A high-purity gas filling system and use method thereof

By introducing a PLC control system and specific valve design into the high-purity gas filling system, automatic control of gas purity and safety during the high-pressure filling process of NF3 and CF4 is achieved, solving the problem of overpressure, The problem of overcharging and leakage ensures the safety and efficiency of the filling process.

CN110553141BActive Publication Date: 2024-10-01HAOHUA GAS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910772069.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-12
Publication Date
2024-10-01
Estimated Expiration
2039-08-12

AI Technical Summary

Technical Problem

The existing high-purity gas filling system cannot effectively control gas purity and safety during the high-pressure filling process, and there are risks of overpressure, overcharging and leakage. It is especially unsuitable for high-pressure filling of NF3 and CF4.

Method used

A high-purity gas filling system including material storage tank, liquid pump, filling part and PLC control system is designed. Automatic control of gas purity and pressure is achieved through low-temperature stop valve, diaphragm valve and PLC control to avoid overpressure. and overcharging, and uses EP-grade stainless steel pipelines and welding technology to improve system safety.

Benefits of technology

It realizes the controllability and safety of gas purity during the high-pressure filling process of high-purity gas, and avoids the risks of overpressure, overfilling and leakage. It is suitable for high-pressure filling of NF3 and CF4, ensuring the safety and safety of the filling process. Efficient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110553141B_ABST
    Figure CN110553141B_ABST
Patent Text Reader

Abstract

The present invention discloses a high-purity gas filling system and a method for using the same, comprising four parts: a material storage tank part, a liquid pump part, a filling part, and a PLC control system. The material storage tank part comprises a high-purity gas storage tank (1) and a low-pressure vaporizer (2); the liquid pump part comprises a liquid pump (3) and a high-pressure vaporizer (4); the filling part comprises a filling panel (5), an electronic scale (6), and a packaging container (20); a filter (19) and a diaphragm valve V12 are arranged on the filling panel (5); a helium pipe (7), a vacuum pipe (9), a recovery pipe (8), an analysis pipe (10), a panel pressure sensor (13), and a vacuum gauge (14) are arranged on the pipeline between the filter (19) and the diaphragm valve V12; the PLC control system comprises a liquid pump control cabinet (15) and a filling control cabinet (16). The high-purity gas filling system can be manually operated or automatically filled. The packaging container can be filled with one or more containers such as steel cylinders or tank trucks, and the process is efficient and fast.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a high-purity gas filling system and a method of using the same, which is particularly suitable for high-purity NF 3 CF 4 The high-pressure filling of gases such as argon and so on belongs to the field of high-purity gas filling. Background Art

[0002] Fluorine-containing electronic special gases are essential basic supporting raw materials in the manufacturing process of ultra-large-scale integrated circuits, liquid crystal display panels, semiconductor light-emitting devices and semiconductor materials, especially NF 3 and CF 4 Gas is widely used as a cleaning agent and etching agent. With the development of the industry, the requirements for product purity are getting higher and higher. Filling, as the final link, has a great impact on product quality and is prone to quality accidents that contaminate qualified materials.

[0003] When high purity NF 3 or CF 4 During filling, the liquefied gas in the cryogenic storage tank is filled into packaging containers such as steel cylinders and ISO tank trucks through high-pressure pumps and other equipment. The pressure rises slowly during the filling process, and the pressure at the end of the filling reaches more than 1500psig. The slightest negligence will lead to safety accidents such as overpressure, overfilling, and even leakage. At present, when designing high-purity gas filling systems in the industry, the purity of the filling gas can be controlled by introducing a high-purity gas replacement system and increasing the online analysis and monitoring of the filling material gas during the filling process. However, the filling process does not introduce a control system, the operation is accidental, and the risk of overpressure, overfilling, and even leakage cannot be effectively avoided through engineering control measures.

[0004] Patent document CN103775822A discloses an ultra-pure gas fully automatic high-precision filling system, which uses an ultra-pure gas fully automatic, high-precision (mass accuracy better than 0.5%) filling system. When the system described in the patent is working, the ultra-pure gas source cylinder needs to be connected to the ultra-pure gas storage tank through an air supply pipeline, and high-purity ammonia gas is added to the ultra-pure gas storage tank for pressurization. The container to be filled is placed in a vacuum filling chamber. Before filling, the packaging container needs to be cooled by a refrigerator. The filling process is completed by controlling the front and rear pressure difference. However, this system is only suitable for low-pressure or liquid material filling, and has no safety design, so it is not suitable for NF 3 CF 4 High pressure filling.

[0005] Patent document CN205331790U discloses a high-purity gas filling system, providing a gas filling system that integrates detection, purification, and replacement functions. It uses the detection function of the analyzer, the purification function of the purifier, the auxiliary replacement function of the vacuum pump, and the synergy between these functions to achieve control of the purity of the gas during the filling process. Similarly, the filling system has no safety design, the pressure during the filling process increases, the filling speed is fast, and the design of the purifier in parallel with the filling pipeline for the purification of the filling material itself has great safety hazards and is not suitable for NF 3 CF 4 High pressure filling. Summary of the invention

[0006] The first technical problem to be solved by the present invention is to provide a high-purity gas filling system, through which the gas purity and safety of the filling process can be controlled.

[0007] The second technical problem to be solved by the present invention is to provide a method for using the system.

[0008] In order to solve the first technical problem, the technical solution of the present invention is: a high-purity gas filling system, including a material storage tank part, a liquid pump part, a filling part, and a PLC control system. The material storage tank part includes a high-purity gas storage tank 1 and a low-pressure vaporizer 2. The high-purity gas storage tank 1 and the low-pressure vaporizer 2 form a closed loop through a pipeline and a low-temperature stop valve V2. A liquid level gauge 11 is installed at the bottom of the high-purity gas storage tank 1, and a storage tank pressure sensor 12 is installed at the top. A liquid nitrogen coil 21 is arranged in the storage tank, and the inlet and outlet of the liquid nitrogen coil 21 are respectively connected to a low-temperature stop valve V3 and a low-temperature stop valve V4; the liquid pump part includes a liquid pump 3 and a high-pressure vaporizer 4, and the liquid pump 3 is connected to the bottom of the high-purity gas storage tank 1 through a low-temperature stop valve V1; the filling part includes A filling panel 5, an electronic scale 6 and a packaging container 20, a filter 19 and a diaphragm valve V12 are arranged on the filling panel 5, and a helium pipe 7, a vacuum pipe 9, a recovery pipe 8, an analysis pipe 10, a panel pressure sensor 13 and a vacuum gauge 14 are arranged on the pipeline between the filter 19 and the diaphragm valve V12; the filter 19 is connected to the high-pressure vaporizer 4 through the diaphragm valve V5, the diaphragm valve V12 is connected to the packaging container 20, and the packaging container 20 is placed on the electronic scale 6; the PLC control system includes a liquid pump control cabinet 15 and a filling control cabinet 16, and the signals of the liquid level meter 11, the panel pressure sensor 13 and the electronic scale 6 are connected to the liquid pump control cabinet 15; the signals of the panel pressure sensor 13, the electronic scale 6 and the vacuum gauge 14 are connected to the filling control cabinet 16.

[0009] The helium tube 7 is used for the helium purge system; the recovery tube 8 can introduce high-purity gas into the gas recovery device; the analysis tube 10 is used for the detection of low-content moisture and low-content impurity gases such as oxygen and nitrogen in the filled high-purity gas. The packaging container includes a steel cylinder or a tank truck.

[0010] Furthermore, the diaphragm valve and cryogenic stop valve used in the high-purity gas filling system are valves with remote control, and automatic control can be achieved through the control program in the liquid pump control cabinet and the filling control cabinet.

[0011] By adjusting the opening of the cryogenic stop valve V2, the high-purity gas storage tank 1 can be pressurized, and by adjusting the opening of the cryogenic stop valve V3 and the cryogenic stop valve V4, the pressure can be reduced. 3 CF 4 High-purity gas filling, the pressure of high-purity gas storage tanks is generally controlled at 0.25~0.55MPa; the liquid level is controlled at 800~4800mm.

[0012] The liquid level gauge 11 is interlocked with the low-temperature stop valve V1 and the liquid pump 3 to avoid liquid pump failure due to too low liquid level in the storage tank; the panel pressure sensor 13 is interlocked with the diaphragm valve V5, the diaphragm valve V12 and the liquid pump 3 to avoid overpressure during the filling process; the electronic scale 6 is interlocked with the diaphragm valve V5, the diaphragm valve V12 and the liquid pump 3 to avoid overcharging during the filling process.

[0013] The pipeline is an EP grade stainless steel pipe, the pipeline is connected by an EP grade welding joint, the pressure reducing valve and the filter 19 are EP grade, and the whole system is connected together by orbital automatic welding technology (TIG) and metal face sealing (VCR).

[0014] To solve the second technical problem, the present invention provides a method for using the system, comprising the following steps:

[0015] (1) Weighing: Place the packaging container to be filled on the electronic scale and set the filling weight;

[0016] (2) Pressure test: introduce helium into the system and wait for the pressure of the panel pressure sensor to reach 50-70 bar. Maintain for 30 minutes. If the reading does not change, the test is passed. If the reading becomes lower, reinstall the connector and repeat step (2).

[0017] (3) Purging: Open the recovery pipe, and the pressure drops to 0.5-1 bar. Open the helium pipe to introduce helium. When the pressure of the panel pressure sensor 13 reaches 50-70 bar, open the recovery pipe, and the pressure drops to 0.5-1 bar. Stop the discharge. Repeat this 10 times, and then close the helium pipe and the recovery pipe.

[0018] (4) Evacuate: Open the vacuum tube and wait until the vacuum gauge reading reaches 1×10 -8 After Pa, the vacuum tube is turned off;

[0019] (5) Filling test: Turn on the liquid pump, and when the panel pressure sensor reaches 13 to 30-50 bar, turn off the liquid pump, open the analysis tube, and analyze the purity of the high-purity gas online. If it is qualified, close the analysis tube and proceed to the next step; if it is unqualified, return to steps (3) and (4);

[0020] (6) Filling: Start the liquid pump and fill.

[0021] Furthermore, the high-purity gas filling system can be manually operated or automatically filled.

[0022] Compared with the prior art, the high-purity gas filling system of the present invention can be directly applied to high-purity gas high-pressure filling, ensuring the purity of the filling gas and avoiding pollution incidents. In addition, the design adds safety control measures during the filling process to avoid safety incidents such as overpressure, overfilling and even leakage, which is particularly suitable for high-purity NF 3 CF 4 By slightly modifying the filling connector of this solution, one or more packaging containers such as cylinders or tank trucks can be filled, and the process is efficient and fast. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the high-purity gas filling system of the present invention.

[0024] In the figure: 1 is a high-purity gas storage tank, 2 is a low-pressure vaporizer, 3 is a liquid pump, 4 is a high-pressure vaporizer, 5 is a filling panel, 6 is an electronic scale, 7 is a helium tube, 8 is a recovery tube, 9 is a vacuum tube, 10 is an analysis tube, 11 is a liquid level gauge, 12 is a storage tank pressure sensor, 13 is a panel pressure sensor, 14 is a vacuum gauge, 17 is a recovery tube pressure reducing valve, 18 is an analysis tube pressure reducing valve, 19 is a filter, 20 is a packaging container, and 21 is a liquid nitrogen coil.

[0025] Figure 2 It is a schematic diagram of the PLC control system of the present invention.

[0026] In the figure: 6 is an electronic scale, 11 is a liquid level gauge, 13 is a panel pressure sensor, 14 is a vacuum gauge, 15 is a liquid pump control cabinet, and 16 is a filling control cabinet. DETAILED DESCRIPTION

[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0028] like Figure 1 and Figure 2As shown, a high-purity gas filling system includes four parts: a material storage tank part, a liquid pump part, a filling part, and a PLC control system control part. The material storage tank part includes a high-purity gas storage tank 1 and a low-pressure vaporizer 2. The high-purity gas storage tank 1 and the low-pressure vaporizer 2 form a closed loop through a pipeline and a low-temperature stop valve V2. A liquid level gauge 11 is installed at the bottom of the high-purity gas storage tank 1, and a storage tank pressure sensor 12 is installed at the top. A liquid nitrogen coil 21 is arranged in the storage tank, and the inlet and outlet of the liquid nitrogen coil 21 are respectively connected to a low-temperature stop valve V3 and a low-temperature stop valve V4; the liquid pump part includes a liquid pump 3 and a high-pressure vaporizer 4, and the liquid pump 3 is connected to the bottom of the high-purity gas storage tank 1 through a low-temperature stop valve V1; the filling part includes a filling panel 5, an electronic The filling panel 5 is provided with a filter 19 and a diaphragm valve V12, and the pipeline between the filter 19 and the diaphragm valve V12 is provided with a helium pipe 7, a vacuum pipe 9, a recovery pipe 8, an analysis pipe 10, a panel pressure sensor 13 and a vacuum gauge 14; the filter 19 is connected to the high-pressure vaporizer 4 through a diaphragm valve V5, and the diaphragm valve V12 is connected to the packaging container 20, and the packaging container 20 is placed on the electronic scale 6; the PLC control system includes a liquid pump control cabinet 15 and a filling control cabinet 16, and the signals of the liquid level gauge 11, the panel pressure sensor 13 and the electronic scale 6 are connected to the liquid pump control cabinet 15; the signals of the panel pressure sensor 13, the electronic scale 6 and the vacuum gauge 14 are connected to the filling control cabinet 16. The control part of the high-purity gas filling system is an automatic control part, and the diaphragm valve and the low-temperature stop valve used are valves with remote control. The liquid level gauge 11 is interlocked with the low temperature stop valve V1 and the liquid pump 3 to avoid the liquid pump failure caused by the low liquid level in the storage tank; the panel pressure sensor 13 is interlocked with the diaphragm valve V5, the diaphragm valve V12 and the liquid pump 3 to avoid overpressure during the filling process; the electronic scale 6 is interlocked with the diaphragm valve V5, the diaphragm valve V12 and the liquid pump 3 to avoid overcharging during the filling process. The pipeline is EP grade stainless steel pipe, the pipeline is connected by EP grade welding joints, the pressure reducing valve and filter 19 are EP grade, and the whole system is connected together by orbital automatic welding technology (TIG) and metal face sealing (VCR).

[0029] NF 3 CF 4 For high-purity gas filling, the pressure of the storage tank is controlled at 0.25-0.55 MPa, and the liquid level is controlled at 800-4800 mm. For high-purity helium, the moisture, oxygen and nitrogen content are less than 10 ppbv.

[0030] Example 1

[0031] The high-purity gas storage tank 1 stores high-purity NF at a liquid level of about 3510 mm. 3 The tanker capacity to be filled is 9026L, and the filling mass is set to 4010kg. Analyze the NF in the tank before filling 3 The impurity conditions are shown in Table 1.

[0032] Table 1 NF in the tank before filling 3 Impurity content

[0033]

[0034] The operation is as follows:

[0035] Under the automatic control system, each valve is opened and closed automatically.

[0036] On the scale: Start the weighing module of the filling control cabinet, put the tank truck to be filled on the electronic scale, weigh it, set the filling weight to 4010kg, connect the filling connector, and set the electronic scale to zero. Pressure test: Start the pressure test module of the filling control cabinet 16, open the diaphragm valve V6, diaphragm valve V7, and diaphragm valve V12, and when the pressure of the pressure sensor 13 reaches 60bar, the diaphragm valve V6 is closed and maintained for 30 minutes. If the reading does not change, the test is passed. Proceed to the next step: purge, start the purge module of the filling control cabinet 16, open the diaphragm valve V8, the pressure drops to 0.5 bar, close the diaphragm valve V8, open the diaphragm valve V6, the pressure reaches 60 bar, close the diaphragm valve V6, open the diaphragm valve V8, the pressure drops to 0.5 bar, and close the diaphragm valve V8. Repeat this 10 times and proceed to the next step: evacuate, start the evacuation module of the filling control cabinet 16, open the diaphragm valve V9 and the diaphragm valve V10, and wait until the reading of the vacuum gauge 14 reaches 1×10 -8 After Pa, diaphragm valve V9 and diaphragm valve V10 are closed, and the next step is to be carried out: filling test, start the liquid pump control cabinet 15, open the diaphragm valve V1, and after the liquid pump 3 reaches the starting conditions, start the liquid pump, open the diaphragm valve V5 and diaphragm valve V12, and the pressure reaches 35bar. The liquid pump 3 is paused, the diaphragm valve V5 is closed, and the diaphragm valve V11 is opened. The quality of high-purity gas is analyzed online. After monitoring the impurity indicators and the analysis results of the finished product storage tank are basically consistent, the diaphragm valve V11 is closed, and the test is carried out. Next step: filling, start the filling module of the liquid pump control cabinet 15 and the filling control cabinet 16, start the liquid pump 3, open the diaphragm valve V5, open the cylinder valve to start filling, wait for the electronic scale to show the set value of 4010kg, close the diaphragm valve V12 and diaphragm valve V1, close the liquid pump 3, open the diaphragm valve V8, wait for the pressure to drop to 0.5bar, close the diaphragm valves V5 and V8, and proceed to the next step: unweigh, close the cylinder valve, remove the bottle, reweigh, the filling weight and impurity analysis data are shown in Table 2.

[0037] Table 2 NF in the tank after filling 3 Impurity content

[0038]

[0039] As shown in Table 2, after filling, the various impurity indicators of the tank truck were basically consistent with the impurity content of the storage tank, no pollution occurred during the filling process, and the filling weight was basically consistent with the equipment weight.

[0040] Example 2

[0041] High-purity gas storage tank 1 stores high-purity CF at a liquid level of about 3750 mm. 4 The volume of the cylinder to be filled is 47L, the filling mass is set to 30.3kg, and the number of cylinders is 20. Analyze the CF in the tank before filling 4 The impurity conditions are shown in Table 3.

[0042] Table 3 CF in the tank before filling 4 Impurity content

[0043]

[0044] The operation process is the same as in Example 1. After the filling is completed, the filling weight and impurity analysis data are shown in Table 4.

[0045] Table 4 CF in the tank after filling 4 Impurity content

[0046]

[0047]

[0048] As shown in Table 4, after filling, the impurity indicators of the cylinder were basically consistent with the impurity content of the storage tank, no pollution occurred during the filling process, and the filling weight was basically consistent with the equipment weight.

[0049] Example 3

[0050] The high-purity gas storage tank 1 stores high-purity NF with a liquid level of about 1200mm. 3 The tanker capacity to be filled is 18664L, and the filling mass is set to 8010kg. Analyze the NF in the tank before filling 3 The impurity conditions are shown in Table 5.

[0051] Table 5 NF in the tank before filling 3 Impurity content

[0052]

[0053] The control steps are the same as those in Example 1. After 10 hours of filling, the system alarms. On-site inspection shows that the liquid pump has automatically stopped running, and the system automatically closes the low-temperature stop valve V1 and diaphragm valve V12 with remote control. Checking the alarm records shows that the liquid level in storage tank 1 is low. Stop filling, and when the liquid level in storage tank 1 returns to normal, cancel the alarm and resume filling. After filling, re-weigh the filling weight and impurity analysis data as shown in Table 6.

[0054] Table 6 NF in the tank after filling 3 Impurity content

[0055]

[0056] As shown in Table 6, after filling, the impurity indicators of the tank truck are basically consistent with the impurity content of the storage tank, no pollution occurs during the filling process, and the filling weight is basically consistent with the equipment weight. If the liquid level is low during the filling process, the liquid pump control cabinet 15 and the filling control cabinet 16 can immediately stop the pump and stop filling to avoid the liquid pump failure caused by the low liquid level in the storage tank.

[0057] Example 4

[0058] The high-purity gas storage tank 1 stores high-purity NF at a liquid level of about 3250 mm. 3 The volume of the cylinder to be filled is 440L, the filling mass is set to 201kg, and the number of cylinders is 3. Analyze the NF in the tank before filling 3 The impurity situation is shown in Table 7.

[0059] Table 7 NF in the tank before filling 3 Impurity content

[0060]

[0061] The control steps are the same as those in Example 1. When filling is close to 1 hour, the system alarms. On-site inspection shows that the liquid pump has automatically stopped running, and the system automatically closes the low-temperature stop valve V1 and diaphragm valve V12 with remote control. Checking the alarm records shows that the panel pressure sensor 13 has an overpressure alarm. The filling is stopped. After investigation, it is found that the connector of the electronic scale is loose and the weight signal is not connected to the system. After troubleshooting, the scale is re-weighed, and the filling weight and impurity analysis data are shown in Table 8.

[0062] Table 8 NF in the tank after filling 3 Impurity content

[0063]

[0064] As shown in Table 8, after filling, the impurity indicators of the tank truck were basically consistent with the impurity content of the storage tank, and no pollution occurred during the filling process. Due to the failure of the electronic scale signal during the filling process, the filling was overpressured. The liquid pump control cabinet 15 and the filling control system 16 were able to stop the pump immediately and stop filling to avoid the risk of overpressure or even leakage.

Claims

1. A high-purity gas filling system, comprising four parts: a material storage tank part, a liquid pump part, a filling part, and a PLC control system. The material storage tank part comprises a high-purity gas storage tank (1) and a low-pressure vaporizer (2). The high-purity gas storage tank (1) and the low-pressure vaporizer (2) form a closed loop through a pipeline and a low-temperature stop valve V2. A liquid level gauge (11) is installed at the bottom of the high-purity gas storage tank (1), and a storage tank pressure sensor (12) is installed at the top. A liquid nitrogen coil (21) is installed in the storage tank, and the inlet and outlet of the liquid nitrogen coil (21) are respectively connected to a low-temperature stop valve V3 and a low-temperature stop valve V4; the liquid pump part comprises a liquid pump (3) and a high-pressure vaporizer (4), and the liquid pump (3) is connected to the bottom of the high-purity gas storage tank (1) through a low-temperature stop valve V1; the filling part comprises a filling panel (5), an electronic scale (6), and a packaging container (20). A filter (19) and a diaphragm valve V12 are arranged on the filling panel (5); a helium pipe (7), a vacuum pipe (9), a recovery pipe (8), an analysis pipe (10), a panel pressure sensor (13) and a vacuum gauge (14) are arranged on the pipeline between the filter (19) and the diaphragm valve V12; the filter (19) is connected to the high-pressure vaporizer (4) through the diaphragm valve V5; the diaphragm valve V12 is connected to the packaging container (20); the packaging container (20) is placed on the electronic scale (6); the PLC control system comprises a liquid pump control cabinet (15) and a filling control cabinet (16); the signals of the liquid level gauge (11), the panel pressure sensor (13) and the electronic scale (6) are connected to the liquid pump control cabinet (15); the signals of the panel pressure sensor (13), the electronic scale (6) and the vacuum gauge (14) are connected to the filling control cabinet (16).

2. According to the high-purity gas filling system of claim 1, the diaphragm valve and low-temperature stop valve used are valves with remote control, and the liquid pump control cabinet and the filling control cabinet are installed with control programs to achieve automatic control.

3. According to the high-purity gas filling system of claim 1 or 2, the liquid level gauge (11) is interlocked with the low-temperature stop valve V1 and the liquid pump (3); the panel pressure sensor (13) is interlocked with the diaphragm valve V5, the diaphragm valve V12 and the liquid pump (3); the electronic scale (6) is interlocked with the diaphragm valve V5, the diaphragm valve V12 and the liquid pump (3).

4. According to the high-purity gas filling system of claim 1 or 2, the pipeline is an EP grade stainless steel pipe, the pipeline is connected by an EP grade welding joint, the pressure reducing valve and the filter (19) are EP grade, and the entire system is connected together by orbital automatic welding technology (TIG) and metal face sealing (VCR).

5. According to the high-purity gas filling system of claim 1 or 2, the packaging container is a steel cylinder or a tank truck.

6. The high-purity gas filling system according to claim 1 or 2, wherein the packaging container is one or more.

7. A method for using the high-purity gas filling system according to any one of claims 1 to 6, comprising the following steps: (1) Weighing: Place the packaging container to be filled on the electronic scale and set the filling weight; (2) Pressure test: introduce helium into the system and wait for the pressure of the panel pressure sensor to reach 50-70 bar. Maintain for 30 minutes. If the reading does not change, the test is passed. If the reading becomes lower, reinstall the connector and repeat step (2). (3) Purging: Open the recovery pipe, and the pressure drops to 0.5-1 bar. Open the helium pipe to introduce helium. When the pressure of the panel pressure sensor (13) reaches 50-70 bar, open the recovery pipe, and the pressure drops to 0.5-1 bar. Stop the discharge. Repeat this process 10 times, and then close the helium pipe and the recovery pipe. (4) Evacuate: Open the vacuum tube and wait until the vacuum gauge reading reaches 1×10 -8 After Pa, the vacuum tube is turned off; (5) Filling test: Turn on the liquid pump, and when the panel pressure sensor (13) reaches 30-50 bar, turn off the liquid pump, open the analysis tube, and analyze the purity of the high-purity gas online. If it is qualified, close the analysis tube and proceed to the next step; if it is unqualified, return to steps (3) and (4); (6) Filling: Start the liquid pump and fill.

8. According to the method of use of claim 7, the high-purity gas storage tank (1) is pressurized by adjusting the opening of the cryogenic stop valve V2, and the pressure is reduced by adjusting the opening of the cryogenic stop valve V3 and the cryogenic stop valve V4.

9. The method of use according to claim 7, wherein the high-purity gas of NF3 and CF4 is filled, the pressure of the high-purity gas storage tank is 0.25-0.55 MPa, and the liquid level is controlled at 800-4800 mm.

10. The method of use according to claim 7, wherein the moisture, oxygen and nitrogen in the helium are less than 10 ppbv.