Method and computer program for converting floor plans into template plans and manufacturing buildings

The floor plan is converted into a formwork plan through a computer program, and the spatial arrangement of the formwork elements is used to automatically plan the formwork installation, which solves the complex and time-consuming problem of formwork planning in the existing technology, realizes an efficient and flexible construction process, and adapts to different optimization goals and construction needs. .

CN111199063BActive Publication Date: 2024-10-18PERI GMBH
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN201911129277.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-18
Publication Date
2024-10-18
Estimated Expiration
2039-11-18

AI Technical Summary

Technical Problem

In the existing technology, when pouring concrete into a building, formwork planning is complex and time-consuming, requiring a lot of professional knowledge. Moreover, during the construction process, the planning is easily invalidated due to changes in optimization targets, making it difficult to adjust quickly.

Method used

Convert the pre-given floor plan into a formwork plan through a computer program, utilize the spatial arrangement of formwork elements in the catalog, automatically plan formwork installation, support multiple optimization goals and configurations, including rotation, scaling and supplementary formwork elements to adapt to different construction needs. Avoid planning errors and material waste.

Benefits of technology

It greatly simplifies the formwork planning process, reduces the qualification requirements for planning execution personnel, improves construction efficiency and quality, can quickly adapt to optimization target changes, and reduces material movement and warehousing management costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111199063B_ABST
    Figure CN111199063B_ABST
Patent Text Reader

Abstract

The method for converting a predetermined floor plan into a formwork planning comprises the following steps: providing a predetermined floor plan by a user; providing a catalogue, which respectively assigns a plurality of patterns for a planned wall course to a plurality of patterns; searching for occurrences of patterns contained in the catalogue in areas of the predetermined floor plan in which occurrences of the patterns contained in the catalogue have not yet been found; for each occurrence of a pattern found, adding the spatial arrangement of the formwork elements assigned to the pattern in the catalogue to the formwork planning; checking whether the predetermined floor plan has been completely processed; in response to the predetermined floor plan not being completely processed, checking whether the catalogue contains other patterns that have not been searched for in the predetermined floor plan; in response to the catalogue containing such other patterns, branching back to searching in the unprocessed part of the predetermined floor plan with one of these other patterns. The invention also relates to a method and a computer program for producing a building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a formwork used when manufacturing a building by pouring concrete. Background Art

[0002] When a building is produced by pouring concrete, formwork is usually used as a casting mold for fresh concrete. In this case, the building is usually not produced "by pouring", but in defined building sections, which are also called work sections. Usually, the formwork for a work section is installed, filled with concrete, and removed after the concrete has set. During and / or after the setting of the concrete of a work section, the formwork for the next work section is installed.

[0003] In order to be able to produce the formwork quickly and to be able to reuse the material multiple times, formwork systems made of prefabricated standard elements are used. Such an exemplary formwork system is known from WO 2005 / 040 525 A1.

[0004] Usually, starting from a floor plan of the building to be manufactured, the work trips are planned and the formwork to be installed separately for each work trip. Summary of the invention

[0005] The object of the present invention is to provide a method by which the planning of a formwork can be simplified starting from a predetermined floor plan and at the same time the quality of the result achieved can be improved.

[0006] According to the invention, this object is achieved by the method according to the invention and by the computer program. Further advantageous embodiments are apparent from the following description.

[0007] In the context of the present invention, a method has been developed for converting a predetermined floor plan into a formwork plan, which is a plan for installing formwork elements for producing at least one work step of a building corresponding to the floor plan by pouring concrete.

[0008] In the method, a pre-given floor plan is provided by the user. This can be achieved in any manner, for example using a mouse, by touch input, by analyzing a photo or other image document and / or by importing from a CAD application. Mixed forms are also possible. So, for example, the user can put a PDF document or a photo of a floor plan in paper form into the background on a display device, such as a monitor or a tablet computer, and draw the floor plan from it.

[0009] A catalogue is provided which in each case assigns to a plurality of patterns for the planned course of a wall a spatial arrangement of formwork elements with which the course can be introduced into the building to be produced by concreting.

[0010] In the area of ​​the pre-given floor plan, in which the pattern contained in the catalogue has not been found to occur, the occurrence of the pattern contained in the catalogue is searched. For each occurrence of the pattern found, the spatial arrangement of the template elements assigned to the pattern by the catalogue is added to the template planning.

[0011] Each area of ​​a pre-given floor plan that has been identified as corresponding to a pattern contained in the catalog can be considered as processed. This means that a template solution has been found for this area of ​​the floor plan and it is no longer necessary to search this area for other patterns. The bookkeeping of which areas of the floor plan have been processed can be performed in any way. Thus, for example, it can be seen from the spatial arrangement of the template elements in the template planning that the area of ​​the floor plan corresponding thereto has been processed. However, it is also possible to mark each processed area of ​​the floor plan as processed, for example in a diagram of the floor plan.

[0012] After all occurrences of a pattern have been processed, a check is made to see whether the predefined floor plan has been completely processed. If this is not the case, i.e. if the template planning is not yet complete, a check is made to see whether the catalog contains other patterns that were not searched for in the predefined floor plan. If this is the case, the search is branched back to the unprocessed part of the predefined floor plan with one of these other patterns.

[0013] It has been found that the planning of the template can be greatly simplified in this way. In particular, the requirements for the qualifications of the personnel who carry out the planning are reduced.

[0014] A technician who has a pre-given floor plan in front of him and is familiar with the available standard elements of the formwork system is usually able to convert each floor plan into at least one configuration of standard elements and, if necessary, supplement the at least one configuration with a formwork that is individual to the building. Thus, the technician is able to produce a building starting from the floor plan by pouring concrete. However, it has been pointed out that a formwork for a given work stroke can be produced using a given floor plan using many different configurations of standard elements. Although essentially the same results are produced after pouring concrete and removing the formwork, some configurations are better than others in terms of the requirements imposed on the construction process. For example, the possible configurations may differ in the following aspects:

[0015] how many formwork elements have to be moved during installation, e.g. by crane,

[0016] how many different formwork elements must remain on the building site,

[0017] How long will the formwork installation take in total, and / or

[0018] What is the total cost of the template?

[0019] These goals can be diametrically opposed. For example, a large inventory of formwork elements on a building site enables rapid installation of a variety of different configurations, at the expense of capital constraints on warehouse management and space requirements on the building site.

[0020] In the experience of the applicant, many years of expertise have been developed, namely, which spatial arrangement of formwork elements makes the most sense for the formwork of a specific wall path with respect to a specific optimization goal. Thus, for example, for a given wall path there is a first spatial arrangement that can be installed the fastest, a second spatial arrangement that is sufficient with the least number of different components, and a third arrangement that is sufficient for its installation with the least number of material movements. This expertise is made available for at least partially automated preparation of the formwork plan by calling up the corresponding arrangement from the catalog and adding it to the formwork plan.

[0021] This at least partially automated preparation can be carried out in particular by personnel on site at the construction site who, although they have the basic knowledge to find any suitable configuration of the formwork elements, do not have the expert knowledge to find the optimal configuration. Thus, for example, it may be necessary to change the planned floor plan at short notice due to complex situations of a certain nature, whereby the formwork planning becomes invalid.

[0022] Likewise, the optimization target based on the initial template planning can be replaced by a new optimization target, for example. For example, if the initial planning was made under the premise that the total costs should be minimized, new situations may suddenly arise, such as weather delays in the construction project and the work schedule must be completed as quickly as possible without regard to costs. Weather dependence is a factor that fundamentally limits the safety of planning during construction. The automated method described here makes it possible to change the optimization target at any time and in a short time, for which purpose the used catalog is exchanged with a catalog for the new optimization target.

[0023] In a particularly advantageous embodiment, the catalog is therefore selected from a plurality of catalogs and the catalogs differ with regard to the optimization target with respect to which the spatial arrangement of the formwork elements contained therein is optimized.

[0024] The described process is iterative, that is, when all occurrences of a pattern have been processed, the next occurrence of the pattern contained in the catalog is searched for. This procedure is particularly advantageous if there are offsets between the spatial arrangements of the template elements in the template planning. For example, the catalog can start with patterns related to a specific fixing situation and the spatial arrangements of the template elements corresponding thereto. For example, the following patterns and the spatial arrangements corresponding thereto can be followed in the catalog, by which offsets between the spatial arrangements included in the plan can be completely or partially compensated.

[0025] At the end of the method, the pre-given floor plan is ideally fully processed, i.e. completely converted into a formwork plan. However, this is not necessary for the described advantageous effects. Even if only parts of the floor plan can be automatically converted into a formwork plan and separate formworks are required, for example, for special structures that cannot be realized with prefabricated formwork elements, simplification and quality improvement are achieved with regard to the optimization goals followed according to the catalog.

[0026] Advantageously, the patterns contained in the catalog are rotated and / or scaled when searching in a predetermined floor plan. Then, in response to the occurrence of a rotated and / or scaled pattern found in the predetermined floor plan, the spatial arrangement of the template elements added to the template planning is rotated and / or scaled accordingly. In most of these spatial arrangements, the qualitative behavior with respect to the corresponding optimization goal does not change. Therefore, it is not necessary to expand the catalog with a plurality of rotated and / or scaled copies of essentially the same pattern or functionally identical spatial arrangements.

[0027] Whether, for example, the left and right corners of a building are technically identical in this way and can therefore be represented in the catalog by a single universal angle can depend, for example, on the modular system used for the formwork. The modular system can also predetermine, for example, to what extent the spatial arrangement of the formwork elements can be physically rotated and / or scaled.

[0028] Advantageously, the catalog includes at least changes in direction and / or branches of the wall as patterns. With these elements, most common floor plans can be covered. Straight walls can also be optionally included in the catalog. However, they can also be supplemented, for example, between the spatial arrangements of formwork elements that have been provided here in a subsequent work phase in the formwork planning. This process is also referred to as pulling on or closing the gap (gaps).

[0029] In a particularly advantageous embodiment, the catalog includes at least right-angled or other angled changes in direction of the wall, intersections of the wall, T-shaped branches of the wall and / or curved walls with a constant radius of curvature as patterns. In particular, whether these elements are realized in the best or worst way in the spatial arrangement of the formwork elements that are basically matched can make a particularly large difference in terms of typical optimization goals. If curved walls do not appear in the catalog, they can also be added later in the formwork planning, for example within the scope of the above-mentioned pull-on or gap closing.

[0030] In a further particularly advantageous embodiment, the plan view is first searched for changes in direction and / or branches of the wall. Only then is the search for straight walls made. In this way, it is achieved that those elements of the plan view are processed first, which, when implemented, could be carried out in the most incorrect way without specialist knowledge in the catalog. In particular, the tendency is counteracted that, by processing straight walls in the plan view, changes in direction and / or branches that have not yet been processed in the plan view are less recognizable.

[0031] In a particularly advantageous embodiment, a predefined floor plan is provided, which contains predefined stroke joints. These stroke joints successively separate the building sections of the building to be produced that are to be concreted and can be set by the user in the floor plan, for example using a mouse or by touch input. For example, the stroke joints can be statically motivated so that certain structures that are important for the statics of the building are not interrupted by the stroke joints. However, the stroke joints can also be motivated, for example, by the planning of the working time, for example by the maximum formwork surface that can be processed within a certain time or by the amount of concrete available per working stroke, and for example by aesthetic aspects.

[0032] In particular, the amount of concrete available per work stroke is often a rigid boundary condition, and there is no practical option of purchasing the required greater amount of concrete at short notice. If a work stroke is planned in such a way that an insufficient amount of concrete is available, the work stroke cannot be realized "by pouring", since the formwork cannot be completely filled with concrete. However, if the missing concrete is added later, the previously provided concrete will have already partially or completely solidified. As a result, boundary surfaces are created in the component between areas in which the degree of setting of the concrete further differs. Such boundary surfaces are to be avoided, since they lead to structural weakening of the component.

[0033] In order to automatically intercept such planning errors, in a further particularly advantageous embodiment, for at least one working stroke, the amount of concrete and / or the wall length required for realization is calculated from the plan view and compared with a predefined threshold value. In response to exceeding the predefined threshold value, a warning is issued to the user and / or a suggestion is made to the user for the offset of at least one stroke joint. The suggestion is such that if the user accepts the suggestion, the predefined threshold value is no longer exceeded. The wall length is a further boundary condition, since cracks tend to form during setting due to shrinkage of the concrete in the case of a wall that is too long and measures to limit the crack width are required.

[0034] Due to the division into a plurality of working strokes, a particularly separate template planning can be made for these working strokes. Thus, the following condition is taken into account, that the wall planned in the scope of the working stroke should not extend on the stroke joint.

[0035] In a further advantageous embodiment, in response to the fact that the predetermined floor plan has not been completely processed and the catalog contains no further patterns that have not been searched for in the predetermined floor plan, it is checked whether at least one area in the floor plan that has not yet been processed contains at least one run seam. If this is the case, the area is searched for a pattern from the catalog while the run seam is hidden. This means that the search is performed as if there were no run seams.

[0036] If a pattern is found during the search, this means that the user has set a stroke seam in a disadvantageous manner in the sense that it interrupts the pattern. The requirement to end the working stroke in the middle of the pattern and to continue working there later conflicts with the requirement to give the pattern a structural formwork corresponding to the pattern according to the spatial arrangement of the formwork elements provided for the pattern in the catalog. There is a high probability that the stroke seam will extend through the middle of the formwork element.

[0037] Therefore, in this case, in the planned plan, at least one run seam is shifted and / or rotated so that at least one run seam no longer interrupts the found pattern, and / or a request is made to the user to shift the run seam in this way. Usually, the user does not consciously set the run seam so that it interrupts one of the patterns in the catalog, but this happens unintentionally because the user cannot remember all of these patterns.

[0038] As explained above, the advantageous effect of the method already occurs when the template planning can be automatically prepared for only a portion of a predetermined floor plan. However, the larger the portion is relative to the entire floor plan, the greater the effect.

[0039] Furthermore, the effectiveness of the method is not reduced by the fact that the formwork plan created within the scope of the method is subsequently supplemented by the described closing or sealing of the gaps, or that accessories and / or adhesives are also provided in further subsequent steps.

[0040] The catalog used within the scope of the method can be stored on the construction site, for example, on a mobile device, such as a tablet computer. However, it is also possible, for example, to send a predefined floor plan to a server and to process the floor plan on the server.

[0041] In a further particularly advantageous embodiment, the formwork planning is converted into an order list for formwork elements by matching with a list of formwork elements that can be ordered. In this way, the procurement of the required materials for the formwork according to the formwork planning is simplified and in particular transmission errors are avoided. In particular, the order list can be a maximum list that specifies those components that are most required simultaneously on the construction site.

[0042] There is not always a 1:1 correspondence between the formwork elements provided according to the formwork planning and the ordered formwork elements. In another particularly advantageous embodiment, it is checked whether there is an alternative formwork element that fulfills the same function for two or more formwork elements in the order list. If this is the case, the alternative formwork element replaces the two or more previously provided formwork elements.

[0043] As described above, the formwork planning is iteratively developed by successively searching for the occurrence of different styles from the catalog in a pre-given plan and adding the spatial arrangements of the formwork elements to the formwork planning in accordance with the catalog. Here, the same formwork element can appear in multiple spatial arrangements, so that, for example, when multiple arrangements are arranged side by side, each arrangement contains a straight formwork element with a length of 3 m, and in the final formwork planning, two identical straight formwork elements with a length of 3 m are placed side by side. Now, if straight formwork elements with a length of 6 m can be used, it is advantageous to use straight formwork elements with a length of 6 m instead of formwork elements with a length of 3 m. In this way, less material movement is required during installation, and fewer connections must be connected and then released between the formwork elements. As a result, working time is saved.

[0044] The invention also relates to a method for producing a building. In this method, a formwork plan prepared by the method described above is provided. A spatial arrangement of formwork elements is created in accordance with the formwork plan. The cavity defined by this spatial arrangement is filled with concrete. By this method, the optimization goals based on which the formwork plan was prepared can be achieved, for example, the building can be built faster, more economically and / or with less material movement.

[0045] The method can be executed in particular on a computer and / or on a mobile device, for example on a tablet or a smartphone on site at a construction site. It can therefore be embodied in software that provides a computer or mobile device with automatic formwork planning functionality. Therefore, the invention also relates to a computer program with machine-readable instructions, which, when executed on a computer and / or mobile device, cause the computer and / or mobile device to perform the described method. Likewise, the invention also relates to a machine-readable data carrier or a download product with the computer program. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The subject of the present invention is described below with reference to the accompanying drawings, but the subject of the present invention is not limited thereto. In the accompanying drawings:

[0047] Figure 1a and Figure 1b An embodiment of a method 100 is shown;

[0048] Figure 2 An exemplary treatment of a plan view 1 with an advantageously arranged travel seam 12 is shown;

[0049] Figure 3 An exemplary treatment of a plan view 1 with an unfavorably disposed travel seam 12 is shown;

[0050] Figure 4 An exemplary embodiment of a method 300 is shown. DETAILED DESCRIPTION

[0051] Depend on Figure 1a and Figure 1b FIG. 1 shows an exemplary embodiment of a method 100. In step 105, a predetermined floor plan 1 is provided by a user, here including one or more travel joints 12. In step 106, the amount of concrete and / or the wall length required for each working stroke is calculated and compared with a predetermined threshold value in step 107. If the threshold value is exceeded (true value 1), a warning is issued to the user in step 108 and / or a suggestion is made to the user in step 109 for the offset of at least one travel joint 12 so that, when the suggestion is implemented, the predetermined threshold value is no longer exceeded.

[0052] In step 110, a catalogue 3 is provided which assigns spatial arrangements 31b-33b of formwork elements to the patterns 31a-33a of the planned course of the wall 11. According to block 111, the catalogue 3 can be selected, for example from a plurality of catalogues 3a-3c, depending on which optimization objective is followed when formulating the formwork planning 2.

[0053] In step 120, the occurrence of patterns 31a-33a from the catalog 3 is searched in the plan view 1. In this case, the patterns can be rotated and / or scaled according to block 121. Alternatively or in combination, according to block 122, a search can first be made for changes in direction and / or branches of the wall before the subsequent search for straight walls according to block 123. However, as described above, straight walls can also be supplemented afterwards, for example in the case of drawing up or closing gaps.

[0054] In step 130, for each occurrence of a pattern 31a-33a, a spatial arrangement 31b-33b of the template element to which it belongs according to the catalog 3 is added to the template planning 2. In this case, the spatial arrangement 31b-33b is rotated and / or scaled in the same way as the pattern 31a-33a, if necessary. In step 140, the occurrence of the pattern can optionally be marked in the illustration of the floor plan 1 as processed. However, as described above, this is not mandatory, because it can be seen from the fact that the template element is included in the planning at a certain position in the template planning 2 that the corresponding part of the floor plan 1 has already been processed.

[0055] In step 150, it is checked whether the predefined floor plan 1 has been completely processed. If this is the case (true value 1), the formwork plan 2 is converted into an order list for formwork elements by matching it with the list 5 of orderable formwork elements in step 240. As described above, this can be a maximum list in particular.

[0056] If the predefined floor plan 1 has not been completely processed (true value 0), first in step 160 a check is made as to whether the catalog 3 still contains further patterns 31a-33a which have not yet been searched for in the predefined floor plan 1. If this is the case (true value 1), the search is branched back to the search 120 with one of these further patterns 31a-33a.

[0057] On the contrary, if there are no more patterns 31a-33a that have not been searched, then in step 180, it is checked whether the run seam 12 divides the area 1a of the plan view 1 that has not been processed. If this is the case (true value 1), then in step 190, the area 1a is investigated for the patterns 31a-33a when the run seam 12 is hidden. In step 195, it is checked whether the patterns 31a-33a have been found. If one has been found (true value 1), the unfavorably set run seam 12 will result in the pattern 31a-33a not being recognized. Then, in step 200a, the run seam 12 can be automatically offset and / or rotated so that the run seam no longer terminates the found pattern 31a-33a, that is, the direction of the wall can be produced by "casting" according to the pattern 31a-33a. For this purpose, alternatively or in combination, the user can be asked to make such a change of the run seam in step 200b. Then, from step 110, the formulation of the template planning 2 can be restarted.

[0058] Figure 2 A simple exemplary plan view 1 with a planned wall 11 is shown. The plan view 1 is divided into three working strokes A, B and C by two stroke joints 12. This means that separate template planning 2 is required for the three working strokes A, B and C. The walls planned within the scope of each working stroke A, B and C end at a stroke joint 12 or 13 that limits this working stroke.

[0059] The catalogue 3 used in this simple example comprises three patterns for the planned course of the wall 11 , namely a right-angle change of direction 31 a of the wall 11 , a T-shaped branch 32 a of the wall 11 and a straight piece 33 a of the wall 11 .

[0060] When converting the plan view 1 into the template planning 2 for each working stroke A, B and C, the occurrence of a right-angle direction change 31a is first searched in the plan view 1 accordingly. It occurs twice in the first working stroke A and the third working stroke C respectively, but not in the second working stroke. The spatial arrangement 31b of the template elements assigned to the right-angle direction change 31a according to the catalog 3 is added to the corresponding template planning 2 for the working strokes A, B and C. The right-angle change direction 31a is thus processed, which is indicated by its dashed marking in the plan view 1.

[0061] Subsequently, the occurrence of the T-branch 32a is searched in the plan view 1. Here, it occurs only twice in the second working stroke B; it does not occur in the first working stroke A and the third working stroke C. The spatial arrangement 32b of the formwork elements assigned to the T-branch 32a according to the catalog 3 is added to the corresponding formwork planning 2 for the working strokes A, B and C. The T-branch 32a is thus processed, which is again indicated by a dashed marking in the plan view 1.

[0062] Finally, the occurrence of the straight wall element 33a is searched in the plan view 1. Here, it occurs three times in the first working stroke A, four times in the second working stroke B, and three times again in the third working stroke C. The spatial arrangement 33b of the formwork elements assigned to the straight wall element 33a according to the catalog 3 is added to the corresponding formwork planning 2 for the working strokes A, B and C. The straight wall element 33a is thus processed, which is again indicated by a dashed marking in the plan view 1.

[0063] In this simple example, the floor plan 1 is therefore completely processed and converted into a template plan 2 for the individual work runs A, B and C.

[0064] exist Figure 2 In the example shown in , the catalog 3 contains only one sample each of a right-angle change of direction 31a, a T-shaped branch 32a and a straight wall piece 33a. In order to search for occurrences in the plan view 1, these elements will be appropriately scaled and / or rotated, respectively.

[0065] Figure 3 Another simple example of a plan view 1 is shown, which is divided into two working paths A and B by a path joint 12. In this example, however, the manual placement of the path joint 12 was disadvantageously chosen, because in the upper left corner and the lower right corner of the plan view, the planned wall 11 ends at the path joint 12 with a bevel, which does not appear in the catalog 3 as a pattern 31a-33a. Figure 3 After the right-angle change of direction 31a and the straight wall 33a shown in FIG. 1, an unprocessed area 1a of the plan view 1 remains. The design of the method 100 proposes to offset and / or rotate the travel seam 12 and / or require the user to make such a change. If the travel seam 12 is changed to a travel seam 12', for example, it can be similar to Figure 2 The entire floor plan 1 is processed with the same directory 3 of styles 31a-33a.

[0066] Figure 4 An embodiment of a method 300 for producing a building is shown. In step 310, at least one formwork plan 2 is prepared from a planned floor plan 1 according to method 100. In step 320, a spatial arrangement of formwork elements is created that corresponds to the formwork plan 2. In step 330, the cavity defined by the spatial arrangement is filled with concrete.

[0067] Reference numerals list

[0068] 1 Planned floor plan

[0069] 1a Unprocessed portion of plan 1

[0070] 11 The planned wall path in plan 1

[0071] 12 Stroke joints in plan 1

[0072] 2 Template Planning

[0073] 3 Catalog with styles 31a-33a and spatial arrangements 31b-33b

[0074] 3a-3c Directories with different optimization goals

[0075] 31a-33a Pattern for the planned wall course 11

[0076] 31b-33b Spatial arrangement of formwork elements

[0077] 5 List of orderable formwork elements

[0078] 6 Order List

[0079] 100 Methods for formwork planning

[0080] 105 Provide floor plan 1

[0081] 106 Calculate the amount of concrete per work stroke

[0082] 107 Check whether the concrete volume exceeds the threshold

[0083] 108 Warning to user

[0084] 109 Submit suggestions to users

[0085] 110 Provide directory 3

[0086] 111 Select directory 3 from multiple directories 3a-3c

[0087] 120 Search for occurrences of styles 31a-33a in floor plan 1

[0088] 121 Rotate and / or scale styles 31a-33a

[0089] 122 Search Direction Changes and Branches

[0090] 123 Search for straight wall

[0091] 130 Add space arrangement 31b-33b according to style 31a-33a

[0092] 131 Rotate and / or scale arrangement 31b-33b

[0093] 140 Mark styles 31a-33a as processed

[0094] 150 Check if floor plan 1 has been fully processed

[0095] 160 Check if there are styles 31a-33a that have not been searched yet

[0096] 170 Continue searching with new style 120

[0097] 180 Check whether there is a travel seam 12 in the untreated area 1a

[0098] 190 Search for styles 31a-33a with stroke seam 12 hidden

[0099] 195 Check if styles 31a-33a are found

[0100] 200a Offset and / or rotation travel joint 12

[0101] 200b Request user to change travel seam 12

[0102] 240 Convert template plan 2 into order list 6

[0103] 300 Methods for making buildings

[0104] 310 Provide template planning2

[0105] 320 Establish spatial arrangement of formwork elements

[0106] 330 Filling the cavity of the spatial arrangement with concrete

[0107] A, B, C work schedule

Claims

1. A computer-implemented method (100) for converting a predetermined floor plan (1) into a formwork plan (2) for installing formwork elements for at least one work step (A, B, C) of manufacturing a building corresponding to the floor plan (1) by pouring concrete, the method comprising the following steps: The user provides the predetermined floor plan (1), in, The predetermined plan includes predetermined path joints (12), which successively separate the building sections to be concreted of the building to be manufactured; Providing a catalogue (3, 3a-3c) which in each case assigns to a plurality of patterns (31a-33a) for the course of the planned wall (11) a spatial arrangement (31b-33b) of formwork elements, with which the course can be introduced into the building to be produced by pouring concrete; Searching for the occurrence of the patterns (31a-33a) contained in the catalog (3, 3a-3c) in an area of ​​the predetermined floor plan (1) in which the patterns (31a-33a) contained in the catalog (3, 3a-3c) have not been found to occur; For each occurrence of the pattern (31a-33a), adding to the template planning (2) the spatial arrangement (31b-33b) of the template elements assigned to the pattern (31a-33a) by the catalog (3, 3a-3c); Checking whether the predetermined plan (1) has been completely processed; In response to the predetermined floor plan (1) not being completely processed, checking whether the catalog contains other patterns (31a-33a) that have not been searched in the predetermined floor plan (1); In response to the catalog (3, 3a-3c) containing the other patterns (31a-33a), branching back to perform the above search in the unprocessed part of the predetermined floor plan (1) with one of the other patterns (31a-33a), so that the above steps of searching, adding and checking are repeatedly performed in sequence to completely process the predetermined floor plan; and In response to the fact that the predetermined floor plan (1) has not been completely processed and the catalog (3, 3a-3c) does not contain any further patterns (31a-33a) that have not been searched for in the predetermined floor plan (1): Checking whether at least one unprocessed area (1a) of the plan (1) contains at least one travel seam (12); In response to the region (1a) containing at least one run seam (12), searching the region for a pattern (31a-33a) from the catalog (3, 3a-3c) with the run seam (12) hidden; and In response to finding a pattern (31a-33a) in the area (1a), at least one stroke seam (12) in the predetermined plan (1) is offset and / or rotated so that the at least one stroke seam no longer interrupts the found pattern (31a-33a), and / or a request is made to the user to offset the stroke seam (12) in this manner.

2. The method (100) according to claim 1, in, The catalog (3) is selected from a plurality of catalogs (3a-3c) which differ in terms of an optimization target with respect to which the spatial arrangements (31b-33b) of the formwork elements contained therein are optimized.

3. The method (100) according to claim 1 or 2, in, When searching for the occurrence of a pattern (31a-33a) contained in the catalog (3, 3a-3c), the pattern (31a-33a) is rotated and / or scaled, and in response to the occurrence of the rotated and / or scaled pattern (31a-33a) being found in the predetermined floor plan (1), the spatial arrangement (31b-33b) of the template elements added to the template planning (2) is correspondingly rotated and / or scaled (131).

4. The method (100) according to claim 1, in, The catalog (3, 3a-3c) comprises at least direction changes and / or branches of walls as patterns (31a-33a).

5. The method (100) according to claim 4, in, The catalog (3, 3a-3c) includes at least right-angled or other angled changes in direction of walls, intersections of walls, T-shaped branches of walls and / or curved walls with a constant radius of curvature as patterns (31a-33a).

6. The method (100) according to claim 4 or 5, in, Direction changes and / or branching of walls are first searched for in the plan view (1) and only then are straight walls searched.

7. The method (100) according to claim 1, in, For at least one working stroke (A, B, C), the required amount of concrete and / or wall length to achieve the desired result is calculated from the plan (1), the required amount of concrete and / or wall length is compared with a predetermined threshold value, and in response to exceeding the predetermined threshold value, a warning (108) is issued to a user and / or a suggestion is made to the user for shifting at least one stroke joint (12) so that the predetermined threshold value is no longer exceeded.

8. The method according to claim 1, in, Create a separate template plan (2) for each work trip (A, B, C).

9. The method (100) according to claim 1, in, By matching with the list (5) of orderable formwork elements, the formwork planning (2) is converted into an order list (6) for formwork elements.

10. The method (100) according to claim 9, in, A check is made to determine whether there is an alternative template element that satisfies the same function for two or more template elements in the order list (6), and in response to the existence of such an alternative template element, the alternative template element replaces the two or more template elements previously provided.

11. A method (300) for manufacturing a building, the method comprising the following steps: Providing a template plan (2) prepared using the method (100) according to any one of claims 1 to 10; Establishing a spatial arrangement of template elements, wherein the spatial arrangement of template elements is consistent with the template plan (2); The cavity defined by the spatial arrangement is filled with concrete.

12. A computer program comprising machine-readable instructions which, when executed on a computer and / or on a mobile device, cause the computer and / or the mobile device to perform the method (100) according to any one of claims 1 to 10.

Citation Information

Patent Citations

  • Formwork system

    WO2005040525A1

  • Method and system for formwork matching of three-dimension space software

    CN104200026A

  • Built-up template component generation system and method and template arrangement system and method

    CN105302929A

  • Implementation method for intelligent template of modeling wall based on parametric design

    CN107330209A

  • Concrete structure formwork arrangement method

    CN107423472A