A large steel pipe hoisting assembly positioning and adjustment device and hoisting assembly method
Through the combined use of ear plates, wedge plates, splints and jacks, the problem of low precision and difficult operation of large-diameter steel pipe docking nodes is solved, efficient and low-cost combined positioning and adjustment of steel pipes is achieved, and the overall performance and performance of the structure are improved. Seismic performance.
Patent Information
- Application Number
- CN201711189005.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2017-11-16
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2037-11-16
AI Technical Summary
Traditional construction methods have problems such as low accuracy, long time consumption, and difficult operation when dealing with large-diameter steel pipe docking nodes, which affect the overall performance and seismic performance of the structure.
A combined device including an upper ear plate, a lower ear plate, a wedge plate and a splint is used to realize the precise positioning and concentricity adjustment of the steel pipe through bolt connection and jack adjustment. It is combined with the ear plate welding positioning template and the detachable clamp jack to simplify the operation. and improve accuracy.
It achieves precise positioning and concentricity adjustment of steel pipes, reduces operating difficulty and cost, improves construction efficiency, reduces pipe string correction time, and ensures high precision and stability of the structure.
Smart Images

Figure CN107738984B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a steel pipe hoisting assembly device and an assembly method, and in particular to a large steel pipe hoisting assembly positioning and adjustment device and a hoisting assembly method. Background Art
[0002] At present, there are inevitably a large number of butt joint connections in traditional prefabricated steel tube concrete structures. The stress performance of these steel tube concrete nodes directly determines the overall performance of the structure. The stress performance and seismic performance of the nodes are key technical issues and important determining factors of the structure. The existing construction methods generally have problems such as low centering accuracy, long time consumption, and difficult operation when dealing with large-diameter steel tube butt joints. Summary of the invention
[0003] The invention provides a large steel pipe combined hoisting positioning and adjusting device to solve the technical problems existing in the known technology.
[0004] The technical solution adopted by the present invention to solve the technical problems existing in the known technology is: a large-scale steel pipe hoisting combination positioning and adjustment device, including N groups of alignment adjustment devices, N≥3; each group of the alignment adjustment devices includes an upper ear plate, a lower ear plate, a wedge plate and a pair of clamps; the clamp is provided with an adjustment long hole; the upper ear plate and the lower ear plate are provided with a positioning through hole; the upper ear plate is welded to the outer side of the lower butt end of the upper section of the steel pipe of the hoisting combination; the lower ear plate is welded to the outer side of the upper butt end of the lower section of the steel pipe; when the upper section of the steel pipe and the lower section of the steel pipe are hoisted and docked together, the upper ear plate and the lower ear plate are aligned up and down, with a gap in the middle, the clamp is connected on the left and right sides, and the wedge is inserted into the middle gap; the clamp is connected to the upper ear plate and the lower ear plate by bolts passing through the positioning through hole and the adjustment long hole.
[0005] Furthermore, it also includes an ear plate welding positioning template and N pads with the same thickness as the ear plate; the shape and outer dimensions of the ear plate welding positioning template are the same as the cross-sectional shape and outer dimensions of the steel pipe, and its side is provided with N protrusions, and the left and right sides of the protrusions are parallel and the width is the same as the thickness of the ear plate; the pad is provided with a mounting through hole; when the upper section of the steel pipe or the lower section of the steel pipe is welded to the upper ear plate or the lower ear plate, the upper ear plate or the lower ear plate, the protrusion and the pad are arranged in sequence between a pair of the clamping plates; and are clamped and fixed by bolts passing through the mounting through hole, the positioning through hole and the adjustment long hole.
[0006] Furthermore, the ear plate welding positioning template is a steel plate with a thickness of 8-20 mm.
[0007] Furthermore, it also includes a detachable upper clamp and an upper horizontal jack, wherein the upper clamp is sleeved on the upper section of the steel pipe and is close to the welded upper ear plate, the base of the upper horizontal jack is installed on the upper clamp, and the top cover of the upper horizontal jack is in contact with the outer surface of the lower section of the steel pipe.
[0008] Furthermore, it also includes a detachable lower clamp and a lower horizontal jack, wherein the lower clamp is sleeved on the lower steel pipe section and close to the welded lower ear plate, the base of the lower horizontal jack is installed on the lower clamp, and the top cover of the lower horizontal jack is in contact with the outer surface of the upper steel pipe section.
[0009] Furthermore, the spatial angle between the top cover axis of the lower horizontal jack and the top cover axis of the upper horizontal jack is 90 degrees.
[0010] The present invention also provides a large steel pipe hoisting assembly method using the above device, comprising the following steps:
[0011] Step a: Before lifting the steel pipe, the welding area of the pipe end should be polished and rusted, and the column axis and elevation should be marked;
[0012] Step b, N upper ear plates are welded on the outer side of the lower butt end of the upper steel pipe to be hoisted and assembled; N lower ear plates are welded on the outer side of the upper butt end of the lower steel pipe; the welding positions of the ear plates of the upper steel pipe and the lower steel pipe correspond; N≥3;
[0013] Step c, lifting the steel pipe with a tower crane, inserting the lower end of the upper steel pipe into the upper end of the lower steel pipe, aligning the upper ear plate and the lower ear plate up and down, connecting the clamping plates on the left and right sides of the two with bolts passing through the adjustment long holes, and inserting the wedge plate into the gap between the two;
[0014] Step d, adjusting the insertion depth of the wedge plate to adjust the concentricity of the two sections of steel pipes;
[0015] Step e, after the process is met, tighten the connecting bolts to fix the upper ear plate, the lower ear plate and the clamping plate; weld the upper and lower sections of the steel pipe.
[0016] Furthermore, in step b, when the upper ear plate is welded to the outer side of the lower butt end of the upper steel pipe, and the lower ear plate is welded to the outer side of the upper butt end of the lower steel pipe, an ear plate welding positioning template is used to locate the welding position of the ear plate; the shape and outer dimensions of the ear plate welding positioning template are the same as the cross-sectional shape and outer dimensions of the steel pipe, and N protrusions are provided on its side, and the left and right sides of the protrusions are parallel and the width is the same as the thickness of the ear plate; the cushion block is provided with a mounting through hole; when the upper steel pipe or the lower steel pipe is welded to the upper ear plate or the lower ear plate, the upper ear plate or the lower ear plate, the protrusions and the cushion block are arranged in sequence between a pair of the clamping plates; and are clamped and fixed by bolts passing through the mounting through hole, the positioning through hole and the adjustment long hole.
[0017] Furthermore, in step d, a detachable upper clamp and an upper horizontal jack are used simultaneously to adjust the concentricity; the upper clamp is sleeved on the upper section of the steel pipe and close to the welded upper ear plate, and the base of the upper horizontal jack is installed on the upper clamp so that the top cover of the upper horizontal jack is in contact with the outer surface of the lower section of the steel pipe, and the concentricity of the upper and lower sections of the steel pipe is adjusted by adjusting the protruding length of the top cover of the upper horizontal jack.
[0018] Furthermore, in step d, a detachable lower clamp and a lower horizontal jack are used simultaneously to adjust the concentricity; the lower clamp is sleeved on the lower section of the steel pipe and close to the welded lower ear plate, and the base of the lower horizontal jack is installed on the lower clamp so that the top cover of the lower horizontal jack is in contact with the outer surface of the upper section of the steel pipe, and the concentricity of the upper and lower sections of the steel pipe is adjusted by adjusting the protruding length of the top cover of the lower horizontal jack.
[0019] The advantages and positive effects of the present invention are:
[0020] (1) Accurate positioning: The vertical adjustment and horizontal centering can be accurately performed through the wedge plate and the upper and lower horizontal jacks installed at 90 degrees to each other. The torsion of the steel pipe can be controlled by bolting the ear plate, which can achieve three-way adjustment in torsion, vertical and horizontal directions, effectively controlling the positioning deviation of the steel pipe;
[0021] (2) Easy to operate: Based on the test results of conventional testing instruments such as theodolite or total station, the operator can manually perform the centering work. The centering device has a simple principle, convenient installation and disassembly procedures, and low skill requirements for personnel.
[0022] (3) Low cost: The device of the present invention has a low manufacturing cost, and some components in the device, such as upper and lower clamps, ear plate welding positioning templates, etc., can be reused.
[0023] (4) High efficiency: The large-scale steel composite structure installation and construction device can quickly and efficiently perform installation, torsion, horizontal and vertical adjustment and disassembly work, greatly reducing the time for pipe column correction operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural schematic diagram of the present invention;
[0025] Figure 2 This is a schematic diagram of the ear plate welding positioning template and ear plate assembly;
[0026] Figure 3 This is the schematic diagram of ear plate welding using ear plate welding positioning template.
[0027] In the figure: 1. upper ear plate; 2. lower ear plate; 3. upper section of steel pipe; 4. upper clamp; 5. bolt; 6. wedge plate; 7. clamp; 8. upper horizontal jack; 9. lower horizontal jack; 10. lower section of steel pipe; 11. lower clamp; 12. top cover; 13. pad; 14. ear plate welding positioning template. DETAILED DESCRIPTION
[0028] In order to further understand the content, features and effects of the present invention, the following embodiments are listed and described in detail with reference to the accompanying drawings:
[0029] See also Figures 1 to 3 A large steel pipe hoisting assembly positioning and adjustment device comprises N groups of alignment adjustment devices, N≥3; each group of the alignment adjustment devices comprises an upper ear plate 1, a lower ear plate 2, a wedge plate 6 and a pair of clamping plates 7; the clamping plate 7 is provided with an adjustment long hole; the upper ear plate 1 and the lower ear plate 2 are provided with positioning through holes; the upper ear plate 1 is welded to the outer side of the lower butt end of the upper steel pipe 3 of the hoisting assembly; the lower ear plate 2 is welded to the outer side of the upper butt end of the lower steel pipe 10; when the upper steel pipe 3 and the lower steel pipe 10 are hoisted and butt-jointed, the upper ear plate 1 and the lower ear plate 2 are aligned up and down, with a gap in the middle, the clamping plates 7 are connected on the left and right sides, and the wedge plate 6 is inserted into the middle gap; the clamping plates 7 are connected to the upper ear plate 1 and the lower ear plate 2 by bolts 5 passing through the positioning through holes and the adjustment long holes. The upper and lower ear plates can be used as hoisting earrings.
[0030] Furthermore, it can also include an ear plate welding positioning template 14 and N pads 13 with the same thickness as the ear plate; the shape and outer dimensions of the ear plate welding positioning template 14 can be the same as the cross-sectional shape and outer dimensions of the steel pipe, and its side can be provided with N protrusions, and the left and right sides of the protrusions are parallel and the width is the same as the thickness of the ear plate; the pad 13 is provided with a mounting through hole; when the upper section of the steel pipe 3 or the lower section of the steel pipe 10 is welded to the upper ear plate 1 or the lower ear plate 2, the upper ear plate 1 or the lower ear plate 2, the protrusions and the pad 13 are arranged in sequence between a pair of the clamping plates 7; and they are clamped and fixed by bolts passing through the mounting through hole, the positioning through hole and the adjusting long hole. The number N is the same as the number of groups of the alignment adjustment device. The protrusions can be evenly distributed on the side of the ear plate welding positioning template 14. If the cross section of the steel pipe is circular, the protrusions may be evenly distributed on the side of the ear plate welding positioning template 14 in the circumferential direction; if the cross section of the steel pipe is square, the protrusions may be evenly distributed on the four sides of the ear plate welding positioning template 14.
[0031] Furthermore, the ear plate welding positioning template 14 can be a steel plate with a thickness of 8-20 mm.
[0032] Furthermore, it can also include a detachable upper clamp 4 and an upper horizontal jack 8, wherein the upper clamp 4 is sleeved on the upper section steel pipe 3 and close to the welded upper ear plate 1, the base of the upper horizontal jack 8 is installed on the upper clamp 4, and the top cover 12 of the upper horizontal jack 8 is in contact with the outer surface of the lower section steel pipe 10.
[0033] Furthermore, it may also include a detachable lower clamp 11 and a lower horizontal jack 9, wherein the lower clamp 11 is sleeved on the lower steel pipe 10 and close to the welded lower ear plate 2, the base of the lower horizontal jack 9 can be installed on the lower clamp 11, and the top cover 12 of the lower horizontal jack 9 is in contact with the outer surface of the upper steel pipe 3.
[0034] Furthermore, the spatial angle between the axis center of the top cover 12 of the lower horizontal jack 9 and the axis center of the top cover 12 of the upper horizontal jack 8 may be 90 degrees.
[0035] The present invention also provides an embodiment of a large steel pipe hoisting assembly method using the above device, which comprises the following steps:
[0036] Step a: Before lifting the steel pipe, the welding area of the pipe end should be polished and rusted, and the column axis and elevation should be marked;
[0037] Step b, N upper ear plates 1 are welded to the outer side of the lower butt end of the upper steel pipe 3 to be hoisted and assembled; N lower ear plates 2 are welded to the outer side of the upper butt end of the lower steel pipe 10; the welding positions of the ear plates of the upper steel pipe 3 and the lower steel pipe 10 correspond; N≥3;
[0038] Step c, lift the steel pipe with a tower crane, insert the lower end of the upper steel pipe 3 into the upper end of the lower steel pipe 10, align the upper ear plate 1 and the lower ear plate 2 up and down, connect the clamping plate 7 on the left and right sides of the two with bolts passing through the adjustment long holes, and insert the wedge plate 6 into the gap between the two;
[0039] Step d, adjusting the insertion depth of the wedge plate 6 to adjust the concentricity of the two sections of steel pipes;
[0040] Step e, after the process is met, tighten the connecting bolts to fix the upper ear plate 1, the lower ear plate 2 and the clamping plate 7; weld the upper and lower sections of the steel pipe.
[0041] Further, in the step b, when the upper ear plate 1 is welded to the outer side of the lower butt end of the upper steel pipe 3, and the lower ear plate 2 is welded to the outer side of the upper butt end of the lower steel pipe 10, an ear plate welding positioning template 14 can be used to locate the welding position of the ear plate; the shape and outer dimensions of the ear plate welding positioning template 14 can be the same as the cross-sectional shape and outer dimensions of the steel pipe, and its side surface can be provided with N protrusions, and the left and right sides of the protrusions are parallel and the width is the same as the thickness of the ear plate; the cushion block 13 is provided with a mounting through hole; when the upper steel pipe 3 or the lower steel pipe 10 is welded to the upper ear plate 1 or the lower ear plate 2, the upper ear plate 1 or the lower ear plate 2, the protrusions and the cushion block 13 are arranged in sequence between a pair of the clamping plates 7; and are clamped and fixed by bolts passing through the mounting through hole, the positioning through hole and the adjusting long hole. The value of N can be ≥3. When welding, you can first weld an upper ear plate 1 or a lower ear plate 2, then fix the welded upper ear plate 1 or lower ear plate 2 to the welding positioning template, and then assemble and fix other upper ear plates 1 or lower ear plates 2 to be welded, and then respectively weld the upper ear plates 1 or lower ear plates 2 to be welded to the outer side of the butt ends of the upper and lower sections of the steel pipe 10. After the upper ear plates 1 or lower ear plates 2 are all welded, remove the ear plate 2 welding positioning template from the upper ear plate 1 or lower ear plate 2. In this way, the upper ear plate 1 and the lower ear plate 2 can be accurately aligned during the hoisting assembly. The number of N is the same as the number of upper and lower ear plates welded on the outer side of the butt ends of the upper and lower sections of the steel pipe.
[0042] Furthermore, in step d, the removable upper clamp 4 and the upper horizontal jack 8 can be used simultaneously to adjust the concentricity; the upper clamp 4 is sleeved on the upper section of the steel pipe 3 and close to the welded upper ear plate 11, and the base of the upper horizontal jack 8 can be installed on the upper clamp 4, so that the top cover 12 of the upper horizontal jack 8 is in contact with the outer surface of the lower section of the steel pipe 10, and the concentricity of the upper and lower sections of the steel pipe 10 can be adjusted by adjusting the protruding length of the top cover 12 of the upper horizontal jack 8.
[0043] Furthermore, in step d, the removable lower clamp 11 and the lower horizontal jack 9 can be used simultaneously to adjust the concentricity; the lower clamp 11 is sleeved on the lower steel pipe 10 and close to the welded lower ear plate 2, and the base of the lower horizontal jack 9 can be installed on the lower clamp 11, so that the top cover 12 of the lower horizontal jack 9 is in contact with the outer surface of the upper steel pipe 3, and the concentricity of the upper and lower steel pipes 10 can be adjusted by adjusting the protruding length of the top cover 12 of the lower horizontal jack 9.
[0044] The working principle of the present invention: the ear plate welding positioning template 14 is used to make the ear plate welding positions on the upper and lower sections of the steel pipe 10 correspond to each other. When welding, an upper ear plate 1 or a lower ear plate 2 can be welded first, and then the welded upper ear plate 1 or lower ear plate 2 can be fixed to the welding positioning template, and then other upper ear plates 1 or lower ear plates 2 to be welded can be assembled and fixed, and then the upper ear plates 1 or lower ear plates 2 to be welded can be welded to the outer side of the butt ends of the upper and lower sections of the steel pipe 10 respectively. After the upper ear plates 1 or the lower ear plates 2 are all welded, the ear plate 2 welding positioning template is removed from the upper ear plates 1 or the lower ear plates 2. In this way, the upper ear plates 1 and the lower ear plates 2 can be accurately aligned when hoisted and assembled.
[0045] After the upper ear plate 1 and the lower ear plate 2 are completely welded, the steel pipe is hoisted and initially aligned, and the upper and lower ear plates 2 are clamped by two clamping plates 7 with adjustment long holes; the bolts are passed through the positioning holes on the upper and lower ear plates 2 and the adjustment long holes of the clamping plates 7, and the wedge plate 6 is inserted between the upper and lower ear plates 2. By adjusting the insertion depth of the wedge plate 6, the center distance of the bolts passing through the upper and lower ear plates 2 is increased or reduced, thereby adjusting the concentricity of the upper steel pipe 3 relative to the lower steel pipe 10. If the verticality of the lower steel pipe 10 is 90°, the verticality of the upper steel pipe 3 is also 90°, thereby adjusting the verticality of the hoisted steel pipe. After meeting the process requirements, tighten the bolts to limit the mutual rotation between the upper and lower steel pipes 10;
[0046] The removable upper clamp 4 and / or lower clamp 11 can also be installed separately: the upper clamp 4 is sleeved on the upper steel pipe 3 and close to the welded upper ear plate 1, the base of the upper horizontal jack 8 can be installed on the upper clamp 4, so that the top cover 12 of the upper horizontal jack 8 contacts the outer surface of the lower steel pipe 10, the lower clamp 11 is sleeved on the lower steel pipe 10 and close to the welded lower ear plate 2, the base of the lower horizontal jack 9 can be installed on the lower clamp 11, and the top cover 12 of the lower horizontal jack 9 contacts the outer surface of the upper steel pipe 3. The concentricity of the upper and lower steel pipes 10 can be adjusted by adjusting the extension length of the top covers 12 of the upper and lower horizontal jacks 9; the axis of the top cover 12 of the lower horizontal jack 9 and the axis of the top cover 12 of the upper horizontal jack 8 can be at an angle of 90 degrees in space, so that it can be adjusted from the horizontal XY directions;
[0047] Through the above adjustment method, when the steel pipe hoisting assembly is connected, the torsion, vertical and horizontal directions can be adjusted, and the steel column hoisting can be quickly adjusted in three directions, which effectively improves the accuracy and reduces the pipe column correction operation time.
[0048] Until the specification requirements are met; after all dimensions are re-measured and qualified, the clamping plate 7 and the ear plate are fixed by bolts, the wire rope is untied, and welding is carried out after passing the inspection.
[0049] The embodiments described above are only used to illustrate the technical ideas and features of the present invention, and their purpose is to enable those skilled in the art to understand the contents of the present invention and implement them accordingly. The patent scope of the present invention cannot be limited only by this embodiment, that is, any equivalent changes or modifications made to the spirit disclosed by the present invention still fall within the patent scope of the present invention.
Claims
1. A large steel pipe hoisting combined positioning and adjustment device, characterized in that: It comprises N groups of alignment adjustment devices, N≥3; each group of the alignment adjustment devices comprises an upper ear plate, a lower ear plate, a wedge plate and a pair of clamping plates; the clamping plates are provided with an adjustment long hole; the upper ear plate and the lower ear plate are provided with a positioning through hole; the upper ear plate is welded to the outer side of the lower butt end of the upper section of the steel pipe of the hoisting assembly; the lower ear plate is welded to the outer side of the upper butt end of the lower section of the steel pipe; when the upper section of the steel pipe and the lower section of the steel pipe are hoisted and butt-jointed, the upper ear plate and the lower ear plate are aligned up and down, with a gap in the middle, the clamping plates are connected on the left and right sides, and the wedge plate is inserted into the middle gap; the clamping plate is connected to the upper ear plate and the lower ear plate by bolts passing through the positioning through hole and the adjustment long hole; the concentricity of the two sections of the steel pipe is adjusted by adjusting the insertion depth of the wedge plate; It also includes an ear plate welding positioning template and N pads with the same thickness as the ear plate; the shape and outer dimensions of the ear plate welding positioning template are the same as the cross-sectional shape and outer dimensions of the steel pipe, and N protrusions are provided on its side, and the left and right sides of the protrusions are parallel and have the same width as the thickness of the ear plate; the pad is provided with a mounting through hole; when the upper section of the steel pipe or the lower section of the steel pipe is correspondingly welded to the upper ear plate or the lower ear plate, the upper ear plate or the lower ear plate, the protrusions and the pad are arranged in sequence between a pair of the clamping plates; and are clamped and fixed by bolts passing through the mounting through hole, the positioning through hole and the adjusting long hole; It also includes a detachable upper clamp and an upper horizontal jack, wherein the upper clamp is sleeved on the upper section of the steel pipe and close to the welded upper ear plate, the base of the upper horizontal jack is installed on the upper clamp, and the top cover of the upper horizontal jack is in contact with the outer surface of the lower section of the steel pipe; It also includes a detachable lower clamp and a lower horizontal jack. The lower clamp is sleeved on the lower steel pipe and close to the welded lower ear plate. The base of the lower horizontal jack is installed on the lower clamp, and the top cover of the lower horizontal jack is in contact with the outer surface of the upper steel pipe.
2. The large steel pipe hoisting combined positioning and adjusting device according to claim 1 is characterized in that: The ear plate welding positioning template is a steel plate with a thickness of 8-20 mm.
3. The large steel pipe hoisting combined positioning and adjusting device according to claim 1 is characterized in that: The included angle between the top cover axis of the lower horizontal jack and the top cover axis of the upper horizontal jack in space is 90 degrees.
4. A method for hoisting and assembling a large steel pipe using the large steel pipe hoisting and assembly positioning and adjustment device according to claim 1, characterized in that: The following steps are involved: Step a: Before lifting the steel pipe, the welding area of the pipe end should be polished and rusted, and the column axis and elevation should be marked; Step b, N upper ear plates are welded on the outer side of the lower butt end of the upper steel pipe to be hoisted and assembled; N lower ear plates are welded on the outer side of the upper butt end of the lower steel pipe; the welding positions of the ear plates of the upper steel pipe and the lower steel pipe correspond; N≥3; Step c, lifting the steel pipe with a tower crane, inserting the lower end of the upper steel pipe into the upper end of the lower steel pipe, aligning the upper ear plate and the lower ear plate up and down, connecting the clamping plates on the left and right sides of the two with bolts passing through the adjustment long holes, and inserting the wedge plate into the gap between the two; Step d, adjusting the insertion depth of the wedge plate to adjust the concentricity of the two sections of steel pipes; Step e, after the process is met, tighten the connecting bolts to fix the upper ear plate, the lower ear plate and the clamping plate; weld the upper and lower sections of the steel pipe.
5. The large steel pipe hoisting assembly method according to claim 4 is characterized in that: In the step b, when the upper ear plate is welded to the outer side of the lower butt end of the upper steel pipe, and the lower ear plate is welded to the outer side of the upper butt end of the lower steel pipe, an ear plate welding positioning template is used to locate the welding position of the ear plate; the shape and outer dimensions of the ear plate welding positioning template are the same as the cross-sectional shape and outer dimensions of the steel pipe, and N protrusions are provided on its side, and the left and right sides of the protrusions are parallel and the width is the same as the thickness of the ear plate; the cushion block is provided with a mounting through hole; when the upper steel pipe or the lower steel pipe is welded to the upper ear plate or the lower ear plate, the upper ear plate or the lower ear plate, the protrusions and the cushion block are arranged in sequence between a pair of the clamping plates; and they are clamped and fixed by bolts passing through the mounting through hole, the positioning through hole and the adjustment long hole.
6. The large steel pipe hoisting assembly method according to claim 4 is characterized in that: In the step d, a detachable upper clamp and an upper horizontal jack are used simultaneously to adjust the concentricity; the upper clamp is sleeved on the upper section of the steel pipe and close to the welded upper ear plate, and the base of the upper horizontal jack is installed on the upper clamp so that the top cover of the upper horizontal jack contacts the outer surface of the lower section of the steel pipe, and the concentricity of the upper and lower sections of the steel pipe is adjusted by adjusting the protruding length of the top cover of the upper horizontal jack.
7. The large steel pipe hoisting assembly method according to claim 6 is characterized in that: In the step d, a detachable lower clamp and a lower horizontal jack are used simultaneously to adjust the concentricity; the lower clamp is sleeved on the lower section of the steel pipe and close to the welded lower ear plate, and the base of the lower horizontal jack is installed on the lower clamp so that the top cover of the lower horizontal jack is in contact with the outer surface of the upper section of the steel pipe, and the concentricity of the upper and lower sections of the steel pipe is adjusted by adjusting the protruding length of the top cover of the lower horizontal jack.