the cloud server 20. Note that the camera 12 may be provided with a control unit and a communication unit so as to transmit the image data directly to the cloud server 20.
[0055] <Cloud Server 20> The cloud server 20 is a server built in a cloud environment (in other words, outside the construction site PC). In this embodiment, the cloud server 20 is a server for monitoring ground vibrations and grasping the occurrence of an earthquake, and here, a server having a storage unit 21, a communication unit 22, and a control unit 23 is exemplified.
[0056] When the communication unit 22 of the cloud server 20 receives the measurement data from the vibration measuring device 11 of each construction site PC, the control unit 23 creates a vibration database and stores it in the storage unit 21. The vibration database is a data group in which the measurement data is associated with the name, location, and measurement time of the construction site PC for each construction site PC. In this embodiment, the control unit 23 converts the measurement data (vibration value or waveform) of the ground vibration measured by the vibration measuring device 11 into "seismic intensity" which indicates the strength of the shaking. This makes it easier for non-experts to understand the level of shaking, making it easier to grasp the earthquake occurrence situation. It is to be noted that other indices may be used instead of "seismic intensity", such as maximum acceleration, maximum velocity, and amplitude value for each vibration frequency.
[0057] As described above, image data captured by the camera 12 of each construction site PC is also transmitted to the cloud server 20. When the communication unit 22 of the cloud server 20 receives the image data of each construction site PC, the control unit 23 creates an image database and stores it in the storage unit 21. The image database is a data group that associates image data for each construction site PC with the name, position, image capture time, etc. of the construction site PC.
[0058] The storage unit 21 also stores a map database. The map database is a data group that associates the name and position (latitude, longitude, etc.) of each construction site PC with map image data. The map database also includes information (data) about the seismometer PS, as well as the construction site PC.
[0059] By configuring a data management system in this manner in which multiple construction site PCs and the cloud server 20 are connected via a network N, data measured at multiple construction site PCs can be centrally managed using the network N.
[0060] Users (for example, construction workers) can obtain vibration measurement data (seismic intensity) and image data for each construction site PC simply by accessing the cloud server 20 from the user terminal 30 via the network N. In other words, as long as there is an environment where it is possible to connect to the network N, it is possible to access the cloud server 20 from anywhere (even from outside the construction site PC), and the earthquake occurrence situation (seismic intensity, etc.) for each construction site PC can be grasped quickly and accurately.
[0061] The measurement data may be stored in a server (computer) capable of centralized management, not limited to the cloud server 20. In this case, the server and multiple construction site PCs (monitoring systems 10) may be connected via the network N.
[0062] <<How to assess earthquake occurrence status>> FIG. 6 is a flow diagram showing the earthquake occurrence situation grasping method of this embodiment.
[0063] First, ground vibration is measured by a vibration measuring device 11 installed at the construction site pc, and vibration measurement data is obtained (S01). In this embodiment, ground vibration is measured for each of the multiple construction sites pc. As described above, ground vibration measurement is performed continuously during at least a portion of the construction work period (construction period).
[0064] Also, the construction site PC is imaged by the camera 12. As a result, image data showing the state (situation) of the construction site PC is acquired.
[0065] Next, the control unit 14 of the monitoring system 10 controls the communication unit 15 to transmit the measurement data (data indicating vibration information) measured by the vibration measuring instrument 11 and the image data captured by the camera 12 to the cloud server 20 via the network N (S02). As a result, each piece of data (measurement data and image data) is transmitted to the cloud server 20.
[0066] When the communication unit 22 of the cloud server 20 receives the measurement data from the vibration measuring device 11, the control unit 23 creates a vibration database that associates the measurement data with the name, location, measurement time, etc. of the construction site PC, and stores the data in the memory unit 21. At this time, the control unit 23 also analyzes the shaking information (for example, analyzes the waveform) and converts the ground vibration data into seismic intensity (S03). Note that the control unit 14 of the monitoring system 10 may convert the data into seismic intensity and transmit it to the cloud server 20.
[0067] In addition, when the communication unit 22 of the cloud server 20 receives image data (or video data) captured by the camera 12, the control unit 23 creates an image database that associates the image data with the name, location, and shooting time of the construction site PC, similar to the vibration database, and stores the image data in the memory unit 21.
[0068] When an earthquake occurs and a user accesses the cloud server 20 from the user terminal 30, the control unit 23 of the cloud server 20 refers to the memory unit 21 and causes the user terminal 30 to display a map of the target location (see FIG. 1, etc.), and also displays on the map information indicating the location of each construction site pc and the earthquake occurrence status (seismic intensity) corresponding to the construction site pc (S04). For example, it is advisable to display the mark (■) of each construction site pc in FIG. 1 in a different color depending on the seismic intensity. This makes it easier to visually understand the earthquake occurrence status of each construction site pc.
[0069] Also, when the user clicks on the mark (■) of a construction site PC on the map, an image captured by the camera 12 of that construction site PC (an image showing the earthquake occurrence situation) may be displayed. By displaying an image in this way, for example, if there is damage within the site, the damage situation can be understood. Therefore, the earthquake occurrence situation at each construction site PC can be grasped more accurately.
[0070] The user then determines the priority of the earthquake response based on the earthquake occurrence status of each construction site PC (S05). Specifically, if there is a construction site PC with a seismic intensity of 4 and another with a seismic intensity of 6-weak as shown in Figure 3, the construction site PC with the greater seismic intensity (in this case, seismic intensity 6-weak) is investigated first. This makes it possible to reduce delays in the initial response.
[0071] In addition, in this embodiment, the earthquake occurrence situation at the construction site PC is estimated, but this is not limited to this, and the earthquake occurrence situation around the construction site PC can also be estimated.
[0072] For example, based on the measurement data (seismic intensity) of the vibration measuring device 11 at the construction site PC and the seismic intensity measurement results (seismic intensity announced by the Japan Meteorological Agency) by the nearby seismometer PS, the earthquake occurrence situation around the construction site PC can be grasped. This makes it possible to estimate the damage situation of structures (e.g., bridges, roads, buildings, etc.) around the construction site PC, and to respond quickly.
[0073] In addition, for example, based on the measurement data (seismic intensity) of the vibration measuring device 11 at two construction sites pc (the target construction site pc and another construction site pc), the earthquake occurrence situation around the target construction site pc can be grasped in the same manner. In this case, the same effect as above can be obtained.
[0074] ===Other embodiments=== The above-mentioned embodiment is for the purpose of facilitating understanding of the present invention, and is not intended to limit the present invention. The present invention can be modified or improved without departing from the spirit of the present invention, and it goes without saying that the present invention includes equivalents thereof.
[0075] In the above embodiment, one vibration measuring device 11 was installed on the construction site PC, but this is not limited to this and multiple (two or more) devices may be installed. In this case, the measurement values of all vibration measuring devices 11 may be displayed on the monitor 2, or the measurement value of a specific vibration measuring device 11 may be displayed. Alternatively, the maximum measurement value (maximum value) of the multiple vibration measuring devices 11 may be displayed. Similarly, when grasping the occurrence status of an earthquake, for example, the measurement value (seismic intensity) of a specific vibration measuring device 11 may be used, or the maximum measurement value may be used.
[0076] Also, two or more cameras 12 may be installed in the construction site PC so that each camera captures a different location in the construction site PC. This allows the state (situation) of the construction site PC to be grasped more accurately.
[0077] In addition, this can be used not only on construction site PCs, but also in locations where vibrations are measured (such as factories), etc., to grasp the earthquake occurrence situation in a similar manner. [Explanation of symbols]
[0078] 1 Temporary enclosure, 2 monitors, 10. Surveillance systems, 11 Vibration measuring instrument, 11A sensor, 12 cameras, 13 storage unit, 14 control unit, 15 communication unit, 20 cloud servers, 21 memory unit, 22 communication unit, 23 control unit, 30 user terminals, PC construction site, PS seismometer,
Claims
1. Based on the measurement data of ground vibration temporarily measured at the construction site, the earthquake occurrence status at the construction site is grasped from outside the construction site. A method for grasping an earthquake occurrence situation.
2. The method for grasping an earthquake occurrence situation according to claim 1, There are multiple construction sites, Determine the priority of earthquake response based on the earthquake occurrence status at each of the construction sites; A method for grasping an earthquake occurrence situation.
3. The method for grasping an earthquake occurrence situation according to claim 1, Based on the measurement data and the results of seismic intensity measurements by seismometers installed at predetermined observation points, the occurrence of earthquakes in the vicinity of the construction site is grasped. A method for grasping an earthquake occurrence situation.
4. The method for grasping an earthquake occurrence situation according to claim 1, There are multiple construction sites, Based on the measurement data at the target construction site and the measurement data at other construction sites, an earthquake occurrence situation around the target construction site is grasped. A method for grasping an earthquake occurrence situation.
5. The method for grasping an earthquake occurrence situation according to any one of claims 1 to 4, An image of the earthquake occurrence situation at the construction site is captured by an imaging device installed at the construction site. A method for grasping an earthquake occurrence situation.
6. The method for grasping an earthquake occurrence situation according to any one of claims 1 to 4, The measurement of the ground vibration is performed continuously. A method for grasping an earthquake occurrence situation.
7. The method for grasping an earthquake occurrence situation according to any one of claims 1 to 4, The measurement data is transmitted to a server outside the construction site. A method for grasping an earthquake occurrence situation.
8. The method for grasping an earthquake occurrence situation according to any one of claims 1 to 4, displaying information indicating the location of the construction site and the earthquake occurrence status corresponding to the construction site on a map; A method for grasping an earthquake occurrence situation.
9. A vibration measuring device is installed at the construction site to temporarily measure ground vibrations, A server outside the construction site for grasping the occurrence status of an earthquake at the construction site; Equipped with The measurement data of the ground vibration by the vibration measuring instrument is transmitted to the server. An earthquake occurrence status management system characterized by the above.