Automatic control device and process for making brine

By designing automatic control devices in decentralized salt fields and using wireless transmission and photovoltaic power supply systems to monitor brine concentration and automatically adjust gates, the problem of high impact of manual operations is solved and the accuracy and efficiency of brine management are improved.

CN110850815BActive Publication Date: 2024-10-01TANGSHAN SANYOU SALT CHEM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910686993.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-07-29
Publication Date
2024-10-01
Estimated Expiration
2039-07-29

AI Technical Summary

Technical Problem

The existing brine management in decentralized salt fields relies on manual operations, which results in the operation process being greatly affected by human factors, and the detection and adjustment of brine concentration are not timely and accurate enough.

Method used

An automatic control device for brine production is designed, including a gate opening device, a remote control box, a photovoltaic power supply system and a wireless transmission device. The brine parameters are monitored in real time through a liquid level meter and density meter, and a wireless transmission device is used for remote operation and automatic control. control to realize automatic adjustment of the gate.

Benefits of technology

It achieves timely and accurate production operation information feedback and remote operation, reduces manual intervention, improves operating efficiency, and enhances the automated control capabilities of production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110850815B_ABST
    Figure CN110850815B_ABST
Patent Text Reader

Abstract

The present invention relates to a control device for a decentralized salt pan, in particular to a brine production automatic control device process. It includes a gate opening device, a remote control box, a photovoltaic power supply system, a wireless transmission device, and a density meter and a liquid level meter are respectively placed on the gate frame. Control method: control operation is performed through a wireless transmission device; the outlet gate of the water storage area is opened, and after all the gates are opened, the closed status is fed back to the remote control monitoring room; the water inlet gate of the water storage area is opened, and the water inlet gate of the water storage area is closed after the time is reached, and the closed status indication is fed back; the outlet gate of the upstream evaporation pool is closed after the time is reached, and the outlet gate of the upstream evaporation pool receives a closing instruction, and the outlet water pump of the upstream evaporation pool is delayed to stop after the opening signal is lost; the timing starts after the upstream evaporation pool inlet pump is running, and it is closed after the upstream evaporation pool inlet pump runs. Compared with the prior art, the present invention can realize timely and accurate feedback of production operation information, realize remote operation, automatic control, and can reduce staff and increase efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a control device for a dispersed salt pan, in particular to an automatic control device and process for making brine. Background Art

[0002] In the existing decentralized salt pans, there are 20 to 30 gates in each unit evaporation area, and brine management is a crucial link. At present, the detection of brine concentration and the transfer of brine through the gates are completely manual. The production operation process is greatly affected by human factors. Summary of the invention

[0003] The object of the present invention is to provide a brine production automatic control device and control method which can monitor the brine concentration, depth and various parameters in real time.

[0004] The present invention adopts the following technical scheme: an automatic control device for brine production, including a gate opening device, a remote control box, a photovoltaic power supply system, a wireless transmission device, and a liquid level meter. The gate opening device includes a frame, a gate, and a solar panel. The gate is installed on the frame, and the gate is connected to the frame through a hinge shaft. A motor is installed at one end of the hinge shaft, and the motor is connected to the solar panel circuit; the density meter and the liquid level meter are respectively placed on the gate frame.

[0005] Compared with the prior art, the present invention adopting the above technical solution can realize timely and accurate feedback of production operation information, realize remote operation and automatic control, and can reduce staff and increase efficiency.

[0006] The preferred solution adopted by the control device of the present invention is:

[0007] Two gate plates are provided, and sleeves are respectively sleeved on the hinge shafts where the two gate plates are located. The sleeves are fixedly connected to the hinge shafts through screws, and the two hinge shafts are connected through a connecting rod mechanism.

[0008] The connecting rod mechanism consists of a first short rod, a long rod and a second short rod; one end of the first short rod is connected to the first sleeve, the other end of the first short rod is connected to one end of the long rod, the other end of the long rod is connected to one end of the second short rod, the other end of the second short rod is connected to the second sleeve, and the lengths of the first short rod and the second short rod are equal.

[0009] A cover body is arranged above the motor, and the cover body is arranged on the top of the frame.

[0010] The gate is a square structure.

[0011] The technical solution adopted by the control method is:

[0012] The control method of the automatic control device for brine production is carried out according to the following steps: performing control operations through a wireless transmission device;

[0013] a. First, open the water outlet gate of the water storage area. After all the gates are opened, start timing. When the set time is reached, the water outlet gate is closed and the closed status is fed back to the remote control monitoring room;

[0014] b. Open the water inlet gate of the water storage area, start timing after it is fully opened and open the water outlet gate of the upstream evaporation pool. After the upstream evaporation pool water outlet gate receives the opening command and the fully closed signal is lost, the upstream water outlet pump of the water pump is started after a delay time of T1. After T5 time, the fully opened state of the upstream evaporation pool water outlet gate and the operating state of the upstream evaporation pool water outlet pump are detected. After the water storage inlet gate reaches the time, it is closed and the fully closed state indication is fed back;

[0015] c. The upstream evaporation pond outlet gate is closed after the time is reached. The upstream evaporation pond outlet gate receives the closing command, and stops the upstream evaporation pond outlet pump after the opening signal is lost for a delay of T2; after the upstream evaporation pond outlet gate is opened for T3 time, the upstream evaporation pond regulating gate is opened, and the timing starts after it is opened, and the upstream evaporation pond regulating gate is automatically closed after the time is reached; after the upstream evaporation pond regulating gate is opened for T4 time, the upstream evaporation pond water inlet pump is opened, and the timing starts after the upstream evaporation pond water inlet pump starts running, and it is closed after the upstream evaporation pond water inlet pump running time is reached; thus, one water discharge operation is completed.

[0016] The preferred scheme adopted by the control method is: three upstream evaporation pools are set, namely upstream evaporation pool 1, upstream evaporation pool 2 and upstream evaporation pool 3; two water storage areas are set, namely water storage area 1 and water storage area 2; the specific operation steps are: control operation is performed through a wireless transmission device;

[0017] a. First, open the outlet gate of water storage area 2. After all the gates are opened, start timing when it is open. When the set time is reached, the outlet gate of water storage area 2 is closed, and the closed status is fed back to the remote control monitoring room; open the water storage area connecting gate between water storage area 1 and water storage area 2, start timing after it is fully opened, and close the water storage area connecting gate after the time is reached, and feed back the closed status to the remote control monitoring room;

[0018] b. Open the water inlet gate of the first water storage area. After it is fully opened, start timing and open the three water outlet gates of the upstream evaporation pool. After the three water outlet gates of the upstream evaporation pool receive the opening command and the fully closed signal is lost, the first water pump of the three outlets of the upstream evaporation pool is started after a delay time of T1. After T5 time, the fully opened state of the three water outlet gates of the upstream evaporation pool and the operating state of the first water pump of the three outlets of the upstream evaporation pool are detected. After the time is reached, the water inlet gate of the first water storage area is closed and the fully closed state indication is fed back;

[0019] c. The three outlet gates of the upstream evaporation pond are closed after the time is reached. The three outlet gates of the upstream evaporation pond receive the closing command, and delay T2 to stop the first water pump of the three outlets of the upstream evaporation pond after the opening signal is lost; wherein, after the three outlet gates of the upstream evaporation pond are opened to the position for T3 time, the upstream evaporation pond control gate between the upstream evaporation pond one and the upstream evaporation pond two is opened, and the timing starts after it is opened to the position, and the upstream evaporation pond control gate is automatically closed after the time is reached; wherein, after the upstream evaporation pond control gate is opened to the position for T4 time, the upstream evaporation pond water inlet pump is opened, and the timing starts after the upstream evaporation pond water inlet pump starts running, and it is closed after the upstream evaporation pond water inlet pump running time is reached; thus, one water discharge operation is completed.

[0020] The actual evaporation of the previous day or the gate and water pump operation time of the day is manually input before 6 o'clock every day. When the Baume measurement value displayed by the density meter at the outlet of the second water storage area is ≧ the set value B1 at 6 o'clock, the program will run automatically. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of the present invention.

[0022] Figure 2 It is a structural schematic diagram of the gate opening device of the present invention.

[0023] Figure 3 yes Figure 2 Top view of the .

[0024] Figure 4 yes Figure 2 A view in the figure.

[0025] Figure 5 This is the main circuit diagram.

[0026] Figure 6 This is the circuit diagram of the main controller.

[0027] Figure 7 is a circuit diagram of the first sub-controller.

[0028] Figure 8 is the circuit diagram of the second sub-controller.

[0029] Fig. 9 It is the circuit diagram of the third sub-controller. DETAILED DESCRIPTION

[0030] The present invention is described in detail below in conjunction with the accompanying drawings and embodiments:

[0031] An automatic control device for making brine, see attached Figure 1 To Attachment Figure 4 , Figure 1Middle: upstream evaporation pond 1, upstream evaporation pond regulating gate 2, upstream evaporation pond three outlet gate 3, first density meter 4, water storage area one water inlet gate 5, water storage area 1, first liquid level meter 7, water storage area series gate 8, brine production area road 9, brine delivery channel 10, brine return channel 11, water storage area 2 12, evaporation pond 13, water delivery road 14, second liquid level meter 15, second density meter 16, water storage area two outlet gate 17, upstream evaporation pond three outlet first water pump 18, upstream evaporation pond three outlet second water pump 19, upstream evaporation pond inlet pump 20, upstream evaporation pond two 21, upstream evaporation pond three 22, white water machine room 23; Figures 2 to 4 Middle: first cross bar 24, cover 25, motor 26, first hinge shaft 27, first sleeve 28, first short rod 29, long rod 30, first gate 31, rubber block 32, longitudinal rod 33, second cross bar 35, third cross bar 34, fourth cross bar 36, second short rod 37, second sleeve 38, second hinge shaft 39, second gate 40.

[0032] In this embodiment, a control box is installed in the remote monitoring room, and the control box has a main controller and three sub-controllers built in. The water supply line 14 is connected to the upstream evaporation pool 1, and the upstream evaporation pool 1 inlet is provided with an upstream evaporation pool water inlet pump 20 (the upstream evaporation pool water inlet pump 20 adopts the original 500 axial flow pump, specification model: 350ZLB-4.0 Manufacturer: Tangshan Shanglishi Pump Industry Co., Ltd.), and an upstream evaporation pool regulating gate 2 is provided between the upstream evaporation pool 1 and the upstream evaporation pool 2 21, and the upstream evaporation pool 3 outlet gate 3 is provided at the outlet of the upstream evaporation pool 3, and two water pumps are provided at the upstream evaporation pool 3 outlet gate 3: the first water pump 18 at the upstream evaporation pool 3 outlet and the second water pump 19 at the upstream evaporation pool 3 outlet, respectively (these two water pumps adopt the original 350 axial flow pump and a new 350 axial flow pump, the specification model of the axial flow pump: 350ZLB-4 .0 Manufacturer: Tangshan Shanglishi Pump Industry Co., Ltd. Two small pumps are used because the bottom drop of the pool is small and gravity flow cannot be achieved. Two water pumps are set up to pump water and transport it backwards). A white water machine room 23 is set near the first water pump 18 (new 350 axial flow pump) at the third outlet of the upstream evaporation pool, and a starter cabinet is added to the third outlet gate 3 of the upstream evaporation pool. A wireless transmission module (AB433G type, produced by Xi'an Aibao Internet of Things Technology Co., Ltd.) is installed on the water inlet pump 20 of the upstream evaporation pool.

[0033] The first water storage area 6 is provided with a water storage area inlet gate 5, a water storage area series gate 8 is provided between the first water storage area inlet gate 5 and the second water storage area 12, a second water storage area outlet gate 17 is provided in the second water storage area 12, and the second water storage area outlet gate 17 is connected to the brine delivery channel 10, one side of the brine delivery channel 10 is a return brine channel 11, and one side of the return brine channel 11 is an evaporation pond 13. The brine delivery channel 10 is the brine flowing out of the water storage at the test position, and is sent to the chemical enterprise for bromine blowing. The return brine channel 11 is the brine returned by the chemical enterprise after bromine blowing. The brine flows from the return brine channel 11 through the evaporation pond gate into the evaporation pond 13 for beach drying.

[0034] The second liquid level meter 15 and the second density meter 16 are installed on the gate frame of the water outlet gate 17 of the water storage area 2, the first liquid level meter 7 is installed on the gate frame of the water storage area series gate, and the first density meter 4 is installed on the gate frame plate of the water outlet gate 3 of the upstream evaporation pool. The liquid level meter adopts a high-frequency radar liquid level meter (HHLW55-PRFAABAMA, produced by Jiangsu Henghe Group Co., Ltd.). The density meter adopts a tuning fork type online density meter (model: SDT600-4BF, produced by Sanyi Measurement Instrument (Zhongshan) Co., Ltd.).

[0035] The upstream evaporation pond regulating gate 2, the water storage area one water inlet gate 5, the water storage area series water gate 8 and the water storage area two water outlet gate 17 respectively use a photovoltaic power supply system (using solar panels to power the motor 26) and a fiberglass cover 25. The cover 25 is placed above the motor 26, and wireless transmission modules (AB433G type, produced by Xi'an Aibao Internet of Things Technology Co., Ltd.) are respectively installed on the four gates.

[0036] The third water outlet gate 3 of the upstream evaporation pond is equipped with a 2-ton hand-held integrated gate opening and closing machine, and electricity is laid to the white water machine room 23. The first density meter is located 4 on the gate frame close to the third water outlet gate 3 of the upstream evaporation pond, and the second density meter 16 is located on the gate frame of the water outlet gate 17 of the water storage area 2.

[0037] The gate frame in the gate opening device is composed of three longitudinal bars 33 and a first cross bar 24, a second cross bar 35, a third cross bar 34 and a fourth cross bar 36 connecting the upper parts of the three longitudinal bars. Figure 2 The structure shown in .

[0038] There are two gates, which are symmetrically arranged. The first gate 31 is connected to the fourth crossbar 36 of the frame through the first hinge shaft 27; the second gate 40 is connected to the third crossbar 34 through the second hinge shaft 39. A motor 26 is installed at one end of the first hinge shaft 27, and the motor 26 is connected to the battery panel (not shown in the figure, it should be located on the ground on one side of the gate frame) by circuit. A cover 25 is installed above the motor 26, and the cover 25 is installed on the second crossbar 35 at the top of the frame. The cover 25 is made of glass fiber reinforced plastic.

[0039] The first hinge shaft 27 is sleeved with a first sleeve 28 , the second hinge shaft 39 is sleeved with a second sleeve 38 , the first sleeve 28 is fixedly connected to the first hinge shaft 27 via a screw, and the second sleeve 38 is fixedly connected to the second hinge shaft 39 via a screw.

[0040] The first hinge shaft 27 and the second hinge shaft 39 are connected via a connecting rod mechanism.

[0041] The connecting rod mechanism is composed of a first short rod 29, a long rod 30 and a second short rod 37; one end of the first short rod 29 is connected to the first sleeve 28, the other end of the first short rod 29 is connected to one end of the long rod 30, the other end of the long rod 30 is connected to one end of the second short rod 37, the other end of the second short rod 37 is connected to the second sleeve 38, and the lengths of the first short rod 29 and the second short rod 37 are equal.

[0042] The first gate plate 31 and the second gate plate 40 are respectively of square structure, and rubber blocks 32 are respectively installed on both sides of each gate plate in contact with the longitudinal plate 31 to achieve a better sealing effect in the closed state.

[0043] The control method of this embodiment is carried out according to the following steps: control operation is performed through a wireless transmission device; the actual evaporation of yesterday or the operation time of the gate and water pump on that day is manually input before 6 o'clock every day. At 6 o'clock, when the Baume measurement value displayed by the density at the outlet of the second water storage area is ≧ the set value B1 (the B1 value varies with the evaporation of the weather station dish, generally 7°Bé), the program runs automatically.

[0044] a. First, open the water outlet gate 17 of the water storage area 2. After all the gates are opened, the opening time is counted. After the set time of 2 hours is reached, the gate of the water outlet gate 17 of the water storage area 2 is closed, and the closed status is fed back to the remote control monitoring room.

[0045] Open the water storage area connecting sluice gate 8 between water storage area 1 and water storage area 2, start timing after it is fully opened, and close the water storage area connecting sluice gate 8 after 2 hours, and feedback the fully closed status to the remote control monitoring room.

[0046] b. Open the water inlet gate 5 of the water storage area 1. Start timing after it is fully opened and open the three water outlet gates 3 of the upstream evaporation pool. After the three water outlet gates 3 of the upstream evaporation pool receive the opening command and the closed position signal is lost, the first water pump 18 of the three outlets of the upstream evaporation pool is started after a delay time T1 (for example, 5 seconds, in order to protect the pump from being exhausted). After T5 (feedback detection time, 180 seconds), the open position status of the three water outlet gates 3 of the upstream evaporation pool and the operating status of the first water pump 18 of the three outlets of the upstream evaporation pool are detected. The water inlet gate 5 of the water storage area 1 is closed after 2 hours, and the closed position status indication is fed back.

[0047] c. The three outlet gates of the upstream evaporation pond will be closed after 3 to 2 hours. The three outlet gates of the upstream evaporation pond will receive the closing command, and after the opening signal is lost, the first water pump 18 of the three outlets of the upstream evaporation pond will be stopped for a delay of T2 (5 seconds) (to prevent the water pump from running dry); wherein, after the three outlet gates of the upstream evaporation pond are opened for T3 (0-3 hours), the upstream evaporation pond control gate 2 between the upstream evaporation pond 1 and the upstream evaporation pond 2 21 is opened, and the timing starts after the upstream evaporation pond control gate 2 is opened, and the upstream evaporation pond control gate 2 is automatically closed after 2 hours; wherein, after the upstream evaporation pond control gate 2 is opened for T4 (0-12 hours), the upstream evaporation pond water inlet pump 20 is opened, and the timing starts after the upstream evaporation pond water inlet pump 20 is running, and the upstream evaporation pond water inlet pump 20 is closed after running for 2 hours; thus, a water discharge operation is completed.

[0048] This embodiment communicates with the central dispatching room of the safety production department through GPRS signal wireless transmission to realize automatic control of water flow of the first water pump 18 of the three outlets of the upstream evaporation pool, the second water pump 19 of the three outlets of the upstream evaporation pool, the upstream evaporation pool water inlet pump (original 500 axial flow pump), and 5 gates, a total of 8 devices.

[0049] The present invention is not limited to the three upstream evaporation ponds and two water storage areas listed in the above embodiments. More upstream evaporation ponds and / or more water storage areas may be provided according to the requirements of the terrain or topography; all of which are deemed to be within the protection scope of the present invention.

Claims

1. A control method for an automatic control device for making brine, the automatic control device for making brine comprising a gate opening device, a remote control box, a photovoltaic power supply system, a wireless transmission device and a liquid level meter; the gate opening device comprises a frame, a gate and a battery panel, the gate is mounted on the frame, the gate is connected to the frame through a hinge shaft, one end of the hinge shaft is equipped with a motor, the motor is connected to the battery panel circuit; the density meter and the liquid level meter are respectively placed on the gate frame; there are two gates, and the hinge shafts where the two gates are located are respectively provided with sleeves, the sleeves are fixed to the hinge shaft by screws, and the two hinge shafts are connected by a connecting rod mechanism; the connecting rod mechanism is composed of a first short rod, a long rod and a second short rod; one end of the first short rod is connected to the first sleeve, the other end of the first short rod is connected to one end of the long rod, the other end of the long rod is connected to one end of the second short rod, the other end of the second short rod is connected to the second sleeve, and the lengths of the first short rod and the second short rod are equal; a cover is mounted above the motor, and the cover is mounted on the top of the frame; the gate is a square structure; rubber blocks are respectively mounted on both sides of each gate contacting the longitudinal plate; There are three upstream evaporation ponds, namely upstream evaporation pond 1, upstream evaporation pond 2 and upstream evaporation pond 3; there are two water storage areas, namely water storage area 1 and water storage area 2; a control box is installed in the remote monitoring room, and the control box has a built-in main controller and three sub-controllers; the water supply path (14) is connected to the upstream evaporation pond 1 (1), and the inlet of the upstream evaporation pond 1 (1) is provided with an upstream evaporation pond water inlet pump (20); an upstream evaporation pond regulating gate (2) is provided between the upstream evaporation pond 1 (1) and the upstream evaporation pond 2 (21), and the upstream evaporation pond 3 (22) is provided with a control gate (2). The outlet of the upstream evaporation pool is provided with a third water outlet gate (3). Two water pumps are provided at the third water outlet gate (3): the first water pump (18) at the third outlet of the upstream evaporation pool and the second water pump (19) at the third outlet of the upstream evaporation pool. The two water pumps are 350 axial flow pumps. The reason for using two small pumps is that the bottom drop of the pool is small and gravity flow cannot be achieved. Two water pumps are provided to pump water and transport it backwards. A white water machine room (23) is provided near the first water pump (18) at the third outlet of the upstream evaporation pool. A starter cabinet is added to the third water outlet gate (3) of the upstream evaporation pool. A water inlet gate (5) for the first water storage area is provided in the first water storage area (6). A water storage area series water gate (8) is provided between the water inlet gate (5) for the first water storage area and the second water storage area (12). A water storage area outlet gate (17) for the second water storage area is provided in the second water storage area (12). The water storage area outlet gate (17) is connected to the brine delivery channel (10). The brine delivery channel (10) is connected to a brine return channel (11) on one side, and an evaporation pond (13) on the other side of the brine return channel (11); The brine delivery channel (10) is the brine flowing out from the water storage at the test location and is sent to the chemical enterprise for bromine blowing. The brine return channel (11) is the brine returned by the chemical enterprise after bromine blowing. The brine flows from the brine return channel (11) through the evaporation pond gate into the evaporation pond (13) for beach drying. It is characterized in that The control method is as follows: Control operation through wireless transmission device; a. First, open the outlet gate of water storage area 2. After all the gates are opened, start timing when it is open. When the set time is reached, the outlet gate of water storage area 2 is closed, and the closed status is fed back to the remote control monitoring room; open the water storage area connecting gate between water storage area 1 and water storage area 2, start timing after it is fully opened, and close the water storage area connecting gate after the time is reached, and feed back the closed status to the remote control monitoring room; b. Open the water inlet gate of the first water storage area. After it is fully opened, start timing and open the three water outlet gates of the upstream evaporation pool. After the three water outlet gates of the upstream evaporation pool receive the opening command and the fully closed signal is lost, the first water pump of the three outlets of the upstream evaporation pool is started after a delay time of T1. After T5 time, the fully opened state of the three water outlet gates of the upstream evaporation pool and the operating state of the first water pump of the three outlets of the upstream evaporation pool are detected. After the time is reached, the water inlet gate of the first water storage area is closed and the fully closed state indication is fed back; c. The three outlet gates of the upstream evaporation pool are closed after reaching the time. The three outlet gates of the upstream evaporation pool receive the closing command, and after the opening signal is lost, the first water pump of the three outlets of the upstream evaporation pool is stopped after a delay of T2; wherein, after the three outlet gates of the upstream evaporation pool are opened to the full position for T3 time, the upstream evaporation pool control gate between the upstream evaporation pool one and the upstream evaporation pool two is opened, and the timing starts after it is opened to the full position, and the upstream evaporation pool control gate is automatically closed after the time is reached; wherein, after the upstream evaporation pool control gate is opened to the full position for T4 time, the upstream evaporation pool water inlet pump is opened, and the timing starts after the upstream evaporation pool water inlet pump is running, and it is closed after the upstream evaporation pool water inlet pump running time is reached; thus, a water discharge operation is completed; The actual evaporation of the previous day or the gate and water pump operation time of the day is manually input before 6 o'clock every day. When the Baume measurement value displayed by the density meter at the outlet of the second water storage area is ≧ the set value B1 at 6 o'clock, the program will run automatically.