Tunnel secondary lining vault and side wall sealing maintenance device and method
By setting up sealing and curing devices on the tunnel's secondary lining vault and side walls, using the sealing layer and steam nozzles to form a closed cavity, and sending water vapor into the cavity, the problem of poor maintenance of the tunnel's secondary lining concrete has been solved and rapid construction has been achieved. Improve the strength of concrete.
Patent Information
- Application Number
- CN201810385854.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-04-26
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2038-04-26
AI Technical Summary
In the existing technology, the secondary lining concrete of the tunnel is not properly maintained, resulting in insufficient strength of the lining concrete and frequent quality problems such as surface cracking, peeling and chipping.
Provides a tunnel secondary lining vault and side wall sealing and maintenance device, including a sealing mechanism, an ejection mechanism, a traveling mechanism and a steam generation control and monitoring mechanism. The sealing layer and the steam nozzle are used to form a sealed cavity, and water is sent into the cavity. Steam curing can quickly improve the strength of concrete.
By forming a sealed cavity through sealing technology and feeding water vapor into it, the effect of rapidly increasing the strength of the concrete is achieved. The operation is simple and fast, and the problem of insufficient maintenance of the secondary lining concrete of the tunnel is solved.
Smart Images

Figure CN108442946B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete maintenance, and in particular to a device and method for sealing and maintaining a tunnel secondary lining vault and side wall. Background Art
[0002] Lining is an important engineering measure to balance surrounding rock stress, extend tunnel service life and ensure safe operation.
[0003] With the technological advancement of tunnel engineering, in terms of tunnel lining technology, a composite lining structure of initial shotcrete support + flexible waterproof layer + reinforced concrete secondary lining has been fully adopted. The construction method has also changed from a full-section (arch and side wall) lining trolley + pumping concrete process to a lining method of arch first and then wall + small template assembly + manual loading, and the construction efficiency has been greatly improved.
[0004] Curing is one of the important processes in concrete construction. Currently, commonly used methods include water covering, curing agent spraying and steam curing.
[0005] After the concrete is poured, the concrete undergoes a hydration reaction in a static state (cement particles are converted into crystals). Under the action of hydration, the concrete gradually hardens (the strength gradually increases). The early strength growth rate of concrete is faster, and the later strength growth rate gradually decreases.
[0006] The water content in the concrete mix is the basic condition for completing the hydration reaction. Sprinkling curing provides a high humidity environment for the surface of concrete components, which can effectively prevent the dehydration of concrete and ensure the full hydration of concrete, thereby ensuring the final strength of concrete. Spraying curing agents to seal the surface of concrete components can also effectively prevent the dehydration of concrete and ensure the full hydration of concrete, thereby ensuring the final strength of concrete. Steam curing provides a high humidity and high temperature environment for concrete components at the same time. While ensuring the full hydration of concrete and the final strength of concrete, it also accelerates the speed of hydration reaction and can quickly improve the strength of concrete in a short time. In the construction of the second lining concrete of the tunnel, the effect of steam curing is better than that of sprinkling curing and spraying curing agents. It is more difficult to achieve in the actual construction process due to the constraints of the cross-sectional shape and the construction environment.
[0007] In the past, tunnel construction technology was primitive and the construction cycle was long. There was no rush to remove the formwork after the lining concrete was poured. The sealing of the formwork blocked the escape path of concrete moisture (called the formwork curing effect). Years of engineering practice have verified that even if no other curing measures are taken, it will not have a significant impact on the final strength of the concrete, forming an inertial thinking that the secondary lining concrete of the tunnel is not maintained.
[0008] Due to the rapid development of tunnel secondary lining construction technology, the application of lining trolley + pumped concrete technology, the substantial improvement of mechanization, and the shortening of lining construction cycle, the curing effect of secondary lining concrete with formwork has been greatly weakened. At the same time, with the development of high-speed railways, the application of high-performance concrete has put forward higher requirements on the quality of concrete. In addition, the inertial thinking of construction personnel has ignored the importance of secondary lining concrete maintenance, resulting in ineffective existing concrete maintenance measures, and frequent quality problems such as weak lining concrete, surface cracking, peeling and falling off. Summary of the invention
[0009] The technical problem to be solved by the present invention is to provide a tunnel secondary lining vault and side wall sealing maintenance device and method to solve the quality problems existing in the prior art such as ineffective concrete maintenance measures, weak lining concrete, surface cracking, peeling and falling off.
[0010] In order to solve the above problems, the technical solution adopted by the present invention is to provide a tunnel secondary lining arch and side wall sealing maintenance device and method, including a sealing mechanism, a pushing mechanism, a traveling mechanism and a steam generation control and monitoring mechanism, the sealing mechanism includes a sealing layer adapted to the shape of the arch surface, the pushing mechanism includes a frame arranged on the lower side of the sealing layer and a jack arranged on the frame for pushing the sealing layer, the traveling mechanism includes a track wheel connected to the lower end of the frame and a running rail arranged on the ground, the steam generation control and monitoring mechanism includes a steam generating mechanism and a control and monitoring mechanism arranged on the frame, and the steam pipeline of the steam generating mechanism is connected to the steam nozzle arranged on the sealing layer.
[0011] Preferably, the sealing layer is made of a light flexible heat-insulating board material, an inflatable air bag is squeezed between the edge of the sealing layer and the arch wall, and the lower side of the sealing layer is connected to the ground through a sealing curtain.
[0012] Preferably, the frame includes a plurality of cross beams, longitudinal beams and columns made of square light tubes, concrete is poured inside the bottom cross beams, the jacks are arranged on the cross beams and the columns, the pushing directions of the jacks are vertical pushing and horizontal pushing, an adjustment base is also provided at the bottom of the jacks, the track wheels are installed on the lower side of the bottom cross beams, and a screw jack is provided between the bottom cross beams and the running rails.
[0013] Preferably, the sealing layer is provided with a horizontal or vertical contact surface made of special-shaped steel plate in the area for receiving the pushing of the jack, and a limit support is provided at the corresponding position of the back of the sealing layer and the contact surface, and the limit support is sandwiched between the sealing layer and the arch surface.
[0014] Preferably, the steam generating mechanism comprises a water tank and a steam generator which are interconnected, and the steam generator is connected to the steam nozzle via a steam pipeline.
[0015] Preferably, the control and monitoring mechanism includes two hydraulic pumps connected to the vertical pushing jack and the horizontal pushing jack respectively by parallel pipelines, an electric air pump for inflating the airbag, and also includes a distribution box and a control panel. The control panel is equipped with a water tank water level monitor, a steam pressure monitor, a hydraulic pump pressure gauge, and a maintenance space temperature and humidity monitor.
[0016] Preferably, sleepers are provided between the shaped rails and the ground.
[0017] The method for using the sealing maintenance device for the secondary lining vault and side wall of a tunnel comprises: (1) setting the device on a running rail, lifting the device with a screw jack, switching the receiving system, and evenly applying the weight of the device to the running rail to constrain the free movement of the frame; starting the vertical hydraulic system to push the sealing layer upward until all vertical limit supports are pressed against the tunnel vault; starting the horizontal hydraulic system to push the sealing layer to open to both sides until all horizontal limit supports are pressed against the tunnel side wall; starting the electric air pump to press compressed air into the inflatable airbag to expand it and then seal the surrounding of the sealing layer; manually lowering the lower sealing curtain, using a flexible pipe to introduce steam into the sealed space formed by the sealing curtain and the bottom of the side wall, and sealing the ends with the surplus at both ends of the sealing curtain;
[0018] (2) Start the steam generator and supply steam to the sealing layer and between the sealing curtain and the secondary lining. According to the monitored temperature and humidity data, control and adjust the steam supply volume and perform maintenance in four stages: static stop, heating, constant temperature and cooling;
[0019] (3) After the maintenance is completed, the following operations are carried out in the following order: shut down the steam generator → inflate the airbag to relieve pressure → relieve pressure on the horizontal hydraulic system → relieve pressure on the vertical hydraulic system → manually retract the sealing curtain → lower the screw jack.
[0020] The beneficial effect of the present invention is that the device uses sealing technology to form a closed cavity between the waterproof and heat-insulating sealed layer and the secondary lining structure, and sends water vapor into the closed cavity to cure the secondary lining concrete, thereby achieving the purpose of quickly improving the concrete strength, and the operation is simple and quick. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of the front view structure of the device provided by an embodiment of the present invention;
[0022] Figure 2 A schematic side structural diagram of the device provided by an embodiment of the present invention.
[0023] Among them, 1. sealing layer, 2. jack, 3. track wheel, 4. shaped rail, 5. steam nozzle, 6. steam generator, 7. water tank, 8. inflatable airbag, 9. sealing curtain, 10. crossbeam, 12. column, 13. adjusting base, 14. screw jack, 15. arch surface. DETAILED DESCRIPTION
[0024] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0025] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0026] It should be understood that the orientation or position relationship indicated by terms such as "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0027] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "multiple" and "several" is two or more, unless otherwise clearly and specifically defined.
[0028] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments:
[0029] like Figure 1 and Figure 2As shown, an embodiment of the present invention provides a tunnel secondary lining arch and side wall sealing and maintenance device, including a sealing mechanism, a pushing mechanism, a traveling mechanism and a steam generation control and monitoring mechanism, wherein the sealing mechanism includes a sealing layer 1 adapted to the shape of the arch surface 15, the pushing mechanism includes a frame arranged on the lower side of the sealing layer 1 and a jack 2 arranged on the frame for pushing the sealing layer 1, the traveling mechanism includes a track wheel 3 connected to the lower end of the frame and a running rail 4 arranged on the ground, the steam generation control and monitoring mechanism includes a steam generating mechanism and a control and monitoring mechanism arranged on the frame, and the steam pipeline of the steam generating mechanism is connected to a steam nozzle 5 arranged on the sealing layer 1.
[0030] The beneficial effect of this embodiment is that the device forms a closed cavity between the waterproof and heat-insulating sealed layer 1 and the secondary lining structure by using sealing technology, and water vapor is sent into the closed cavity to cure the secondary lining concrete, thereby achieving the purpose of rapidly improving the concrete strength. The sealing layer 1 is composed of an insulation board and a flat steel belt, and the flat steel belt is anchored longitudinally and circumferentially on the inner side of the sealing layer 1 at a certain interval.
[0031] Preferably, this embodiment also provides a preferred implementation mode, such as Figure 1 and Figure 2 As shown, the sealing layer 1 is made of a light flexible heat-insulating sheet material, and an inflatable airbag 8 is squeezed between the edge of the sealing layer 1 and the wall of the arch surface 15, and the lower side of the sealing layer 1 is connected to the ground through a sealing curtain 9. The inflatable airbags 8 are installed on the arc contour lines and the bottom edge of the sealing layer 1 at both ends; the sealing curtain 9 is cut with a thicker waterproof cloth, and sufficient end sealing margins are reserved at both ends. The upper and lower edges of the sealing curtain 9 are tightened with flat steel and fixed with bolts, and a number of lifting rings are welded on the upper and lower flat steels, and an equal number of hooks are welded on the corresponding positions of the flat steel at the bottom of the sealing layer 9. The inflatable airbag 8 is used to close the gap between the sealing layer 9 and the tunnel section to form a complete enclosed space.
[0032] Preferably, this embodiment also provides a preferred implementation mode, such as Figure 1 and Figure 2As shown, the frame includes a plurality of crossbeams 10, longitudinal beams and columns 12 made of square tubes, the bottom crossbeam 10 is poured with concrete, the jack 2 is arranged on the crossbeam 10 and the column 12, the pushing direction of the jack 2 is vertical pushing and horizontal pushing, the bottom of the jack 2 is also provided with an adjustment base, the track wheel 3 is installed on the lower side of the bottom crossbeam 10, and a screw jack 14 is arranged between the bottom crossbeam 10 and the running rail 4. The effect is that the effective working stroke of the jack 2 is adjusted by the height or length of the adjustment base, the square tube longitudinal beam, crossbeam 10 and column 12 are combined into a trolley frame to provide sufficient overall rigidity, and concrete is poured into the bottom crossbeam 10 to increase the rigidity of the lower part of the frame and reduce the overall center of gravity. Two sets of parallel hydraulic pipe networks are used to pressurize the vertical jack 2 and the horizontal jack 2 respectively, so as to achieve thrust balance under different stroke conditions of each jack 2.
[0033] Preferably, this embodiment also provides a preferred implementation mode, such as Figure 1 and Figure 2 As shown, the sealing layer 1 is provided with a horizontal or vertical contact surface made of a special-shaped steel plate at the area where the jack 2 is used to push up. A limit support is provided at the corresponding position of the back of the sealing layer 1 and the contact surface, and the limit support is sandwiched between the sealing layer 1 and the arch surface 15. The limit support and the flat steel belt are connected by thread. The limit support and the tunnel contact surface, i.e., the arch surface, expand the force-bearing area and add an elastic rubber pad to prevent damage to the arch surface. The limit supports at the corresponding positions of the jacks 2 behind the sealing layer 1 are used to control the distance between the sealing layer 1 and the tunnel section.
[0034] Preferably, this embodiment also provides a preferred implementation mode, such as Figure 1 and Figure 2 As shown, the steam generating mechanism includes a water tank 7 and a steam generator 6 which are connected to each other, and the steam generator 6 is connected to the steam nozzle 5 through a steam pipeline.
[0035] Preferably, this embodiment also provides a preferred implementation mode, such as Figure 1 and Figure 2 As shown, the control and monitoring mechanism includes two hydraulic pumps connected to the vertical jack 2 and the horizontal jack 2 respectively by parallel pipelines, an electric air pump for inflating the airbag 8, and a distribution box and a control panel. The control panel is equipped with a water tank water level monitor, a steam pressure monitor, a hydraulic pump pressure gauge, and a maintenance space temperature and humidity monitor. The steam generating mechanism and the control and monitoring mechanism are both arranged on a platform welded to the frame.
[0036] Preferably, this embodiment also provides a preferred implementation mode, such as Figure 1 and Figure 2As shown, sleepers are also arranged between the running rail 4 and the ground. The running direction of the trolley is controlled by the wheel-rail system; the height of the trolley is adjusted by the screw jack 14.
[0037] Method for using the sealing and maintenance device for the secondary lining vault and side wall of the tunnel,
[0038] (1) The device is set on the running rail 4, and the screw jack 14 is used to lift the device, and the receiving system is changed to uniformly apply the weight of the device to the running rail 4 to restrict the free movement of the frame; the vertical hydraulic system is started to push the sealing layer 1 upward until all vertical limit supports are tightly pressed against the tunnel arch; the horizontal hydraulic system is started to push the sealing layer 1 to open to both sides until all horizontal limit supports are tightly pressed against the tunnel side walls; the electric air pump is started to press compressed air into the inflatable airbag 8 to expand it and seal the surrounding of the sealing layer 1; the lower sealing curtain 9 is manually lowered, and steam is introduced into the sealed space formed by the sealing curtain 9 and the bottom of the side wall through a flexible pipe, and the ends of the sealing curtain 9 are sealed with the excess;
[0039] (2) Start the steam generator 6, and supply steam to the sealing layer 1 and between the sealing curtain 9 and the secondary lining. According to the monitored temperature and humidity data, control and adjust the steam supply volume, and perform maintenance in four stages: static stop, heating, constant temperature, and cooling;
[0040] (3) After the maintenance is completed, the operations are carried out in the following order: shut down the steam generator 6 → relieve pressure on the inflatable airbag 8 → relieve pressure on the horizontal hydraulic system → relieve pressure on the vertical hydraulic system → manually assist in retracting the sealing curtain 9 → lowering the screw jack 14.
[0041] The beneficial effect of the present invention is that the device uses sealing technology to form a closed cavity between the waterproof and heat-insulating sealed layer and the secondary lining structure, and sends water vapor into the closed cavity to cure the secondary lining concrete, thereby achieving the purpose of quickly improving the concrete strength, and the operation is simple and quick.
Claims
1. A tunnel secondary lining vault and side wall sealing and maintenance device, characterized in that : It includes a sealing mechanism, a pushing mechanism, a traveling mechanism and a steam generation control and monitoring mechanism, wherein the sealing mechanism includes a sealing layer adapted to the shape of the arch surface, the pushing mechanism includes a frame arranged at the lower side of the sealing layer and a jack arranged on the frame for pushing up the sealing layer, the traveling mechanism includes a track wheel connected to the lower end of the frame and a running rail arranged on the ground, the steam generation control and monitoring mechanism includes a steam generation mechanism and a control and monitoring mechanism arranged on the frame, and the steam pipeline of the steam generation mechanism is connected to a steam nozzle arranged on the sealing layer; The frame includes a plurality of cross beams, longitudinal beams and columns made of square light tubes, the bottom cross beam is poured with concrete, the jack is arranged on the cross beam and the column, the pushing direction of the jack is vertical pushing and horizontal pushing, the bottom of the jack is also provided with an adjustment base, the track wheel is installed on the lower side of the bottom cross beam, and a screw jack is arranged between the bottom cross beam and the running rail; Wherein, two sets of parallel hydraulic pipe networks are used to pressurize the vertical jack and the horizontal jack respectively; The sealing layer is made of a light flexible heat-insulating plate material, an inflatable air bag is squeezed between the edge of the sealing layer and the arch wall, and the lower side of the sealing layer is connected to the ground through a sealing curtain; The method for using the sealing and maintaining device for the secondary lining vault and side wall of a tunnel is characterized by: (1) The device is set on the running rail, and the device is lifted by a screw jack. The receiving system is changed, and the weight of the device is evenly applied to the running rail to restrict the free movement of the frame; the vertical hydraulic system is started to push the sealing layer upward until all vertical limit supports are tightly pressed against the tunnel arch; the horizontal hydraulic system is started to push the sealing layer to open to both sides until all horizontal limit supports are tightly pressed against the tunnel side walls; the electric air pump is started to press compressed air into the inflatable airbag to expand it and seal the surrounding of the sealing layer; the lower sealing curtain is lowered manually, and steam is introduced into the sealed space formed by the sealing curtain and the bottom of the side wall through a flexible pipe, and the ends of the sealing curtain are sealed with the excess; (2) Start the steam generator and supply steam to the sealing layer and between the sealing curtain and the secondary lining. According to the monitored temperature and humidity data, control and adjust the steam supply volume and carry out maintenance in four stages: static stop, heating, constant temperature and cooling; (3) After the maintenance is completed, the following operations shall be carried out in the following order: shut down the steam generator → inflate the airbag to relieve pressure → relieve pressure on the horizontal hydraulic system → relieve pressure on the vertical hydraulic system → manually assist in retracting the sealing curtain → lower the screw jack.
2. The sealing and maintenance device for the secondary lining vault and side wall of a tunnel as claimed in claim 1, characterized in that: The sealing layer is provided with a horizontal or vertical contact surface made of special-shaped steel plate in the area for receiving the pushing of the jack, and a limit support is provided at the corresponding position of the back of the sealing layer and the contact surface, and the limit support is sandwiched between the sealing layer and the arch surface.
3. The sealing and maintenance device for the secondary lining vault and side wall of a tunnel as claimed in claim 1, characterized in that: The steam generating mechanism comprises a water tank and a steam generator which are connected to each other, and the steam generator is connected to the steam nozzle via a steam pipeline.
4. The sealing and maintenance device for the secondary lining vault and side wall of a tunnel as claimed in claim 1, characterized in that: The control and monitoring mechanism includes two hydraulic pumps connected to the vertical pushing jack and the horizontal pushing jack respectively through parallel pipelines, an electric air pump for inflating the airbag, and also includes a distribution box and a control panel. The control panel is equipped with a water tank water level monitor, a steam pressure monitor, a hydraulic pump pressure gauge, and a maintenance space temperature and humidity monitor.
5. The sealing and maintenance device for the secondary lining vault and side wall of a tunnel according to any one of claims 1 to 4, characterized in that: Sleepers are also arranged between the shaped steel rail and the ground.
Citation Information
Patent Citations
Full-automatic tunnel mist spraying trolley for second-lining concrete curing
CN107559021A
Steam curing trolley for tunnel arch wall
CN107575247A
Two lining vaults in tunnel and sealed curing means of side wall
CN208122868U