Blast hole charging structure and method for deep hole step blasting of soft and hard mixed layered rock mass

By setting the charging section in the hard rock layer in the soft and hard mixed layered rock mass and using gun mud to block the high-pressure gas, the problem of poor blasting effect and high cost of the traditional blasting method in the soft and hard mixed rock mass has been solved, and large-scale blasting has been achieved. The block rate is controllable and the cost is reduced, which improves the economic benefits and safety of the project.

CN107328327BActive Publication Date: 2024-10-22GUANGDONG XIYUAN BLASTING TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN201710767717.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2017-08-31
Publication Date
2024-10-22
Estimated Expiration
2037-08-31

AI Technical Summary

Technical Problem

In soft and hard mixed layered rock masses, traditional blasting methods are difficult to control the blasting quality, resulting in poor blasting effects and high costs, especially in shallow surface earthwork blasting projects with large lithological changes.

Method used

Design a blasthole charging structure in which hard rock strata and soft interlayers are alternately distributed. The charging section is set in the hard rock stratum. The filling section uses blast mud to block high-pressure gas to ensure that the high-pressure gas acts in the hard rock stratum to form explosive blasts. cracks and destroy the cementation effect to achieve controllable bulk rate.

Benefits of technology

It improves the blasting effect, reduces the workload of secondary crushing, reduces the cost, achieves a controllable block rate of soft and hard mixed layered rock mass, and significantly improves the economic benefits and safety of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN107328327B_ABST
    Figure CN107328327B_ABST
Patent Text Reader

Abstract

The present invention provides a blasthole charging structure and method for deep hole step blasting of a soft and hard mixed layered rock mass, wherein the layered rock mass comprises multiple hard rock layers and multiple soft interlayers, wherein the hard rock layers and the soft interlayers are alternately distributed layer by layer from top to bottom; charging sections are provided at relative positions in each hard rock layer, wherein the charging sections are filled with gunpowder; filling sections are provided between adjacent charging sections, wherein the filling sections are filled with gun mud, wherein both ends of the filling sections enter adjacent hard rock layers, and a hole bottom filling section is provided in the lowest hard rock layer; the blasthole charging structure of the present invention has good blasting effect and low blasting cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of blasting, and in particular to a blasthole charging structure and a method for deep hole step blasting of soft and hard mixed layered rock mass. Background Art

[0002] With the continuous improvement of drilling rigs and loading and transportation equipment, the continuous perfection of blasting technology, and the continuous improvement of the accuracy of blasting equipment, the superiority of deep hole steps has become more and more obvious, and its application areas have been continuously broadened and its application range has been continuously expanded. It has been widely used in rock blasting projects in technical fields such as open-pit mining, infrastructure construction, water conservancy and hydropower projects, and earth and stone excavation. Since the quality of blasting directly affects the cost of block mining and transportation, as well as vibration safety, and determines the economic benefits of the blasting project, in order to improve the economic benefits and safety of the steps, blasting workers have made fruitful technical improvements and innovations, including pressure relief and vibration reduction, large block rate adjustment, foundation control and other aspects. These achievements are of great significance to most high-step projects with a single rock type. However, for complex rock conditions, especially in earthwork blasting projects on the shallow surface, due to large fluctuations in rock properties and mixed soft and hard rock, the blasting quality is difficult to control using traditional blasting methods, the large block rate appears irregular, the secondary crushing workload is large, and the cost remains high. However, in the existing research results and scheme designs, there has been no targeted technical exploration and scheme design for this engineering geological condition.

[0003] In the traditional deep hole step technology, the blasting structure does not take into account the lithology differences along the depth direction of the blasthole, but adopts a single charge structure. In the layered rock mass with mixed soft and hard layers, the compressive and tensile strengths of the weak interlayers are extremely low and almost negligible compared to the hard rock layers. At this time, the weak interlayers can easily become the escape channel of the detonation gas and weaken the extrusion, crushing and throwing effects of the high-pressure gas generated by the explosion; on the other hand, in the case that large hard rocks do not produce explosive cracks, due to the existence of weak interlayers, it is difficult to crush large rocks using the secondary crushing principle of block-rock collision during the throwing process, which will increase the large block rate of earth and stone, and it is irregular.

[0004] Therefore, there is an urgent need for a blasthole charging structure for deep hole step blasting of soft and hard mixed layered rock mass with good blasting effect and low blasting cost. Summary of the invention

[0005] In view of this, in order to solve the technical problems of poor blasting effect and high blasting cost of soft and hard interlayered rock mass in the prior art, the present invention aims to provide a blasthole charging structure and method for deep hole step blasting of soft and hard mixed layered rock mass with good blasting effect and low blasting cost.

[0006] The purpose of the present invention is achieved through the following technical solutions:

[0007] A blasthole charging structure for deep-hole step blasting of a soft-hard mixed layered rock mass, wherein the layered rock mass comprises multiple hard rock layers and multiple soft interlayers, the hard rock layers and the soft interlayers are alternately distributed layer by layer from top to bottom; charging sections are provided at relative positions in each hard rock layer, and the charging sections are filled with gunpowder; filling sections are provided between adjacent charging sections, and the filling sections are filled with gun mud, both ends of the filling sections enter adjacent hard rock layers, and the bottom hard rock layer is provided with a hole bottom filling section.

[0008] By setting the charging section in the hard rock formation, the high-pressure gas generated when the charging section is detonated is confined in the hard rock formation, preventing the high-pressure gas from escaping from the soft and weak interlayers, thereby weakening the blasting effect and reducing the workload of the secondary blasting. The high-pressure gas and detonation wave generated by the explosive explosion are mainly applied to the hard rock formation to form a large number of blasting cracks in the hard rock formation. Then, the secondary collision effect brought by the blasting gas throwing the rock mass is utilized to knock open the blasting cracks in the hard rock formation while destroying the cementation effect of the soft and weak interlayers, thereby finally achieving controllable large block rate during the blasting of soft and hard mixed layered rock masses.

[0009] Preferably, the distance between the top of the charge section and the bottom of the weak interlayer adjacent to the top of the charge section is greater than or equal to 200 mm.

[0010] Ensure the distance between the charging section and the weak interlayer to prevent the high-pressure gas generated during blasting from escaping from the weak layer.

[0011] When the weak interlayer area is filled with gun mud, it is to isolate the direct contact between the high-pressure gas generated by the explosion and the weak interlayer. It ensures that the filling section limits the high-pressure gas generated during the blasting of the charging section to avoid the escape of high-pressure gas. The filling section filled with gun mud has high strength during blasting, and the local impact force generated by the instantaneous rupture of the blasting enhances the blasting effect.

[0012] Preferably, the top of the uppermost weak interlayer and the top of the filling section are located at the same horizontal plane.

[0013] The present invention also provides a blasthole charging method for deep hole step blasting of soft and hard mixed layered rock mass, comprising the following steps:

[0014] S1: Mark the location of the blastholes on the surface of the area to be blasted;

[0015] S2: Set up a drilling rig to drill holes at the marked blasthole locations. During the drilling process, record the lithology and corresponding coverage depth of the core samples taken from the blastholes in real time until all blastholes are completed;

[0016] S3: Input the lithology and coverage depth parameters of each blasthole into the 3D geological imaging software to simulate and draw the overall lithology distribution law of the area to be blasted;

[0017] S4: Design the charging scheme according to the lithological characteristics of each blasthole, and the charging process follows the following rules;

[0018] ①Filling of the filling section formed by the weak interlayer of the blasthole mud;

[0019] ② Both ends of the filling section penetrate into the hard rock layer;

[0020] ③ The hard rock layer between two adjacent filling sections is filled with a charging section formed by gunpowder;

[0021] S5: Detonate the explosive pack according to the detonation plan to complete the blasting operation.

[0022] By setting the charging section in the hard rock formation, the high-pressure gas generated when the charging section is detonated is confined to the hard rock formation, preventing the high-pressure gas from escaping from the soft and weak interlayers, thereby weakening the blasting effect and reducing the workload of the secondary blasting. The high-pressure gas and detonation wave generated by the explosive explosion are mainly applied to the hard rock formation to form a large number of blasting cracks in the hard rock formation. Then, the secondary collision effect brought by the blasting gas throwing the rock mass is used to knock open the blasting cracks in the hard rock formation while destroying the cementation effect of the soft and weak interlayers, ultimately achieving controllable large block rate during the blasting of soft and hard mixed layered rock masses.

[0023] Preferably, the distance between the top of the charge section and the bottom of the weak interlayer adjacent to the top of the charge section is greater than or equal to 200 mm.

[0024] Preferably, after step S4, a hole bottom filling section formed of gun mud is arranged in the lowest hard rock layer, and the hole bottom filling section is arranged just below the bottom of the lowest charging section.

[0025] Beneficial effects of the present invention:

[0026] 1. The blasting structure of deep hole steps in soft and hard interlayered rock mass provided by the present invention, by setting the charge section in the hard rock layer, the high-pressure gas generated when the charge section is detonated is confined in the hard rock layer, so as to prevent the high-pressure gas from escaping from the soft and weak interlayer, thereby weakening the blasting effect, reducing the workload of secondary blasting, and making the high-pressure gas and detonation wave generated by the explosive explosion mainly act on the hard rock layer to form a large number of explosion cracks in the hard rock layer, and then utilize the secondary collision effect brought by the explosion gas throwing the rock mass to knock open the explosion cracks in the hard rock layer while destroying the cementation effect of the soft and weak interlayer, finally realizing the controllable large block rate in the blasting process of the soft and hard mixed layered rock mass.

[0027] 2. The blasting method for deep-hole steps in soft-hard interlayered rock mass provided by the present invention does not increase the workload and difficulty of on-site drilling; the three-dimensional geological imaging is completed by a computer, and the difficulty is small; the high-pressure gas generated by the explosion is limited to the hard rock layer; the blasting workload of secondary crushing is significantly reduced, the cost of loading and transporting blocks of stone is reduced, and the economic benefits of the project are improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1It is a schematic diagram of the blasting structure of a deep hole step in a soft and hard interlayered rock mass in a specific embodiment;

[0029] Among them: 10-weak interlayer; 20-hard rock layer; 30-filling section; 40-charging section; 50-bottom hole filling section. Specific embodiments

[0031] like Figure 1 As shown, the present embodiment provides a blasting structure for deep hole steps in a soft-hard interlayered rock mass, comprising multiple hard rock layers 20 and multiple soft interlayers 10, wherein the hard rock layers 20 and the soft interlayers 10 are alternately distributed layer by layer from top to bottom; charging sections 40 are provided at relative positions in each hard rock layer 20, and the charging sections 40 are filled with gunpowder; a filling section 30 is provided between adjacent charging sections 40, and the filling section 30 is filled with gun mud, and both ends of the filling section 30 enter the corresponding hard rock layer 20, and the bottom hard rock layer 20 is provided with a hole bottom filling section 50.

[0032] By setting the charging section 40 in the hard rock layer 20, the high-pressure gas generated when the charging section 40 is detonated is confined to the hard rock layer 20, preventing the high-pressure gas from escaping from the soft and weak interlayer 10, thereby weakening the blasting effect, reducing the workload of the secondary blasting, and making the high-pressure gas and the detonation wave generated by the explosives mainly act on the hard rock layer 20 to form a large number of blasting cracks in the hard rock layer 20, and then utilizing the secondary collision effect brought by the blasting gas throwing the rock mass to knock open the blasting cracks in the hard rock layer 20 while destroying the cementation effect of the soft and weak interlayer 10, ultimately achieving the controllable large block rate in the blasting process of the soft and hard mixed layered rock mass.

[0033] The distance between the top of the charge segment 40 and the bottom of the weak interlayer 10 adjacent to the top of the charge segment 40 is greater than or equal to 200 mm.

[0034] The distance between the charge section 40 and the weak interlayer 10 is ensured to prevent the high-pressure gas generated during blasting from escaping from the weak layer.

[0035] The distance that both ends of the filling section 30 enter the hard rock layer 20 is greater than or equal to 200 mm.

[0036] When the weak interlayer 10 is filled with cannon mud, it is to isolate the high-pressure gas generated by the explosion from directly contacting the weak interlayer 10. It is ensured that the filling section 30 limits the high-pressure gas generated when the charging section 40 is blasted to avoid the escape of the high-pressure gas. The filling section 30 filled with cannon mud has a high strength during blasting, and the local impact force generated by the instantaneous rupture of the blasting enhances the blasting effect.

[0037] Preferably, the top of the uppermost weak interlayer 10 and the top of the filling section 30 are located at the same horizontal plane.

[0038] A method for charging blastholes for deep hole step blasting of soft and hard mixed layered rock mass in this embodiment comprises the following steps:

[0039] S1: Mark the location of the blastholes on the surface of the area to be blasted;

[0040] S2: Set up a drilling rig to drill holes at the marked blasthole locations. During the drilling process, record the lithology and corresponding coverage depth of the core samples taken from the blastholes in real time until all blastholes are completed;

[0041] S3: Input the lithology and coverage depth parameters of each blasthole into the 3D geological imaging software to simulate and draw the overall lithology distribution law of the area to be blasted;

[0042] S4: Design the charging scheme according to the lithological characteristics of each blasthole, and the charging process follows the following rules;

[0043] ④ Filling of the filling section 30 formed by the weak interlayer 10 of the blasthole and the gun mud;

[0044] ⑤ Both ends of the filling section 30 penetrate into the hard rock layer 20;

[0045] ⑥ The hard rock layer 20 between two adjacent filling sections 30 is filled with a charge section 40 formed of gunpowder;

[0046] S5: Detonate the explosive pack according to the detonation plan to complete the blasting operation.

[0047] By setting the charging section 40 in the hard rock layer 20, the high-pressure gas generated when the charging section 40 is detonated is confined to the hard rock layer 20, preventing the high-pressure gas from escaping from the soft and weak interlayer 10, thereby weakening the blasting effect, reducing the workload of the secondary blasting, and making the high-pressure gas and the detonation wave generated by the explosives mainly act on the hard rock layer 20 to form a large number of blasting cracks in the hard rock layer 20, and then utilizing the secondary collision effect brought by the blasting gas throwing the rock mass to knock open the blasting cracks in the hard rock layer 20 while destroying the cementation effect of the soft and weak interlayer 10, ultimately achieving the controllable large block rate in the blasting process of the soft and hard mixed layered rock mass.

[0048] The distance between the top of the charge segment 40 and the bottom of the weak interlayer 10 adjacent to the top of the charge segment 40 is greater than or equal to 200 mm.

[0049] After step S4 , a hole bottom plugging section 30 formed of taphole mud is arranged in the bottommost hard rock layer 20 , and the hole bottom plugging section 30 is arranged just below the bottom of the bottommost charging section 40 .

[0050] The above is a specific implementation of the present invention, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. For ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present invention, and these obvious replacement forms all belong to the protection scope of the present invention.

Claims

1. A method for a blasthole charging structure for deep hole step blasting of a layered rock mass with mixed hard and soft inclusions, the method comprising the following blasthole charging structure for deep hole step blasting of a layered rock mass with mixed hard and soft inclusions, the layered rock mass comprises multiple hard rock layers and multiple soft interlayers, the hard rock layers and the soft interlayers are alternately distributed layer by layer from top to bottom; charging sections are provided at relative positions in each hard rock layer, the charging sections are filled with gunpowder; filling sections are provided between adjacent charging sections, the filling sections are filled with gunpowder mud, both ends of the filling sections enter adjacent hard rock layers, and the bottom hard rock layer is provided with a hole bottom filling section; it is characterized in that, The distance between the top of the charging section and the bottom of the soft interlayer adjacent to the top of the charging section is greater than or equal to 200mm; the top of the uppermost soft interlayer and the top of the filling section are located at the same horizontal plane; the charging section is set in the hard rock layer, and the high-pressure gas generated when the charging section is detonated is confined in the hard rock layer to prevent the high-pressure gas from escaping from the soft interlayer, thereby weakening the blasting effect and reducing the workload of the secondary blasting. The high-pressure gas and detonation wave generated by the explosives are applied to the hard rock layer to form blasting cracks in the hard rock layer, and then the secondary collision effect brought by the blasting gas throwing the rock mass is used to knock open the blasting cracks in the hard rock layer while destroying the cementation effect of the soft interlayer, so as to achieve controllable large block rate during the blasting of soft and hard mixed layered rock mass; The above method comprises the following steps: S1: Mark the location of the blastholes on the surface of the area to be blasted; S2: Set up a drilling rig to drill holes at the marked blasthole locations. During the drilling process, record the lithology and corresponding coverage depth of the core samples taken from the blastholes in real time until all blastholes are completed; S3: Input the lithology and coverage depth parameters of each blasthole into the 3D geological imaging software to simulate and draw the overall lithology distribution law of the area to be blasted; S4: Design a charging scheme based on the lithological characteristics of each blasthole. The charging process follows the following rules: The weak interlayer of the blasthole is filled with the filling section formed by the blasthole mud; Both ends of the filling section extend into the hard rock formation; The space between two adjacent filling sections is filled with a charge section formed by gunpowder; S5: Detonate the explosive pack according to the detonation plan to complete the blasting operation.

2. The method for blasthole charging structure for deep hole step blasting of soft and hard mixed layered rock mass according to claim 1 is characterized in that: The distance between the top of the charge section and the bottom of the weak interlayer adjacent to the top of the charge section is greater than or equal to 200 mm.

3. The method for blasthole charging structure for deep hole step blasting of soft and hard mixed layered rock mass according to claim 2 is characterized in that: After step S4, a hole bottom filling section formed of taphole mud is arranged in the lowest hard rock layer, and the hole bottom filling section is arranged just below the bottom of the lowest charging section.

Citation Information

Cited By

  • Blast hole charging structure and method close to fracture zone and considering influence of large structural plane

    CN121323428A