A pneumatic installation vehicle for gas extraction pipes used in coal mines

By designing a gas extraction pipe pneumatic installation vehicle for coal mines, the existing equipment is solved in the low installation efficiency of narrow tunnels, high labor intensity for workers, and serious damage to the anchor net, and efficient and safe gas extraction and installation operations are achieved.

CN110577160BActive Publication Date: 2025-04-18JIKAI HEBEI MECHATRONICS TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN201910833816.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-04
Publication Date
2025-04-18
Estimated Expiration
2039-09-04

AI Technical Summary

Technical Problem

The existing coal mine gas extraction equipment is inefficient in installation in narrow and complex tunnels, with high labor intensity for workers, and serious damage to the tunnel anchor network, affecting safety.

Method used

A gas extraction pipe pneumatic installation vehicle for coal mines is designed, which adopts a combined structure of folding walking operating table, pneumatic and hydraulic system, main operating table, walking assembly, gripping arm and jaws. It uses gas power, does not contain electrical components, and is suitable for flammable and explosive gas environments.

Benefits of technology

It improves the installation efficiency in narrow tunnels, reduces the labor intensity of workers, reduces damage to the tunnel anchor net, improves the safety in the tunnel, and makes operation more convenient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110577160B_ABST
    Figure CN110577160B_ABST
Patent Text Reader

Abstract

The present invention discloses a pneumatic installation vehicle for gas extraction pipes for coal mines, comprising a folding walking operating platform, a pneumatic and hydraulic system, a main operating platform, a walking assembly, a grab arm, and a clamping claw. The folding walking operating platform is located at the rear end of the pneumatic and hydraulic system, the main operating platform is located at the upper end of the pneumatic and hydraulic system, and the grab arm is located at the front end of the pneumatic and hydraulic system. The present invention can form an integral operating structure through the folding walking operating platform, the pneumatic and hydraulic system, the main operating platform, the walking assembly, the grab arm, and the clamping claw, and uses gas as power, does not contain electrical components, and is fully suitable for use in an environment containing flammable and explosive gas in a mine. And the excellent structural design can work in narrow and complex tunnels, with the purpose of improving installation efficiency, reducing the labor intensity of workers, reducing damage to the tunnel anchor net, and improving the safety of people and objects in the tunnel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of coal mining, in particular to a pneumatic installation vehicle for a gas extraction pipe for a coal mine. Background Art

[0002] Coal is generally divided into underground coal mines and open-pit coal mines. When the coal seam is far from the surface, people generally choose to dig tunnels underground to mine coal. This is an underground coal mine. Gas is a colorless, odorless gas produced by physical and chemical reactions during coal formation, but sometimes you can smell an apple-like fragrance. This is because aromatic hydrocarbon gases are emitted at the same time as gas. Gas is insoluble in water, does not support combustion, and cannot maintain breathing. When it reaches a certain concentration, it can cause people to suffocate due to lack of oxygen, and can cause combustion or explosion. Therefore, when mining coal, it is necessary to extract the gas in time to ensure the safety of normal mining operations.

[0003] During underground operations, the pneumatic installation vehicle for gas extraction pipes for coal mines can perform the following operations: The pneumatic installation vehicle for gas extraction pipes for coal mines uses gas as power and does not contain electrical components. It is fully suitable for use in flammable and explosive gas environments underground in mines. Its excellent structural design allows it to work in narrow and complex tunnels, effectively improving installation efficiency, reducing the labor intensity of workers, reducing damage to the tunnel anchor net, and improving the safety of people and objects in the tunnel, ultimately making the overall operation more convenient.

[0004] Due to the limitation of the layout and size of the space in the tunnel, there is no equipment for installing gas extraction pipes in the coal mine market. The miners mainly rely on manual construction of platforms and installation with lifting hoists. The existing installation method requires frequent construction and dismantling of platforms and replacement of lifting hoists, which is inefficient. In addition, the lifting hoist needs to be installed on the top plate anchor net, which damages the anchor net, affects the stability of the tunnel surrounding rock, and threatens the safety of people and objects in the tunnel. Manually moving the gas extraction pipe weighing 130 to 200 kg is labor-intensive and has a certain adverse effect on the physical and mental health of employees. Therefore, we propose a pneumatic installation vehicle for gas extraction pipes in coal mines. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the existing defects and provide a pneumatic installation vehicle for gas extraction pipes for coal mines, which can effectively solve the problems in the background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a pneumatic installation vehicle for gas extraction pipes for coal mines, comprising a folding walking operating platform, a pneumatic and hydraulic system, a main operating platform, a walking assembly, a grab arm, and a clamping claw, wherein the folding walking operating platform is located at the rear end of the pneumatic and hydraulic system, the main operating platform is located at the upper end of the pneumatic and hydraulic system, the grab arm is located at the front end of the pneumatic and hydraulic system, the walking assembly is located at the lower end of the grab arm, and the clamping claw is located at the front end of the grab arm.

[0007] Preferably, the grab arm includes a primary forearm, a secondary forearm, a forearm flip cylinder, a boom, a boom lifting cylinder, a sliding base and a rotary cylinder. A boom is provided in the middle of the grab arm, a secondary forearm is provided at the upper end of the boom, the secondary forearm and the boom are movably connected via the forearm flip cylinder, a primary forearm is provided inside the secondary forearm, a rotary cylinder is provided at the lower end of the boom, the rotary cylinder and the boom are movably connected via the boom lifting cylinder, and a sliding base is provided at the lower end of the rotary cylinder.

[0008] Preferably, the outer surface of the main operating table is provided with seven groups of control levers, whose functions are horizontal propulsion, horizontal rotation, boom lifting, arm lifting, arm telescopic, claw opening and closing, and reserved functions.

[0009] Preferably, the traveling assembly is composed of guide wheels, supporting wheels, sprockets, tensioning devices, etc., and adopts a combined sealed crawler chain made of high-strength alloy steel.

[0010] Preferably, the pneumatic and hydraulic system consists of an air intake processing system, a rotary motor assembly and a gear pump. The air motor is a gear motor with an applicable compressed air pressure of 0.3 to 0.76 MPa and a rated power of up to 10 kW. The motor outputs hydraulic energy through the output shaft after being decelerated and connected to the gear pump.

[0011] Preferably, the main operating console is composed of a control valve, a pressure gauge, pipe fittings and a frame, and two groups of reversing valves are arranged inside the main operating console. The reversing valves are located in the frame of the main operating console, and the joints are arranged neatly and beautifully. They respectively control the operation of the grab arm and the claw, as well as the high and low gear positions of the travel motor and the interlocking of various actions.

[0012] Preferably, the folding walking operating platform is composed of a pilot handle, a roller control valve, a latch-type safety control mechanism, a folding mechanism, etc., and is a humanized control device that is convenient for controlling the walking of the entire vehicle. The walking locking button valve equipped on the folding walking operating platform must be pressed before the walking pilot handle can work. This safety design allows the operator to stop the walking action of the entire machine in time when danger occurs, thereby maximizing personnel safety. The emergency stop button can quickly cut off the power output of the entire machine.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] 1. The present invention can form an integrated operating structure by folding the walking operating platform, pneumatic and hydraulic systems, main operating platform, walking assembly, grab arm and claws, and uses gas as power, does not contain electrical components, and is fully suitable for use in an environment containing flammable and explosive gas in a mine. And the excellent structural design can work in narrow and complex tunnels, the purpose is to improve installation efficiency, reduce the labor intensity of workers, reduce damage to the anchor net in the tunnel, and improve the safety of people and objects in the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0016] Figure 2 It is an enlarged view of the main operating table 3 of the present invention;

[0017] Figure 3 It is an enlarged view of the traveling assembly 4 of the present invention;

[0018] Figure 4 is an enlarged view of the claw 6 of the present invention;

[0019] Figure 5 is an enlarged view of the grab arm 5 of the present invention;

[0020] In the figure: 1. Folding walking operating table; 2. Pneumatic and hydraulic system; 3. Main operating table; 4. Walking assembly; 5. Grabbing arm; 6. Clamping claw; 51. First-level forearm; 52. Second-level forearm; 53. Forearm tilting cylinder; 54. Boom; 55. Boom lifting cylinder; 56. Sliding base; 57. Rotating cylinder. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] See also Figure 1-5 The present invention provides a technical solution: a pneumatic installation vehicle for a gas extraction pipe for a coal mine, comprising a folding walking operating platform 1, a pneumatic and hydraulic system 2, a main operating platform 3, a walking assembly 4, a grab arm 5, and a claw 6. The folding walking operating platform 1 is located at the rear end of the pneumatic and hydraulic system 2, the main operating platform 3 is located at the upper end of the pneumatic and hydraulic system 2, the grab arm 5 is located at the front end of the pneumatic and hydraulic system 2, the walking assembly 4 is located at the lower end of the grab arm 5, and the claw 6 is located at the front end of the grab arm 5.

[0023] It can better adjust different installation angles and heights. In this embodiment, preferably, the grab arm 5 includes a primary arm 51, a secondary arm 52, an arm turning cylinder 53, a boom 54, an boom lifting cylinder 55, a sliding base 56 and a rotary cylinder 57. The boom 54 is arranged in the middle of the grab arm 5, and the secondary arm 52 is arranged on the upper end of the boom 54. The secondary arm 52 and the boom 54 are movably connected by the arm turning cylinder 53. The primary arm 51 is arranged inside the secondary arm 52, and the rotary cylinder 57 is arranged at the lower end of the boom 54. The rotary cylinder 57 and the boom 54 are movably connected by the boom lifting cylinder 55, and the sliding base 56 is arranged at the lower end of the rotary cylinder 57.

[0024] It can be controlled more accurately and conveniently. Preferably, the outer surface of the main operating table 3 is provided with seven groups of control levers, and their functions are horizontal propulsion, horizontal rotation, boom lifting, arm lifting, arm extension and retraction, claw opening and closing, and reserved functions.

[0025] It can ensure walking more stably. In this embodiment, preferably, the walking assembly 4 is composed of a guide wheel, a supporting wheel, a sprocket, a tensioning device, etc., and a combined sealed crawler chain made of high-strength alloy steel is adopted.

[0026] In order to better ensure sufficient and stable power, in this embodiment, preferably, the pneumatic and hydraulic system 2 is composed of an air intake processing system, a rotary motor assembly and a gear pump. The air motor is a gear motor with a suitable compressed air pressure of 0.3 to 0.76 MPa and a rated power of up to 10 kW. The motor is connected to the gear pump through the output shaft after deceleration to output hydraulic energy.

[0027] In order to better ensure the stability of operation, in this embodiment, preferably, the main operating table 3 is composed of a control valve, a pressure gauge, pipe fittings and a frame, and two groups of reversing valves are arranged inside the main operating table 3. The reversing valves are located in the frame of the main operating table 3, and the joints are arranged neatly and beautifully, respectively controlling the operation of the grabbing arm 5 and the claw 6, as well as the high and low gears of the travel motor and the interlocking of each action.

[0028] In order to better enhance the safety of actual use, in this embodiment, preferably, the folding walking operating platform 1 is composed of a pilot handle, a roller control valve, a latch-type safety control mechanism, a folding mechanism, etc., which is a humanized control device that is convenient for controlling the walking of the entire vehicle. The walking lock button valve equipped on the folding walking operating platform 1 must be pressed before the walking pilot handle can work. This safety design allows the operator to stop the walking action of the entire machine in time when danger occurs, thereby maximizing personnel safety. The emergency stop button can quickly cut off the power output of the entire machine.

[0029] The working principle and use process of the present invention are as follows: in actual use, compressed air is used to drive the pneumatic gear motor to rotate, and then drive the oil pump to provide high-pressure oil. The high-pressure oil is used for the movement of the grab arm 5 and the claw 6. The walking and operation of the entire equipment are controlled by folding the walking operating platform 1 and the main operating platform 3. In this way, the walking assembly 4 and the guide wheels, supporting wheels, sprockets, tensioning devices and combined sealed crawler chains contained therein can achieve walking, and then the grab arm 5 and the first-level arm 51, the second-level arm 52, the arm flip cylinder 53, the arm 54, the arm lifting cylinder 55, the sliding base 56 and the rotary cylinder 57 contained therein can achieve overall lifting and rotation. Then the claw 6 contacts the extraction and release pipe, and then the moving, lifting and installation in the tunnel are completed, which effectively improves the installation efficiency, reduces the labor intensity of workers, reduces the damage to the anchor net in the tunnel, and improves the safety of people and objects in the tunnel, and finally makes the overall operation more convenient, and it is more convenient for people to use when the whole is combined together.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pneumatic installation vehicle for gas extraction pipes for coal mines, comprising a folding walking operating platform (1), a pneumatic and hydraulic system (2), a main operating platform (3), a walking assembly (4), a grab arm (5), and a clamping claw (6), characterized in that: The folding walking operating platform (1) is located at the rear end of the pneumatic and hydraulic system (2), the main operating platform (3) is located at the upper end of the pneumatic and hydraulic system (2), the grab arm (5) is located at the front end of the pneumatic and hydraulic system (2), the walking assembly (4) is located at the lower end of the grab arm (5), and the clamping claw (6) is located at the front end of the grab arm (5); The grab arm (5) comprises a primary arm (51), a secondary arm (52), an arm tilting cylinder (53), a boom (54), an arm lifting cylinder (55), a sliding base (56) and a rotary cylinder (57); a boom (54) is arranged at the middle of the grab arm (5), a secondary arm (52) is arranged at the upper end of the boom (54), the secondary arm (52) and the boom (54) are movably connected via the arm tilting cylinder (53), a primary arm (51) is arranged inside the secondary arm (52), a rotary cylinder (57) is arranged at the lower end of the boom (54), the rotary cylinder (57) and the boom (54) are movably connected via the boom lifting cylinder (55), and a sliding base (56) is arranged at the lower end of the rotary cylinder (57); The pneumatic and hydraulic system (2) is composed of an air intake processing system, a rotary motor assembly and a gear pump. The pneumatic motor is a gear motor with an applicable compressed air pressure of 0.3-0.76 MPa and a rated power of 10 kW. The pneumatic motor is connected to the gear pump through an output shaft after being decelerated to output hydraulic energy. The foldable walking operating platform (1) is composed of a pilot handle, a roller control valve, a latch-type safety control mechanism, and a folding mechanism. The walking locking button valve provided on the foldable walking operating platform (1) can only work after the walking pilot handle is pressed.

2. The pneumatic installation vehicle for gas extraction pipe for coal mine according to claim 1, characterized in that: The outer surface of the main operating table (3) is provided with seven groups of control levers, which respectively have the functions of horizontal propulsion, horizontal rotation, upper arm lifting and lowering, lower arm lifting and lowering, lower arm telescopic extension, claw opening and closing, and reserved functions.

3. The pneumatic installation vehicle for coal mine gas drainage pipe according to claim 1 is characterized in that: The traveling assembly (4) is composed of a guide wheel, a supporting wheel, a sprocket, and a tensioning device.

Citation Information

Patent Citations

  • Gas drainage pipe pneumatic mounting vehicle for coal mine

    CN210655912U