A water chamber installation structure for automobile radiator
Through the combined structure of the split end standard block and the water chamber body, combined with the use of aluminum and plastic blocks, the problem of material waste and low structural strength of the automobile radiator water chamber is solved, and a water chamber with efficient assembly and long life is achieved. Installation structure.
Patent Information
- Application Number
- CN201811588531.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-12-25
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2038-12-25
AI Technical Summary
The existing automobile radiator water chamber has problems of material waste, pollution, high cost, low structural strength and short service life.
The combined structure of the split end standard block and the water chamber body is adopted. The standard block is fixedly connected to the installation groove of the side plate. The limit port, barb structure and installation cutout are used to achieve automatic locking. The aluminum block and the plastic block are combined. Use to improve structural strength and service life.
It improves assembly efficiency and structural strength, reduces damage to the aluminum water chamber, extends service life, simplifies the assembly process, has strong adaptability, and reduces mold waste.
Smart Images

Figure CN109458857B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of automobile cooling systems, and in particular to a water chamber installation structure for an automobile radiator. Background Art
[0002] With the rapid development of the automobile industry, people's demand for personalized automobiles is getting higher and higher, and the replacement of automobiles is accelerating.
[0003] At present, the upper and lower water chambers used in car radiators are mostly plastic water chambers, cast aluminum water chambers or welded aluminum water chambers. Among them, plastic water chambers are mostly made of nylon 66 and glass fiber. Their structure is relatively complex, wasting a lot of nylon, and glass fiber is a highly polluting material, which has a serious destructive effect on the environment. In addition, the investment cost of plastic water chambers and cast aluminum water chambers is high. Different products need to have different molds, and the repeated investment of products is high, especially for small batches of products, which causes a lot of mold waste. The quality of welded water chambers is unstable and the structural strength is low. At the same time, after the aluminum water chamber is connected and assembled with the iron side plate, the assembly part is prone to failure during long-term use due to the soft material of aluminum. Existing products have problems such as high manufacturing cost, poor structural strength, poor pressure bearing strength, and short service life. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a water chamber installation structure for an automobile radiator, which has the advantages of simple assembly, strong adaptability, high structural strength, long service life, etc.
[0005] The present invention is achieved through the following technical solutions:
[0006] Provided is a water chamber mounting structure for an automobile radiator, comprising a radiator side plate and a water chamber body mounted on the side plate, wherein both ends of the water chamber body are fixedly connected to a mounting groove of the side plate through end standard blocks, respectively; the end standard blocks comprise a first standard block and a second standard block mounted in the first standard block, and mounting blocks are protruding from two end faces in the length direction of the second standard block, and mounting openings matching the mounting blocks are respectively provided on two side walls of the mounting groove.
[0007] This solution uses end standard blocks to connect the water chamber body and the side panels. The end standard blocks adopt a split structure of a first standard block and a second standard block. The second standard block is inserted into the first standard block and installed through the assembly blocks at both ends and the assembly ports on the side panel mounting grooves to achieve installation and fixation of the water chamber body.
[0008] Furthermore, one side of the first standard block is sealed and fixed to the end face of the water chamber body, and a mounting block is fixed to the other side thereof. A receiving cavity penetrating the mounting block and used to place the second standard block is provided in the mounting block along the width direction of the mounting groove.
[0009] The first standard block is plugged into and matched with the second standard block through the accommodating cavity in the mounting block, so as to facilitate the overall assembly.
[0010] Furthermore, a guide cutout communicating with the accommodating cavity and having the same length as the accommodating cavity is provided on the top surface of the mounting block in the length direction of the accommodating cavity, and a guide protrusion located in the guide cutout is provided on the upper surface of the second standard block.
[0011] A guide cutout communicating with the accommodating cavity is provided above the accommodating cavity for cooperating with the guide protrusion on the second standard block, so that the second standard block is limited in the width direction of the accommodating cavity when inserted into the accommodating cavity and does not move, thereby ensuring the stability of the connection.
[0012] Furthermore, a limiting cutout communicating with the guide cutout is provided on the top surface of the installation block in the width direction of the guide cutout, and a barb structure which can be engaged in the limiting cutout to prevent withdrawal is provided on the second standard block.
[0013] The guide cut is connected to the limiting cut, and the barb structure on the second standard block cooperates with the limiting cut. After the second standard block is inserted into the first standard block, the barb structure is engaged in the limiting cut to prevent the second standard block from exiting the first standard block, thereby achieving the limitation of the second standard block.
[0014] Furthermore, the barb structure is a V-shaped protrusion, and the ends of both sides of the V-shaped protrusion are respectively located in the limiting cutout and abut against both sides of the limiting cutout.
[0015] The barb structure is V-shaped, and the opening direction of the V-shaped protrusion is opposite to the insertion direction of the second standard block. After the second standard block is inserted into the accommodating cavity, the two sides of the V-shaped protrusion are respectively located in the limiting cutouts and abut against the guide cutouts, effectively preventing the second standard block from retreating.
[0016] Furthermore, a mounting stop surface for limiting the position of the second standard block is fixedly provided between the end surface of the second standard block and one of the assembly blocks.
[0017] In order to locate the second standard block in the accommodating cavity of the first standard block, a mounting stop surface is provided on the end surface of the second standard block, and the mounting stop surface and the end surface of the accommodating cavity can be used for limiting, so as to facilitate positioning and installation.
[0018] Furthermore, the end surface of the mounting block is provided with a mounting cut surface that matches the mounting stop surface.
[0019] The end surface of the mounting block is concavely provided with a mounting cut surface, which cooperates with the mounting stop surface, so that the connection between the first standard block and the second standard block is more beautiful and neat, and is convenient for positioning and installation.
[0020] Furthermore, a limiting protrusion is provided on the mounting block, and a limiting opening cooperating with the limiting protrusion is provided on the bottom wall of the side plate mounting groove.
[0021] The mounting block is provided with a limiting protrusion which cooperates with the limiting opening on the bottom wall of the side plate mounting groove, so as to limit the mounting block as a whole, making the connection between the mounting block and the mounting groove more stable and preventing movement, which is beneficial to maintaining the stability of the water chamber body.
[0022] Furthermore, the assembly block is provided with a blind hole for connecting a self-tapping screw.
[0023] The assembly block is provided with a blind hole, and locking is achieved by installing a self-tapping screw, thereby enhancing the stability of the connection between the end standard block and the side panel mounting groove.
[0024] Preferably, the first standard block is an aluminum block, and the second standard block is a plastic block.
[0025] The two end surfaces of the plastic block and the side panels cooperate with each other to effectively reduce the damage of the side panels to the aluminum water chamber body and increase the service life of the aluminum water chamber. The aluminum block is easy to weld and fix with the water chamber body to enhance the structural strength of the water chamber.
[0026] Beneficial effects of the present invention:
[0027] 1. The first standard block and the second standard block are assembled with each other to form an end standard block. The automatic locking function of the end standard block is realized through the mutual assembly and coordination of the limit opening, the barb structure and the installation cut surface, which greatly improves the assembly efficiency and structural strength.
[0028] 2. The second standard block is made of plastic blocks, and its two end faces are in contact with the side panels, which can effectively reduce the damage of the side panels to the aluminum water chamber body and increase the service life of the aluminum water chamber; the aluminum block of the first standard block is made of the same material as the water chamber body, which is convenient for welding and fixing with the water chamber body, thereby improving the structural strength and pressure-bearing strength of the water chamber.
[0029] 3. Simple structure, easy assembly and high production efficiency. The aluminum profile water chamber body and the standard blocks at both ends can be used as standard parts. The length of the water chamber body can be adjusted according to the use requirements to meet the use needs. The structure has strong adaptability and does not require too much mold investment, which is more suitable for the current changing market requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a structural schematic diagram of the present invention.
[0031] Figure 2 This is a schematic diagram of the assembly structure of the end standard block and the side panel
[0032] Figure 3 It is a structural diagram of the end standard block.
[0033] Figure 4 yes Figure 2 Top view of the structure.
[0034] Figure 5 It is a schematic diagram of the structure of the first standard block.
[0035] Figure 6 yes Figure 5 Top view
[0036] Figure 7 yes Figure 5 main view.
[0037] Figure 8 It is a structural diagram of the second standard block.
[0038] Fig. 9 yes Figure 8 Top view
[0039] Fig.10 yes Figure 8 The main view;
[0040] As shown in the figure:
[0041] 1. Water chamber body, 2. End standard block, 3. First standard block, 4. Second standard block, 5. Assembly block, 6. Assembly port, 7. Side plate, 8. Side wall of mounting groove, 9. Limit port, 10. Self-tapping screw, 11. Limit protrusion, 12. Mounting block, 13. Mounting stop surface, 14. Blind hole, 15. Mounting cut surface, 16. Limit incision, 17. Barb structure, 18. Accommodation cavity, 19. Guide incision, 20. Guide protrusion. DETAILED DESCRIPTION
[0042] In order to clearly illustrate the technical features of this solution, this solution is described below through a specific implementation method.
[0043] A water chamber installation structure for an automobile radiator comprises a radiator side panel 7 and a water chamber body 1 assembled on the side panel 7. Both ends of the water chamber body 1 are fixedly connected to the mounting grooves of the side panel 7 through end standard blocks 2 respectively. The end standard block 2 comprises a first standard block 3 and a second standard block 4 assembled in the first standard block 3. As an embodiment of the present invention, the first standard block 3 is an aluminum block, and the second standard block 4 is a plastic block.
[0044] The two end faces of the second standard block 4 in the length direction are respectively provided with assembly blocks 5, and the two side walls 8 of the installation groove are respectively provided with assembly openings 6 that match the assembly blocks 5. The assembly block 5 is provided with a blind hole 14 for connecting the self-tapping screw 10, and the end standard block 2 can be locked and fixed by connecting the self-tapping screw 10. The installation block 12 is provided with a limiting protrusion 11, and the bottom wall of the installation groove of the side plate 7 is provided with a limiting opening 9 that matches the limiting protrusion 11.
[0045] One side surface of the described first standard block 3 is hermetically fixed to the end surface of the water chamber body 1, and an installation block 12 is fixed to the other side surface. An accommodation cavity 18 that penetrates the installation block 12 and is used for placing the second standard block 4 is provided in the installation block 12 along the width direction of the installation groove. A guiding notch 19 that communicates with the accommodation cavity 18 and has the same length as the accommodation cavity 18 is provided on the top surface of the installation block 12 in the length direction of the accommodation cavity 18. A guiding protrusion 20 located in the guiding notch 19 is provided on the upper surface of the second standard block 4.
[0046] A limiting notch 16 that communicates with the guiding notch 19 is provided on the top surface of the installation block 12 in the width direction of the guiding notch 19. A barb structure 17 that can be engaged in the limiting notch 16 to prevent withdrawal is provided on the second standard block 4. As an implementation manner of the present invention, as Figure 5 shown, the guiding notch 19 and the limiting notch 20 form a "middle" - shaped notch.
[0047] The barb structure 17 is a V - shaped protrusion. The end parts of both sides of the V - shaped protrusion are respectively located in the limiting notch 16 and are abutted against both sides of the limiting notch 16.
[0048] An installation stop surface 13 for limiting the second standard block 4 is also fixedly provided between the end surface of the second standard block 4 and one of the assembly blocks 5. An installation cutting surface 15 that cooperates with the installation stop surface 13 is provided on the end surface of the installation block 12.
[0049] In the present invention, the length of the installation block 12 on the aluminum block of the first standard block 3 is L, the width is H, and the height is T; wherein the length L is the same as the width L3 of the installation groove of the side plate 7, the thickness of the installation cutting surface 15 is C1, the length of the accommodation cavity 18 is L1, the width is H1, and the height is T1; the length of the "middle" - shaped guiding notch 19 provided on the upper part of the installation block 12 is the same as the length of the accommodation cavity 18, which is L1, the length of the middle rectangular limiting notch 16 is N1, and the width is M1; wherein T1 < T, H1 < H, and C1 + L1 = L.
[0050] The overall structure of the plastic block of the second standard block 4 is in a cuboid structure. When the guiding protrusion 20 on its upper surface is assembled with the installation block 12, it is located in the guiding notch 19 of the installation block 12, while the barb structure 17 is located in the limiting notch 16 for assembly and fixation to prevent the plastic block from retreating; an installation stop surface 13 that cooperates with the installation cutting surface 15 on the installation block 12 is provided on one side end surface of the plastic block; the assembly blocks 5 with protrusions on both end surfaces are assembled with the assembly openings 6 on both side walls 8 of the installation groove of the side plate 7, and the blind holes 14 on the assembly blocks 5 are used for the assembly of the self - tapping screws 10.
[0051] The length of the plastic block is L2, the width is H2, and the height is T2. The length of the barb structure 17 is N2 and the width is M2. The thickness of the mounting stop surface 13 is C2, the total length of the protrusions of the assembly blocks 5 at both ends is A2, and the total length of the side panel 7 is A3, where L2=L=L3, A2=A3, H2=H1, T2=T1, M2=M1, and N2=N1.
[0052] When the plastic block is assembled with the mounting block 12 on the aluminum block, the plastic block is inserted into the mounting block 12 through the accommodating groove 18 from the mounting cut surface 15 at one end of the mounting block 12 until the mounting stop surface 13 contacts and positions the mounting cut surface 15. The guide protrusion 20 on the upper surface of the plastic block is located in the guide cutout 19 on the mounting block 12, and the two sides of the V-shaped protrusion on the upper surface of the plastic block are respectively engaged in the limiting cutout 16. The guide cutout 19 and the guide protrusion 20, the barb structure 17 and the limiting cutout 16, and the mounting cut surface 15 and the mounting stop surface are connected. 13 are assembled and matched with each other to realize the locking function. After the assembly is completed, the plastic block is fixed in six directions, so that the plastic block and the aluminum block form a whole. The aluminum block is welded and fixed to the water chamber body 1 on one side of the water chamber body 1, thereby improving the structural strength and pressure bearing strength of the water chamber 1; the two ends of the plastic block are fixed by the assembly block 5 and the two side walls 8 of the mounting groove on the side plate 7. The plastic block can effectively reduce the damage of the side plate to the aluminum water chamber body 1, thereby improving the service life of the aluminum water chamber, and the installation operation is convenient, the assembly precision is high, and the work efficiency is high.
[0053] Of course, the above description is not limited to the above examples. Technical features not described in the present invention can be achieved by or by using existing technologies, which will not be described here. The above embodiments and drawings are only used to illustrate the technical scheme of the present invention and are not limitations of the present invention. The present invention is described in detail with reference to the preferred implementation methods. Ordinary technicians in this field should understand that changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention do not depart from the purpose of the present invention, and should also fall within the scope of protection of the claims of the present invention.
Claims
1. A water chamber mounting structure for an automobile radiator, comprising a radiator side plate and a water chamber body assembled on the side plate, Features: The two ends of the water chamber body are fixedly connected to the mounting groove of the side plate through the end standard blocks, respectively. The end standard blocks include a first standard block and a second standard block assembled in the first standard block. The two end faces of the second standard block in the length direction are respectively provided with mounting blocks, and the two side walls of the mounting groove are respectively provided with mounting openings matched with the mounting blocks. The first standard block is an aluminum block, and the second standard block is a plastic block; One side of the first standard block is sealed and fixed to the end surface of the water chamber body, and the other side thereof is fixed with a mounting block. An accommodating cavity penetrating the mounting block and used for placing the second standard block is provided in the mounting block along the width direction of the mounting groove.
2. The water chamber installation structure for automobile radiator according to claim 1, Features: The top surface of the mounting block is provided with a guide cutout in the length direction of the accommodating cavity, which is in communication with the accommodating cavity and has the same length as the accommodating cavity. The upper surface of the second standard block is provided with a guide protrusion located in the guide cutout.
3. The water chamber installation structure for automobile radiator according to claim 2, Features: The top surface of the installation block is provided with a limiting notch in communication with the guide notch in the width direction of the guide notch, and the second standard block is provided with a barb structure that can be engaged in the limiting notch to prevent withdrawal.
4. The water chamber installation structure for automobile radiator according to claim 3, Features: The barb structure is a V-shaped protrusion, and the ends of both sides of the V-shaped protrusion are respectively located in the limiting cutout and abut against the two sides of the limiting cutout.
5. The water chamber installation structure for automobile radiator according to claim 1, Features: A mounting stop surface for limiting the position of the second standard block is also fixedly provided between the end surface of the second standard block and one of the assembly blocks.
6. The water chamber installation structure for automobile radiator according to claim 5, Features: The end surface of the installation block is provided with an installation cut surface which matches with the installation stop surface.
7. The water chamber installation structure for automobile radiator according to claim 1, Features: The mounting block is provided with a limiting protrusion, and the bottom wall of the side plate mounting groove is provided with a limiting opening matched with the limiting protrusion.
8. The water chamber installation structure for automobile radiator according to claim 1, Features: The assembly block is provided with a blind hole for connecting a self-tapping screw.
Citation Information
Patent Citations
Radiator with clamping strip
CN102312716A
Molten aluminum chamber for high-strength radiator
CN103528422A
Heat radiator installing structure
CN106218393A
Novel structure of radiator for vehicle
CN200968809Y
High-strength automobile aluminum-plastic radiator
CN203964708U
