Traffic channel beam device and construction method for crossing railway operating line
By designing a removable traffic trough beam device and utilizing the overall structure of trough beams, canopies and anchor screw groups, the construction restrictions of the railway business line are solved, construction efficiency and safety are improved, and efficient crossing of the railway is achieved construction.
Patent Information
- Application Number
- CN202010335476.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-24
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2040-04-24
AI Technical Summary
The existing traffic channel beam devices and construction methods used to cross railway business lines are restricted by the railway business lines, affecting construction efficiency.
A traffic trough beam device including a trough beam, a canopy and an anchor screw group is designed. The trough beam is used to support the canopy. The canopy blocks rain and sunlight. The anchor screw group connects the trough beam and the canopy to form a The removable overall structure eliminates construction restrictions imposed by railway business lines.
It improves the construction efficiency of the traffic trough beam device, ensures the safety and quality of construction, reduces the risk of interaction with existing lines, and shortens the construction period.
Smart Images

Figure CN111485479B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a traffic trough beam device, in particular to a traffic trough beam device for crossing a railway operating line and a construction method. Background Art
[0002] During the construction of railway lines, in order to ensure the smooth flow of urban roads, it is necessary to cross the railway operating line. Therefore, the traffic trough beam device and construction method for crossing the railway operating line are an important civil engineering device. In the existing traffic trough beam device and construction method for crossing the railway operating line, the traffic trough beam device is installed after the bridge piers crossing the railway operating line are completed, and then the canopy and sound barrier cloth are installed. Due to the limitation of the railway operating line, the efficiency of the traffic trough beam device is affected.
[0003] Based on the applicant's technical briefing and the existing technical problems, technical features and technical effects in the background technology, the technical solution of the present invention is made. Summary of the invention
[0004] The object of the present invention is a traffic trough beam device for crossing a railway operating line.
[0005] The object of the present invention is a construction method for a traffic channel beam device for crossing a railway operating line.
[0006] In order to overcome the above technical shortcomings, the purpose of the present invention is to provide a traffic trough beam device and construction method for crossing a railway operating line, thereby eliminating the construction restrictions of the railway operating line and improving the construction efficiency of the traffic trough beam device.
[0007] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a traffic trough beam device for crossing a railway operating line, comprising a trough beam set as one of the necessary components of the main body, a canopy set as the second necessary component of the main body, and a ground anchor screw group set between the canopy and the trough beam.
[0008] Due to the design of the trough beam, canopy and anchor screw group, the trough beam is used to support the canopy, the canopy is used to block rain and sunlight, and the anchor screw group is used to connect the canopy and the trough beam as a whole to form a movable whole, thus eliminating the construction restrictions of the railway operating line and improving the construction efficiency of the traffic trough beam device.
[0009] The present invention provides for connecting the channel beam, the canopy and the anchor bolt assembly to each other in a manner that forms a displaceable integral component.
[0010] The present invention designs that the anchor screw group is arranged to include a main anchor screw and an auxiliary anchor screw.
[0011] The present invention is designed to further include a first accessory device, and the first accessory device is arranged on the trough beam, and the first accessory device is arranged as a sound barrier cloth.
[0012] The present invention is designed that a canopy and a sound barrier cloth are respectively arranged on the trough beam, and a main anchor screw rod and an auxiliary anchor screw rod are respectively arranged between the canopy and the trough beam.
[0013] The present invention is designed that a canopy is provided to include a first canopy column, a second canopy column, a third canopy column, a fourth canopy column, a fifth canopy column, a first canopy support rod, a second canopy support rod, a first side angle block, a second side angle block, a middle angle block and a paving piece, and the upper end head of the first canopy column is provided to be connected to the lower end face portion of the first side angle block, the upper end head of the fourth canopy column is provided to be connected to the lower end face portion of the second side angle block, and the side face portion of the first side angle block and the side face portion of the second side angle block are respectively provided to be connected to one of the ends of the first canopy support rod, the other end head of the first canopy support rod is provided to be connected to one of the ends of the second canopy support rod, and the other end head of the second canopy support rod is provided to be connected to the side face portion of the middle angle block, the lower end face portion of the middle angle block is respectively provided to be connected to the upper end head of the second canopy column, the upper end head of the third canopy column and the upper end head of the fifth canopy column, and the outer side face portion of the first canopy column, the The outer side surface, the outer side surface of the first shed support rod and the outer side surface of the second shed support rod are respectively arranged to be connected to the paving member, the lower end of the first shed column, the lower end of the second shed column, the lower end of the third shed column and the lower end of the fourth shed column are respectively arranged to be connected to the main anchor screw, the lower end of the fifth shed column is arranged to be connected to the auxiliary anchor screw, and the first shed column, the second shed column, the third shed column, the fourth shed column and the fifth shed column are respectively arranged as columnar bodies, and the first shed column and the fourth shed column are arranged to be arranged to be distributed at intervals along the front and rear side surfaces of the trough beam, the second shed column, the third shed column and the fifth shed column are arranged to be distributed at intervals along the middle part of the trough beam, and the three fifth shed columns are arranged to be located on the right side surface of the second shed column and the right side surface of the third shed column, the first shed support rod and the second shed support rod are arranged to be rod-shaped bodies, and the first side angle block and the second side angle block are respectively arranged to be triangular steel components, and the middle angle blocks are respectively arranged to be rectangular steel components.
[0014] The present invention is designed that the angle α between the two second shed support rods located on the middle corner block connected to the fifth shed column and located in the horizontal plane is set to 174-178°, and the angle between the two second shed support rods located on the middle corner block respectively connected to the first shed column, the second shed column, the third shed column and the fourth shed column and located in the horizontal plane is set to 180°.
[0015] The present invention is designed that the paving material is configured to include fasteners, screws, locking plates and purlins, and one of the end surfaces of the fasteners is configured to be snap-fitted to the locking plates, another end surface of the fasteners is configured to be contact-connected to the purlins and screws are configured between the fasteners and the locking plates, the flange portion of the screws is configured to be contact-connected to the fasteners and the ends of the screws are respectively configured to be embedded-connected to the fasteners and the purlins, the fasteners are respectively configured to be connected to the first shed column, the fourth shed column, the first shed support rod and the second shed support rod and the screws are configured to be self-tapping screws, the locking plates are configured to be polycarbonate convex strip bodies and the purlins are configured to be rectangular plate bodies.
[0016] The present invention is designed that the fastener is configured to include a notch portion, a first edge portion, a second edge portion and a buckle strip portion, and one of the open side portions of the notch portion is configured to be connected to the second edge portion, and the other open side portions of the notch portion are respectively configured to be connected to the first edge portion and the buckle strip portion, and the first edge portion and the second edge portion are respectively configured to extend and distribute along the transverse center line of the notch portion, the buckle strip portion is configured to extend and distribute along the vertical center line of the notch portion, and a through hole body is provided at the bottom end face portion of the notch portion, and the first edge portion is respectively configured to be connected to the first shed column, the fourth shed column and the first shed column. The shed column, the first shed support rod and the second shed support rod are connected and the buckle strip portion is set to be embeddedly connected with the locking plate, the upper end surface portion of the first edge portion is set to be connected with the locking plate and the bottom end surface portion of the notch portion is set to be contact-connected with the purlin, the through-hole body is set to be connected with the screw and the notch portion is set to be a U-shaped groove body, the first edge portion is set to be a rectangular sheet body and the second edge portion is set to be an L-shaped sheet body, the buckle strip portion is set to be a T-shaped plate body and the through-hole body is set to be a circular hole body, and the through-hole bodies are set to be arranged and distributed at intervals along the vertical center line of the notch portion.
[0017] The present invention is designed that a first vertical wall portion is arranged in the middle portion of the trough beam and a second vertical wall portion is arranged on the rear side portion of the trough beam, a third vertical wall portion is arranged on the front side portion of the trough beam, and bracket portions are respectively arranged on the outer side portions of the first vertical wall portion and the second vertical wall portion, toothed portions are respectively arranged on the upper end portion of the first vertical wall portion, the upper end portion of the second vertical wall portion and the upper end portion of the third vertical wall portion, and the upper end portion of the first vertical wall portion, the upper end portion of the second vertical wall portion and the upper end portion of the third vertical wall portion are respectively arranged to be connected to the main anchor screw and the auxiliary anchor screw, the bracket portion is arranged to be connected to the sound barrier cloth and the first vertical wall portion, the second vertical wall portion and the third vertical wall portion are arranged to be rectangular strips, the bracket portion is arranged to be an L-shaped strip and the inner end portion of the horizontal portion of the bracket portion is arranged to be connected to the second vertical wall portion and the third vertical wall portion, the toothed portion is arranged to be a wedge-shaped block and the toothed portion is arranged to be arranged to be spaced apart and distributed along the transverse center line of the first vertical wall portion, the transverse center line of the second vertical wall portion and the transverse center line of the third vertical wall portion.
[0018] The present invention is designed that the left and right end portions of the second vertical wall portion and the third vertical wall portion are arranged to be inwardly contracted, and the angle β between the center line of the inwardly contracted portion of the second vertical wall portion and the transverse horizontal line, and the angle β between the center line of the inwardly contracted portion of the third vertical wall portion and the transverse horizontal line are respectively set to 5-13°.
[0019] The present invention is designed that the toothed portion is arranged as a block body, an open rod body, a cross rod body, a vertical rod body, an oblique rod body and a through rod body, and the open rod body, the cross rod body, the vertical rod body, the oblique rod body and the through rod body are arranged in the block body, the outer side surface portion of the open rod body is arranged to be connected to the through rod body and the vertical portion of the open rod body is respectively arranged to be connected to the end head of the cross rod body, the middle portion of the cross rod body is arranged to be connected to one end head of the vertical rod body and one end head of the oblique rod body and the other end head of the vertical rod body is arranged to be connected to the middle portion of the cross portion of the open rod body, the other end head of the oblique rod body is arranged to be connected to the cross portion of the open rod body and the lower end surface portions of the block are respectively arranged to be connected to the first A vertical wall portion, a second vertical wall portion and a third vertical wall portion are connected, the block body is set as a cement mortar solidified body and the through rod body is set to extend and distribute along the transverse center line of the block body, the open rod body is set as a U-shaped rod and the cross rod body, the vertical rod body, the oblique rod body and the through rod body are respectively set as rod-shaped bodies, six oblique rod bodies are set between the open rod body and the cross rod body and the vertical rod body and the oblique rod body are set to distribute in a fan-shaped surface, the through rod body is set to be arranged and distributed at intervals along the peripheral line of the open rod body and an open rod body, a cross rod body, a vertical rod body and six oblique rod bodies are set to form a group of open frame components, and multiple groups of open frame components are respectively set to be arranged and distributed at intervals along the center line of the through rod body.
[0020] The present invention is designed that the sound barrier cloth is configured to include a first barrier cloth portion and a second barrier cloth portion, and the lower end of the first barrier cloth portion and the lower end of the second barrier cloth portion are respectively configured to be connected to the trough beam, and the first barrier cloth portion and the second barrier cloth portion are respectively configured to be arranged front and back along the transverse center line of the trough beam.
[0021] The present invention is designed that the first barrier cloth part and the second barrier cloth part are configured to include a screen cloth body and a supporting beam body, and the side parts of the screen cloth body are configured to be connected to the supporting beam body, the lower ends of the supporting beam bodies are respectively configured to be connected to the trough beams, the screen cloth body is configured to be a rectangular cloth piece, and the supporting beam bodies are configured to be arranged and distributed at intervals along the transverse center line of the trough beam.
[0022] The present invention is designed that the support beam body is configured to include a sliding plate, a fixed plate and a support leg, and the right side surface of the sliding plate is configured to be slidably connected to the left side surface of the fixed plate, the lower end of the sliding plate is configured to be connected to the vertical end of the support leg and an open hole body is provided at the transverse end of the support leg, the left side surface of the sliding plate and the left side surface of the fixed plate are respectively configured to be connected to the screen cloth body, the open hole body is configured to be connected to the groove beam through expansion bolts and the sliding plate and the fixed plate are respectively provided with a strip body with a hook portion on the side surface, the hook portion of the sliding plate is configured to be overlapped with the hook portion of the fixed plate and the lower end surface portion of the fixed plate is configured to be supported with the lower end surface portion of the sliding plate, the support leg is configured to be a T-shaped seat body and the open hole body is configured to be a U-shaped groove body.
[0023] The present invention is designed that the main anchor screw is arranged to include a first panel portion, a first shear key portion, a first embedded screw, a second embedded screw, a third embedded screw, a fourth embedded screw, a fifth embedded screw and a sixth embedded screw, and the lower end surface portion of the first panel portion is arranged to be connected to the first shear key portion, the rear end surface portion of the first panel portion is respectively arranged to be connected to the first embedded screw, the second embedded screw and the third embedded screw, and the front end surface portion of the first panel portion is respectively arranged to be connected to the fourth embedded screw, the fifth embedded screw and the sixth embedded screw, the upper end head of the first embedded screw, the upper end head of the second embedded screw, the upper end head of the third embedded screw, the upper end head of the fourth embedded screw, The upper end of the fifth embedded screw and the upper end of the sixth embedded screw are respectively arranged to be connected in series with the first panel portion and the nut located on the first embedded screw is arranged to be welded to the first panel portion, the first panel portion is arranged to be connected to the canopy and the first shear key portion is arranged to be embedded with the groove beam, the first embedded screw, the second embedded screw, the third embedded screw, the fourth embedded screw, the fifth embedded screw and the sixth embedded screw are respectively arranged to be implanted with the groove beam, the first panel portion is arranged to be a rectangular sheet body and the first embedded screw, the second embedded screw, the third embedded screw, the fourth embedded screw, the fifth embedded screw and the sixth embedded screw are respectively arranged to be L-shaped bolts.
[0024] The present invention is designed that the first shear key portion is configured to include an intermediate key body, a first vertical bar body and a second vertical bar body, and the transverse portions of the ends of the intermediate key body are respectively configured to be connected to the inner ends of the first vertical bar body and the inner ends of the second vertical bar body, the upper end face portion of the intermediate key body, the upper end face portion of the first vertical bar body and the upper end face portion of the second vertical bar body are respectively configured to be connected to the first panel portion, and the intermediate key body is configured to be a W-shaped steel member, and the first vertical bar body and the second vertical bar body are respectively configured to be rectangular strip bodies.
[0025] The present invention is designed that the auxiliary anchor screw is arranged to include a second panel portion, a second shear key portion, a seventh embedded screw, an eighth embedded screw, a ninth embedded screw and a tenth embedded screw, and the lower end surface portion of the second panel portion is arranged to be connected to the second shear key portion, the rear end surface portion of the second panel portion is respectively arranged to be connected to the seventh embedded screw and the eighth embedded screw, and the front end surface portion of the second panel portion is respectively arranged to be connected to the ninth embedded screw and the tenth embedded screw, and the upper end head of the seventh embedded screw, the upper end head of the eighth embedded screw, the upper end head of the ninth embedded screw and the upper end head of the tenth embedded screw are respectively arranged to be connected in series with the second panel portion and positioned The nut on the seventh embedded screw is arranged to be welded to the second panel portion, the second panel portion is arranged to be connected to the canopy and the second shear key portion is arranged to be embedded with the groove beam, the seventh embedded screw, the eighth embedded screw, the ninth embedded screw and the tenth embedded screw are respectively arranged to be implanted with the groove beam, the second panel portion is arranged to be a rectangular sheet body and the seventh embedded screw, the eighth embedded screw, the ninth embedded screw and the tenth embedded screw are respectively arranged to be L-shaped bolts, the second shear key portion is a W-shaped steel member and the seventh embedded screw, the eighth embedded screw, the ninth embedded screw and the tenth embedded screw are respectively arranged between the transverse portions of the second shear key portion.
[0026] The present invention is designed that the trough beam and the canopy, the main anchor screw and the auxiliary anchor screw are arranged to be distributed in a manner of embedding anchor points in different areas, and the trough beam, the canopy, the main anchor screw and the auxiliary anchor screw and the sound barrier cloth are arranged to be distributed in a manner of vertical screen shielding sound wall, the second shear key portion, the seventh embedded screw, the eighth embedded screw, the ninth embedded screw, the tenth embedded screw, the first shear key portion, the first embedded screw, the second embedded screw, the third embedded screw, the fourth embedded screw, the fifth embedded screw and the sixth embedded screw are respectively arranged to be connected to the first vertical wall portion, the second vertical wall portion and the third vertical wall portion, the second panel portion and the first panel portion are respectively arranged to be connected to the first shed column, the second shed column, the third shed column, the fourth shed column and the fifth shed column, and the supporting beam body is arranged to be connected to the bracket portion.
[0027] The present invention designs a construction method for a traffic trough beam device for crossing a railway operating line, and the steps are: on the seventh pier, the eighth pier, the ninth pier, the tenth pier, the eleventh pier, the twelfth pier, the thirteenth pier, the fourteenth pier, the fifteenth pier, the sixteenth pier and the seventeenth pier, a canopy is installed on the trough beam by means of main anchor screws and auxiliary anchor screws, thereby completing the installation of a movable integral component, and then the movable integral component is installed on the first pier, the second pier, the third pier, the fifth pier and the sixth pier by means of pushing.
[0028] The present invention is designed, and its steps are: first, when the trough beam is cast, the seventh embedded screw, the eighth embedded screw, the ninth embedded screw and the tenth embedded screw of three sets of auxiliary anchor screws are installed on the right side face of the first vertical wall part, and the first embedded screw, the second embedded screw, the third embedded screw, the fourth embedded screw, the fifth embedded screw and the sixth embedded screw of multiple sets of main anchor screws are installed on the other end faces of the first vertical wall part, the second vertical wall part and the third vertical wall part;
[0029] Install the jacking device on the upper end face of the fourth pier, the upper end face of the seventh pier, the upper end face of the eighth pier, the upper end face of the tenth pier, the upper end face of the twelfth pier, the upper end face of the fourteenth pier and the upper end face of the sixteenth pier, and install the trough beam on the seventh pier, the eighth pier, the ninth pier, the tenth pier, the eleventh pier, the twelfth pier, the thirteenth pier, the fourteenth pier, the fifteenth pier, the sixteenth pier and the seventeenth pier,
[0030] Connect the second panel part to the fifth shed column respectively, connect the second panel part to the seventh embedded screw, the eighth embedded screw, the ninth embedded screw and the tenth embedded screw through nuts, connect the second shear key part to the first vertical wall part,
[0031] Connect the first panel parts on the other end surfaces of the first vertical wall part to the second shed column and the third shed column respectively, connect the first panel parts on the second vertical wall part to the first shed column respectively, connect the first panel parts on the third vertical wall part to the fourth shed column respectively, connect the first panel part to the first embedded screw, the second embedded screw, the third embedded screw, the fourth embedded screw, the fifth embedded screw and the sixth embedded screw through nuts, connect the first shear key part to the first vertical wall part, the second vertical wall part and the third vertical wall part, and connect the first vertical wall part to the first vertical wall part. The first shed support rod and the second shed support rod are installed between the column and the fifth shed column through the first side angle block and the middle angle block, and the first shed support rod and the second shed support rod are installed between the fourth shed column and the fifth shed column through the second side angle block and the middle angle block. The first edge portion is respectively connected to the first shed column, the first shed support rod, the second shed support rod and the fourth shed column. The purlin is installed on the groove portion through screws and the through-hole body, the locking plate is connected to the buckle strip portion, and the locking plate is installed on the second edge portion, thereby completing the installation of the canopy on the trough beam.
[0032] Install the legs on the bracket part, install the supporting beam body on the bracket part through the expansion bolts and the opening hole body, and connect the side parts of the screen cloth body with the adjacent sliding plate and fixed plate respectively, so as to complete the installation of the sound barrier cloth on the groove beam.
[0033] Second, push the trough beam onto the sixth pier, make the front end of the trough beam go down 2m, and make the sixth pier, the eighth pier, the tenth pier, the twelfth pier, the fourteenth pier and the sixteenth pier support the trough beam, ensuring that the compressive stress of the bottom of the trough beam 90m away from the front end of the trough beam is 1.6Mpa, and the compressive stress of the top of the trough beam 10m away from the front end of the trough beam is 13.4Mpa, that is, the trough beam is in a safe state.
[0034] 3. Push the trough beam onto the fifth pier, make the front end of the trough beam go down 28m, and make the fifth, sixth, eighth, tenth and twelfth piers support the trough beam, ensuring that the compressive stress of the bottom of the trough beam 90m away from the front end of the trough beam is 2.1Mpa, and the compressive stress of the top of the trough beam 36m away from the front end of the trough beam is 11.8Mpa, that is, the trough beam is in a safe state.
[0035] Fourth, push the trough beam onto the third pier so that the front end of the trough beam is not in a downward winding state, and the third pier, the fifth pier, the sixth pier, the eighth pier and the tenth pier support the trough beam to ensure that the compressive stress on the bottom of the trough beam 24m away from the front end of the trough beam is 0Mpa, and the compressive stress on the top of the trough beam 73m away from the front end of the trough beam is 17.3Mpa, that is, the trough beam is in a safe state.
[0036] 5. Push the trough beam to the railway guardrail in the railway operating line section, 5.25m away from the upline of the railway operating line section, so that the front end of the trough beam is 4mm lower, and the third pier, the fifth pier, the sixth pier, the eighth pier and the tenth pier support the trough beam, ensuring that the compressive stress of the bottom of the trough beam 28m away from the front end of the trough beam is 0.6Mpa, and the compressive stress of the top of the trough beam 73m away from the front end of the trough beam is 18.1Mpa, that is, the trough beam is in a safe state.
[0037] 6. Push the trough beam to the middle of the up and down lines of the railway operating line section, make the front end of the trough beam go down 1mm, and make the third pier, the fifth pier, the sixth pier, the eighth pier and the tenth pier support the trough beam, ensuring that the compressive stress of the bottom of the trough beam 28m away from the front end of the trough beam is 0.1Mpa, and the compressive stress of the top of the trough beam 73m away from the front end of the trough beam is 17.2Mpa, that is, the trough beam is in a safe state.
[0038] 7. Push the trough beam to the section across the railway operating line, 9m away from the second pier, so that the front end of the trough beam is 8mm lower, and the third, fifth, sixth and eighth piers support the trough beam, ensuring that the compressive stress of the bottom of the trough beam 73m away from the front end of the trough beam is 0.5Mpa, and the compressive stress of the top of the trough beam 73m away from the front end of the trough beam is 16.6Mpa, that is, the trough beam is in a safe state.
[0039] 8. Push the trough beam to a distance of 5m from the second pier, make the front end of the trough beam go down by 10mm, and make the third, fifth, sixth and eighth piers support the trough beam, ensuring that the compressive stress of the bottom of the trough beam at a distance of 73m from the front end of the trough beam is 1.4Mpa, and the compressive stress of the top of the trough beam at a distance of 73m from the front end of the trough beam is 16.2Mpa, that is, the trough beam is in a safe state.
[0040] 9. Push the trough beam to a distance of 1m from the second pier, make the front end of the trough beam go down 9mm, and make the third, fifth, sixth and eighth piers support the trough beam, ensuring that the compressive stress of the bottom of the trough beam at a distance of 73m from the front end of the trough beam is 0.8Mpa, and the compressive stress of the top of the trough beam at a distance of 73m from the front end of the trough beam is 15.6Mpa, that is, the trough beam is in a safe state.
[0041] 10. Push the trough beam onto the second pier, make the front end of the trough beam go down 2mm, and make the second, third, fifth, sixth and eighth piers support the trough beam, ensuring that the compressive stress of the bottom of the trough beam 73m away from the front end of the trough beam is 0.2Mpa, and the compressive stress of the top of the trough beam 73m away from the front end of the trough beam is 15.8Mpa, that is, the trough beam is in a safe state.
[0042] 11. Push the trough beam to a distance of 1.6m from the first pier, make the front end of the trough beam go down 2mm, and make the second, third, fifth and sixth piers support the trough beam, ensuring that the compressive stress of the bottom of the trough beam at a distance of 73m from the front end of the trough beam is 0.4Mpa, and the compressive stress of the top of the trough beam at a distance of 73m from the front end of the trough beam is 17.5Mpa, that is, the trough beam is in a safe state.
[0043] 12. Push the trough beam onto the first pier so that the front end of the trough beam is not in a downward winding state, and the second, third, fifth and sixth piers support the trough beam to ensure that the compressive stress on the bottom of the trough beam 73m away from the front end of the trough beam is 0.8Mpa, and the compressive stress on the top of the trough beam 73m away from the front end of the trough beam is 16.3Mpa, that is, the trough beam is in a safe state.
[0044] 12. Remove the fourth pier, the seventh pier, the eighth pier, the tenth pier, the twelfth pier, the fourteenth pier, the sixteenth pier and the jacking device, install permanent supports on the first pier, the second pier, the third pier, the fifth pier and the sixth pier, and drop the trough beams into place simultaneously.
[0045] The present invention is designed such that only the last pushing device located at the rear end of the trough beam performs a pushing movement on the trough beam body.
[0046] The technical effect of the present invention is that in order to ensure the smooth jacking construction of the trough beam canopy on the vertical curve, the canopy installation and construction is completed before the beam body is jacked, and then it is jacked into place together with the bridge. The construction period is shortened, and the double-width jacking correction system includes a limit device and a fine-tuning slideway. The fine-tuning slideway includes a stainless steel plate slideway, a pressure plate, a slider, a 2cm thick MGE plate, a vertical jack, a horizontal jack, a temporary connection angle iron, a slideway bottom plate, bolts and a support block for supporting the sliding device. The limit device includes a connecting steel plate, a guide wheel, an adjustable screw, a channel steel and a high-strength bolt. During the jacking process, the limit roller side reserves 1cm of activity from the beam body contact surface. The beam body is corrected by adjusting the length of the screw during jacking. By fine-tuning the slideway, the movement of the trough beam body is realized, and the movement direction of the beam body is controlled by the limit device to avoid deviation during the top-pushing process. In order to ensure the smooth top-pushing construction of the trough beam canopy on the vertical curve, the canopy installation and construction are completed before the top-pushing of the beam body. In order to increase the safety factor, ensure the construction quality, and ensure that the canopy itself does not crack when it is loaded during the top-pushing process, under the premise of saving construction costs, our unit actively communicated with the design to change the canopy board from the 8mm PC sound insulation board originally designed to 14mm high-quality transparent PC (polycarbonate) board. After further communication with the manufacturer, it was finally determined that the board type was 14mm thick five-layer M-shaped lock plate. The 14mm thick five-layer M-shaped lock plate adopts a hollow design, and the overall material performance is flexible. The PC board and the purlin are connected by means of T-shaped aluminum fasteners, and the connection between the T-shaped aluminum fastener and the purlin is self-tapping screws. PC boards are flexibly connected by plastic strips. All PC board parameters meet the design requirements. The minimum bending radius reaches 5600mm, which is much smaller than the radius of 8603mm after the PC board is installed. The safety reserve is sufficient. The PC board weighs 2.70kg / m 2It is ensured that the load generated by the canopy during the jacking process of the bridge is as small as possible. The correction device is constructed. The correction device includes a limit device and a fine-tuning slideway. The fine-tuning slideway includes a stainless steel plate slideway, a pressure plate, a slider, a 2cm thick MGE plate, a vertical jack, a horizontal jack, a temporary connection angle iron, a slideway bottom plate, bolts and a support block for supporting the sliding device. The limit device includes a connecting steel plate, a guide wheel, an adjustable screw rod, a channel steel and a high-strength bolt. Limit devices are set on the outside and middle positions of the 2#, 3#, 4# permanent piers and the L1, L2, L3, L5, L7, L11 temporary pier trough beams. The limit device is connected to the limit frame through an adjustable screw rod. The limit device frame is made of channel steel, which is connected into a whole with the same type of channel steel and bolted to the permanent pier embedded steel plate with high-strength bolts. During the jacking process, a 1cm movable amount is reserved between the edge of the limit roller and the contact surface of the beam body. The length of the threaded rod is used to correct the deviation of the beam. During construction, the support block for supporting the sliding device is first constructed according to the relevant parameters of the vertical curve, the slide base plate is placed on the support block, and the stainless steel plate slide is fixed to the slide base plate through a pressure plate to form a channel for the movement of the slider. The vertical jack is placed on the slider, and the horizontal jack is fixed to the slide base plate. When preparing for jacking and translation, the temporary connecting angle iron that serves as a fixation is removed, and the horizontal jack provides a horizontal jacking force to push the slider and the vertical jack to move. The stainless steel plate slide is fixed to the slide base plate through a pressure plate, and the direction of movement can be controlled to avoid deviation during the jacking process. The movement of the trough beam is realized by fine-tuning the slide, and the moving direction of the beam is controlled by the limit device to avoid deviation during the jacking process. The characteristic of this method is that the canopy installation construction is completed before the beam body is jacked, and then it is jacked into place together with the bridge. The advantage of this construction method is that during the jacking process, since the beam body is above the railway after the bridge is jacked into place, if the canopy is installed, it will be considered as existing line construction, which greatly increases the safety risk and involves multiple responsible parties and complicated procedures. By completing the installation before jacking, the risk of operating line construction is reduced, and the movement direction of the beam body is controlled by the limit device to avoid deviation during the jacking process. The work content adjacent to the existing line is reduced, ensuring the driving safety of the existing line, while accelerating the construction progress and ensuring the construction period.
[0047] In the present technical scheme, the canopy and the trough beam are basic components and are also the necessary technical features of the present invention. The sound barrier cloth, the main anchor screws and the auxiliary anchor screws are functional components and are the features for realizing other technical effects of the present invention. The first shed column, the second shed column, the third shed column, the fourth shed column, the fifth shed column, the first shed support rod, the second shed support rod, the first side angle block, the second side angle block, the middle angle block, the paving piece, the fastener, the screw, the locking plate, the purlin, the notch portion, the first edge portion, the second edge portion, the buckle strip portion, the through hole body, the first vertical wall portion, the second vertical wall portion, the third vertical wall portion, the bracket portion, the toothed portion, the block body, The designs of the technical features of the opening rod body, the horizontal rod body, the vertical rod body, the oblique rod body, the through rod body, the first barrier cloth part, the second barrier cloth part, the screen cloth body, the supporting beam body, the sliding plate, the fixed plate, the supporting legs, the opening hole body, the first panel part, the first shear key part, the first embedded screw, the second embedded screw, the third embedded screw, the fourth embedded screw, the fifth embedded screw, the sixth embedded screw, the middle key body, the first vertical bar body, the second vertical bar body, the second panel part, the second shear key part, the seventh embedded screw, the eighth embedded screw, the ninth embedded screw and the tenth embedded screw are technical features that comply with the Patent Law and its implementing rules.
[0048] In the present technical scheme, the trough beam, canopy and anchor screw group that form a movable integral component are important technical features. In the technical field of traffic trough beam devices and construction methods for crossing railway operating lines, it has novelty, creativity and practicality. The terms in the present technical scheme can be explained and understood using patent documents in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0050] Figure 1 This is a schematic diagram of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0051] Figure 2 Schematic diagram of the connection relationship between the canopy 1 and the trough beam 2 of the present invention,
[0052] Figure 3 is a schematic diagram of the structure of the pavement 10 of the present invention,
[0053] Figure 4 is a schematic structural diagram of a fastener 101 of the present invention,
[0054] Figure 5Schematic diagram of the connection relationship between the first vertical wall portion 211, the second vertical wall portion 221, the bracket portion 241 and the toothed portion 20 of the present invention.
[0055] Figure 6 for Figure 5 Right view of
[0056] Figure 7 Schematic diagram of the connection relationship between the first vertical wall portion 211, the toothed portion 20 and the first shelf column 111 of the present invention.
[0057] Figure 8 is a schematic structural diagram of the toothed portion 20 of the present invention,
[0058] Fig. 9 Schematic diagram of the structure of the first barrier fabric part 31 and the second barrier fabric part 32 of the present invention.
[0059] Fig.10 is a schematic structural diagram of the support beam 34 of the present invention,
[0060] Fig.11 is a schematic structural diagram of the main anchor screw 4 of the present invention,
[0061] Fig.12 Schematic diagram of the structure of the anchor screw 5 of the present invention,
[0062] Fig.13 This is one of the flow diagrams of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0063] Fig.14 This is a second flow chart of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0064] Fig.15 The third flow diagram of the construction method of a traffic trough beam device for crossing a railway operating line according to the present invention is shown in FIG.
[0065] Fig.16 This is a fourth flow chart of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0066] Fig.17 This is a fifth flow chart of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0067] Fig.18 This is a sixth flow chart of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0068] Fig.19This is a seventh flow diagram of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0069] Fig. 20 This is a flow chart of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0070] Fig.21 This is a ninth flow chart of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0071] Fig. 22 This is a tenth flow chart of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0072] Fig.23 The eleventh flowchart of the construction method of a traffic trough beam device for crossing a railway operating line according to the present invention is shown in FIG.
[0073] Fig.24 This is a twelfth flow diagram of a construction method of a traffic trough beam device for crossing a railway operating line according to the present invention.
[0074] Canopy-1, trough beam-2, sound barrier cloth-3, main anchor screw-4, auxiliary anchor screw-5, first shed column-111, second shed column-121, third shed column-131, fourth shed column-141, fifth shed column-191, first shed support rod-151, second shed support rod-161, first side angle block-171, second side angle block-181, middle angle block-190, paving piece-10, fastener-101, screw-102, locking plate-103, purlin-104, notch part-1011, first edge part-1012, second edge part-1013, buckle strip part-1014, through hole body-1015, first vertical wall part-211, second vertical wall part-221, third vertical wall part-231, bracket part-241, toothed part-20,
[0075] Block body 201, open rod body 202, horizontal rod body 203, vertical rod body 204, inclined rod body 205, through rod body 207,
[0076] The first barrier cloth part-31, the second barrier cloth part-32, the screen cloth body-33, the support beam body-34, the sliding plate-341, the fixing plate-342, the leg-343, the opening hole body-345, the first panel part-41, the first shear key part-42, the first embedded screw-43, the second embedded screw-44, the third embedded screw-45, the fourth embedded screw-46, the fifth embedded screw-47, the sixth embedded screw-48, the middle key body-421, the first vertical bar body-422, the second vertical bar body-423, the second panel part-51, the second shear key Part-52, the seventh embedded screw -53, the eighth embedded screw -54, the ninth embedded screw -55, the tenth embedded screw -56, the first pier -11, the second pier -12, the third pier -13, the fourth pier -14, the fifth pier -15, the sixth pier -16, the seventh pier -17, the eighth pier -18, the ninth pier -19, the tenth pier -21, the eleventh pier -22, the twelfth pier -23, the thirteenth pier -24, the fourteenth pier -25, the fifteenth pier -26, the sixteenth pier -27, and the seventeenth pier -28. DETAILED DESCRIPTION
[0077] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not dispensing with the existence or addition of one or more other elements or combinations thereof.
[0078] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0079] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0080] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following examples are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the art.
[0081] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0082] A traffic trough beam device for crossing a railway operating line, Figure 1 This is one of the first embodiments of the present invention. This embodiment is specifically described in conjunction with the accompanying drawings. It includes a canopy 1, a trough beam 2, a sound barrier cloth 3, a main anchor screw 4 and an auxiliary anchor screw 5. The canopy 1 and the sound barrier cloth 3 are respectively arranged on the trough beam 2, and the main anchor screw 4 and the auxiliary anchor screw 5 are respectively arranged between the canopy 1 and the trough beam 2.
[0083] In this embodiment, the canopy 1 is configured to include a first canopy column 111, a second canopy column 121, a third canopy column 131, a fourth canopy column 141, a fifth canopy column 191, a first canopy support rod 151, a second canopy support rod 161, a first side angle block 171, a second side angle block 181, an intermediate angle block 190 and a paving piece 10, and the upper end of the first canopy column 111 is configured to be connected to the lower end face portion of the first side angle block 171, the upper end of the fourth canopy column 141 is configured to be connected to the lower end face portion of the second side angle block 181, and the side portion of the first side angle block 171 and the second side angle block 181 are connected to the side portion of the first side angle block 171 and the second side angle block 181. The side portions of the side angle block 181 are respectively configured to be connected to one of the ends of the first shed support rod 151, the other end of the first shed support rod 151 is configured to be connected to one of the ends of the second shed support rod 161, and the other end of the second shed support rod 161 is configured to be connected to the side portion of the middle angle block 190, and the lower end portion of the middle angle block 190 is respectively configured to be connected to the upper end of the second shed column 121, the upper end of the third shed column 131 and the upper end of the fifth shed column 191, and the outer side portions of the first shed column 111, the fourth shed column 141 The outer side surface of the first shed support rod 151 and the outer side surface of the second shed support rod 161 are respectively configured to be connected to the paving member 10, the lower end of the first shed column 111, the lower end of the second shed column 121, the lower end of the third shed column 131 and the lower end of the fourth shed column 141 are respectively configured to be connected to the main anchor screw 4, the lower end of the fifth shed column 191 is configured to be connected to the auxiliary anchor screw 5, and the first shed column 111, the second shed column 121, the third shed column 131, the fourth shed column 141 and the fifth shed column 191 are respectively configured to be columnar bodies and the first shed column The first shelf column 111 and the fourth shelf column 141 are arranged to be spaced apart and distributed along the front and rear side surfaces of the trough beam 2, the second shelf column 121, the third shelf column 131 and the fifth shelf column 191 are arranged to be spaced apart and distributed along the middle portion of the trough beam 2, and the three fifth shelf columns 191 are arranged to be located on the right side surface of the second shelf column 121 and the right side surface of the third shelf column 131, the first shelf support rod 151 and the second shelf support rod 161 are arranged to be rod-shaped bodies, and the first side angle block 171 and the second side angle block 181 are respectively arranged to be triangular steel components, and the middle angle blocks 190 are respectively arranged to be rectangular steel components.
[0084] Through the canopy 1, supporting connection points for the main anchor screw 4 and the auxiliary anchor screw 5 are formed, and the connection with the main anchor screw 4 is realized by the first canopy column 111, the second canopy column 121, the third canopy column 131 and the fourth canopy column 141. The connection with the auxiliary anchor screw 5 is realized by the fifth canopy column 191. The first canopy support rod 151, the second canopy support rod 161, the first side angle block 171, the second side angle block 181, the middle angle block 190 and the paving member 10 are used to shield rain and sunlight. The technical purpose is to be used as a shielding component of the arch canopy.
[0085] In this embodiment, the angle α between the two second shed support rods 161 located on the middle corner block 190 connected to the fifth shed column 191 and located in the horizontal plane is set to 174-178°, and the angle α between the two second shed support rods 161 located on the middle corner block 190 respectively connected to the first shed column 111, the second shed column 121, the third shed column 131 and the fourth shed column 141 and located in the horizontal plane is set to 180°.
[0086] The first shed column 111 , the second shed column 121 , the third shed column 131 , the fourth shed column 141 , the second shed support rod 161 , the fifth shed column 191 and the middle corner block 190 realize the support connection of the decking 10 , and its technical purpose is to enhance the strength of the side opening of the canopy 1 .
[0087] In this embodiment, the pavement 10 is configured to include a fastener 101, a screw 102, a locking plate 103 and a purlin 104, and one of the end surfaces of the fastener 101 is configured to be snap-fitted with the locking plate 103, another end surface of the fastener 101 is configured to be contact-connected with the purlin 104 and a screw 102 is provided between the fastener 101 and the locking plate 103, the flange portion of the screw 102 is configured to be contact-connected with the fastener 101 and the end heads of the screw 102 are respectively configured to be embedded-connected with the fastener 101 and the purlin 104, the fastener 101 is respectively configured to be connected with the first shed column 111, the fourth shed column 141, the first shed support rod 151 and the second shed support rod 161 and the screw 102 is configured to be a self-tapping screw, the locking plate 103 is configured to be a polycarbonate convex strip body and the purlin 104 is configured to be a rectangular plate body.
[0088] The fastener 101 is used to achieve connection with the first shed column 111, connection with the fourth shed column 141, connection with the first shed support rod 151, and connection with the second shed support rod 161. The screws 102, locking plates 103 and purlins 104 are used to achieve anti-explosion treatment. The technical purpose is to be used as a covering part of the canopy 1.
[0089] In this embodiment, the fastener 101 is configured to include a notch portion 1011, a first edge portion 1012, a second edge portion 1013 and a buckle portion 1014, and one of the open side portions of the notch portion 1011 is configured to be connected to the second edge portion 1013, and the other open side portions of the notch portion 1011 are respectively configured to be connected to the first edge portion 1012 and the buckle portion 1014, and the first edge portion 1012 and the second edge portion 1013 are respectively configured to extend along the horizontal center line of the notch portion 1011, and the buckle portion 1014 is configured to extend along the vertical center line of the notch portion 1011 and a through hole body 1015 is provided at the bottom end portion of the notch portion 1011, and the first edge portion 1012 is respectively configured to be connected to the first shed column 11 1. The fourth shed column 141, the first shed support rod 151 and the second shed support rod 161 are connected and the buckle strip portion 1014 is configured to be embeddedly connected to the locking plate 103, the upper end surface portion of the first edge portion 1012 is configured to be connected to the locking plate 103 and the bottom end surface portion of the notch portion 1011 is configured to be contact-connected to the purlin 104, the through-hole body 1015 is configured to be connected to the screw 102 and the notch portion 1011 is configured to be a U-shaped groove-shaped body, the first edge portion 1012 is configured to be a rectangular sheet-shaped body and the second edge portion 1013 is configured to be an L-shaped sheet-shaped body, the buckle strip portion 1014 is configured to be a T-shaped plate-shaped body and the through-hole body 1015 is configured to be arranged and distributed at intervals along the vertical center line of the notch portion 1011.
[0090] The first edge portion 1012 is used to connect with the first shed column 111, the fourth shed column 141, the first shed support rod 151, and the second shed support rod 161. The through hole body 1015 is used to connect with the screw 102. The buckle strip portion 1014 and the first edge portion 1012 are used to connect with the locking plate 103. The groove portion 1011 is used to connect with the purlin 104. The technical purpose is to serve as a supporting carrier for the locking plate 103 and the purlin 104.
[0091] In this embodiment, a first vertical wall portion 211 is provided in the middle portion of the trough beam 2, a second vertical wall portion 221 is provided on the rear side portion of the trough beam 2, a third vertical wall portion 231 is provided on the front side portion of the trough beam 2, and a bracket portion 241 is provided on the outer side portion of the first vertical wall portion 211 and the outer side portion of the second vertical wall portion 221, respectively, and a toothed portion 20 is provided on the upper end portion of the first vertical wall portion 211, the upper end portion of the second vertical wall portion 221, and the upper end portion of the third vertical wall portion 231, respectively. The upper end face portions are respectively arranged to be connected to the main anchor screw 4 and the auxiliary anchor screw 5, the bracket portion 241 is arranged to be connected to the sound barrier cloth 3 and the first vertical wall portion 211, the second vertical wall portion 221 and the third vertical wall portion 231 are arranged to be rectangular strips, the bracket portion 241 is arranged to be an L-shaped strip and the transverse inner end face portion of the bracket portion 241 is arranged to be connected to the second vertical wall portion 221 and the third vertical wall portion 231, the toothed portion 20 is arranged to be a wedge-shaped block and the toothed portion 20 is arranged to be arranged to be spaced apart along the transverse center line of the first vertical wall portion 211, the transverse center line of the second vertical wall portion 221 and the transverse center line of the third vertical wall portion 231.
[0092] Through the grooved beam 2, supporting connection points for the sound barrier cloth 3, the main anchor screw 4 and the auxiliary anchor screw 5 are formed. The bracket part 241 realizes the connection with the sound barrier cloth 3. The first vertical wall part 211, the second vertical wall part 221 and the third vertical wall part 231 realize the connection with the main anchor screw 4 and the auxiliary anchor screw 5. The toothed part 20 realizes the end surface reinforcement treatment of the first vertical wall part 211, the second vertical wall part 221 and the third vertical wall part 231. The technical purpose is to serve as a supporting component for the sound barrier cloth 3, the main anchor screw 4 and the auxiliary anchor screw 5.
[0093] In this embodiment, the left and right end portions of the second vertical wall portion 221 and the third vertical wall portion 231 are arranged to be inwardly contracted, and the angle β between the center line of the inwardly contracted portion of the second vertical wall portion 221 and the transverse horizontal line, and the angle β between the center line of the inwardly contracted portion of the third vertical wall portion 231 and the transverse horizontal line are respectively set to 5-13°.
[0094] The second vertical wall portion 221 and the third vertical wall portion 231 are connected to the main anchor screw 4 and the auxiliary anchor screw 5 , and the technical purpose is to serve as a component for increasing the supporting strength of the canopy 1 .
[0095] In the present embodiment, the toothed portion 20 is configured as a block 201, an open rod body 202, a cross rod body 203, a vertical rod body 204, an oblique rod body 205 and a through rod body 207, and the open rod body 202, the cross rod body 203, the vertical rod body 204, the oblique rod body 205 and the through rod body 207 are arranged in the block 201, the outer side surface of the open rod body 202 is arranged to be connected to the through rod body 207 and the vertical parts of the open rod body 202 are respectively arranged to be connected to the ends of the cross rod body 203, the middle part of the cross rod body 203 is arranged to be connected to one of the ends of the vertical rod body 204 and one of the ends of the oblique rod body 205 and the other end of the vertical rod body 204 is arranged to be connected to the middle part of the cross part of the open rod body 202, the other end of the oblique rod body 205 is arranged to be connected to the cross part of the open rod body 202 and the lower end surface of the block 201 is respectively arranged In order to connect with the first vertical wall portion 211, the second vertical wall portion 221 and the third vertical wall portion 231, the block 201 is set as a cement mortar solidified body and the through rod body 207 is set to extend and distribute along the transverse center line of the block 201, the opening rod body 202 is set as a U-shaped rod and the cross rod body 203, the vertical rod body 204, the oblique rod body 205 and the through rod body 207 are respectively set as rod-shaped bodies, six oblique rod bodies 205 are set between the opening rod body 202 and the cross rod body 203, and the vertical rod body 204 and the oblique rod body 205 are set to be distributed in a fan-shaped surface, the through rod body 207 is set to be arranged and distributed at intervals along the peripheral line of the opening rod body 202, and one opening rod body 202, one cross rod body 203, one vertical rod body 204 and six oblique rod bodies 205 are set to form a group of opening frame components, and multiple groups of opening frame components are respectively set to be arranged and distributed at intervals along the center line of the through rod body 207.
[0096] The block 201 is connected to the first vertical wall portion 211, the second vertical wall portion 221, and the third vertical wall portion 231. The opening rod body 202, the horizontal rod body 203, the vertical rod body 204, the oblique rod body 205 and the through rod body 207 are used as a skeleton of the block 201. The technical purpose is to serve as a component for increasing the reinforcement strength of the first vertical wall portion 211, the second vertical wall portion 221 and the third vertical wall portion 231.
[0097] In this embodiment, the sound barrier cloth 3 is configured to include a first barrier cloth portion 31 and a second barrier cloth portion 32, and the lower end of the first barrier cloth portion 31 and the lower end of the second barrier cloth portion 32 are respectively configured to be connected to the trough beam 2, and the first barrier cloth portion 31 and the second barrier cloth portion 32 are respectively configured to be arranged front and back along the transverse center line of the trough beam 2.
[0098] A supporting connection point for the trough beam 2 is formed by the sound barrier cloth 3, and the connection with the trough beam 2 is realized by the first barrier cloth part 31 and the second barrier cloth part 32. The technical purpose is to be used as a sound insulation component for noise generated by the traffic trough beam device.
[0099] In this embodiment, the first barrier cloth part 31 and the second barrier cloth part 32 are configured to include a screen cloth body 33 and a support beam body 34, and the side parts of the screen cloth body 33 are configured to be connected to the support beam body 34, the lower ends of the support beam bodies 34 are respectively configured to be connected to the trough beam 2, the screen cloth body 33 is configured to be a rectangular cloth piece, and the support beam bodies 34 are configured to be arranged and distributed at intervals along the transverse center line of the trough beam 2.
[0100] The support beam body 34 realizes connection with the trough beam 2, and the screen cloth body 33 realizes noise shielding. The technical purpose is to be used as a continuous sound insulation component on the traffic trough beam device.
[0101] In this embodiment, the support beam body 34 is configured to include a sliding plate 341, a fixed plate 342 and a support leg 343, and the right side surface of the sliding plate 341 is configured to be slidably connected to the left side surface of the fixed plate 342, the lower end of the sliding plate 341 is configured to be connected to the vertical end of the support leg 343 and an opening hole body 345 is provided at the horizontal end of the support leg 343, the left side surface of the sliding plate 341 and the left side surface of the fixed plate 342 are respectively configured to be connected to the screen cloth body 33, the opening hole body 345 is configured to be connected to the groove beam 2 through expansion bolts, and the sliding plate 341 and the fixed plate 342 are respectively provided with a strip body with a hook portion on the side surface, the hook portion of the sliding plate 341 is configured to be overlapped with the hook portion of the fixed plate 342 and the lower end surface portion of the fixed plate 342 is configured to be supported with the lower end surface portion of the sliding plate 341, the support leg 343 is configured to be a T-shaped seat body and the opening hole body 345 is configured to be a U-shaped groove body.
[0102] The connection with the trough beam 2 is realized by the supporting legs 343 and the opening hole body 345 , and the connection with the screen cloth body 33 is realized by the sliding plate 341 and the fixed plate 342 , and its technical purpose is to be used as a telescopic supporting component for the screen cloth body 33 .
[0103] In this embodiment, the main anchor screw 4 is configured to include a first panel portion 41, a first shear key portion 42, a first embedded screw 43, a second embedded screw 44, a third embedded screw 45, a fourth embedded screw 46, a fifth embedded screw 47 and a sixth embedded screw 48, and the lower end surface portion of the first panel portion 41 is configured to be connected to the first shear key portion 42, the rear end surface portion of the first panel portion 41 is respectively configured to be connected to the first embedded screw 43, the second embedded screw 44 and the third embedded screw 45, and the front end surface portion of the first panel portion 41 is respectively configured to be connected to the fourth embedded screw 46, the fifth embedded screw 47 and the sixth embedded screw 48, the upper end head of the first embedded screw 43, the upper end head of the second embedded screw 44, the upper end head of the third embedded screw 45, the upper end head of the fourth embedded screw 46 , the upper ends of the fifth embedded screw 47 and the upper ends of the sixth embedded screw 48 are respectively arranged to be connected in series with the first panel portion 41 and the nut located on the first embedded screw 43 is arranged to be welded to the first panel portion 41, the first panel portion 41 is arranged to be connected to the canopy 1 and the first shear key portion 42 is arranged to be embedded with the groove beam 2, the first embedded screw 43, the second embedded screw 44, the third embedded screw 45, the fourth embedded screw 46, the fifth embedded screw 47 and the sixth embedded screw 48 are respectively arranged to be implanted with the groove beam 2, the first panel portion 41 is arranged to be a rectangular sheet body and the first embedded screw 43, the second embedded screw 44, the third embedded screw 45, the fourth embedded screw 46, the fifth embedded screw 47 and the sixth embedded screw 48 are respectively arranged to be L-shaped bolts.
[0104] A supporting connection point for the canopy 1 and the trough beam 2 is formed through the main anchor screw 4, the connection with the canopy 1 is realized by the first panel part 41, and the connection with the trough beam 2 is realized by the first shear key part 42, the first embedded screw 43, the second embedded screw 44, the third embedded screw 45, the fourth embedded screw 46, the fifth embedded screw 47 and the sixth embedded screw 48. The technical purpose is to serve as an intermediate connecting component between the canopy 1 and the trough beam 2.
[0105] In this embodiment, the first anti-shear key portion 42 is configured to include an intermediate key body 421, a first vertical bar body 422 and a second vertical bar body 423, and the transverse portions of the ends of the intermediate key body 421 are respectively configured to be connected to the inner ends of the first vertical bar body 422 and the inner ends of the second vertical bar body 423, the upper end face portions of the intermediate key body 421, the upper end face portions of the first vertical bar body 422 and the upper end face portions of the second vertical bar body 423 are respectively configured to be connected to the first panel portion 41, and the intermediate key body 421 is configured to be a W-shaped steel member, and the first vertical bar body 422 and the second vertical bar body 423 are respectively configured to be rectangular strip bodies.
[0106] The connection with the first panel portion 41 is realized by the middle key body 421 , the first vertical bar body 422 and the second vertical bar body 423 , and its technical purpose is to be used as one of the components for increasing the connection strength with the trough beam 2 .
[0107] In the present embodiment, the auxiliary anchor screw 5 is configured to include a second panel portion 51, a second shear key portion 52, a seventh embedded screw 53, an eighth embedded screw 54, a ninth embedded screw 55 and a tenth embedded screw 56, and the lower end surface portion of the second panel portion 51 is configured to be connected to the second shear key portion 52, the rear end surface portion of the second panel portion 51 is respectively configured to be connected to the seventh embedded screw 53 and the eighth embedded screw 54, and the front end surface portion of the second panel portion 51 is respectively configured to be connected to the ninth embedded screw 55 and the tenth embedded screw 56, the upper end head of the seventh embedded screw 53, the upper end head of the eighth embedded screw 54, the upper end head of the ninth embedded screw 55 and the upper end head of the tenth embedded screw 56 are respectively configured to be connected in series with the second panel portion 51 and are located The nut on the seventh embedded screw 53 is configured to be welded to the second panel portion 51, the second panel portion 51 is configured to be connected to the canopy 1 and the second shear key portion 52 is configured to be embedded in the trough beam 2, the seventh embedded screw 53, the eighth embedded screw 54, the ninth embedded screw 55 and the tenth embedded screw 56 are respectively configured to be implanted in the trough beam 2, the second panel portion 51 is configured to be a rectangular sheet body and the seventh embedded screw 53, the eighth embedded screw 54, the ninth embedded screw 55 and the tenth embedded screw 56 are respectively configured to be L-shaped bolts, the second shear key portion 52 is a W-shaped steel component and the seventh embedded screw 53, the eighth embedded screw 54, the ninth embedded screw 55 and the tenth embedded screw 56 are respectively arranged between the transverse portions of the second shear key portion 52.
[0108] Through the auxiliary anchor screw 5, a supporting connection point for the canopy 1 and the trough beam 2 is formed, the second panel part 51 realizes the connection with the canopy 1, and the second shear key part 52, the seventh embedded screw 53, the eighth embedded screw 54, the ninth embedded screw 55 and the tenth embedded screw 56 realize the connection with the trough beam 2. Its technical purpose is to serve as the second intermediate connecting component between the canopy 1 and the trough beam 2.
[0109] In this embodiment, the trough beam 2 and the canopy 1, the main anchor screw 4 and the auxiliary anchor screw 5 are arranged to be distributed in a manner of embedding anchor points in different regions, and the trough beam 2, the canopy 1, the main anchor screw 4 and the auxiliary anchor screw 5 and the sound barrier cloth 3 are arranged to be distributed in a manner of vertically shielding the sound wall, the second shear key portion 52, the seventh embedded screw 53, the eighth embedded screw 54, the ninth embedded screw 55, the tenth embedded screw 56, the first shear key portion 42, the first embedded screw 43, the The second embedded screw 44, the third embedded screw 45, the fourth embedded screw 46, the fifth embedded screw 47 and the sixth embedded screw 48 are respectively arranged to be connected to the first vertical wall portion 211, the second vertical wall portion 221 and the third vertical wall portion 231, the second panel portion 51 and the first panel portion 41 are respectively arranged to be connected to the first column 111, the second column 121, the third column 131, the fourth column 141 and the fifth column 191, and the supporting beam body 34 is arranged to be connected to the bracket portion 241.
[0110] In the second embodiment of the first embodiment of the present invention, the angle α between the two second shelf support rods 161 located on the middle corner block 190 connected to the fifth shelf column 191 and located on the horizontal plane is set to 174°.
[0111] In this embodiment, the angle β between the center line of the inner contraction portion of the second vertical wall portion 221 and the horizontal horizontal line, and the angle β between the center line of the inner contraction portion of the third vertical wall portion 231 and the horizontal horizontal line are respectively set to 5°.
[0112] In the third embodiment of the present invention, the angle α between the two second shelf support rods 161 located on the middle corner block 190 connected to the fifth shelf column 191 and located on the horizontal plane is set to 178°.
[0113] In this embodiment, the angle β between the center line of the inner contraction portion of the second vertical wall portion 221 and the horizontal horizontal line, and the angle β between the center line of the inner contraction portion of the third vertical wall portion 231 and the horizontal horizontal line are respectively set to 13°.
[0114] In the fourth embodiment of the first embodiment of the present invention, the angle α between the two second shelf support rods 161 located on the middle corner block 190 connected to the fifth shelf column 191 and located on the horizontal plane is set to 176°.
[0115] In this embodiment, the angle β between the center line of the inner contraction portion of the second vertical wall portion 221 and the horizontal horizontal line, and the angle β between the center line of the inner contraction portion of the third vertical wall portion 231 and the horizontal horizontal line are respectively set to 9°.
[0116] In the second embodiment of the present invention, the channel beam 2, the canopy 1 and the anchor bolt assembly are connected to each other in such a way as to form a movable integral member.
[0117] In this embodiment, the anchor screw assembly is configured to include a main anchor screw 4 and an auxiliary anchor screw 5 .
[0118] In this embodiment, a first accessory device is also included and is arranged on the trough beam 2 , and the first accessory device is arranged as a sound barrier cloth 3 .
[0119] The second embodiment of the present invention is based on the first embodiment.
[0120] The present invention is further described below in conjunction with examples. The following examples are intended to illustrate the present invention rather than to further limit the present invention.
[0121] A construction method for a traffic trough beam device for crossing a railway operating line, the steps of which are:
[0122] 1. When the trough beam 2 is cast, the seventh embedded screw 53, the eighth embedded screw 54, the ninth embedded screw 55 and the tenth embedded screw 56 of three sets of auxiliary anchor screws 5 are installed on the right side face of the first vertical wall portion 211, and the first embedded screw 43, the second embedded screw 44, the third embedded screw 45, the fourth embedded screw 46, the fifth embedded screw 47 and the sixth embedded screw 48 of multiple sets of main anchor screws 4 are installed on the other end faces of the first vertical wall portion 211, the second vertical wall portion 221 and the third vertical wall portion 231.
[0123] The jacking device is installed on the upper end surface of the fourth pier 14, the upper end surface of the seventh pier 17, the upper end surface of the eighth pier 18, the upper end surface of the tenth pier 21, the upper end surface of the twelfth pier 23, the upper end surface of the fourteenth pier 25 and the upper end surface of the sixteenth pier 27, and the trough beam 2 is installed on the seventh pier 17, the eighth pier 18, the ninth pier 19, the tenth pier 21, the eleventh pier 22, the twelfth pier 23, the thirteenth pier 24, the fourteenth pier 25, the fifteenth pier 26, the sixteenth pier 27 and the seventeenth pier 28.
[0124] The second panel portion 51 is connected to the fifth shelf column 191 respectively, the second panel portion 51 is connected to the seventh embedded screw 53, the eighth embedded screw 54, the ninth embedded screw 55 and the tenth embedded screw 56 through nuts, and the second shear key portion 52 is connected to the first vertical wall portion 211.
[0125] The first panel portion 41 on the other end surface of the first vertical wall portion 211 is connected to the second column 121 and the third column 131 respectively, the first panel portion 41 on the second vertical wall portion 221 is connected to the first column 111 respectively, the first panel portion 41 on the third vertical wall portion 231 is connected to the fourth column 141 respectively, the first panel portion 41 is connected to the first embedded screw 43, the second embedded screw 44, the third embedded screw 45, the fourth embedded screw 46, the fifth embedded screw 47 and the sixth embedded screw 48 through nuts, the first shear key portion 42 is connected to the first vertical wall portion 211, the second vertical wall portion 221 and the third vertical wall portion 231, and between the first column 111 and the fifth column 191 The first shed support rod 151 and the second shed support rod 161 are installed through the first side angle block 171 and the middle angle block 190, and the first shed support rod 151 and the second shed support rod 161 are installed between the fourth shed column 141 and the fifth shed column 191 through the second side angle block 181 and the middle angle block 190. The first edge portion 1012 is respectively connected to the first shed column 111, the first shed support rod 151, the second shed support rod 161 and the fourth shed column 141, and the purlin 104 is installed on the notch portion 1011 through the screws 102 and the through-hole body 101, and the locking plate 103 is connected to the buckle strip portion 1014, and the locking plate 103 is installed on the second edge portion 1013, thereby completing the installation of the canopy 1 on the trough beam 2.
[0126] The legs 343 are mounted on the bracket part 241, and the support beam body 34 is mounted on the bracket part 241 through the expansion bolts and the opening hole body 345, and the side parts of the screen cloth body 33 are respectively connected to the adjacent sliding plate 341 and the fixing plate 342, thereby completing the installation of the sound barrier cloth 3 on the groove beam 2.
[0127] Second, push the trough beam 2 onto the sixth pier 16, so that the front end of the trough beam 2 is 2m downward, and the sixth pier 16, the eighth pier 18, the tenth pier 21, the twelfth pier 23, the fourteenth pier 25 and the sixteenth pier 27 support the trough beam 2, ensuring that the compressive stress of the bottom of the trough beam 2 at 90m from the front end of the trough beam 2 is 1.6Mpa, and the compressive stress of the top of the trough beam 2 at 10m from the front end of the trough beam 2 is 13.4Mpa, that is, the trough beam 2 is in a safe state.
[0128] 3. Push the trough beam 2 onto the fifth pier 15, so that the front end of the trough beam 2 goes down by 28m, and the fifth pier 15, the sixth pier 16, the eighth pier 18, the tenth pier 21 and the twelfth pier 23 support the trough beam 2, ensuring that the compressive stress of the bottom of the trough beam 2 at 90m from the front end of the trough beam 2 is 2.1Mpa, and the compressive stress of the top of the trough beam 2 at 36m from the front end of the trough beam 2 is 11.8Mpa, that is, the trough beam 2 is in a safe state.
[0129] Fourth, push the trough beam 2 onto the third pier 13, so that the front end of the trough beam 2 is not in a downward winding state, and the third pier 13, the fifth pier 15, the sixth pier 16, the eighth pier 18 and the tenth pier 21 support the trough beam 2, ensuring that the compressive stress of the bottom surface of the trough beam 2 24m away from the front end of the trough beam 2 is 0Mpa, and the compressive stress of the top surface of the trough beam 2 73m away from the front end of the trough beam 2 is 17.3Mpa, that is, the trough beam 2 is in a safe state.
[0130] 5. Push the trough beam 2 to the railway guardrail in the railway operating line section, 5.25m away from the up line of the railway operating line section, so that the front end of the trough beam 2 is turned down by 4mm, and the third pier 13, the fifth pier 15, the sixth pier 16, the eighth pier 18 and the tenth pier 21 support the trough beam 2, ensuring that the compressive stress of the bottom of the trough beam 2 28m away from the front end of the trough beam 2 is 0.6Mpa, and the compressive stress of the top of the trough beam 2 73m away from the front end of the trough beam 2 is 18.1Mpa, that is, the trough beam 2 is in a safe state.
[0131] 6. Push the trough beam 2 to the middle of the up and down lines of the railway operating line section, so that the front end of the trough beam 2 is turned down by 1mm, and the third pier 13, the fifth pier 15, the sixth pier 16, the eighth pier 18 and the tenth pier 21 support the trough beam 2, ensuring that the compressive stress of the bottom of the trough beam 2 28m away from the front end of the trough beam 2 is 0.1Mpa, and the compressive stress of the top of the trough beam 2 73m away from the front end of the trough beam 2 is 17.2Mpa, that is, the trough beam 2 is in a safe state.
[0132] 7. Push the trough beam 2 to the section across the railway operating line, 9m away from the second pier 12, so that the front end of the trough beam 2 is turned down by 8mm, and the third pier 13, the fifth pier 15, the sixth pier 16 and the eighth pier 18 support the trough beam 2, ensuring that the compressive stress of the bottom of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 0.5Mpa, and the compressive stress of the top of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 16.6Mpa, that is, the trough beam 2 is in a safe state.
[0133] 8. Push the trough beam 2 to a position 5m away from the second pier 12, make the front end of the trough beam 2 go down by 10mm, and make the third pier 13, the fifth pier 15, the sixth pier 16 and the eighth pier 18 support the trough beam 2, and ensure that the compressive stress of the bottom of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 1.4Mpa, and the compressive stress of the top of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 16.2Mpa, that is, the trough beam 2 is in a safe state.
[0134] 9. Push the trough beam 2 to a position 1m away from the second pier 12, so that the front end of the trough beam 2 is wound down by 9mm, and the third pier 13, the fifth pier 15, the sixth pier 16 and the eighth pier 18 support the trough beam 2, ensuring that the compressive stress of the bottom of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 0.8Mpa, and the compressive stress of the top of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 15.6Mpa, that is, the trough beam 2 is in a safe state.
[0135] 10. Push the trough beam 2 onto the second pier 12, so that the front end of the trough beam 2 is bent down by 2mm, and the second pier 12, the third pier 13, the fifth pier 15, the sixth pier 16 and the eighth pier 18 support the trough beam 2, ensuring that the compressive stress of the bottom of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 0.2Mpa, and the compressive stress of the top of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 15.8Mpa, that is, the trough beam 2 is in a safe state.
[0136] 11. Push the trough beam 2 to a position 1.6m away from the first pier 11, make the front end of the trough beam 2 go down by 2mm, and make the second pier 12, the third pier 13, the fifth pier 15 and the sixth pier 16 support the trough beam 2, and ensure that the compressive stress of the bottom of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 0.4Mpa, and the compressive stress of the top of the trough beam 2 at a distance of 73m from the front end of the trough beam 2 is 17.5Mpa, that is, the trough beam 2 is in a safe state.
[0137] 12. Push the trough beam 2 onto the first pier 11, so that the front end of the trough beam 2 is not in a downward winding state, and the second pier 12, the third pier 13, the fifth pier 15 and the sixth pier 16 support the trough beam 2, ensuring that the compressive stress of the bottom of the trough beam 2 73m away from the front end of the trough beam 2 is 0.8Mpa, and the compressive stress of the top of the trough beam 2 73m away from the front end of the trough beam 2 is 16.3Mpa, that is, the trough beam 2 is in a safe state.
[0138] 12. Remove the fourth pier 14, the seventh pier 17, the eighth pier 18, the tenth pier 21, the twelfth pier 23, the fourteenth pier 25, the sixteenth pier 27 and the jacking device, install permanent supports on the first pier 11, the second pier 12, the third pier 13, the fifth pier 15 and the sixth pier 16, and drop the trough beam 2 into place synchronously.
[0139] In this embodiment, only the last pushing device located at the rear end of the trough beam 2 performs a pushing movement on the trough beam body.
[0140] In this embodiment, the pushing device has been described in patent number 202010197774.3, entitled: A trough beam support device and a pushing method for spanning two railway operating lines and its application.
[0141] In the second embodiment of the present invention, the canopy 1 is installed on the trough beam 2 by means of the main anchor screws 4 and the auxiliary anchor screws 5 on the seventh pier 17, the eighth pier 18, the ninth pier 19, the tenth pier 21, the eleventh pier 22, the twelfth pier 23, the thirteenth pier 24, the fourteenth pier 25, the fifteenth pier 26, the sixteenth pier 27 and the seventeenth pier 28, thereby completing the installation of the movable integral component, and then the movable integral component is installed on the first pier 11, the second pier 12, the third pier 13, the fifth pier 15 and the sixth pier 16 by pushing.
[0142] The second embodiment of the present invention is based on the first embodiment.
[0143] When verifying the present invention, accessories on the trough beam 2, such as the canopy 1 and the sound barrier cloth 3, are generally installed after the trough beam 2 is installed on the pier group. However, due to the influence of the railway operating line, the present invention designs a movable whole including the canopy 1, the trough beam 2 and the sound barrier cloth 3, which solves the influence on the railway operating line. The main anchor screw 4 and the auxiliary anchor screw 5 are used to improve the connection strength between the canopy 1 and the trough beam 2. The connection strength between the sound barrier cloth 3 and the trough beam 2 is improved by the supporting beam body 34, and the strength of the movable whole is met. The coincidence of the center of gravity of the canopy 1 and the center of gravity of the trough beam 2 is ensured by the angle α and the angle β, and the stability of the movable whole is improved. The parameter limitation of the construction method ensures the mobile safety performance of the movable whole and the reliability of various parameters of the canopy 1 and the trough beam 2. Through the present invention, it is not a simple overlapping whole of the canopy 1, the sound barrier cloth 3 and the trough beam 2, but a composite traffic component that can cross the railway operating line.
[0144] Canopy 1, trough beam 2, sound barrier cloth 3, main anchor bolt 4 and auxiliary anchor bolt 5,
[0145] The first shed column 111, the second shed column 121, the third shed column 131, the fourth shed column 141, the fifth shed column 191, the first shed support rod 151, the second shed support rod 161, the first side angle block 171, the second side angle block 181, the middle angle block 190 and the paving member 10,
[0146] Fastener 101, screw 102, locking plate 103 and purlin 104,
[0147] The notch portion 1011, the first edge portion 1012, the second edge portion 1013 and the buckle strip portion 1014, the through hole body 1015,
[0148] The first vertical wall portion 211, the second vertical wall portion 221, the third vertical wall portion 231, the bracket portion 241, the toothed portion 20,
[0149] The block 201, the open rod 202, the horizontal rod 203, the vertical rod 204, the inclined rod 205 and the through rod 207,
[0150] The first barrier cloth part 31 and the second barrier cloth part 32, the screen cloth body 33 and the support beam body 34,
[0151] Sliding plate 341, fixing plate 342, legs 343, opening hole body 345,
[0152] The first panel portion 41, the first shear key portion 42, the first embedded screw 43, the second embedded screw 44, the third embedded screw 45, the fourth embedded screw 46, the fifth embedded screw 47 and the sixth embedded screw 48,
[0153] The middle key body 421, the first vertical bar body 422 and the second vertical bar body 423,
[0154] The second panel portion 51, the second anti-shear key portion 52, the seventh embedded screw 53, the eighth embedded screw 54, the ninth embedded screw 55, the tenth embedded screw 56,
[0155] The present invention has the following characteristics:
[0156] 1. Due to the design of the trough beam 2, the canopy 1 and the anchor screw group, the trough beam 2 is used to support the canopy 1, the canopy 1 is used to block rain and sunlight, and the anchor screw group is used to connect the canopy 1 with the trough beam 2 as a whole to form a movable whole, thereby eliminating the construction restrictions of the railway operating line, thereby improving the construction efficiency of the traffic trough beam device.
[0157] 2. Due to the design of the sound barrier cloth 3, the traffic noise is handled.
[0158] 3. Due to the design of the main anchor screw 4 and the auxiliary anchor screw 5, the distribution of different connection points is achieved, and the connection strength between the canopy 1 and the trough beam 2 is improved.
[0159] 4. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the present invention, rather than a technical feature calculated by a formula or obtained through a limited number of tests. Tests have shown that the technical feature of this numerical range has achieved good technical effects.
[0160] 5. Due to the design of the technical features of the present invention, the effects of the individual and combined technical features have been shown through experiments to have various performance indicators of the present invention that are at least 1.7 times the existing performance indicators, and have been evaluated to have good market value.
[0161] There are other technical features connected with the trough beam 2, the canopy 1 and the anchor screw group that form a movable integral component, which are all embodiments of the present invention, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, the Patent Implementing Rules and the Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.
[0162] The above embodiment is only one implementation form of the traffic trough beam device and construction method for crossing the railway operating line provided by the present invention. Other variations of the scheme provided by the present invention, adding or reducing components or steps therein, or applying the present invention to other technical fields close to the present invention, all fall within the scope of protection of the present invention.
Claims
1. A construction method for a traffic trough beam device for crossing a railway operating line, characterized by: The traffic trough beam device comprises a trough beam (2) which is one of the essential components of the main body, a canopy (1) which is another essential component of the main body, and a ground anchor screw group which is arranged between the canopy (1) and the trough beam (2). The anchor screw assembly is configured to include a main anchor screw (4) and an auxiliary anchor screw (5). It also includes a first accessory device, and the first accessory device is arranged on the grooved beam (2), and the first accessory device is arranged as a sound barrier cloth (3). A canopy (1) and a sound barrier cloth (3) are respectively arranged on the trough beam (2), and a main anchor bolt (4) and an auxiliary anchor bolt (5) are respectively arranged between the canopy (1) and the trough beam (2). The canopy (1) is configured to include a first canopy column (111), a second canopy column (121), a third canopy column (131), a fourth canopy column (141), a fifth canopy column (191), a first canopy support rod (151), a second canopy support rod (161), a first side angle block (171), a second side angle block (181), an intermediate angle block (190) and a paving piece (10), wherein the upper end of the first canopy column (111) is configured to be connected to the lower end face portion of the first side angle block (171), the upper end of the fourth canopy column (141) is configured to be connected to the lower end face portion of the second side angle block (181), and the side face portion of the first side angle block (171) and the second side angle block (181) are connected to the side face portion of the first side angle block (171). The side portions of the corner block (181) are respectively arranged to be connected to one end of the first shed support rod (151), the other end of the first shed support rod (151) is arranged to be connected to one end of the second shed support rod (161), and the other end of the second shed support rod (161) is arranged to be connected to the side portion of the middle corner block (190), and the lower end portion of the middle corner block (190) is respectively arranged to be connected to the upper end of the second shed column (121), the upper end of the third shed column (131) and the upper end of the fifth shed column (191), and the outer side surface of the first shed column (111) and the outer side surface of the fourth shed column (141) The outer surface of the first shed support rod (151) and the outer surface of the second shed support rod (161) are respectively configured to be connected to the paving member (10), the lower end of the first shed column (111), the lower end of the second shed column (121), the lower end of the third shed column (131) and the lower end of the fourth shed column (141) are respectively configured to be connected to the main anchor screw (4), the lower end of the fifth shed column (191) is configured to be connected to the auxiliary anchor screw (5), and the first shed column (111), the second shed column (121), the third shed column (131), the fourth shed column (141) and the fifth shed column (191) are respectively configured to be columnar bodies, and the first shed column (111) The first shelf support rod (151) and the second shelf support rod (161) are configured as rod-shaped bodies, and the first side angle block (171) and the second side angle block (181) are configured as triangular steel members, and the middle angle blocks (190) are configured as rectangular steel members. The angle α between the two second shed support rods (161) located on the middle corner block (190) connected to the fifth shed column (191) and located on the horizontal plane is set to 174-178°, and the angle between the two second shed support rods (161) located on the middle corner block (190) respectively connected to the first shed column (111), the second shed column (121), the third shed column (131) and the fourth shed column (141) and located on the horizontal plane is set to 180°. The decking piece (10) is provided to include a fastener (101), a screw (102), a locking plate (103) and a purlin (104), and one end surface of the fastener (101) is provided with a snap-on connection with the locking plate (103), another end surface of the fastener (101) is provided with a contact connection with the purlin (104), and a screw (102) is provided between the fastener (101) and the locking plate (103), and a flange portion of the screw (102) is provided to be connected to the fastener ( 101) is contact-connected and the ends of the screws (102) are respectively configured to be embeddedly connected with the fasteners (101) and the purlins (104), the fasteners (101) are respectively configured to be connected with the first shed column (111), the fourth shed column (141), the first shed support rod (151) and the second shed support rod (161) and the screws (102) are configured to be self-tapping screws, the locking plate (103) is configured to be a polycarbonate convex strip body and the purlins (104) are configured to be rectangular plate bodies, The fastener (101) is configured to include a notch portion (1011), a first edge portion (1012), a second edge portion (1013) and a buckle portion (1014); one of the open side portions of the notch portion (1011) is configured to be connected to the second edge portion (1013); another of the open side portions of the notch portion (1011) is configured to be connected to the first edge portion (1012) and the buckle portion (1014); the first edge portion (1012) and the second edge portion (1013) are configured to be extended and distributed along the transverse center line of the notch portion (1011); the buckle portion (1014) is configured to be extended and distributed along the vertical center line of the notch portion (1011); and a through hole body (1015) is configured at the bottom end portion of the notch portion (1011); the first edge portion (1012) is configured to be connected to the first shed column (111), The fourth shed column (141), the first shed support rod (151) and the second shed support rod (161) are connected and the buckle strip portion (1014) is configured to be embeddedly connected with the locking plate (103), the upper end surface portion of the first edge portion (1012) is configured to be connected with the locking plate (103) and the bottom end surface portion of the notch portion (1011) is configured to be contact-connected with the purlin (104), the through-hole body (1015) is configured to be connected with the screw (102) and the notch portion (1011) is configured to be a U-shaped groove body, the first edge portion (1012) is configured to be a rectangular sheet body and the second edge portion (1013) is configured to be an L-shaped sheet body, the buckle strip portion (1014) is configured to be a T-shaped plate body and the through-hole body (1015) is configured to be arranged and distributed at intervals along the vertical center line of the notch portion (1011), A first vertical wall portion (211) is provided in the middle portion of the trough beam (2), a second vertical wall portion (221) is provided on the rear side of the trough beam (2), a third vertical wall portion (231) is provided on the front side of the trough beam (2), and bracket portions (241) are provided on the outer side of the first vertical wall portion (211) and the outer side of the second vertical wall portion (221), respectively, and toothed portions (20) are provided on the upper end face of the first vertical wall portion (211), the upper end face of the second vertical wall portion (221), and the upper end face of the third vertical wall portion (231), respectively, and the upper end face of the first vertical wall portion (211), the upper end face of the second vertical wall portion (221), and the upper end face of the third vertical wall portion (231) are The face portions are respectively arranged to be connected to the main anchor screw (4) and the auxiliary anchor screw (5); the bracket portion (241) is arranged to be connected to the sound barrier cloth (3); and the first vertical wall portion (211), the second vertical wall portion (221) and the third vertical wall portion (231) are arranged to be rectangular strips; the bracket portion (241) is arranged to be an L-shaped strip; and the face portion of the inner end of the horizontal portion of the bracket portion (241) is arranged to be connected to the second vertical wall portion (221) and the third vertical wall portion (231); the toothed portion (20) is arranged to be arranged to be spaced apart and distributed along the transverse center line of the first vertical wall portion (211), the transverse center line of the second vertical wall portion (221) and the transverse center line of the third vertical wall portion (231); The left and right end portions of the second vertical wall portion (221) and the third vertical wall portion (231) are arranged to be inwardly contracted, and the angle β between the center line of the inwardly contracted portion of the second vertical wall portion (221) and the horizontal horizontal line, and the angle β between the center line of the inwardly contracted portion of the third vertical wall portion (231) and the horizontal horizontal line are respectively set to 5-13°, The toothed portion (20) is provided as a block body (201), an open rod body (202), a cross rod body (203), a vertical rod body (204), an oblique rod body (205) and a through rod body (207); and the block body (201) is provided with an open rod body (202), a cross rod body (203), a vertical rod body (204), an oblique rod body (205) and a through rod body (207); an outer side surface of the open rod body (202) is provided to be connected to the through rod body (207); and a vertical portion of the open rod body (202) is provided to be connected to the through rod body (207). The blocks (201) are respectively arranged to be connected to the ends of the cross rod (203), the middle portion of the cross rod (203) is arranged to be connected to one end of the vertical rod (204) and one end of the oblique rod (205), and the other end of the vertical rod (204) is arranged to be connected to the middle portion of the horizontal portion of the open rod (202), the other end of the oblique rod (205) is arranged to be connected to the horizontal portion of the open rod (202), and the lower end face portions of the blocks (201) are respectively arranged to be connected to the middle portion of the horizontal portion of the open rod (202). The first vertical wall portion (211), the second vertical wall portion (221) and the third vertical wall portion (231) are connected, the block (201) is set as a cement mortar solidified body and the through rod body (207) is set to extend and distribute along the transverse center line of the block (201), the open rod body (202) is set as a U-shaped rod and the horizontal rod body (203), the vertical rod body (204), the oblique rod body (205) and the through rod body (207) are respectively set as rod-shaped bodies, and the six oblique rod bodies (205) are arranged on the open rod body (2 02) and the cross bar (203), and the vertical bar (204) and the oblique bar (205) are arranged to be distributed in a fan-shaped surface, the through bar (207) is arranged to be arranged and distributed along the peripheral line of the open bar (202), and one open bar (202), one cross bar (203), one vertical bar (204) and six oblique bar (205) are arranged to form a group of open frame components, and the multiple groups of open frame components are arranged and distributed along the center line of the through bar (207). The sound barrier cloth (3) is configured to include a first barrier cloth portion (31) and a second barrier cloth portion (32), and the lower end of the first barrier cloth portion (31) and the lower end of the second barrier cloth portion (32) are respectively configured to be connected to the trough beam (2), and the first barrier cloth portion (31) and the second barrier cloth portion (32) are respectively configured to be arranged front and back along the transverse center line of the trough beam (2). The first barrier cloth part (31) and the second barrier cloth part (32) are configured to include a screen cloth body (33) and a support beam body (34), and the side surface of the screen cloth body (33) is configured to be connected to the support beam body (34), and the lower end of the support beam body (34) is configured to be connected to the groove beam (2), the screen cloth body (33) is configured to be a rectangular cloth piece, and the support beam body (34) is configured to be arranged and distributed at intervals along the transverse center line of the groove beam (2). The supporting beam body (34) is configured to include a sliding plate (341), a fixed plate (342) and a leg (343), and the right side face of the sliding plate (341) is configured to be slidably connected to the left side face of the fixed plate (342), the lower end of the sliding plate (341) is configured to be connected to the vertical end of the leg (343), and an opening hole body (345) is provided at the horizontal end of the leg (343), and the left side face of the sliding plate (341) and the left side face of the fixed plate (342) are respectively configured to be connected to the screen cloth body (33 ), the opening hole body (345) is configured to be connected to the groove beam (2) through expansion bolts, and the sliding plate (341) and the fixed plate (342) are respectively provided with a strip body with a hook portion on the side surface, the hook portion of the sliding plate (341) is configured to be overlapped with the hook portion of the fixed plate (342), and the lower end surface portion of the fixed plate (342) is configured to be supported with the lower end surface portion of the sliding plate (341), the supporting leg (343) is configured to be a T-shaped seat body, and the opening hole body (345) is configured to be a U-shaped groove body, The main anchor screw (4) is configured to include a first panel portion (41), a first shear key portion (42), a first embedded screw (43), a second embedded screw (44), a third embedded screw (45), a fourth embedded screw (46), a fifth embedded screw (47) and a sixth embedded screw (48), and the lower end face portion of the first panel portion (41) is configured to be connected to the first shear key portion (42), and the rear end face portions of the first panel portion (41) are respectively configured to be The front end surface of the first panel portion (41) is connected to the first embedded screw (43), the second embedded screw (44) and the third embedded screw (45), and the front end surface of the first panel portion (41) is respectively arranged to be connected to the fourth embedded screw (46), the fifth embedded screw (47) and the sixth embedded screw (48), the upper end of the first embedded screw (43), the upper end of the second embedded screw (44), the upper end of the third embedded screw (45), the upper end of the fourth embedded screw (46), the upper end of the fifth embedded screw (47) and the sixth embedded screw (48). The upper end of the embedded screw (47) and the upper end of the sixth embedded screw (48) are respectively arranged to be connected in series with the first panel portion (41), and the nut located on the first embedded screw (43) is arranged to be connected to the first panel portion (41) by welding, the first panel portion (41) is arranged to be connected to the canopy (1), and the first shear key portion (42) is arranged to be embedded with the grooved beam (2), the first embedded screw (43), the second embedded screw (44), the first embedded screw (45), the second embedded screw (46), the first embedded screw (47), the second embedded screw (48), the first embedded screw (43), the second embedded screw (44), the first embedded screw (45) and the first embedded screw (48) are arranged to be connected to the first panel portion (41) by welding, The third embedded screw (45), the fourth embedded screw (46), the fifth embedded screw (47) and the sixth embedded screw (48) are respectively arranged to be connected to the groove beam (2) in an implantable manner, the first panel portion (41) is arranged as a rectangular sheet body and the first embedded screw (43), the second embedded screw (44), the third embedded screw (45), the fourth embedded screw (46), the fifth embedded screw (47) and the sixth embedded screw (48) are respectively arranged as L-shaped bolts, The first shear key part (42) is arranged to include an intermediate key body (421), a first vertical bar body (422) and a second vertical bar body (423), and the transverse parts of the ends of the intermediate key body (421) are respectively arranged to be connected to the inner ends of the first vertical bar body (422) and the second vertical bar body (423). The upper end face parts of the intermediate key body (421), the first vertical bar body (422) and the second vertical bar body (423) are respectively arranged to be connected to the first panel part (41). The intermediate key body (421) is arranged as a king-shaped steel member, and the first vertical bar body (422) and the second vertical bar body (423) are respectively arranged as rectangular bar-shaped bodies. The auxiliary anchor bolt (5) is arranged to include a second panel part (51), a second shear key part (52), a seventh embedded bolt (53), an eighth embedded bolt (54), a ninth embedded bolt (55) and a tenth embedded bolt (56). The lower end face part of the second panel part (51) is arranged to be connected to the second shear key part (52). The rear end face parts of the second panel part (51) are respectively arranged to be connected to the seventh embedded bolt (53) and the eighth embedded bolt (54), and the front end face parts of the second panel part (51) are respectively arranged to be connected to the ninth embedded bolt (55) and the tenth embedded bolt (56). The upper ends of the seventh embedded bolt (53), the eighth embedded bolt (54), the ninth embedded bolt (55) and the tenth embedded bolt (56) are respectively arranged to be connected to the second panel part (51) in a through connection manner, and the nuts located on the seventh embedded bolt (53) are arranged to be connected to the second panel part (51) in a welded connection manner. The second panel part (51) is arranged to be connected to the awning (1), and the second shear key part (52) is arranged to be connected to the trough-shaped beam (2) in an embedded connection manner. The seventh embedded bolt (53), the eighth embedded bolt (54), the ninth embedded bolt (55) and the tenth embedded bolt (56) are respectively arranged to be connected to the trough-shaped beam (2) in an implanted connection manner. The second panel part (51) is arranged as a rectangular sheet body, and the seventh embedded bolt (53), the eighth embedded bolt (54), the ninth embedded bolt (55) and the tenth embedded bolt (56) are respectively arranged as L-shaped bolts. The second shear key part (52) is a king-shaped steel member, and the seventh embedded bolt (53), the eighth embedded bolt (54), the ninth embedded bolt (55) and the tenth embedded bolt (56) are respectively arranged between the transverse parts of the second shear key part (52). The trough beam (2) and the canopy (1), the main anchor screw (4) and the auxiliary anchor screw (5) are arranged to be distributed in a manner of implanting anchor points in different regions, and the trough beam (2), the canopy (1), the main anchor screw (4) and the auxiliary anchor screw (5) and the sound barrier cloth (3) are arranged to be distributed in a manner of vertically shielding a sound wall, the second shear key portion (52), the seventh embedded screw (53), the eighth embedded screw (54), the ninth embedded screw (55), the tenth embedded screw (56), the first shear key portion (42), the first embedded screw (43), the second embedded screw The first panel portion (51) and the second panel portion (41) are respectively connected to the first shelf column (111), the second shelf column (121), the third shelf column (131), the fourth shelf column (141) and the fifth shelf column (191); the support beam body (34) is connected to the bracket portion (241); The construction method steps are: The canopy (1) is installed on the trough beam (2) through the main anchor bolts (4) and the auxiliary anchor bolts (5) on the seventh pier (17), the eighth pier (18), the ninth pier (19), the tenth pier (21), the eleventh pier (22), the twelfth pier (23), the thirteenth pier (24), the fourteenth pier (25), the fifteenth pier (26), the sixteenth pier (27) and the seventeenth pier (28), thereby completing the installation of the movable integral component. The movable integral component is then installed on the first pier (11), the second pier (12), the third pier (13), the fifth pier (15) and the sixth pier (16) by pushing.
1. When the trough beam (2) is cast, the seventh embedded screw (53), the eighth embedded screw (54), the ninth embedded screw (55) and the tenth embedded screw (56) of three sets of auxiliary anchor screws (5) are installed on the right side surface of the first vertical wall portion (211), and the first embedded screw (43), the second embedded screw (44), the third embedded screw (45), the fourth embedded screw (46), the fifth embedded screw (47) and the sixth embedded screw (48) of multiple sets of main anchor screws (4) are installed on the other end surfaces of the first vertical wall portion (211), the second vertical wall portion (221) and the third vertical wall portion (231); The pushing device is installed on the upper end surface of the fourth pier (14), the upper end surface of the seventh pier (17), the upper end surface of the eighth pier (18), the upper end surface of the tenth pier (21), the upper end surface of the twelfth pier (23), the upper end surface of the fourteenth pier (25) and the upper end surface of the sixteenth pier (27); the trough beam (2) is installed on the seventh pier (17), the eighth pier (18), the ninth pier (19), the tenth pier (21), the eleventh pier (22), the twelfth pier (23), the thirteenth pier (24), the fourteenth pier (25), the fifteenth pier (26), the sixteenth pier (27) and the seventeenth pier (28); The second panel portion (51) is connected to the fifth shelf column (191) respectively, the second panel portion (51) is connected to the seventh embedded screw rod (53), the eighth embedded screw rod (54), the ninth embedded screw rod (55) and the tenth embedded screw rod (56) through nuts, and the second shear key portion (52) is connected to the first vertical wall portion (211). The first panel portion (41) on the other end surface of the first vertical wall portion (211) is connected to the second shed column (121) and the third shed column (131) respectively; the first panel portion (41) on the second vertical wall portion (221) is connected to the first shed column (111) respectively; the first panel portion (41) on the third vertical wall portion (231) is connected to the fourth shed column (141) respectively; the first panel portion (41) is connected to the first embedded screw rod (43), the second embedded screw rod (44), the third embedded screw rod (45), the fourth embedded screw rod (46), the fifth embedded screw rod (47) and the sixth embedded screw rod (48) through nuts; the first shear key portion (42) is connected to the first vertical wall portion (211), the second vertical wall portion (221) and the third vertical wall portion (231); the first shed column (111) and the fifth shed column (191) are connected through the first embedded screw rod (43), the second embedded screw rod (44), the third embedded screw rod (45), the fourth embedded screw rod (46), the fifth embedded screw rod (47) and the sixth embedded screw rod (48) through nuts; A first shed support rod (151) and a second shed support rod (161) are installed on a side angle block (171) and a middle angle block (190); the first shed support rod (151) and the second shed support rod (161) are installed between the fourth shed column (141) and the fifth shed column (191) through the second side angle block (181) and the middle angle block (190); the first edge portion (1012) is respectively connected to the first shed column (111), the first shed support rod (151), the second shed support rod (161) and the fourth shed column (141); the purlin (104) is installed on the notch portion (1011) through screws (102) and the through-hole body (1015); the locking plate (103) is connected to the buckle strip portion (1014); the locking plate (103) is installed on the second edge portion (1013), thereby completing the installation of the canopy (1) on the trough beam (2); The legs (343) are mounted on the bracket portion (241), the support beam body (34) is mounted on the bracket portion (241) through expansion bolts and the opening hole body (345), and the side portions of the screen cloth body (33) are respectively connected to the adjacent sliding plate (341) and the fixing plate (342), thereby completing the installation of the sound barrier cloth (3) on the groove beam (2). Second, push the trough beam (2) onto the sixth pier (16), so that the front end of the trough beam (2) is wound down by 2m, and the sixth pier (16), the eighth pier (18), the tenth pier (21), the twelfth pier (23), the fourteenth pier (25) and the sixteenth pier (27) support the trough beam (2), so that the compressive stress of the bottom of the trough beam (2) 90m away from the front end of the trough beam (2) is 1.6Mpa, and the compressive stress of the top of the trough beam (2) 10m away from the front end of the trough beam (2) is 13.4Mpa, that is, the trough beam (2) is in a safe state.
3. Push the trough beam (2) onto the fifth pier (15), so that the front end of the trough beam (2) is wound down by 28m, and the fifth pier (15), the sixth pier (16), the eighth pier (18), the tenth pier (21) and the twelfth pier (23) support the trough beam (2), so that the compressive stress of the bottom of the trough beam (2) at 90m from the front end of the trough beam (2) is 2.1Mpa, and the compressive stress of the top of the trough beam (2) at 36m from the front end of the trough beam (2) is 11.8Mpa, that is, the trough beam (2) is in a safe state. Fourth, push the trough beam (2) onto the third pier (13) so that the front end of the trough beam (2) is not in a downward winding state, and the third pier (13), the fifth pier (15), the sixth pier (16), the eighth pier (18) and the tenth pier (21) support the trough beam (2), ensuring that the compressive stress of the bottom surface of the trough beam (2) 24m away from the front end of the trough beam (2) is 0Mpa, and the compressive stress of the top surface of the trough beam (2) 73m away from the front end of the trough beam (2) is 17.3Mpa, that is, the trough beam (2) is in a safe state.
5. Push the trough beam (2) to the railway guardrail of the railway operating line section, 5.25m away from the up line of the railway operating line section, so that the front end of the trough beam (2) is turned down by 4mm, and the third pier (13), the fifth pier (15), the sixth pier (16), the eighth pier (18) and the tenth pier (21) support the trough beam (2), ensuring that the compressive stress of the bottom of the trough beam (2) 28m away from the front end of the trough beam (2) is 0.6Mpa, and the compressive stress of the top of the trough beam (2) 73m away from the front end of the trough beam (2) is 18.1Mpa, that is, the trough beam (2) is in a safe state.
6. Push the trough beam (2) to the middle of the up and down lines of the railway operating line section, so that the front end of the trough beam (2) is turned down by 1 mm, and the third pier (13), the fifth pier (15), the sixth pier (16), the eighth pier (18) and the tenth pier (21) support the trough beam (2), ensuring that the compressive stress of the bottom of the trough beam (2) 28m away from the front end of the trough beam (2) is 0.1Mpa, and the compressive stress of the top of the trough beam (2) 73m away from the front end of the trough beam (2) is 17.2Mpa, that is, the trough beam (2) is in a safe state.
7. Push the trough beam (2) to a position 9 m from the second pier (12) across the railway operating line section, so that the front end of the trough beam (2) is bent down by 8 mm, and the third pier (13), the fifth pier (15), the sixth pier (16) and the eighth pier (18) support the trough beam (2), so that the compressive stress of the bottom of the trough beam (2) 73 m away from the front end of the trough beam (2) is 0.5 MPa, and the compressive stress of the top of the trough beam (2) 73 m away from the front end of the trough beam (2) is 16.6 MPa, that is, the trough beam (2) is in a safe state.
8. Push the trough beam (2) to a position 5 m away from the second pier (12), so that the front end of the trough beam (2) is bent down by 10 mm, and the third pier (13), the fifth pier (15), the sixth pier (16) and the eighth pier (18) support the trough beam (2), so that the compressive stress of the bottom of the trough beam (2) 73 m away from the front end of the trough beam (2) is 1.4 Mpa, and the compressive stress of the top of the trough beam (2) 73 m away from the front end of the trough beam (2) is 16.2 Mpa, that is, the trough beam (2) is in a safe state.
9. Push the trough beam (2) to a position 1 m away from the second pier (12), so that the front end of the trough beam (2) is bent down by 9 mm, and the third pier (13), the fifth pier (15), the sixth pier (16) and the eighth pier (18) support the trough beam (2), so that the compressive stress of the bottom of the trough beam (2) 73 m away from the front end of the trough beam (2) is 0.8 Mpa, and the compressive stress of the top of the trough beam (2) 73 m away from the front end of the trough beam (2) is 15.6 Mpa, that is, the trough beam (2) is in a safe state.
10. Push the trough beam (2) onto the second pier (12), so that the front end of the trough beam (2) is bent down by 2 mm, and the second pier (12), the third pier (13), the fifth pier (15), the sixth pier (16) and the eighth pier (18) support the trough beam (2), ensuring that the compressive stress of the bottom of the trough beam (2) 73m away from the front end of the trough beam (2) is 0.2Mpa, and the compressive stress of the top of the trough beam (2) 73m away from the front end of the trough beam (2) is 15.8Mpa, that is, the trough beam (2) is in a safe state.
11. Push the trough beam (2) to a position 1.6 m away from the first pier (11), so that the front end of the trough beam (2) is bent down by 2 mm, and the second pier (12), the third pier (13), the fifth pier (15) and the sixth pier (16) support the trough beam (2), so that the compressive stress of the bottom of the trough beam (2) 73 m away from the front end of the trough beam (2) is 0.4 Mpa, and the compressive stress of the top of the trough beam (2) 73 m away from the front end of the trough beam (2) is 17.5 Mpa, that is, the trough beam (2) is in a safe state.
12. Push the trough beam (2) onto the first pier (11) so that the front end of the trough beam (2) is not in a downwardly wound state, and the second pier (12), the third pier (13), the fifth pier (15) and the sixth pier (16) support the trough beam (2) to ensure that the compressive stress on the bottom of the trough beam (2) 73m away from the front end of the trough beam (2) is 0.8Mpa, and the compressive stress on the top of the trough beam (2) 73m away from the front end of the trough beam (2) is 16.3Mpa, that is, the trough beam (2) is in a safe state.
12. Remove the fourth pier (14), the seventh pier (17), the eighth pier (18), the tenth pier (21), the twelfth pier (23), the fourteenth pier (25), the sixteenth pier (27) and the jacking device, install permanent bearings on the first pier (11), the second pier (12), the third pier (13), the fifth pier (15) and the sixth pier (16), and simultaneously drop the trough beam (2) into place.
2. The construction method according to claim 1 is characterized in that: the steps are: Only the last pushing device located at the rear end of the trough beam (2) performs a pushing movement on the trough beam body.
3. The construction method according to claim 1, characterized in that: The channel beam (2), the canopy (1) and the anchor bolt assembly are connected to each other in a manner to form a movable integral component.