A correction device for guide rails of attached lifting scaffolding
By designing the correction device for attached lifting scaffolding rails, the synchronous rolling machine, hydraulic top rod and stress film are used to solve the problem of curing and deformation of the guide rail, and improve the correction efficiency and safety.
Patent Information
- Application Number
- CN201911040060.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-29
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2039-10-29
AI Technical Summary
The attached lifting scaffolding guides are prone to bend and deform during use and disassembly transportation, and lack effective calibration equipment, resulting in safety hazards and low calibration efficiency.
A correction device is designed, including the correction platform and the conduction limit table frame. The synchronous rolling machine, hydraulic top rod and stress chip are used to achieve the correction of the guide track through the electric lifting mechanism and vertical roller.
The efficient correction of the guide track is achieved, the correction efficiency and quality are improved, the human consumption is reduced, and the safety of the construction construction is ensured.
Smart Images

Figure CN110761545B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a correction device for an attached lifting scaffolding guide rail. Background Art
[0002] In the past decade, ground-based external scaffolding, hanging baskets and external scaffolding have been gradually eliminated in construction projects due to their time-consuming, labor-consuming, material-consuming, safety-related and economical nature. Especially in the construction of high-rise and super-high-rise buildings, external scaffolding is used in large quantities, has a long service life, is expensive, and its practicality and safety need to be improved. Attached lifting scaffolding has become one of the main scaffolding methods for high-rise and super-high-rise building construction due to its advantages of low cost, fast installation, easy use and strong adaptability.
[0003] As the main load-bearing component of the attached lifting scaffolding, the guide rail is used to connect the upper and lower scaffolding boards, and cooperates with the wall-mounted supports to have the functions of guiding, unloading and anti-tilting. During the use and disassembly and transfer transportation process, due to the long components, they are easy to deform, causing the guide rail to bend as a whole. The deformation of the guide rail will have a great impact on the verticality of the frame, causing serious safety hazards. Since the guide rail is heavy, the traditional flame correction method consumes manpower and material resources, is difficult to calibrate accurately, has low efficiency, and cannot achieve the desired effect. Contents of the invention
[0004] In order to solve the problem of lack of effective correction equipment for bending deformation of attached lifting scaffold guide rails during use and disassembly and transfer transportation, the present invention provides a correction device for attached lifting scaffold guide rails.
[0005] The present invention is realized through the following technical scheme: a correction device for attached lifting scaffold guide rails, comprising a correction platform and a conduction limit stand symmetrically arranged on both sides of the correction platform, the correction platform is a rectangular box structure and two winches are arranged in parallel in the box, a horizontal plate is arranged on the upper part of the correction platform, a mounting plate and a reaction frame are arranged on the plate surface of the horizontal plate in intervals and in parallel, and three hydraulic push rods arranged at equal intervals are vertically fixed on the mounting plate; the conduction limit stand is a horizontal frame with supporting legs, and horizontal rollers arranged at equal intervals are arranged on the upper part of the conduction limit stand, and the horizontal rollers and the horizontal plate are located on the same horizontal plane, and vertical rollers are arranged on both sides of the conduction limit stand, and the vertical rollers include It includes a first vertical roller and a second vertical roller, the first vertical roller is symmetrically arranged and fixed at a position at a distance from the end of the conduction limit stand that is at least 1 meter greater than the length of the guide rail to be corrected, the second vertical roller is staggered on the conduction limit stand between the first vertical roller and the correction platform, an electric lifting mechanism is arranged on one side of the conduction limit stand, the electric lifting mechanism lifts the guide rail to be corrected upward and moves it to the horizontal roller on the surface of the conduction limit stand, hooks are connected on both sides of the guide rails, the hooks are respectively connected to steel wire ropes, the steel wire ropes pass through fixed pulleys and then wind around to the bottom of the conduction limit stand and are connected to the adjacent winch, the hydraulic push rod and the second vertical roller are both provided with stress plates, and the stress plates are connected to the control cabinet through lines.
[0006] The electric lifting mechanism uses an electric push rod, two of which are symmetrically arranged and a steel plate for bearing the guide rail is hinged at the bottom of the electric push rod.
[0007] The vertical roller is arranged in the vertical roller frame, the vertical roller frame is connected with the conduction limit stand by bolts, and the distance between two adjacent first vertical rollers is twice the distance between two adjacent second vertical rollers.
[0008] The two winches are of the same model and are equipped with a synchronization device, which enables the two winches to synchronously reel in and release the ropes during work. The two winches are connected to a hook respectively through a wire rope, and the hook is connected to the small cross bars at both ends of the guide rail.
[0009] There are two fixed pulleys and they are arranged on the same vertical line. A rotating shaft is arranged in the middle of the fixed pulley, and the rotating shaft is fixed between two frame channel steels. The fixed pulley and the frame channel steel together form a pulley frame, and the pulley frame is fixed at both ends of the conduction limit stand and is located on the center line of the conduction limit stand.
[0010] The spacing between the first vertical rollers located at the outermost group is 1.5 to 2 times the width of the guide rail, and the width between the first vertical rollers gradually decreases to the width of the guide rail along the direction of movement toward the correction platform.
[0011] The stress sheet in the second vertical roller is arranged on the rotating shaft of the second vertical roller.
[0012] The reaction frame comprises an I-beam vertically fixed on the upper part of the horizontal plate, and a rib plate is arranged on one side of the I-beam away from the mounting plate.
[0013] Compared with the prior art, the present invention has the following beneficial effects:
[0014] The present invention unifies the correction of the entire attached lifting scaffolding guide rail into a complete system device, and has a strong sense of overall structural design. The guide rail to be corrected is transmitted to the horizontal roller of the conductive limit platform body, and the guide rail is pulled by a synchronous winch to perform reciprocating motion on the vertical roller and the correction platform with a hydraulic push rod. During the movement, the deformed guide rail is corrected by the force brought by the hydraulic push rod and the second vertical roller until the stress sheet set on the hydraulic push rod and the second vertical roller reads zero, thereby realizing a complete correction process.
[0015] The present invention can complete the entire correction work with the cooperation of only 1 to 2 persons, effectively improving the correction efficiency and the correction quality, and creating a precedent for automatic correction in the scaffolding industry. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0017] Figure 2 for Figure 1 Schematic diagram of the structure on the middle left;
[0018] Figure 3 for Figure 2 A schematic diagram of a structure in which only horizontal rollers are provided;
[0019] Figure 4 for Figure 2 Different from Figure 3 Schematic diagram of the structure;
[0020] Figure 5 for Figure 1 Schematic diagram of the structure of the center correction platform;
[0021] Figure 6 for Figure 4 A structural schematic diagram showing the relative position of the hook and the guide rail being calibrated;
[0022] Figure 7 is a structural schematic diagram of a pulley frame;
[0023] Figure 8 A guide rail transfer trolley for use with the present invention.
[0024] Numbers in the figure: 1-conduction limit stand, 2-horizontal roller, 3-vertical roller, 3.1-first vertical roller, 3.2-second vertical roller, 4-correction platform, 4.1-horizontal plate, 4.2-mounting plate, 4.3-reaction frame, 4.4-hydraulic jack, 5-control cabinet, 6-electric lifting mechanism, 7-guide rail, 8-winch, 9-vertical roller frame, 10-pulley frame, 10.1-frame channel steel, 10.2-fixed pulley, 10.3-wire rope, 11-hook, 12-transport trolley. DETAILED DESCRIPTION
[0025] Reference Figure 1 to Figure 7 The present invention is specifically described. A correction device for an attached lifting scaffold guide rail comprises a correction platform 4 and a conductive limit stand 1 symmetrically arranged on both sides of the correction platform 4. The correction platform 4 is a rectangular box structure and two winches 8 are arranged in parallel in the box. A horizontal plate 4.1 is arranged on the upper part of the correction platform 4. A mounting plate 4.2 and a reaction frame 4.3 are arranged on the plate surface of the horizontal plate 4.1 at intervals and in parallel. Three hydraulic jacks 4.4 arranged at equal intervals are vertically fixed on the mounting plate 4.2. The conductive limit stand 1 is a horizontal frame with legs. Horizontal rollers 2 arranged at equal intervals are arranged on the upper part of the conductive limit stand 1. The horizontal rollers 2 and the horizontal plate 4.1 are located on the same horizontal plane. Vertical rollers 3 are arranged on both sides of the conductive limit stand 1. The vertical rollers 3 include a first vertical roller 3.1 and The second vertical roller 3.2 and the first vertical roller 3.1 are symmetrically arranged and fixed at a position at a distance of at least 1 meter from the end of the conduction limit stand 1 that is greater than the length of the guide rail 7 to be corrected. The second vertical roller 3.2 is staggered on the conduction limit stand 1 between the first vertical roller 3.1 and the correction platform 4. An electric lifting mechanism 6 is arranged on one side of the conduction limit stand 1. The electric lifting mechanism 6 lifts the guide rail 7 to be corrected upward and moves it to the horizontal roller 2 on the surface of the conduction limit stand 1. Hooks 11 are connected to both sides of the guide rail 7. The hooks 11 are respectively connected to steel wire ropes 10.3. The steel wire ropes 10.3 pass through the fixed pulley 10.2 and then are wound around the bottom of the conduction limit stand 1 and connected to the adjacent winch 8. The hydraulic push rod 4.4 and the second vertical roller 3.2 are both provided with stress plates, and the stress plates are connected to the control cabinet 5 through lines.
[0026] The electric lifting mechanism 6 uses an electric push rod, two of which are symmetrically arranged, and a steel plate for carrying the guide rail 7 is hinged at the bottom of the electric lifting mechanism 6. The vertical roller 3 is arranged in the vertical roller frame 9, and the vertical roller frame 9 is bolted to the conductive limit stand 1. The spacing between two adjacent first vertical rollers 3.1 is twice the spacing between two adjacent second vertical rollers 3.2. The two winches 8 are of the same model and are equipped with a synchronization device, which can realize the synchronous rope collection and release of the two winches 8 during work. The two winches 8 are respectively connected to a hook 11 through a wire rope 10.3, and the hook 11 is connected to the small cross bars at both ends of the guide rail 7.
[0027] The reaction frame 4.3 comprises an I-beam fixed vertically on the upper part of the horizontal plate 4.1, and a rib is arranged on the side of the I-beam facing away from the mounting plate 4.2.
[0028] The transport trolley 12 is a hollow rectangular box structure with front and rear openings, and wheels are arranged at the bottom. A steel plate on one side of the transport trolley 12 can be automatically raised and lowered, and the height of the lifting is greater than the height of the guide rail 7 and less than 1.5 times the height of the guide rail 7. The guide rail 7 to be corrected is placed in the transport trolley 12, which can be achieved by using power equipment, such as a winch or a crane to drag it.
[0029] The steps of working with the present invention are as follows:
[0030] Depend on Figure 8 It can be seen that the guide rail 7 to be corrected is first transported to the vicinity of the present invention by the transport trolley 12. The transport trolley 12 opens one side of the steel plate, and manually assists to remove a guide rail 7 to be corrected to the bearing steel plate of the electric lifting mechanism 6, ensuring that the guide rail 7 and the bearing steel plate are in two-point contact and remain stable.
[0031] Furthermore, the electric lifting mechanism 6 is used to lift the guide rail 7 to be corrected to a position higher than the conduction limit stand 1. An inclined stop block is arranged at the top of the electric lifting mechanism 6. Since the steel plate used to support the guide rail 7 at the bottom of the electric lifting mechanism 6 is hinged, when the guide rail 7 reaches the top, the steel plate contacts and collides with the stop block and flips over, thereby achieving the guide rail 7 falling on the horizontal roller 2 of the conduction limit stand 1.
[0032] Furthermore, two hooks 11 are respectively hung on the small cross bars on both sides of the guide rail 7, and the other side of the hook is connected to a wire rope 10.3, and the wire rope 10.3 is respectively connected to the winch 8 located at the bottom of the conductive limit stand 1. At the same time, a synchronization device is added between the two winches 8 so that the two can achieve synchronous linkage. That is: while one of the winches 8 is retracting the wire rope 10.3, the other winch 8 is releasing a wire rope 10.3 of the same length. Through the above movement, under the action of the winch 8, the guide rail 7 can achieve reciprocating motion between the vertical rollers 3 and the hydraulic jack 4.4 and the reaction frame 4.3 of the correction platform 4.
[0033] The hydraulic push rod 4.4 is adjusted to continuously move toward the reaction frame 4.3 until it is the same width as the guide rail 7. During the movement, there are a total of three hydraulic push rods 4.4 and they must be synchronously linked to achieve stable force on the guide rail 7 during the correction process.
[0034] There are two fixed pulleys 10.2 and they are arranged on the same vertical line. A rotating shaft is arranged in the middle of the fixed pulley 10.2 and the rotating shaft is fixed between two frame channel steels 10.1. The fixed pulley 10.2 and the frame channel steel 10.1 together form a pulley frame 10. The pulley frame 10 is fixed at both ends of the conduction limit stand 1 and is located on the center line of the conduction limit stand. The spacing of the first vertical rollers 3.1 located at the outermost group is 1.5 to 2 times the width of the guide rail. The width between the first vertical rollers 3.1 gradually decreases to the width of the guide rail 7 along the direction of movement toward the correction platform 4. It is fundamentally convenient for the guide rail 7 to enter between the second vertical roller 3.2 and the hydraulic jack 4.4 and the reaction frame 4.3.
[0035] The stress sheet of the hydraulic push rod 4.4 is arranged on the hydraulic push rod 4.4, and the stress sheet in the second vertical roller 3.2 is arranged on the rotating shaft of the second vertical roller 3.2. The stress sheet feeds back the force reading to the computer of the control cabinet 5 in real time through the data line. In this process, the control cabinet 5 with the computer constantly monitors the force of the whole movement process.
[0036] When the stress value of the stress gauge is zero, the computer sends a signal to the control cabinet 5, and the control cabinet 5 controls the hydraulic push rod 4.4 to push inward through the circuit. At this time, the force exerted by the hydraulic push rod 4.4 on the guide rail 7 increases, and the stress gauge reading also increases accordingly. Then, the control cabinet 5 controls the hoist 8 to work through the circuit, pulling the guide rail 7 to continue to reciprocate, and realizing the tightening correction of the guide rail 7 by the hydraulic push rod 4.4, until the reading of the stress gauge feedback is zero. At this time, the control cabinet 5 issues a command to stop the hoist 8, and then the movement of the guide rail 7 stops.
[0037] At this time, the control cabinet 5 continues to issue movement instructions to the hydraulic push rod 4.4, repeating the above process, and finally making the hydraulic push rod 4.4 squeeze the guide rail 7 to be corrected until the width is the same as the guide rail.
[0038] In order to ensure the correction quality of the guide rail 7, the hydraulic push rod 4.4 pushes the guide rail 7 at least three times during the above process.
[0039] Until the final stress sheet feedback force is zero, it can be considered that the correction of the guide rail 7 meets the expected requirements.
Claims
1. A correction device for an attached lifting scaffolding guide rail, characterized in that: The invention comprises a correction platform (4) and a conductive limit stand (1) symmetrically arranged on both sides of the correction platform (4); the correction platform (4) is a rectangular box structure and two winches (8) are arranged in parallel in the box; a horizontal plate (4.1) is arranged on the upper part of the correction platform (4); a mounting plate (4.2) and a reaction frame (4.3) are arranged on the plate surface of the horizontal plate (4.1) in parallel and at intervals; three hydraulic push rods (4.4) arranged at equal intervals are vertically fixed on the mounting plate (4.2); the conductive limit stand (1) is A horizontal frame with legs, the upper part of the conductive limit stand (1) is provided with horizontal rollers (2) arranged at equal intervals, the horizontal rollers (2) and the horizontal plate (4.1) are located on the same horizontal plane, vertical rollers (3) are provided on both sides of the conductive limit stand (1), the vertical rollers (3) include a first vertical roller (3.1) and a second vertical roller (3.2), the first vertical roller (3.1) is symmetrically arranged and fixed at a position at a distance from the end of the conductive limit stand (1) greater than the length of the guide rail (7) to be corrected by at least 1 meter The second vertical rollers (3.2) are staggeredly arranged on the conduction limit stand (1) between the first vertical rollers (3.1) and the correction platform (4); an electric lifting mechanism (6) is arranged on one side of the conduction limit stand (1); the electric lifting mechanism (6) lifts the guide rail (7) to be corrected upward and moves it to the horizontal roller (2) on the surface of the conduction limit stand (1); both sides of the guide rail (7) are connected with a hook (11); the hook (11) is respectively connected with a steel wire rope (10.3); the steel wire rope (10.3) After passing through a fixed pulley (10.2), it is wound around to the bottom of the conduction limit stand (1) and connected to an adjacent winch (8); the hydraulic push rod (4.4) and the second vertical roller (3.2) are both provided with stress plates, and the stress plates are connected to a control cabinet (5) through a line; the stress plates in the second vertical roller (3.2) are arranged on the rotating shaft of the second vertical roller (3.2); and the reaction frame (4.3) comprises an I-beam vertically fixed to the upper part of the horizontal plate (4.1), and a rib plate is arranged on the side of the I-beam facing away from the mounting plate (4.2).
2. The correction device for the guide rail of an attached lifting scaffold according to claim 1 is characterized in that: The electric lifting mechanism (6) uses an electric push rod, two electric push rods are symmetrically arranged, and a steel plate for carrying the guide rail (7) is hinged at the bottom of the electric lifting mechanism (6).
3. The correction device for the guide rail of an attached lifting scaffold according to claim 1 is characterized in that: The vertical roller (3) is arranged in a vertical roller frame (9), and the vertical roller frame (9) is bolted to the conductive limit stand (1), and the distance between two adjacent first vertical rollers (3.1) is twice the distance between two adjacent second vertical rollers (3.2).
4. The correction device for the guide rail of an attached lifting scaffold according to claim 1 is characterized in that: The two winches (8) are of the same model and are equipped with a synchronization device, which can realize the synchronous rope collection and rope release of the two winches (8) during operation. The two winches (8) are respectively connected to a hook (11) through a steel wire rope (10.3), and the hook (11) is connected to the small cross bars at both ends of the guide rail (7).
5. The correction device for the guide rail of an attached lifting scaffold according to claim 1 is characterized in that: There are two fixed pulleys (10.2) arranged on the same vertical line. A rotating shaft is arranged in the middle of the fixed pulley (10.2), and the rotating shaft is fixed between two frame channel steels (10.1). The fixed pulley (10.2) and the frame channel steel (10.1) together form a pulley frame (10). The pulley frame (10) is fixed at both ends of the conduction limit stand (1) and is located on the center line of the conduction limit stand.
6. The correction device for the guide rail of an attached lifting scaffold according to claim 1 is characterized in that: The spacing between the first vertical rollers (3.1) located at the outermost group is 1.5 to 2 times the width of the guide rail, and the width between the first vertical rollers (3.1) gradually decreases to the width of the guide rail (7) along the direction of movement toward the correction platform (4).
Citation Information
Patent Citations
Correcting device for attached lifting scaffold guide rail
CN211597655U