Brick splitting production line and processing technology

By designing a bricklaying and splitting production line, including a pallet flow system and automated hoisting equipment, the problem of low automation in bricklaying and splitting production in the existing technology has been solved, efficient bricklaying production and waste management have been achieved, and production efficiency has been improved. and degree of automation.

CN110712992BActive Publication Date: 2024-10-08QUANGONG MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910958772.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-10
Publication Date
2024-10-08
Estimated Expiration
2039-10-10

AI Technical Summary

Technical Problem

The existing bricklaying splitting production has low automation and low production efficiency. The market urgently needs to improve the production efficiency and automation of splitting bricklaying.

Method used

A bricklaying splitting production line is designed, including a pallet circulation system, a first bricklaying device, a front bricklaying conveyor system, a bricklaying splitting machine, a rear bricklaying conveyor system and a second bricklaying device. Through these systems, For the smooth transfer of bricks from the brick input port to the splitter and then to the brick output port, automated lifting and conveying equipment is used to avoid manual handling, and a waste collection system is set up to increase the degree of automation.

Benefits of technology

It greatly improves the automation and production efficiency of brick splitting, realizes the smooth transfer of bricks from the brick board feeding port to the finished product output port, reduces manual operations, improves production efficiency, and effectively prevents intact bricks from falling into waste. collection system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110712992B_ABST
    Figure CN110712992B_ABST
Patent Text Reader

Abstract

The invention relates to a brick splitting production line and a processing technology, comprising a pallet circulation system, a first brick hanging device, a front brick conveying system, a brick splitting machine, a rear brick conveying system, a waste collection system and a second brick hanging device; the pallet circulation system is connected to the front brick conveying system through the first brick hanging device, and is connected to the rear brick conveying system through the second brick hanging device; the first brick hanging device and the second brick hanging device are both cranes with special clamps for hoisting; the brick splitting machine is installed between the front brick conveying system and the rear brick conveying system; the conveying direction of the front brick conveying system is from the first brick hanging device to the brick splitting machine; the conveying direction of the rear brick conveying system is from the brick splitting working position to the second brick hanging device; the waste collection system is installed below the rear brick conveying system and is respectively connected to the rear brick conveying system, the bottom of the brick splitting machine and the end of the rear brick conveying system, with a high degree of automation and high production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bricklaying production equipment, in particular to a bricklaying splitting production line and a processing technology. Background Art

[0002] With the development of concrete brickwork, decorative concrete brickwork is increasingly valued by owners, designers, and construction units in the fields of construction engineering, municipal engineering, and water conservancy engineering, and the development speed is accelerating. Architectural decorative brickwork not only has load-bearing and enclosure functions, but also has good decorative properties.

[0003] Split brickwork is a new type of composite wall material that integrates wall structure and decoration, and belongs to decorative concrete brickwork. Split brickwork is to combine two brickworks into a large brickwork, and after forming, curing and reaching a certain strength, it is split into two parts at the specified section by a splitting machine.

[0004] The existing brick splitting production has a low degree of automation and low production efficiency. The market urgently needs to improve the production efficiency and automation of splitting bricks. Summary of the invention

[0005] In order to overcome the technical defects of the prior art, the present invention provides a brick splitting production line and processing technology with high automation and high production efficiency.

[0006] The technical solution adopted by the present invention is: a brick splitting production line, including a pallet circulation system, a first brick hoisting device, a front brick conveying system, a brick splitting machine, a rear brick conveying system and a second brick hoisting device;

[0007] The pallet circulation system has a brick delivery inlet and a brick delivery outlet, the brick delivery inlet is connected to the front brick delivery system through a first brick hanging device, and the brick delivery outlet is connected to the rear brick delivery system through a second brick hanging device;

[0008] The first brick-hanging device and the second brick-hanging device are both cranes with special clamps for hoisting;

[0009] The brick splitting machine is installed between the front brick conveying system and the rear brick conveying system and has a brick splitting working position;

[0010] The conveying direction of the front bricklaying conveying system is from the first brick hanging device to the brick splitting working position;

[0011] The conveying direction of the rear bricklaying conveying system is from the brick splitting working position to the second brick hanging device.

[0012] As a further improvement of the present invention, the front brick conveying system includes a front brick conveyor belt, a front brick pushing bracket, a front brick pushing device and a brick splitting front plate. The brick splitting front plate is installed on the side of the front brick conveyor belt close to the brick splitting machine and points to the brick splitting working position. The front brick pushing device slides along the front brick pushing bracket and is located above the front brick conveyor belt. The conveying direction of the front brick pushing device is from the first brick hanging device to the brick splitting working position.

[0013] As a further improvement of the present invention, the forward-pushing brick device includes a forward-pushing walking assembly and a forward-pushing lifting assembly. The forward-pushing walking assembly moves forward and backward along the forward-pushing brick bracket, and the forward-pushing lifting assembly is installed on the forward-pushing walking assembly and moves in the up and down directions.

[0014] As a further improvement of the present invention, the rear brick conveying system includes a rear brick support, a rear brick connecting platform, a rear brick device and a rear brick splitting conveyor belt. The rear brick connecting platform is installed on the rear brick support and connects the brick splitting work position and the rear brick splitting conveyor belt. The rear brick connecting platform is provided with a brick splitting rear plate and a flap. The flap is located on the rear side of the brick splitting rear plate. The flap has two states, horizontal and downward. When the flap is in the horizontal state, it is at the same height as the brick splitting rear plate and the rear brick splitting conveyor belt. The rear brick device is installed on the rear brick support behind the brick splitting machine. The rear brick device is located above the flap and slides along the rear brick support. The conveying direction of the rear brick device is from the brick splitting work position to the second brick hanging device, and when the flap is in the downward state, the rear brick device clamps the bricks above the flap.

[0015] As a further improvement of the present invention, the rear-push brick device includes a rear-push walking assembly, a rear-push brick clamping assembly and a rear-push lifting assembly. The rear-push walking assembly moves forward and backward along the rear-push brick bracket, the rear-push lifting assembly is installed on the rear-push walking assembly and moves in the up and down directions, the rear-push brick clamping assembly is installed on the rear-push walking assembly and is located in front of the rear-push lifting assembly, and the rear-push brick clamping assembly clamps bricks.

[0016] As a further improvement of the present invention, the pallet circulation system includes a brick conveyor belt, a brick feeding belt, a pallet recovery belt, a rotating pallet warehouse, a pallet delivery belt, a brick delivery belt, and a finished product output belt. The output end of the brick conveyor belt is connected to the input end of the brick feeding belt, the input end of the brick feeding belt is connected to the input end of the pallet recovery belt, the output end of the pallet recovery belt is connected to the input end of the rotating pallet warehouse, the output end of the rotating pallet warehouse is connected to the input end of the pallet delivery belt, the output end of the pallet delivery belt is connected to the output end of the brick delivery belt, the input end of the finished product output belt is connected to the output end of the brick delivery belt, the output end of the brick feeding belt is the brick delivery entrance and is connected to the input end of the front brick conveying system through a first brick hanging device, and the input end of the brick delivery belt is the brick delivery exit and is connected to the output end of the rear brick conveying system through a second brick hanging device.

[0017] As a further improvement of the present invention, the rotating pallet warehouse includes a pallet warehouse body, a fixed bracket, a rotating power mechanism, a pallet slow-down device, an in-warehouse pallet conveying device and a synchronous lifting assembly, the pallet slow-down device and the in-warehouse pallet conveying device are both installed on the pallet warehouse body, the rotating power mechanism is installed on the fixed bracket and the output end is connected to the pallet warehouse body, the pallet slow-down device is located in the in-warehouse pallet conveying device and the pallet slow-down device moves in a vertical direction, the pallet slow-down device has two states, lifting and lowering, the pallet slow-down device is in the lifting state, the top end height is higher than the in-warehouse pallet conveying device and in the lowering state, the top end is lower than the in-warehouse pallet conveying device, and the synchronous lifting assembly is installed on the pallet warehouse body and is located above the in-warehouse pallet conveying device.

[0018] As a further improvement of the present invention, the brick splitting machine includes an inner frame, an outer frame, a main driving member, an upper knife assembly, a lower knife assembly and a guide device, the main driving member is installed at the upper end of the inner frame, the upper knife assembly is installed at the output end of the main driving member and slides along the inner frame, the lower knife assembly is installed at the lower end of the inner frame, the upper knife assembly and the lower knife assembly are arranged vertically opposite to each other to form a brick splitting working position between the upper knife assembly and the lower knife assembly, the guide device is installed between the inner frame and the outer frame, and a plurality of elastic support components for supporting the inner frame are symmetrically arranged between the inner frame and the outer frame, and the action direction of each elastic support component is vertically upward.

[0019] As a further improvement of the present invention, the brick splitting production line also includes a waste collection system, which includes a first inlet device, a second inlet device and a third inlet device. The input end of the first inlet device is connected to the bottom of the brick splitting machine, the input end of the second inlet device is connected to the lower side of the rear brick conveying system, and the input end of the third inlet device is connected to the end of the rear brick conveying system. The rear brick conveying system is provided with a drop opening on the upper side of the waste collection system and the drop opening has two states of closed and connected. The rear brick conveying system clamps the bricks on the upper side of the second inlet device.

[0020] The brick splitting process comprises the following steps:

[0021] S1: The pallet together with the unsplit bricks are transported on the pallet circulation system toward the first brick hoisting device, the first brick hoisting device hoists the unsplit bricks from the pallet circulation system to the front brick conveying system, and the pallet is circulated in the pallet circulation system for standby;

[0022] S2: The front brick conveying system conveys the bricks to the brick splitting working position of the brick splitting machine. The bricks are supported by the front brick conveying system and the rear brick conveying system at the brick splitting working position. The brick splitting machine operates to split the bricks.

[0023] S3: The split bricks are transported away from the brick splitting work station by the rear brick conveying system;

[0024] S4: The second brick hoisting device hoists the bricks from the rear brick conveying system to the pallet of the pallet circulation system to complete the split brick production.

[0025] The beneficial effects of the present invention are:

[0026] 1: The pallet circulation system has a brick delivery entrance and a brick delivery exit. The pallet circulation system is connected to the front brick conveying system through the first brick hoisting device and is connected to the rear brick conveying system through the second brick hoisting device. Bricks are transferred from the brick delivery entrance to the front brick conveying system via the first brick hoisting device. The conveying direction of the front brick conveying system is from the first brick hoisting device to the brick splitting machine. The finished products are transferred from the rear brick conveying system to the brick delivery exit via the second brick hoisting device. The conveying direction of the rear brick conveying system is from the brick splitting machine to the second brick hoisting device. Both the first brick hoisting device and the second brick hoisting device are cranes with special clamps for lifting, which avoids manual handling. The brick splitting machine is installed between the front brick conveying system and the rear brick conveying system and the brick splitting machine has a brick splitting working position, which realizes the smooth transfer of bricks from the brick board delivery entrance to the splitting machine and then to the brick board output outlet, greatly improving the degree of automation of brick splitting and improving production efficiency.

[0027] 2: The upper side of the waste collection system is connected to the lower side of the rear bricklaying conveying system. The waste collection system is installed below the rear bricklaying conveying system, and the waste collection system is connected to the bottom of the bricklaying splitter and the end of the rear bricklaying conveying system. The waste after brick splitting falls into the waste collection system from the rear bricklaying conveying system, the bottom of the bricklaying splitter and the end of the rear bricklaying conveying system respectively. The rear bricklaying conveying system clamps the bricks on the upper side of the waste collection system to prevent intact bricks from falling into the waste collection system. The waste automatically falls at the bottom of the rear bricklaying conveying system and the bricklaying splitter, which greatly improves the automation of brick splitting and improves production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the structure of the present invention.

[0029] Figure 2 This is a schematic diagram of the structure of the pallet circulation system.

[0030] Figure 3 for Figure 2 Enlarged schematic diagram at point C in the middle.

[0031] Figure 4 This is a top view schematic diagram of the front bricklaying conveying system structure.

[0032] Figure 5 This is a schematic diagram of the front bricklaying conveying system structure.

[0033] Figure 6This is a schematic diagram of the installation relationship between the forward-pushing brick bracket and the forward-pushing brick device.

[0034] Figure 7 It is a schematic diagram of the structure of the forward brick pushing device.

[0035] Figure 8 It is a schematic diagram of the installation relationship between the rear-push brick bracket and the rear-push brick device.

[0036] Fig. 9 It is a schematic diagram of the structure of the push-brick device.

[0037] Fig.10 It is a front view schematic diagram of the push-back brick device structure.

[0038] Fig.11 It is a schematic side view of the push-back brick device structure.

[0039] Fig.12 It is a top view schematic diagram of the push-back brick device structure.

[0040] Fig.13 for Fig.11 Schematic diagram of EE section view.

[0041] Fig.14 for Fig.12 Schematic diagram of the cross-section along the BB direction.

[0042] Fig.15 for Fig.12 Schematic diagram of the AA section view.

[0043] Fig.16 for Fig.12 Schematic diagram of the cross-section along the GG axis.

[0044] Fig.17 It is a top view schematic diagram of the push-brick device system.

[0045] Fig.18 It is a front view schematic diagram of the push-back brick device system.

[0046] Fig.19 Schematic diagram of the waste collection system structure.

[0047] Fig. 20 This is a schematic diagram of the rotating pallet warehouse structure.

[0048] Fig.21 It is a schematic diagram of the structure of the synchronous lifting assembly.

[0049] Fig. 22 This is a schematic diagram of the structure of the cargo pallet slow-down device.

[0050] Fig.23 Schematic diagram of the structure of a brick splitting machine.

[0051] Fig.24This is a schematic diagram of the external frame structure.

[0052] Fig.25 It is a schematic diagram of the cooperation between the guide rail and the moving part mounting seat.

[0053] Explanation of the reference numerals: 1. Pallet circulation system; 11. Brick board delivery port; 12. Brick board delivery port; 13. Brick board conveyor belt; 14. Bricklaying delivery belt; 141. Roller; 142. Bricklaying delivery port; 15. Pallet recovery belt; 151. Closing chain; 152. Pallet lifting member; 16. Rotating pallet warehouse; 161. Pallet warehouse body; 1611. Slow-down mounting beam; 1612. Warehouse column; 162. Fixed bracket; 163. Rotating power mechanism; 164. Pallet slow-down device; 1641. Pallet slow-down cylinder; 1642. Pallet slow-down guide assembly; 16421. Pallet slow-down guide assembly sets; 16422, guide column for slow-down of pallet; 1643, pallet slow-down support plate; 165, pallet conveying device in warehouse; 166, synchronous lifting assembly; 1661, lifting claw assembly; 16611, lifting power part; 16612, lifting shaft; 16613, hook claw; 1662, lifting synchronization device; 16621, synchronous mounting beam; 16622, synchronous connecting rod assembly; 166221, lifting synchronous gear; 166222, first connecting rod; 166223, second connecting rod; 17, pallet delivery belt; 18, brick delivery belt; 181, brick delivery outlet; 19, finished product output belt;

[0054] 2. The first brick hanging device;

[0055] 3. Front brick conveying system; 31. Front brick conveyor belt; 32. Front brick support; 321. Front guide rail; 3211. Front rack; 3212. Front rail horizontal guide plate; 3213. Front rail vertical guide plate; 33. Front brick device; 3311. Front walking frame; 3312. Front driving force assembly; 33121. Front motor; 33122. Front shaft; 33123. Front gear; 3313 , forward push guide assembly; 33131, forward push wheel; 33132, forward push guide wheel; 332, forward push lifting assembly; 3321, forward push lifting drive member; 3322, forward push lifting guide assembly; 3323, forward push frame; 3324, forward push buffer; 3325, forward push fixing assembly; 33251, positioning mounting plate; 33252, positioning rod; 33253, positioning slot block; 34, brick splitting front plate;

[0056] 4. Brick splitting machine;

[0057] 5. Rear brick conveying system; 51. Rear brick splitting plate; 52. Rear brick pusher bracket; 521. Rear push rack; 522. Rear track vertical guide plate; 523. Rear track horizontal guide plate; 53. Rear brick pusher device; 531. Rear pusher walking assembly; 5311. Rear pusher walking frame; 5312. Rear pusher force assembly; 53121. Rear pusher motor; 53122. Rear pusher shaft; 53123. Rear pusher gear; 5313. Rear pusher guide assembly; 53131. Rear pusher walking wheel; 53132. Rear Push guide wheel; 532, push back brick clamp assembly; 5321, brick clamp device; 53211, brick clamp power piece; 53212, brick clamp guide rail; 53213, brick clamp frame; 5322, brick clamp synchronization device; 53221, synchronization rack; 53222, brick clamp synchronization gear; 533, push back lifting assembly; 5331, push back lifting power piece; 5332, push back lifting sleeve; 5333, push back plate; 5334, push back lifting guide rail; 54, rear brick splitting conveyor belt; 55, flap;

[0058] 6. Waste collection system; 61. First inlet device; 62. Second inlet device; 63. Third inlet device;

[0059] 7. Second brick hanging device;

[0060] 81. Upper knife assembly; 84. Main driving member; 85. Lower knife assembly; 86. Brick splitting work station; 821. Inner frame; 8211. Guide rail group; 82111. Guide rail; 8212. Upper crossbeam of inner frame; 8214. Lower crossbeam of inner frame; 822. Outer frame; 8221. Moving part group; 82211. Moving part mounting seat; 82212. Guide moving part; 8222. Outer frame base; 8224. Upper crossbeam of outer frame; 823. Elastic support assembly. DETAILED DESCRIPTION

[0061] The present invention will be further described below in conjunction with the accompanying drawings:

[0062] like Figure 1-25 As shown, this embodiment provides a brick splitting production line, including a pallet circulation system 1, a first brick hanging device 2, a front brick conveying system 3, a brick splitting machine 4, a rear brick conveying system 5, a waste collection system 6 and a second brick hanging device 7.

[0063] The brick splitting machine 4 is installed between the front brick conveying system 3 and the rear brick conveying system 5 and has a brick splitting working position 86. The brick splitting machine 4 includes an inner frame 821, an outer frame 822, a main driving member 84, an upper knife assembly 81, a lower knife assembly 85, an elastic support component 823 and a guide device. The main driving member 84 is installed at the upper end of the inner frame 821, the lower knife assembly 85 is installed at the lower end of the inner frame 821, and the guide device is installed between the inner frame 821 and the outer frame 822. The inner frame 821 slides up and down along the outer frame 822 under the guidance of the guide device. A plurality of elastic support components 823 for supporting the inner frame 821 are symmetrically arranged between the inner frame 821 and the outer frame 822. The action direction of each elastic support component 823 is vertically upward. The upper knife assembly 81 and the lower knife assembly 85 are arranged vertically opposite to each other, and a brick splitting working position 86 is formed between the upper knife assembly 81 and the lower knife assembly 85. The lower limit position of the lower knife assembly 85 is lower than the front bricklaying conveying system 3 and the rear bricklaying conveying system 5. The upper knife assembly 81 squeezes the bricks downward under the drive of the main driving component 84. The bricks are supported by the front bricklaying conveying system 3 and the rear bricklaying conveying system 5, so the upward supporting force of the upper knife assembly 81 and the force of the elastic supporting component 823 jointly lift the inner frame 821, and the lower knife assembly 85 rises with the inner frame 821, passing through the gap between the front bricklaying conveying system 3 and the rear bricklaying conveying system 5, and then lifts the lower knife assembly 85 that was originally lowered under the front bricklaying conveying system 3 and the rear bricklaying conveying system 5, and works together with the upper knife assembly 81 to complete the brick splitting. The action of the main driving component 84 not only realizes the action of the upper knife assembly 81, but also realizes the adaptive lifting and falling of the lower knife assembly 85, which can realize automatic continuous production, stable and reliable operation, and high production efficiency.

[0064] The inner frame 821 includes an inner frame upper crossbeam 8212 and an inner frame lower crossbeam 8214, the outer frame 822 includes an outer frame base 8222 and an outer frame upper crossbeam 8224, the guide device includes a moving part group 8221, a plurality of moving part mounting seats 82211 mounted on the outer frame upper crossbeam 8224 and the outer frame base 8222, and a guide rail group 8211 mounted on the inner frame 821, the guide rail group 8211 includes a plurality of guide rails 82111 respectively mounted on the inner frame upper crossbeam 8212 and the inner frame lower crossbeam 8214, the moving part group 8221 includes a plurality of guide moving parts 82212, and each guide moving part 82212 is respectively mounted on the moving part mounting seat 822 11, each guide moving part 82212 moves in the corresponding guide rail 82111 along the up and down direction. Because the distance between the upper crossbeam 8224 of the outer frame and the base 8222 of the outer frame is longer, and the distance between the upper crossbeam 8212 of the inner frame and the lower crossbeam 8214 of the inner frame is also longer, the inner frame 821 has better guidance when sliding up and down along the outer frame 822, avoiding the inner frame 821 from tilting. Each guide moving part 82212 is a composite bearing, which can accept left and right and front and back loads, and the bearing capacity can be well distributed on the guide rail 82111. The composite bearing and the guide rail 82111 have a long service life and can be assembled by welding bolts, which is economical and practical, and the composite bearing components are easy to replace.

[0065] In this embodiment, the pallet circulation system 1 includes a brick conveyor belt 13, a brick feeding belt 14, a pallet recovery belt 15, a rotating pallet warehouse 16, a pallet delivery belt 17, a brick delivery belt 18, and a finished product output belt 19. The input end of the brick conveyor belt 13 is the brick feeding entrance 11, the output end of the brick conveyor belt 13 is connected to the input end of the brick feeding belt 14, the input end of the pallet recovery belt 15 is connected to the input end of the brick feeding belt 14, the output end of the pallet recovery belt 15 is connected to the input end of the rotating pallet warehouse 16, the output end of the rotating pallet warehouse 16 is connected to the input end of the pallet delivery belt 17, the output end of the pallet delivery belt 17 is connected to the output end of the brick feeding belt 18, the output end of the brick delivery belt 18 is connected to the input end of the finished product output belt 19, and the output end of the finished product output belt 19 is connected to the The output end of the brick feeding belt 14 is a brick feeding port 142 and is connected to the input end of the front brick conveying system 3 through the first brick hanging device 2. The input end of the brick feeding belt 18 is a brick delivery port 181 and is connected to the output end of the rear brick conveying system 5 through the second brick hanging device 7. The first brick hanging device 2 and the second brick hanging device 7 are both cranes with special clamps for lifting, which avoids manual handling. The brick splitting machine 4 is installed between the front brick conveying system 3 and the rear brick conveying system 5 and the brick splitting machine 4 has a brick splitting work station 86, which realizes the smooth transportation of bricks from the brick board feeding port 11 to the brick splitting machine 4 and then to the brick board output port 12, greatly improving the automation of brick splitting and improving production efficiency. The first brick hanging device 2 and the second brick hanging device 7 can both adopt conventional structures, which will not be repeated here.

[0066] In this embodiment, the brick feeding belt 14 is a roller conveyor including a plurality of rollers 141, and the pallet recovery belt 15 is a reversible chain conveyor including two closing chains 151 embedded between adjacent rollers 141. The pallet recovery belt 15 is provided with a pallet lifting member 152 at the lower end of the side close to the brick feeding belt 14. The closing chain 151 adjusts the relative height with the roller 141 under the action of the pallet lifting member 152. When the brick stack is transferred from the brick plate conveyor belt 13 to the brick feeding belt 14, the pallet lifting member 152 retracts, and the closing chain 151 drops below the roller 141, and the bricks and the pallet can be freely conveyed along the brick feeding belt 14; the pallet lifting member 152 extends, and the closing chain 151 rises above the roller 141 to complete the transfer of the pallet from the brick plate conveyor belt 13 to the brick feeding belt 14. Similarly, the structure of the pallet delivery belt 17 is the same as that of the pallet recovery belt 15, and the output end of the pallet delivery belt 17 is connected to the brick delivery belt 18, and the pallet delivery belt 17 can also run forward and reverse.

[0067] In this embodiment, the rotating pallet warehouse 16 includes a pallet warehouse body 161, a fixed bracket 162, a rotating power mechanism 163, a pallet slow-down device 164, an in-warehouse pallet conveying device 165 and a synchronous lifting assembly 166. Figure 2 , 20 -22.

[0068] The rotating power mechanism 163 is installed on the fixed bracket 162 and the output end is connected to the pallet bin 161 for rotating the pallet bin 161 to facilitate a forklift to fork the pallet into the pallet bin 161 from any direction.

[0069] The synchronous lifting assembly 166 is installed on the pallet warehouse body 161 and is located above the pallet conveying device 165 in the warehouse. The synchronous lifting assembly 166 includes two lifting claw assemblies 1661 symmetrically installed on both sides of the pallet warehouse body 161 and a lifting synchronization device 1662 installed between the two lifting claw assemblies 1661. Each lifting claw assembly 1661 includes a lifting power member 16611, a lifting shaft 16612 and a group of hook claws 16613 parallelly hinged on the cargo pallet body 161, one end of the hook claw 16613 is connected in series through the lifting shaft 16612, the output end of the lifting power member 16611 is hinged to the lifting shaft 16612 and the other end is hinged to the cargo pallet body 161, the lifting power member 16611 drives the lifting shaft 16612 to move, the lifting shaft 16612 connects two hook claws 16613 in series and drives the hook claws 16613 to rotate around the cargo pallet body 161, so that the two hook claws 16613 move synchronously; the lifting synchronization device 1662 includes a synchronous mounting beam 16621, a group of synchronous connecting rod assemblies 16622 symmetrically mounted on the synchronous mounting beam 16621, the synchronous mounting beam 16621 is mounted on the cargo pallet body 161, and the synchronous connecting rod assembly 1 6622 includes a lifting synchronous gear 166221, a first connecting rod 166222 and a second connecting rod 166223. The lifting synchronous gear 166221 is installed on the synchronous mounting beam 16621. One end of the first connecting rod 166222 is fixed on the lifting synchronous gear 166221 and the other end is hinged to one end of the second connecting rod 166223. The other end of the second connecting rod 166223 is hinged to the lifting shaft 16612. The two lifting synchronous gears 166221 are meshed with each other. When the lifting power parts 16611 on both sides are actuated, the meshing of the two lifting synchronous gears 166221 causes the first connecting rods 166222 on both sides to move synchronously, thereby driving the second connecting rods 166223 on both sides to move in the same posture, so that the lifting shafts 16612 on both sides move synchronously, and the hooks 16613 on both sides of the rotating cargo pallet warehouse 16 rotate synchronously.

[0070] In this embodiment, the pallet warehouse body 161 includes a plurality of warehouse body columns 1612 and a plurality of slow-down mounting beams 1611. Each slow-down mounting beam 1611 is horizontally mounted between two adjacent warehouse body columns 1612, and the pallet slow-down device 164 is mounted on the slow-down mounting beam 1611. The pallet slow-down device 164 and the warehouse pallet conveying device 165 are both mounted on the pallet warehouse body 161. The pallet slow-down device 164 includes a plurality of pallet slow-down cylinders 1641, a plurality of pallet slow-down guide assemblies 1642 and a pallet slow-down support plate 1643. The cylinder body of each pallet slow-down cylinder 1641 and each pallet slow-down guide assembly 1642 are plumb fixedly mounted on the slow-down mounting beam 1611, and the output end of each pallet slow-down cylinder 1641 and the movable end of each pallet slow-down guide assembly 1642 are fixedly mounted with a pallet slow-down support plate 1643. The pallet slow-descent guide assembly 1642 includes a pallet slow-descent guide sleeve 16421 and a pallet slow-descent guide column 16422. The pallet slow-descent guide sleeve 16421 is fixedly mounted on the slow-descent mounting beam 1611. One end of the pallet slow-descent guide column 16422 is fixedly mounted on the pallet slow-descent support plate 1643 and the pallet slow-descent guide column 16422 slides up and down along the pallet slow-descent guide sleeve 16421. The pallet slow-descent device 164 is located in the in-warehouse pallet conveying device 165. The pallet slow-descent device 164 has two states, a lifting state and a lowering state. When the pallet slow-descent device 164 is in the lifting state, the top end is higher than the in-warehouse pallet conveying device 165, and when it is in the lowering state, the top end is lower than the in-warehouse pallet conveying device 165.

[0071] The working process of the rotating pallet warehouse 16 of this embodiment is as follows: when the pallet is conveyed to the pallet delivery belt 17 through the pallet recovery belt 15, the pallet slow-down cylinder 1641 is actuated to lift the pallet in the pallet warehouse body 161 upwards, and then the lifting power part 16611 is actuated to drive the hook claw 16613 to fork up the whole pile of pallets, and then the pallet slow-down cylinder 1641 is reversed to leave space for the pallet to enter, and after the pallet passes, the pallet slow-down cylinder 1641 is raised again for a while, and the lifting power part 16611 is reversed to place the pallet on the pallet slow-down pallet 1643.

[0072] When the pallet bin 161 outputs the pallet to the pallet delivery belt 17, the lifting power component 16611 lifts the pallet on the pallet bin 161 upwards. It is worth noting that when the pallet slow-down cylinder 1641 is at the lower limit position, the lifting power component 16611 can only lift the second pallet from bottom to top. In this way, when the lifting power component 16611 completes the lifting, only one pallet is left on the pallet conveying device 165 in the bin, and the pallet is transported to the pallet delivery belt 17 by the pallet conveying device 165 in the bin.

[0073] When the pallet bin 161 stores the pallets from the pallet recovery belt 15, the pallet slow-down cylinder 1641 is actuated to lift the pallet in the pallet bin 161 upwards, and the lifting power member 16611 is actuated to clamp the pallet. It is worth noting that when the pallet slow-down cylinder 1641 is at the upper limit position, the lifting power member 16611 can lift the first pallet from bottom to top, so that when the pallet slow-down cylinder 1641 descends, a space that can accommodate a pallet is left on the pallet conveying device 165 in the bin, and the pallet recovery belt 15 sends the pallet into this space to complete the storage.

[0074] In this embodiment, the front brick conveying system 3 includes a front brick conveying belt 31, a front brick pushing bracket 32, a front brick pushing device 33 and a brick splitting front plate 34. The brick splitting front plate 34 is installed on the side of the front brick conveying belt 31 close to the brick splitting machine 4 and points to the brick splitting working position 86. The front brick pushing device 33 is located above the front brick conveying belt 31. The conveying direction of the front brick pushing device 33 is from the first brick hanging device 2 to the brick splitting working position 86 to push the bricks from the front brick conveying belt 31 to the brick splitting working position 86. Figure 1 , 2 -7.

[0075] The forward brick pushing device 33 includes a forward pushing travel assembly and a forward pushing lifting assembly 332. The forward pushing travel assembly includes a forward pushing travel frame 3311 and a forward pushing force assembly 3312 and a forward pushing guide assembly 3313 installed on the forward pushing travel frame 3311. The forward brick pushing support 32 includes a pair of forward pushing guide rails 321 and two forward pushing racks 3211. The forward pushing guide rails 321 include a front rail horizontal guide plate 3212 and a front rail vertical guide plate 3213. The front pushing rack 3211 is installed at the bottom of the front rail horizontal guide plate 3212. The forward pushing guide assembly 3313 is installed at the bottom of the front rail horizontal guide plate 3212. 313 includes a plurality of front pushing wheels 33131 and a plurality of front pushing guide wheels 33132, each of which rolls and rubs against the front rail vertical guide plate 3213. The guidance of the front rail vertical guide plate 3213 can prevent the front pushing wheel assembly from shaking left and right, and ensure the good directionality of the front pushing wheel assembly, so as to avoid the deviation of the whole row of bricks when pushing the whole row of bricks. Each of the front pushing wheels 33131 rolls and rubs against the front rail horizontal guide plate 3212.

[0076] The front pushing force assembly 3312 includes two front pushing gears 33123, a front pushing motor 33121 and a front pushing shaft 33122 respectively installed on the front pushing carriage 3311, the front pushing motor 33121 is connected to the front pushing shaft 33122 in transmission, the two front pushing gears 33123 are fixedly mounted on the two ends of the front pushing shaft 33122 and respectively mesh with the two front pushing racks 3211, the front pushing wheels 33131 are on the upper side of the front rail horizontal guide plate 3212, the front pushing gears 33123 are on the lower side of the front rail horizontal guide plate 3212 and clamp the front rail horizontal guide plate 3212 together with the front pushing wheels 33131, ensuring that the front pushing wheels 33131 of the front pushing brick device 33 are close to the front rail horizontal guide plate 3212 when pushing bricks, and the front pushing carriage 3311 reciprocates along the front pushing guide rail 321 driven by the front pushing motor 33121.

[0077] In this embodiment, the forward pushing lifting assembly 332 includes a forward pushing lifting drive component 3321, a forward pushing lifting guide component 3322, a front pushing frame 3323, a forward pushing buffer component 3324 and two forward pushing fixing components 3325. The forward pushing lifting drive component 3321 is installed on the forward pushing carriage 3311 and the output end is connected to the front pushing frame 3323. The front pushing frame 3323 is installed on the forward pushing carriage 3311 through the forward pushing lifting guide component 3322 and the front pushing frame 3323 slides in the up and down directions.

[0078] Two forward push fixing components 3325 are symmetrically mounted between the forward push frame 3323 and the forward push carriage frame 3311. Each forward push fixing component 3325 includes a positioning mounting plate 33251, a positioning rod 33252 and a positioning slot block 33253. The positioning mounting plate 33251 is mounted on the lower side of the forward push frame 3323. The positioning slot block 33253 is mounted on the forward push carriage frame 3311 and is provided with a groove. The positioning rod 33252 is mounted on the positioning mounting plate 33251 and the positioning rod 33252 is located at the positioning slot block 33253. When the front push frame 3323 is in the lower limit position, the positioning rod 33252 is lowered and embedded in the groove and is fixed forward and backward by the groove, thereby fixing the front push frame 3323. The front push buffer 3324 is installed on the front push trolley 3311. When pushing bricks, the front push lifting guide assembly 3322 tends to deform backward, causing the front push frame 3323 to squeeze the front push buffer 3324. The support of the front push buffer 3324 to the front push frame 3323 prevents the front push lifting guide assembly 3322 from deforming.

[0079] The working process of the front brick conveying system 3 of this embodiment is as follows: the bricks are hoisted onto the front brick conveyor belt 31 by the first brick hoisting device 2 and then transported in the direction of the forward brick pushing device 33, and then the forward pushing lifting drive member 3321 is actuated to lower the front pushing frame 3323, and the front pushing motor 33121 is actuated to drive the front pushing carriage 3311 to move forward along the front pushing guide rail 321, and after moving forward a set distance to the brick splitting working position 86, the front pushing lifting drive member 3321 is reversed to raise the front pushing frame 3323, and the front pushing frame 3323 returns to the initial position, and the front pushing motor 33121 is reversed to drive the front pushing carriage 3311 to retreat to the initial position along the front pushing guide rail 321, completing a working cycle.

[0080] In this embodiment, the rear brick laying conveying system 5 includes a rear brick pushing support 52, a rear brick pushing connecting platform, a rear brick pushing device 53 and a rear brick splitting conveying belt 54. Figure 1 , 8 -18.

[0081] Among them: the rear brick-pushing connecting platform is installed on the rear brick-pushing bracket 52 and is connected to the brick-splitting working position 86 and the rear brick-splitting conveyor belt 54. The rear brick-pushing connecting platform is provided with a brick-splitting rear plate 51 and a flap 55. The brick-splitting rear plate 51 is used in conjunction with the brick-splitting front plate 34 to jointly support the brickwork in the brick-splitting working position 86. The flap 55 is located at the rear side of the brick-splitting rear plate 51 and above the waste collection system 6. The flap 55 is connected to a flap cylinder, which drives the flap 55 to adjust and switch to a horizontal or downward state. When the flap 55 is in a horizontal state, it is at the same height as the brick-splitting rear plate 51 and the rear brick-splitting conveyor belt 54, and the brickwork can be smoothly pushed onto the flap 55.

[0082] Among them: the conveying direction of the rear brick-pushing device 53 points from the brick-splitting work position 86 to the second brick-hanging device 7, the rear brick-pushing device 53 includes a rear pushing walking assembly 531, a rear pushing brick-clamping assembly 532 and a rear pushing lifting assembly 533, the rear pushing walking assembly 531 is located above the flap 55 and moves back and forth along the rear pushing brick bracket 52, the rear pushing lifting assembly 533 is installed on the rear pushing walking assembly 531 and moves in the up and down directions, the rear pushing brick-clamping assembly 532 is installed on the rear pushing walking assembly 531 and is located in front of the rear pushing lifting assembly 533, when the flap 55 is in a downward tilt state, the rear pushing brick-clamping assembly 532 clamps the bricks above the waste collection system 6.

[0083] The rear pushing walking assembly 531 includes a rear pushing walking frame 5311, a rear pushing force component 5312 and a rear pushing guide component 5313 respectively installed on the rear pushing walking frame 5311, the rear pushing brick bracket 52 includes a pair of rear pushing racks 521, the rear pushing force component 5312 includes a rear pushing gear 53123, a rear pushing motor 53121 and a rear pushing shaft 53122 respectively installed on the rear pushing walking frame 5311, the rear pushing shaft 53122 is transmission-connected to the rear pushing motor 53121, and rear pushing gears 53123 meshing with the corresponding rear pushing racks 521 are respectively fixed at both ends of the rear pushing shaft 53122, and the rear pushing walking frame 5311 is provided with a plurality of rear pushing gears 53123 meshing with the rear pushing racks 521. Driven by the rear driving force component 5312, the rear brick support 52 reciprocates; the rear guide component 5313 includes a rear pushing wheel 53131 and a rear pushing guide wheel 53132, and the rear brick support 52 includes a rear rail horizontal guide plate 523 and a rear rail vertical guide plate 522. The rear pushing wheel 53131 rolls with the rear rail horizontal guide plate 523, and the rear pushing guide wheel 53132 rolls with the rear rail vertical guide plate 522. Through the guidance of the rear rail vertical guide plate 522, the rear pushing wheel assembly 531 is prevented from shaking left and right, and the good directionality of the rear pushing wheel assembly 531 is ensured, thereby avoiding the deviation of the entire row of bricks when pushing the entire row of bricks.

[0084] The rear-pushing brick clamping assembly 532 includes a brick clamping device 5321 and a plurality of brick clamping synchronization devices 5322. The brick clamping device 5321 includes a brick clamping power member 53211, a plurality of brick clamping guide rails 53212 and two symmetrically arranged brick clamping frames 53213. Each brick clamping guide rail 53212 is fixedly mounted on the rear-pushing walking assembly 531 in parallel and horizontally. The two brick clamping frames 53213 slide left and right along the guide rails. The two ends of the brick clamping power member 53211 are respectively connected to the two brick clamping frames 53213 and change the distance between the two brick clamping frames 53213. When the flap 55 is in a downward tilt state, the brick clamping power member 53211 drives the brick clamping frames 53213 on both sides to clamp bricks; each brick clamping synchronization device 5322 includes two synchronous racks 53221 and the brick clamping synchronous gear 53222, the brick clamping synchronous gear 53222 is installed on the rear pushing walking assembly 531, the two synchronous racks 53221 are relatively installed on the two brick clamping frames 53213, the two synchronous racks 53221 are respectively meshed with the corresponding brick clamping synchronous gears 53222 on both sides of the brick clamping synchronous gear 53222, the two synchronous racks 53221 move in opposite directions, because the installation position of the brick clamping synchronous gear 53222 remains unchanged, the two synchronous racks 53221 will move in opposite directions with the same movement distance when meshing with the brick clamping synchronous gear 53222, thereby realizing the synchronous action of the brick clamping frames 53213 on both sides, and correcting the left and right positions of bricks on the rear brick splitting conveyor belt 54.

[0085] The rear push-lift assembly 533 includes a rear push-lift power part 5331, a rear push-lift shaft sleeve 5332, a rear push plate 5333 and a rear push-lift guide rail 5334. The output end of the rear push-lift power part 5331 is fixed on the rear push plate 5333 and the other end is fixed on the rear push-moving travel assembly 531. The output end of the rear push-lift power part 5331 and the rear push-lift guide rail 5334 are both connected to the rear push plate 5333. The rear push-lift shaft sleeve 5332 is fixed on the rear push-moving travel assembly 531. The rear push-lift guide rail 5334 slides up and down along the rear push-lift shaft sleeve 5332. The rear push brick clamping assembly 532 clamps the split bricks and moves forward for a while to create space for the rear push plate 5333 to descend. Then the rear push plate 5333 descends driven by the rear push-lift power part 5331, and pushes the split bricks to the upper side of the flap 55 under the action of the rear pushing force component 5312.

[0086] The working process of the rear brick conveying system 5 of this embodiment is as follows: after the bricks are split, they are pushed down to the rear brick pushing device 53 by the front brick pushing device 33. At this time, since the bricks are close to each other, the brick clamping device 5321 moves to clamp the bricks and move forward for a while. Then the brick clamping device 5321 moves in the opposite direction to release the bricks. The rear push lifting power part 5331 moves to drive the rear push plate 5333 to descend and extend into the space between the bricks. The rear push walking frame 5311 moves forward along the rear push brick bracket 52 under the drive of the rear driving force component 5312, thereby driving the rear push plate 5333 to move forward. The bricks are pushed to the flap driven by the rear push walking assembly 531 55; the brick clamping device 5321 moves to clamp the brickwork again, and the flap cylinder moves to tilt the flap 55 downward, and the waste at the flap 55 falls; the flap cylinder moves in the reverse direction to make the flap 55 horizontal, and the brick clamping device 5321 moves in the reverse direction again to release the brickwork, and the brickwork is pushed to the rear brick-splitting conveyor belt 54 under the push of the rear push plate 5333, and the rear push lifting power part 5331 moves in the reverse direction to drive the rear push plate 5333 to rise, and the rear pushing force component 5312 moves in the reverse direction to drive the rear pushing walking frame 5311 to retreat and make the rear push plate 5333 retreat, and the rear push plate 5333 returns to the initial position to complete a working cycle.

[0087] In this embodiment, the waste collection system 6 includes a first inlet device 61, a second inlet device 62 and a third inlet device 63. The input end of the first inlet device 61 is connected to the brick splitting machine 4 to collect the waste generated at the brick splitting work station 86. The input end of the second inlet device 62 is connected to the rear brick conveying system 5 to collect the waste remaining on the rear brick support 52 after splitting. The input end of the third inlet device 63 is connected to the rear brick conveying system 5 to collect the defective products picked out by manual quality inspection at the end of the rear brick conveying system 5.

[0088] The present invention further provides a brick splitting process, comprising the following steps:

[0089] S1: The pallet together with the unsplit bricks are transported on the pallet circulation system 1 toward the first brick hoisting device 2 , and the first brick hoisting device 2 hoists the unsplit bricks from the pallet circulation system 1 to the front brick conveying system 3 .

[0090] S2: The front brick conveying system 3 conveys the bricks to the brick splitting working position 86 of the brick splitting machine 4. The bricks are supported by the front brick conveying system 3 and the rear brick conveying system 5 at the brick splitting working position 86, and the brick splitting machine 4 operates to split the bricks.

[0091] S3: The rear brick conveying system 5 conveys the split bricks to the second brick hanging device 7.

[0092] S4: The second brick hoisting device 7 hoists the bricks from the rear brick conveying system 5 to the pallet of the pallet circulation system 1 to complete the split brick production.

[0093] The specific process is described as follows:

[0094] 1. Separation of pallets and brickwork

[0095] 1: The forklift forks the cured bricks together with the pallet supporting the brick stack onto the brick conveyor belt 13, which can temporarily store the bricks or convey the bricks to the brick feed belt 14.

[0096] 2: The bricks on the brick feeding belt 14 are hoisted to the front brick conveyor belt 31 by the first brick hoisting device 2, and the pallet is transported in the reverse direction via the brick feeding belt 14 to the junction of the brick feeding belt 14 and the pallet recovery belt 15.

[0097] 2. Pallet Circulation Process

[0098] 1: When the pallet is transported in reverse through the bricklaying feeding belt 14 to the junction of the bricklaying feeding belt 14 and the pallet recovery belt 15, the pallet lifting piece 152 is extended, and the closing chain 151 is raised above the roller 141, and then the pallet recovery belt 15 transports the pallet to the rotating pallet bin 16. When the bricklaying feeding belt 14 is working, the pallet lifting piece 152 under the pallet recovery belt 15 is in a retracted state, and the closing chain 151 is lowered under the roller 141, and the bricks and the pallet can be freely transported along the bricklaying feeding belt 14.

[0099] 2: There are three working conditions for the pallet in the rotating pallet bin 16, specifically:

[0100] 2.1: If the number of incoming and outgoing pallets is equal, there is no need to store them first and then send them out. Instead, the hook 16613 hooks up the pallet above to leave space for direct passage. That is, when the pallet is transported to the pallet delivery belt 17 through the pallet recovery belt 15, the pallet slow-down cylinder 1641 is activated to lift the pallet in the pallet warehouse 161 upwards, and then the lifting power part 16611 is activated to drive the hook 16613 to fork the entire stack of pallets, and then the pallet slow-down cylinder 1641 is reversed to leave space for the pallet to enter. After the pallet passes, the pallet slow-down cylinder 1641 is raised again for a while, and the lifting power part 16611 is reversed to place the entire stack of pallets on the pallet slow-down pallet 1643, and the pallet is transported to the pallet delivery belt 17 by the pallet conveying device 165 in the warehouse.

[0101] 2.2: When the supply is greater than the output, that is, when the pallet bin 161 stores the pallets from the pallet recovery belt 15, the pallet slow-down cylinder 1641 is actuated to lift the pallets in the pallet bin 161 upwards, and the lifting power member 16611 is actuated to clamp the pallets. It is worth noting that when the pallet slow-down cylinder 1641 is at the upper limit position, the lifting power member 16611 can lift the first pallet from bottom to top, so that when the pallet slow-down cylinder 1641 descends, the pallet in the bin A space that can accommodate a pallet is left on the pallet conveying device 165, and the pallet recovery belt 15 delivers the pallet into this space, and then the pallet slow-down cylinder 1641 rises again for a while, and the lifting power part 16611 moves in the reverse direction to place the pallet on the pallet slow-down support plate 1643 to complete the storage; before the pallet in the pallet warehouse 161 is full, the rotating power mechanism 163 is activated to rotate the pallet warehouse 161, so that the forklift can fork the pallet out of the pallet warehouse 161 from any direction.

[0102] 2.3: When the supply is less than the output, that is, when the pallet bin 161 outputs the pallet to the pallet delivery belt 17, the lifting power component 16611 lifts the pallet on the pallet bin 161 upwards. It is worth noting that when the pallet slow-descent cylinder 1641 is at the lower limit position, the lifting power component 16611 can only lift the second pallet from bottom to top, so that when the lifting power component 16611 completes the lifting, only one pallet is left on the pallet conveying device 165 in the bin, and the pallet is transported to the pallet delivery belt 17 by the pallet conveying device 165 in the bin; before the pallets in the pallet bin 161 are exhausted, the rotating power mechanism 163 is actuated to rotate the pallet bin 161, so that the forklift can fork the pallet into the pallet bin 161 from any direction.

[0103] 3: After the pallet is transported from the pallet warehouse body 161 to the pallet delivery belt 17 via the pallet conveying device 165 in the warehouse, the pallet delivery belt 17 transports the pallet to the output end of the bricklaying delivery belt 18, and then the bricklaying delivery belt 18 runs in reverse to deliver the pallet to the input end of the bricklaying delivery belt 18 for standby use.

[0104] 3: Bricklaying splitting process

[0105] 1: The bricks are hoisted onto the front brick conveyor belt 31 by the first brick hoisting device 2 and transported toward the forward brick pushing device 33. Then the forward pushing lifting drive member 3321 is actuated to lower the front pushing frame 3323. The forward pushing motor 33121 is actuated to drive the front pushing carriage 3311 to move forward along the front pushing guide rail 321. After moving forward a group of bricklaying distance, the forward pushing lifting drive member 3321 is actuated in the reverse direction to raise the front pushing frame 3323. The front pushing frame 3323 returns to the initial position. The forward pushing motor 33121 is actuated in the reverse direction to drive the front pushing carriage 3311 to retreat to the initial position along the front pushing guide rail 321, completing a working cycle.

[0106] 2: The bricks are pushed to the brick splitting front plate 34 by the forward brick pushing device 33 and cross the brick splitting working position 86 and are pressed on the brick splitting rear plate 51. The brick splitting front plate 34 and the brick splitting rear plate 51 jointly support the bricks at the brick splitting working position 86. The brick splitting machine 4 operates to split the bricks at the brick splitting working position 86. The waste generated by brick splitting falls into the first inlet device 61 of the waste collection system 6 through the gap between the brick splitting front plate 34 and the brick splitting rear plate 51.

[0107] 3: After the bricks are split, they are pushed down to the rear brick pushing device 53 by the front brick pushing device 33. At this time, since the bricks are close to each other, the brick clamping device 5321 moves in the opposite direction to clamp the bricks and move forward for a while. Then the brick clamping device 5321 moves in the opposite direction to release the bricks. The rear push plate 5333 extends into the space between the bricks. The bricks are pushed to the top of the flap 55 driven by the rear pushing walking assembly 531; the brick clamping device 5321 moves in the opposite direction to clamp the bricks again, and the flap cylinder moves to tilt the flap 55 downward, and the waste at the flap 55 falls into the second inlet device 62 of the waste collection system 6; the flap cylinder moves in the opposite direction to make the flap 55 horizontal, and the brick clamping device 5321 moves in the opposite direction again to release the bricks. The bricks are pushed to the rear brick splitting conveyor belt 54 by the rear push plate 5333, and then the rear push plate 5333 returns to the initial position to complete a working cycle.

[0108] 4: The rear-splitting brick conveyor belt 54 conveys the bricks to the end of the rear-splitting brick conveyor belt 54, and quality inspection is carried out at the end of the rear-splitting brick conveyor belt 54. Unqualified bricks are manually thrown into the third inlet device 63 of the waste collection system 6.

[0109] 5: The second brick hoisting device 7 hoists the split bricks onto the pallet at the input end of the brick delivery belt 18, and transports them along the brick delivery belt 18 and the finished product output belt 19 in sequence, and is forked down the brick splitting production line by a forklift at the brick plate output port 12.

[0110] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for illustrating the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which shall fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. Brick splitting production line, characterized by: It includes a pallet circulation system, a first brick hoisting device, a front brick conveying system, a brick splitting machine, a rear brick conveying system and a second brick hoisting device; The pallet circulation system has a bricklaying inlet and a bricklaying outlet, the bricklaying inlet is connected to the front bricklaying conveying system through a first brick hanging device, and the bricklaying outlet is connected to the rear bricklaying conveying system through a second brick hanging device. The pallet circulation system includes a brick plate conveyor belt, a bricklaying feeding belt, a pallet recovery belt, a rotating pallet warehouse, a pallet delivery belt, a bricklaying delivery belt, and a finished product output belt. The output end of the brick plate conveyor belt is connected to the input end of the bricklaying feeding belt, the input end of the pallet recovery belt is connected to the input end of the bricklaying feeding belt, the output end of the pallet recovery belt is connected to the input end of the rotating pallet warehouse, the output end of the rotating pallet warehouse is connected to the input end of the pallet delivery belt, the output end of the pallet delivery belt is connected to the output end of the bricklaying delivery belt, and the input end of the finished product output belt is connected to the output end of the bricklaying delivery belt. The output end of the bricklaying feeding belt is the bricklaying inlet and is connected to the input end of the front bricklaying conveying system through a first brick hanging device. The rotating pallet warehouse comprises a pallet warehouse body, a fixed bracket, a rotating power mechanism, a pallet slow-down device, a pallet conveying device in the warehouse and a synchronous lifting assembly. The pallet slow-down device and the pallet conveying device in the warehouse are both installed on the pallet warehouse body. The rotating power mechanism is installed on the fixed bracket and the output end is connected to the pallet warehouse body. The pallet slow-down device is located in the pallet conveying device in the warehouse and the pallet slow-down device moves in a vertical direction. The pallet slow-down device has two states, a lifting state and a lowering state. When the pallet slow-down device is in the lifting state, the top height is higher than the pallet conveying device in the warehouse, and when it is in the lowering state, the top height is lower than the pallet conveying device in the warehouse. The synchronous lifting assembly is installed on the pallet warehouse body and is located above the pallet conveying device in the warehouse. The first brick-hanging device and the second brick-hanging device are both cranes with special clamps for hoisting; The brick splitting machine is installed between the front brick conveying system and the rear brick conveying system and has a brick splitting working position; The conveying direction of the front bricklaying conveying system is from the first brick hanging device to the brick splitting working position. The front bricklaying conveying system includes a front bricklaying conveying belt, a front brick pushing bracket, a front brick pushing device and a brick splitting front plate. The brick splitting front plate is installed on the side of the front bricklaying conveying belt close to the brick splitting machine and points to the brick splitting working position. The front brick pushing device slides along the front brick pushing bracket and is located above the front bricklaying conveying belt. The conveying direction of the front brick pushing device is from the first brick hanging device to the brick splitting working position. The conveying direction of the rear bricklaying conveying system is from the brick splitting working position to the second brick hanging device.

2. The brick splitting production line according to claim 1 is characterized in that: The forward brick pushing device comprises a forward pushing travel assembly and a forward pushing lifting assembly. The forward pushing travel assembly moves forward and backward along the forward brick pushing bracket, and the forward pushing lifting assembly is installed on the forward pushing travel assembly and moves in the up and down direction.

3. The brick splitting production line according to claim 1 is characterized in that: The rear brick conveying system includes a rear brick support, a rear brick connection platform, a rear brick device and a rear brick splitting conveyor belt. The rear brick connection platform is installed on the rear brick support and connects the brick splitting work position and the rear brick splitting conveyor belt. The rear brick connection platform is provided with a brick splitting rear plate and a flap. The flap is located on the rear side of the brick splitting rear plate. The flap has two states, horizontal and downward. When the flap is in the horizontal state, it is at the same height as the brick splitting rear plate and the rear brick splitting conveyor belt. The rear brick device is installed on the rear brick support behind the brick splitting machine. The rear brick device is located above the flap and slides along the rear brick support. The conveying direction of the rear brick device is from the brick splitting work position to the second brick hanging device, and when the flap is in the downward state, the rear brick device clamps the bricks above the flap.

4. The brick splitting production line according to claim 3 is characterized in that: The rear-push brick device includes a rear-push walking assembly, a rear-push brick clamping assembly and a rear-push lifting assembly. The rear-push walking assembly moves forward and backward along the rear-push brick bracket. The rear-push lifting assembly is installed on the rear-push walking assembly and moves in the up and down directions. The rear-push brick clamping assembly is installed on the rear-push walking assembly and is located in front of the rear-push lifting assembly. The rear-push brick clamping assembly clamps bricks.

5. The brick splitting production line according to claim 1 is characterized in that: The brick splitting machine includes an inner frame, an outer frame, a main driving member, an upper knife assembly, a lower knife assembly and a guide device, the main driving member is installed at the upper end of the inner frame, the upper knife assembly is installed at the output end of the main driving member and slides along the inner frame, the lower knife assembly is installed at the lower end of the inner frame, the upper knife assembly and the lower knife assembly are arranged vertically opposite to each other and a brick splitting working position is formed between the upper knife assembly and the lower knife assembly, the guide device is installed between the inner frame and the outer frame, and a plurality of elastic support components for supporting the inner frame are symmetrically arranged between the inner frame and the outer frame, and the action direction of each elastic support component is vertically upward.

6. The brick splitting production line according to any one of claims 1 to 5, characterized in that: The brick splitting production line also includes a waste collection system, which includes a first inlet device, a second inlet device and a third inlet device. The input end of the first inlet device is connected to the bottom of the brick splitting machine, the input end of the second inlet device is connected to the lower side of the rear brick conveying system, and the input end of the third inlet device is connected to the end of the rear brick conveying system. The rear brick conveying system is provided with a drop opening on the upper side of the waste collection system, and the drop opening has two states: closed and connected. The rear brick conveying system clamps the bricks on the upper side of the second inlet device.

7. A brick splitting process, using the brick splitting production line according to any one of claims 1 to 5, characterized in that: The steps include: S1: The pallet together with the unsplit bricks are transported on the pallet circulation system toward the first brick hoisting device, the first brick hoisting device hoists the unsplit bricks from the pallet circulation system to the front brick conveying system, and the pallet is circulated in the pallet circulation system for standby; S2: The front brick conveying system conveys the bricks to the brick splitting working position of the brick splitting machine. The bricks are supported by the front brick conveying system and the rear brick conveying system at the brick splitting working position. The brick splitting machine operates to split the bricks. S3: The split bricks are transported away from the brick splitting work station by the rear brick conveying system; S4: The second brick hoisting device hoists the bricks from the rear brick conveying system to the pallet of the pallet circulation system to complete the split brick production.