A prefabricated toolbox for guiding water flow direction

Through the prefabricated water flow direction toolbox, the construction problem of changing the water flow direction of the water treatment facilities is solved, high-precision, safe and reliable water flow guidance is achieved, and the operational impact and safety risks are reduced, and strict construction requirements are met.

CN109252576BActive Publication Date: 2025-08-22SHANGHAI MUNICIPAL ENG DESIGN INST (GRP) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN201811115707.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-09-25
Publication Date
2025-08-22
Estimated Expiration
2038-09-25

AI Technical Summary

Technical Problem

When the prior art changes the water flow direction in the structure of water treatment facilities, concrete partition construction needs to be adopted, which affects normal operation, has great safety risks and is harmful to the environment, and is difficult to meet high-demand construction period, quality and safety standards.

Method used

Design a prefabricated water flow direction tool box, adopting a rectangular box structure, including the top plate, bottom plate, exterior wall plate, inner partition wall plate and water stop measures, prefabricated through container mode or steel plate-truss system, and adopting overall lifting to avoid limited space and toxic and harmful operations, and maintain operation in the water-through area.

Benefits of technology

It has achieved high-precision changes in water flow direction, shortened construction period, reduced impact on water treatment facilities operation, improved safety and environmental protection benefits, and met strict construction period, quality and safety requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109252576B_ABST
    Figure CN109252576B_ABST
Patent Text Reader

Abstract

A prefabricated toolbox for directing water flow is a rectangular box body comprising a top plate, a bottom plate, an exterior wall panel, a water-passing area insert, an interior partition panel, a construction area insert, a bottom anti-floating device, and water-stopping measures. The exterior wall panels form the four sides of the toolbox, the front exterior wall panel is provided with two reserved opening areas, the rear portions of the left and right exterior wall panels are inserted into the water-passing area insert, the interior of the toolbox is divided into a front left space, a front right space, and a rear space, the surface of the interior partition panel separating the front and rear spaces is inserted into the construction area insert, and the inner side surface of the bottom panel is provided with a bottom anti-floating device. The present invention can be implemented in a container model, a steel plate-truss system, or other forms, and has high precision. When used, the construction process is simple and the construction time is short. It avoids workers from performing toxic and harmful operations in confined spaces, making it safe and reliable. The water-passing area is retained, reducing the impact on the normal operation of existing water treatment facilities such as water plants and sewage treatment plants, and achieving high environmental benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water treatment facility construction, and in particular to a prefabricated water flow direction guiding tool box. Background Art

[0002] Municipal water treatment plant construction is gradually entering a peak period across cities and regions, with increasing efforts to upgrade, renovate, and expand water treatment facilities. This involves an increasing number of connections between existing and new structures, making the construction of structural partitions and connections for pump rooms, reservoirs, and box culverts increasingly difficult. This is coupled with increasingly stringent requirements for schedules, quality, and safety. All of these factors are driving the continuous development of structural partition and connection technologies, including prefabricated flow guidance toolboxes.

[0003] Based on the current situation, if the water flow direction within the structure is to be changed, concrete partitions and joints must be constructed. These operations will inevitably result in a low or dry water level in the structure. The disadvantages of this approach are: it significantly impacts the normal operation of existing water treatment facilities, such as waterworks and sewage treatment plants, and in severe cases, can have an impact on the surrounding environment and residents' lives, causing adverse social impacts. Furthermore, construction within the structure involves confined spaces and involves toxic and hazardous operations, posing significant safety risks and numerous potential safety hazards, which are detrimental to the occupational health and safety of workers. Summary of the Invention

[0004] In view of the above problems, the present invention provides a prefabricated water flow direction guiding tool box.

[0005] The purpose of the present invention can be achieved through the following technical solutions: a prefabricated tool box for guiding the direction of water flow, the tool box is a rectangular box body, the tool box includes a top plate, a bottom plate, an outer wall panel, a water-passing area plug-in plate, an inner partition wall panel, a construction area plug-in plate, a bottom anti-floating device and a water-stopping measure; the outer wall panels surround the four sides of the tool box, the lower part of the outer wall panel on the front side of the tool box is provided with two reserved opening areas in the horizontal direction, the rear part of the outer wall panel on the left and right sides of the tool box is provided with a water-passing area slot, the water-passing area plug-in plate is inserted into the water-passing area slot, the inner partition wall panel is provided with a water-passing area slot, and the inner partition wall panel is provided with a water-passing area slot. The board is arranged inside the toolbox, and the internal partition board includes left and right partition boards and front and rear partition boards, which are arranged in a T shape. The left and right partition boards divide the space inside the toolbox into front space and rear space, and the front and rear partition boards divide the front space inside the toolbox into front left space and front right space. The left and right partition boards are provided with two construction area slots in the horizontal direction, and the two construction area slots are respectively arranged corresponding to the front left space and the front right space. The construction area plug-in board is inserted into the construction area slot, and a bottom anti-floating device is provided on the inner side of the bottom plate.

[0006] Furthermore, it comprises a rectangular parallelepiped frame, and eight corners of the frame are provided with lifting devices.

[0007] Furthermore, four tying rings are provided on the outer surface of the top plate, and the four tying rings are respectively welded to four corner columns and connected to the bottom beam at the bottom of the frame and the top beam at the top.

[0008] Furthermore, corrugated boards are provided around the tool box.

[0009] Furthermore, the reserved opening area is provided with an opening frame, and the frame edge of the opening frame is provided with a water-stop seal.

[0010] Furthermore, the bottom anti-floating device is a counterweight block.

[0011] Furthermore, the water-stopping measure is a rubber water-stopping strip, and the rubber water-stopping strip is provided on the inner side of the edge, inside the edge, or outside the edge of the tool box.

[0012] Compared with the existing technology, the present invention has the following advantages: 1. The tool box is prefabricated and assembled in the production workshop according to the design drawings, and can adopt the container model, steel plate-truss system and other forms, with high precision;

[0013] 2. The toolbox is hoisted as a whole during the hoisting process, which is simple in process, in place at one time and short in construction time;

[0014] 3. The toolbox prevents workers from performing confined space, toxic and harmful operations during use, and is safe and reliable;

[0015] 4. During the use of the toolbox, the water flow area is still retained, which reduces the impact on the normal operation of existing water treatment facilities such as water plants and sewage treatment plants, and has high environmental benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a top view of the present invention.

[0017] Figure 2 It is a side view of the present invention.

[0018] Figure 3 It is a front side schematic diagram of the present invention.

[0019] Figure 4 for Figure 1 Middle AA section view.

[0020] Figure 5 for Figure 1 Middle BB cross-section.

[0021] Figure 6 for Figure 1 Cross-section of the middle CC.

[0022] Figure 7 This is a plan view of the existing box culvert and gate entrance before diversion is implemented in one embodiment of the present invention.

[0023] Figure 8 for Figure 7 Middle DD cross-section.

[0024] Figure 9 for Figure 7 Middle EE cross-section.

[0025] Figure 10 This is a plan view of the toolbox, existing box culvert, and gate entrance during the diversion stage of an embodiment of the present invention.

[0026] Figure 11 for Figure 10 Middle FF cross-section.

[0027] Figure 12 for Figure 10 Middle GG cross-section.

[0028] Figure 13 This is a plan view of the tool box, existing box culvert, and gate entrance during the partition wall construction stage of an embodiment of the present invention.

[0029] Figure 14 for Figure 13 Middle HH cross-section.

[0030] Figure 15 for Figure 13 Section II. DETAILED DESCRIPTION

[0031] The following describes the specific embodiments of the present invention in detail in conjunction with the accompanying drawings so that those skilled in the art can more clearly understand how to practice the present invention. Although the present invention has been described in conjunction with its preferred embodiments, these embodiments are merely illustrative, rather than limiting, the scope of the present invention.

[0032] See also Figures 1 to 6 A prefabricated tool box for guiding the direction of water flow is a rectangular box. The tool box includes a top plate, a bottom plate, an outer wall panel 1, a water-passing area plug-in plate 2, an inner partition wall panel 3, a construction area plug-in plate 4, a bottom anti-floating device 5 and a water-stopping measure 6.

[0033] The exterior wall panels 1 form the four sides of the toolbox. Two reserved openings 7 are horizontally defined on the lower portion of the exterior wall panels 1 on the front side of the toolbox. Water-passing slots are located at the rear of the exterior wall panels 1 on both the left and right sides of the toolbox, into which water-passing inserts 2 are inserted from top to bottom. The interior partition panels 3 are disposed within the toolbox and include left and right partition panels and front and rear partition panels. The left and right partition panels and front and rear partition panels are arranged in a T-shape. The left and right partition panels divide the interior of the toolbox into a front space and a rear space, while the front and rear partition panels divide the front space into a front left space and a front right space. The left and right partition panels are horizontally defined with two construction area slots, corresponding to the front left space and the front right space, respectively. Construction area inserts 4 are inserted from top to bottom into these construction area slots. A bottom anti-floating device 5 is provided on the inner side of the bottom panel. Water-stopping measures 6 are provided on the inner side of the edge, inside the edge, or outside the edge of the tool box.

[0034] The toolbox can be prefabricated, assembled, or assembled using a container model or a steel plate-truss system. When the steel plate-truss system is used, the toolbox also includes a rectangular frame. The main beam at the bottom of the frame is channel steel, the crossbeam at the bottom of the frame is angle steel, the corner posts at the four corners of the frame are square tubes, the top beam at the top of the frame is square steel tube, and the middle crossbeam at the top of the frame is angle steel. Welding between the frames requires continuous spot welding, and all gaps are sealed with elastic elements. Lifting devices, which can be lifting rings, are provided at each of the eight corners of the frame for lifting, positioning, and securing during construction.

[0035] The top plate is made of corrugated steel plate, the bottom plate is made of flat steel plate, the exterior wall panel 1 and interior partition panel 3 are made of steel structure and corrugated plate connected by carbon dioxide shielded arc welding, and corrugated plate is provided around the toolbox. The reserved opening area 7 is provided with an opening frame, which is made of channel steel. The frame edge seal of the opening frame is made of rubber waterstop strips to ensure waterproofing. Four tying rings are provided on the outer surface of the top plate. The four tying rings are respectively welded to the four corner columns and connected to the bottom beam and the top beam. The bottom anti-floating device 5 can be a counterweight block. The material of the counterweight block can be concrete block or steel block, or it can be anchored to the original structure with top bolts or other forms. The waterstop measure 6 can be a rubber waterstop strip, a waterstop plate or other waterstop material. The waterstop strip is fixed to the channel steel by pre-embedded nuts and bolts. The height of the water-passing area plug 2 and the construction area plug 4 are both equal to the height of the exterior wall panel 1.

[0036] One embodiment: See Figures 7 to 9The upgrading and renovation project of a municipal sewage treatment plant included the construction of a new gate well 10 and its connection to the existing box culvert 8. The new gate well 10 had plan dimensions of 6.8m × 15.2m, a bottom elevation of -0.5m, a top elevation of 6.7m, and a pool wall thickness of 0.4m. The existing box culvert 8 had plan dimensions of 2.7m × 2.7m, a bottom elevation of 0.3m, a top elevation of 3.35m, and a pool wall and top plate thickness of 0.35m. The top of the existing box culvert 8 was a high-level well 11, and the existing box culvert 8 was 1m away from the new gate well 10. The design required that the new gate well 10 be connected to the existing box culvert 8 by opening a hole in the existing box culvert 8. At the same time, a middle partition wall 12 was installed in the existing box culvert 8 to guide the water flow in the box culvert into the new gate well 10.

[0037] Combined with the above project overview, the application of this product can optimize the design scheme. The use of prefabricated water flow direction guiding toolbox can effectively improve accuracy, construction period, safety, environmental benefits and other aspects.

[0038] The implementation plan is as follows: 1. Customize and prefabricate two tool boxes in the processing workshop according to actual on-site needs;

[0039] 2. Open a hole in the top plate of the existing box culvert 8. For the specific construction location, see Figure 7 Chisel out area 9 from the top plate of the existing box culvert 8, lift up the water-passing area inserts 2 and the construction area inserts 4 of the two tool boxes, and then use the crane to lift the lifting device of the tool box and lower the two tool boxes to the designated position.

[0040] 3. Check for any abnormalities such as water leakage or overturning. After confirming that everything is normal, refer to Figures 10 to 12 , the construction area plug-in board 4 is inserted into both tool boxes;

[0041] 4. Drain the accumulated water from the front left and right spaces of each toolbox, and then drill holes in the two reserved opening areas 7 on the front side of the toolbox and proceed with the subsequent steps. After the subsequent steps are completed, lift all the construction area inserts 4 and insert them into the water-passing area inserts 2 on the adjacent sides of the two toolboxes to complete the water flow guidance work;

[0042] 5. See Figures 13 to 15 , construct the middle partition wall 12 between the adjacent sides of the two tool boxes. After the construction of the middle partition wall 12 is completed, the two tool boxes are hoisted out as a whole to complete the final work.

[0043] The following is the analysis of the program indicators, see Table 1.

[0044] Table 1 Scheme indicator analysis table

[0045]

[0046] It should be noted that the present invention, having been fully described, is susceptible to numerous variations and modifications, and is not limited to the specific embodiments described above. The foregoing embodiments are intended to illustrate the present invention, not to limit it. In short, the scope of protection of the present invention is intended to include those variations, substitutions, and modifications that are obvious to one of ordinary skill in the art, and is subject to the appended claims.

Claims

1. A prefabricated water flow direction guiding tool box, characterized in that: The toolbox is a rectangular box, which includes a top plate, a bottom plate, an outer wall panel, a water-passing area plug-in plate, an inner partition panel, a construction area plug-in plate, a bottom anti-floating device and a water-stopping measure; the outer wall panels surround the four sides of the toolbox, and the lower part of the outer wall panel on the front side of the toolbox is provided with two reserved opening areas in the horizontal direction, and the rear of the outer wall panels on the left and right sides of the toolbox are provided with water-passing area slots, and the water-passing area plug-in plates are inserted into the water-passing area slots. The inner partition panels are arranged inside the toolbox, and the inner partition panels include left and right partition panels and front and rear partition panels. The right partition board and the front and rear partition boards are arranged in a T shape. The left and right partition boards divide the space inside the toolbox into the front space and the rear space. The front and rear partition boards divide the front space inside the toolbox into the front left space and the front right space. The left and right partition boards are provided with two construction area slots in the horizontal direction. The two construction area slots are respectively arranged corresponding to the front left space and the front right space. The construction area plug-ins are inserted into the construction area slots. The inner side of the bottom plate is provided with a bottom anti-floating device. Corrugated boards are arranged around the toolbox, and the bottom anti-floating device is a counterweight block.

2. The prefabricated water flow direction guiding tool box according to claim 1, characterized in that: The utility model comprises a rectangular parallelepiped frame, and eight corners of the frame are provided with lifting devices.

3. The prefabricated water flow direction guiding tool box according to claim 2, characterized in that: Four tying rings are provided on the outer surface of the top plate, and the four tying rings are respectively welded to the four corner columns and connected to the bottom beam at the bottom of the frame and the top beam at the top.

4. The prefabricated water flow direction guiding tool box according to claim 1, characterized in that: The reserved opening area is provided with an opening frame, and the frame edge of the opening frame is provided with a water-stop seal.

5. The prefabricated water flow direction guiding tool box according to claim 1, characterized in that: The water-stopping measure is a rubber water-stopping strip, and the rubber water-stopping strip is provided on the inner side of the edge, inside the edge, or outside the edge of the tool box.

Citation Information

Patent Citations

  • Prefabricated tool box for guiding water flow direction

    CN209243854U