A slag shoveling device for a slag conveyor in a waste incineration power plant
By setting up slag shovel components and roller components on the slag conveyor chain, mechanical failures caused by slag adhesion on the chain are solved to ensure the normal operation of the equipment.
Patent Information
- Application Number
- CN201910879100.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-18
- Publication Date
- 2025-07-25
- Estimated Expiration
- 2039-09-18
AI Technical Summary
When the chain and sprocket are meshed by the existing waste incineration power plant slag conveyor, the meshing gap is uneven due to the adhesion of debris, resulting in accidents such as chain tooth jumps and helical teeth. In severe cases, the chain is broken, affecting the normal operation of the equipment.
A slag member is provided on the chain of the lower side of the slag conveyor. The slag plate is installed inclinedly and fits with the front end of the chain. The front end is suspended on the lower side of the fixed frame through a pin. A roller assembly is provided on the front end of the lower side. The roller rotates synchronously to remove the adherent slag.
Effectively remove slag on the chain, ensure the normal operation of the slag conveyor equipment, and avoid mechanical failures caused by uneven meshing gaps between the chain and sprockets.
Smart Images

Figure CN110671712B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a slag conveyor for a waste incineration power plant, and in particular to a slag shoveling device for a slag conveyor of a waste incineration power plant. Background Art
[0002] At present, the wet scraper conveyor of the slag conveyor in a waste incineration power plant is composed of a sprocket, a tail wheel, a chain, a housing, a track, a speed reducer, a motor, bearings and other structures. When the double-row chain slag conveyor operates, the chain meshes with the sprocket. When there are sundries or relatively large pieces of slag and other sundries on the chain, these sundries and slag will adhere to the sprocket. When the chain and the sprocket mesh again, since there are sundries stuck inside the sprocket, this will cause a gap when the chain and the sprocket mesh. When the meshing gaps of the two sides of the chain and the sprocket are different, accidents such as chain tooth skipping and helical teeth will occur. In severe cases, the chain of the chain type speed reducer at the sprocket will be broken, which has an adverse impact on the normal operation of the on-site equipment. Summary of the Invention
[0003] In order to overcome the existing technical problems, the present invention provides a slag shoveling device for a slag conveyor of a waste incineration power plant, including a slag conveyor chain and a sprocket. The sprocket drives the chain to operate so as to drive the slag conveyor to operate. Since a slag shoveling member is provided on the lower side chain of the slag conveyor and at the front end position of the sprocket, the slag shoveling plate is installed in an inclined state and the front end thereof is in contact with the lower side chain of the slag conveyor, and the rear end is suspended under the fixed frame through a pin shaft. A roller assembly is provided at the front end of the lower side surface of the slag shoveling plate, and the roller of the roller assembly is placed on the lower side chain of the slag conveyor. When the chain operates, the roller rotates synchronously, and the front end of the slag shoveling plate always adheres to the chain, so that the slag shoveling plate can completely remove the slag adhered to the chain, effectively solve the existing technical problems, and ensure the normal operation of the equipment.
[0004] The technical solution adopted by the present invention to solve its technical problems is: a slag shoveling device for a slag conveyor of a waste incineration power plant, including a slag conveyor chain and a sprocket. The sprocket drives the chain to operate so as to drive the slag conveyor to operate. The feature is that a slag shoveling member is further provided. The slag shoveling member is installed on the lower side chain of the slag conveyor and at the front end position of the sprocket. A slag shoveling plate is provided on the slag shoveling member. A roller assembly is provided at the front end of the lower side surface of the slag shoveling plate. The roller assembly includes a roller, a roller shaft, a bearing and an end nut. The roller is placed on the lower side chain of the slag conveyor. When the chain operates, it drives the roller to rotate. The slag shoveling plate is installed in an inclined state and the front end thereof is in contact with the lower side chain of the slag conveyor, and the rear end is suspended and fixed through a pin shaft.
[0005] In a preferred embodiment of the present invention, a first sheet metal bending groove member, a second sheet metal bending groove member, and a third sheet metal bending groove member are further provided, and a fixed frame is also provided. Pin shaft holes and mounting holes are respectively provided on the first sheet metal bending groove member, the second sheet metal bending groove member, and the third sheet metal bending groove member.
[0006] The first sheet metal bending groove member is arranged on the upper side with the groove opening facing downwards, and the second sheet metal bending groove member is arranged on the lower side with the groove opening facing upwards. Their pin shaft holes are aligned with each other, and the first sheet metal bending groove member and the second sheet metal bending groove member are installed together through a shaft pin. The bottom of the second sheet metal bending groove member is fixedly attached to the rear end position of the upper side of the slag shoveling plate, while the bottom of the first sheet metal bending groove member is fixedly attached to the lower side of the fixed frame.
[0007] The groove opening of the third sheet metal bending groove member faces downwards, the bottom of the third sheet metal bending groove member is fixedly attached to the front end position of the lower side of the slag shoveling plate, and the roller assembly is installed on the groove opening of the third sheet metal bending groove member.
[0008] The beneficial effect of the present invention is that the present invention provides a slag shoveling device for a slag conveyor in a waste incineration power plant. Since a slag shoveling member is provided on the lower side chain of the slag conveyor and at the front end position of the sprocket, and the slag shoveling plate is installed in an inclined state with the front end in contact with the lower side chain of the slag conveyor and the rear end suspended by a pin shaft under the fixed frame, a roller assembly is provided at the front end of the lower side surface of the slag shoveling plate, and the roller of the roller assembly is placed on the lower side chain of the slag conveyor. When the chain runs, the roller rotates synchronously, and the slag shoveling plate can completely remove the slag adhered to the chain, effectively solving the problems of the prior art and ensuring the normal operation of the equipment. Description of the Drawings
[0009] Figures 1 - 13 It is a schematic structural diagram of the first embodiment proposed by the present invention. Among them Figure 1 、 Figure 2 is a schematic diagram of the overall structure, Figure 1 is a three-dimensional view, Figure 2 is a front view. Figures 3 - 13 is a schematic diagram of a magnified partial structure.
[0010] In the figure,
[0011] 1. Slag conveyor chain, 1A. Upper side chain of the slag conveyor, 1B. Lower side chain of the slag conveyor,
[0012] 2. Sprocket,
[0013] 3. Slag shoveling member,
[0014] 3.1 Slag shoveling plate,
[0015] 3.21 First sheet metal bending groove part, 3.22 Second sheet metal bending groove part, 3.23 Third sheet metal bending groove part, 3.21A First pin shaft hole, 3.22A Second pin shaft hole, 3.23A Third pin shaft hole, 3.21B, 3.22B, 3.23B Mounting holes, 3.21C Pin shaft
[0016] 3.3 Drum assembly, 3.3A Drum, 3.3B Drum shaft, 3.3C Shaft end nut, 3.3D Bearing
[0017] 4. Fixed frame, 4A First long hole, 4B Second long hole
[0018] 5. Slag Detailed implementation mode
[0019] Figures 1 - 13 It is a structural schematic diagram of the first embodiment proposed by the present invention. Among them Figure 1 、 Figure 2 Overall structural schematic diagram Figure 1 Is a three-dimensional view Figure 2 Is the front view Figures 3 - 13 Is a partial structural schematic diagram Figures 3 - 13 Is an enlarged structural schematic diagram
[0020] As shown in the figure, in this example, a slag shoveling device for a slag conveyor of a waste incineration power plant includes a slag conveyor chain 1 and a sprocket 2. The sprocket 2 drives the chain 1 to run, thereby driving the slag conveyor to run Figure 1 、 Figure 2 As shown, in this example, a slag shoveling member 3 is further provided. The slag shoveling member 3 is installed on the lower side chain 1B of the slag conveyor and is located at the front end position of the sprocket 2. A slag shoveling plate 3.1 is provided on the slag shoveling member 3. A drum assembly 3.3 is provided at the front end of the lower side of the slag shoveling plate 3.1. The drum assembly 3.3 includes a drum 3.3A, a drum shaft 3.3B, a shaft end nut 3.3C and a bearing 3.3D. The drum 3.3A is placed on the lower side chain 1B of the slag conveyor. When the chain 1 runs, it drives the drum 3.3A to rotate. The slag shoveling plate 3.1 is installed in an inclined state and the front end is in contact with the lower side chain 1B of the slag conveyor, and the rear end is suspended and fixed by a pin shaft 3.21C
[0021] As shown in the figure, a first sheet metal bending groove part 3.21, a second sheet metal bending groove part 3.22 and a third sheet metal bending groove part 3.23 are further provided, and a fixed frame 4 is further provided. First pin shaft holes 3.21A, second pin shaft holes 3.22A and third pin shaft holes 3.23A are respectively provided on the first sheet metal bending groove part 3.21, the second sheet metal bending groove part 3.22 and the third sheet metal bending groove part 3.23, and mounting holes 3.21B, 3.22B and 3.23B are respectively provided
[0022] Figure 5It is shown that the first sheet metal bending groove part 3.21 is arranged on the upper side with the notch facing downwards, the second sheet metal bending groove part is arranged on the lower side with the notch facing upwards, the first pin hole 3.21A and the second pin hole 3.22A are aligned with each other, and the first sheet metal bending groove part 3.21 and the second sheet metal bending groove part 3.22 are installed together through a pin 3.21C. The bottom of the groove of the second sheet metal bending groove part 3.22 is fixedly attached to the rear end position of the upper side of the slag shoveling plate 3.1, and the bottom of the groove of the first sheet metal bending groove part 3.21 is fixedly attached to the lower side of the fixed frame 4.
[0023] Figure 5 and Figures 9 - 13 It is shown that the notch of the third sheet metal bending groove part 3.23 faces downwards, the bottom of the groove of the third sheet metal bending groove part 3.23 is fixedly attached to the front end position of the lower side of the slag shoveling plate 3.1, and the roller assembly 3.3 is installed on the notch of the third sheet metal bending groove part.
[0024] As shown in the figure, in the above embodiment, since a slag shoveling member is arranged on the lower side chain of the slag conveyor and at the front end position of the sprocket, the slag shoveling plate is installed in an inclined state, with the front end in contact with the lower side chain of the slag conveyor and the rear end suspended under the fixed frame through a pin. A roller assembly is arranged at the front end of the lower side of the slag shoveling plate, and the roller of the roller assembly is placed on the lower side chain of the slag conveyor. When the chain runs, the roller rotates synchronously, and the slag shoveling plate can completely remove the slag adhered to the chain, effectively solving the problems of the prior art and ensuring the normal operation of the equipment.
Claims
1. A slag shoveling device for a slag conveyor in a waste incineration power plant. The slag conveyor includes a chain and a sprocket, and the sprocket drives the chain to run so as to drive the slag conveyor to operate. It is characterized in that, A slag shoveling member is also provided. The slag shoveling member is installed on the chain under the slag conveyor and is located at the front end position of the sprocket. A slag shoveling plate is provided on the slag shoveling member, and a roller assembly is provided at the front end of the lower side of the slag shoveling plate. The roller assembly includes a roller, a roller shaft, a bearing and an end nut. The roller is placed on the chain under the slag conveyor. When the chain runs, it drives the roller to rotate. The slag shoveling plate is installed in an inclined state, with its front end fitting the chain under the slag conveyor and its rear end suspended and fixed through a pin shaft.
2. The slag shoveling device of the slag conveyor of a waste incineration power plant according to claim 1, characterized in that, A first sheet metal bending groove member, a second sheet metal bending groove member, a third sheet metal bending groove member and a fixed frame are also provided. Pin holes and mounting holes are respectively provided on the first sheet metal bending groove member, the second sheet metal bending groove member and the third sheet metal bending groove member. The first sheet metal bending groove member is arranged on the upper side with the groove opening downward, and the second sheet metal bending groove member is arranged on the lower side with the groove opening upward. Their pin holes are aligned with each other, and the first sheet metal bending groove member and the second sheet metal bending groove member are installed together through a pin. The bottom of the groove of the second sheet metal bending groove member is fixedly attached to the rear end position of the upper side of the slag shoveling plate, while the bottom of the groove of the first sheet metal bending groove member is fixedly attached to the lower side of the fixed frame. The groove opening of the third sheet metal bending groove member is downward, the bottom of the groove of the third sheet metal bending groove member is fixedly attached to the front end position of the lower side of the slag shoveling plate, and the roller assembly is installed on the groove opening of the third sheet metal bending groove member.
Citation Information
Patent Citations
Scraper blade chain wheel cleaning device
CN205221945U
Transportation conveyer belt with glue glutinous material and get rid of function
CN206345390U
Slag shoveling device of waste incineration power plant slag conveyor
CN211011430U