A steel-concrete composite bridge and construction method thereof
By adopting a steel-concrete composite bridge spliced with multiple steel-concrete segments, and using a steel box girder structure with hollow ribs and long openings to reduce welds and simplify connections, the fatigue cracking and fatigue cracking problems of steel-concrete composite bridges in the existing technology are solved. The panel is easily damaged, which improves the strength and construction efficiency of the bridge.
Patent Information
- Application Number
- CN202010477566.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-29
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2040-05-29
AI Technical Summary
The existing steel-concrete composite bridges are prone to fatigue cracking and bridge deck damage, mainly due to the fatigue of the steel structure caused by excessive welds and insufficient bridge deck strength.
A steel-concrete composite bridge formed by splicing multiple steel-concrete segments. Each segment includes a bridge deck and a steel box girder. The bridge deck has a steel box girder structure with hollow ribs and long openings. It is connected through shear nails and transverse partitions. The plate design reduces welds, increases deck strength, and simplifies connection details by fixing the connection ends with poured concrete.
It reduces the influence of welds, reduces the risk of fatigue cracking of steel-concrete segments, enhances the strength of the bridge deck, reduces its own weight, simplifies the connection process, and improves construction efficiency and safety.
Smart Images

Figure CN111549643B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bridge construction, and in particular to a steel-concrete composite bridge and a construction method thereof. Background Art
[0002] At present, in bridge construction, steel-concrete composite beams are widely used due to their superior overall force bearing properties. Steel-concrete composite beams can effectively exert the respective advantages of concrete and steel beams and are easy to assemble.
[0003] In the related art, the steel structure of the steel-concrete composite beam includes a steel top plate, U-ribs and cross diaphragms. The steel top plate, U-ribs and cross diaphragms are connected by welding, and there are multiple welds. The concrete layer of the steel-concrete composite beam can be made of ordinary concrete or UHPC (Ultra-High Performance Concrete), and the concrete layer is laid on the steel top plate.
[0004] However, due to the growing traffic demand, the bridge deck load is heavier and the movement is more frequent, the existing steel-concrete composite bridges have the problem of cracking of the bridge deck and fatigue cracking of the steel structure of the steel-concrete composite beam (including weld failure, steel plate cracking and cracking in other parts). The reason is that the bridge deck has a large deadweight, and when a thin bridge deck is used, the bridge deck strength is insufficient and it is easy to be damaged; there are too many welds between the steel top plate, U ribs and diaphragms, which affect each other, the welding workload is large, the welding difficulty is high, the bridge deck load is too heavy and the movement is too frequent, which makes the steel structure of the steel-concrete composite beam prone to fatigue cracking. Summary of the invention
[0005] The embodiments of the present application provide a steel-concrete composite bridge and a construction method thereof, which solve the technical problems in the prior art that the steel-concrete composite bridge is prone to fatigue cracking and the bridge deck is prone to damage.
[0006] In a first aspect, a steel-concrete composite bridge is provided, characterized in that: the steel-concrete composite bridge is formed by splicing a plurality of steel-concrete segments, each of which comprises a bridge deck and a steel box girder;
[0007] The top plate of the steel box girder is provided with a long strip opening along the longitudinal direction of the bridge; the bridge deck comprises a deck body and a plurality of hollow ribs arranged below the deck body, the deck body is fixedly arranged on the upper surface of the top plate, and the hollow ribs are accommodated in the long strip opening.
[0008] In some embodiments, a plurality of groups of first shear nails are disposed on the upper surface of the top plate, and a plurality of shear grooves for pouring concrete are provided on the panel body, and each of the shear grooves corresponds to a group of first shear nails.
[0009] In some embodiments, the hollow rib contains a steel skeleton arranged along its length; the end of the hollow rib at the segment connection of two adjacent steel-concrete segments is a connecting end, and the steel skeleton extends from the connecting end;
[0010] The steel box girder comprises a transverse support plate fixedly arranged inside the steel box girder, wherein the transverse support plate is horizontal and located below the connecting end; a plurality of second shear nails are arranged on the upper surface of the transverse support plate;
[0011] The diaphragm support plates on both sides of any segment connection are aligned one by one, and the two adjacent steel-concrete segments are fixed by pouring concrete through the aligned steel skeleton and the second shear nails.
[0012] In some embodiments, the steel box girder further includes a transverse diaphragm, and the transverse diaphragm supports and fixes the transverse diaphragm support plate.
[0013] In some embodiments, the panel body, hollow ribs and steel reinforcement frame are cast in one piece.
[0014] In some embodiments, the panel body on both sides of the segment connection is provided with a plurality of tongue-and-groove grooves for expanding the casting area, the tongue-and-groove grooves are formed inwardly from the end surfaces of the panel body, and the tongue-and-groove grooves on both sides of the segment connection are aligned one by one.
[0015] In some embodiments, each of the tongue-and-groove grooves is roughened.
[0016] In a second aspect, the present application provides a construction method for the above-mentioned steel-concrete composite bridge, comprising the following steps:
[0017] S1: Prefabricate the steel box girder and bridge deck separately;
[0018] S2: aligning the hollow rib with the long strip opening, installing the bridge deck to the upper surface of the top plate of the steel box girder to form a steel-concrete segment, and completing the assembly of multiple steel-concrete segments;
[0019] S3: Assemble the steel-concrete segments to form a steel-concrete composite bridge.
[0020] In some embodiments, in step S1, a plurality of groups of first shear nails are fixedly arranged on the upper surface of the top plate, a plurality of shear grooves for pouring concrete are opened in the panel body, and the position of each shear groove corresponds to a group of first shear nails;
[0021] In step S2, a plurality of shear grooves of the bridge deck are aligned one by one with a plurality of groups of first shear nails on the top plate, and the shear grooves are poured with concrete to fix them.
[0022] In some embodiments, in step S1, a steel bar skeleton is arranged inside the hollow rib along its length direction; the steel bar skeleton extends outward from the hollow rib; a horizontal diaphragm support plate is arranged inside the steel box girder, and the diaphragm support plate is located below the extended steel bar skeleton; a plurality of second shear nails are installed on the upper surface of the diaphragm support plate;
[0023] In step S3, each steel-concrete segment is transported to the construction site, the diaphragm support plates of two adjacent steel-concrete segments are aligned one by one, and the steel skeleton and the second shear nails on the diaphragm support plates are cast with concrete to fix them.
[0024] The beneficial effects of the technical solution provided by this application include:
[0025] The embodiment of the present application provides a steel-concrete composite bridge and a construction method thereof. Since the steel-concrete segments of the steel-concrete composite bridge are assembled by using a bridge deck with hollow ribs and a steel box girder with a long opening on the top plate, the traditional steel top plate, U-ribs, diaphragms and bridge deck are replaced, the welds between the steel top plate, U-ribs, diaphragms and bridge deck are reduced, the mutual influence of multiple welds is avoided, the number of parts is reduced, the internal connection details of the steel-concrete segments are simplified, the connection workload is reduced, the connection difficulty is reduced, the internal connection of the steel-concrete segments is more refined, and the risk of fatigue cracking of the steel-concrete segments is reduced; at the same time, the hollow ribs enhance the strength of the bridge deck, reduce the dead weight of the bridge deck, and reduce the possibility of damage to the bridge deck when the thickness of the bridge deck is constant. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0027] Figure 1 A schematic diagram of a steel-concrete segment structure provided in an embodiment of the present application;
[0028] Figure 2 A schematic diagram of a bridge deck structure provided in an embodiment of the present application;
[0029] Figure 3 A schematic diagram of a steel box girder structure provided in an embodiment of the present application;
[0030] Figure 4 A partial schematic diagram of two adjacent steel-concrete segments at the segment connection provided in an embodiment of the present application;
[0031] Figure numerals: 1-bridge deck, 11-hollow rib, 12-panel body, 13-shear groove, 14-tongue and groove groove, 15-steel skeleton, 2-steel box girder, 21-cross diaphragm support plate, 22-cross diaphragm, 23-top plate, 24-first shear nail, 25-second shear nail, 100-steel-concrete segment. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0033] The embodiment of the present application provides a steel-concrete composite bridge, which can solve the technical problems in the prior art that the steel-concrete composite bridge is prone to fatigue cracking and the bridge deck is prone to damage.
[0034] like Figure 1 As shown, a steel-concrete composite bridge is formed by splicing a plurality of steel-concrete segments 100 , and each steel-concrete segment 100 includes a bridge deck 1 and a steel box girder 2 .
[0035] The top plate 23 of the steel box girder 2 has a long opening along the longitudinal direction of the bridge; the bridge deck 1 includes a panel body 12 and a plurality of hollow ribs 11 arranged below the panel body 12, the panel body 12 is fixedly arranged on the upper surface of the top plate 23, the panel body 12 is closely attached to the top plate 23, and the hollow ribs 11 are accommodated in the long opening. The hollow ribs 11 enhance the strength of the bridge deck 1 and reduce the possibility of damage to the bridge deck 1; at the same time, the top plate 23 with a long opening cooperates with the bridge deck 1 with the hollow ribs 11, avoiding the problem of easy damage caused by the inconsistency of elastic modulus between the bridge deck 1 and the top plate 23.
[0036] Specifically, a plurality of groups of first shear nails 24 are arranged on the upper surface of the top plate 23, and a plurality of shear grooves 13 for pouring concrete are provided on the panel body 12, and each shear groove 13 corresponds to a group of first shear nails 24. During installation, the shear grooves 13 are aligned one by one with the first shear nails 24, and concrete is poured to fix them.
[0037] like Figure 2 As shown, the hollow rib 11 contains a steel skeleton 15 arranged along its length direction; at the segment connection of two adjacent steel-concrete segments 100, the end of the hollow rib 11 is a connecting end, and the steel skeleton 15 extends from the connecting end.
[0038] The steel box girder 2 includes a diaphragm support plate 21, which is fixedly arranged inside the steel box girder 2, is horizontal and located below the connection end; a plurality of second shear nails 42 are arranged on the upper surface of the diaphragm support plate 21. The diaphragm support plates 21 on both sides of any segment connection are aligned one by one, and two adjacent steel-concrete segments 100 are fixed by pouring concrete through the aligned steel skeletons 15 and the second shear nails 42. The diaphragm support plate 21 is used to support the poured concrete, and the concrete fixes the steel skeletons 15 and the second shear nails 42 of the two adjacent steel-concrete segments 100.
[0039] Specifically, the steel-concrete segments 100 are divided into two categories, the first category is the two steel-concrete segments located at both ends of the bridge, and the second category is the steel-concrete segments located in the middle of the bridge. Both ends of the hollow rib 11 of the second type of steel-concrete segments are connection ends, and the steel skeleton 15 extends from the two connection ends; the hollow rib 11 of the first type of steel-concrete segments has only one end as a connection end, and the steel skeleton 15 extends from one connection end.
[0040] like Figure 3 As shown, the steel box girder 2 further includes a transverse diaphragm 22 , which is arranged transversely to the bridge and is used to support and fix the transverse diaphragm support plate 21 .
[0041] Furthermore, the steel box girder 2 further comprises a bottom plate, two side webs located on both sides of the bottom plate, and a middle web arranged perpendicular to the bottom plate, the bottom plate and the two side webs enclose a cavity with an opening facing upward, and the middle web divides the cavity into two symmetrical halves. The diaphragm 22 is perpendicular to the bottom plate, the side webs, and the middle web.
[0042] In this embodiment, each second type steel-concrete segment 100 has two segment connections, and each segment connection is correspondingly provided with two transverse diaphragm support plates 21. Each first type steel-concrete segment 100 has one segment connection, and the segment connection is provided with two transverse diaphragm support plates 21. The transverse diaphragm support plates 21 are used to support the poured concrete.
[0043] In this embodiment, the panel body 12 , the hollow ribs 11 and the steel skeleton 15 are cast in one piece to form the bridge panel 1 .
[0044] like Figure 4 As shown, the panel bodies 12 on both sides of the segment connection are provided with a plurality of tongue-and-groove grooves 14 for expanding the casting area. The tongue-and-groove grooves 14 are formed inwardly by the end surfaces of the panel bodies 12, and the tongue-and-groove grooves 14 on both sides of the segment connection are aligned one by one. Preferably, each tongue-and-groove groove 14 is roughened. The tongue-and-groove groove 14 increases the contact area of the cast concrete and enhances the connection strength. The roughening treatment further enhances the connection performance of the cast concrete.
[0045] Preferably, the depth of the groove 14 is 1 / 2 to 2 / 3 of the thickness of the panel body 12. The groove 14 of this size can maximize the contact area of the poured concrete without damaging the panel body 12. Preferably, the groove 14 is in an isosceles trapezoidal shape, and the bottom edge of the isosceles trapezoid faces the inside of the panel body 12. The isosceles trapezoidal groove 14 facilitates the pouring of concrete.
[0046] Preferably, the panel body 12 and the hollow ribs 11 are both made of UHPC. The panel body 12 and the hollow ribs 11 made of UHPC reduce the deadweight of the bridge deck 1 and increase the strength of the bridge deck, further preventing the bridge deck from being damaged.
[0047] The steel-concrete composite bridge of the present invention simplifies the structure of the traditional steel-concrete segment 100 because the steel-concrete segment 100 of the steel-concrete composite bridge is formed by assembling a bridge deck 1 with a hollow rib 11 and a steel box girder 2 with a long opening on the top plate 23, replaces the steel top plate, U rib, diaphragm and bridge deck of the traditional steel-concrete segment 100, reduces the welds between the steel top plate, U rib, diaphragm and bridge deck, avoids the mutual influence of multiple welds, and simplifies the connection details inside the steel-concrete segment 100 (the steel top plate of the traditional steel-concrete segment 100 is , U-ribs, diaphragms and bridge decks have a large number of welding positions, the welding task is large, and the welding difficulty is relatively high). The present application reduces the connection workload, reduces the connection difficulty, makes the internal connection of the steel-concrete segment more refined, and reduces the risk of fatigue cracking of the steel-concrete segment; at the same time, compared with traditional bridge decks, bridge decks with hollow ribs reduce the total amount of materials, save construction costs, and reduce the self-weight of the bridge deck under the condition of the same design strength. The hollow ribs enhance the strength of the bridge deck 1 and reduce the possibility of damage to the bridge deck.
[0048] The present invention adopts UHPC casting to form the panel body 12 and the hollow rib 11, which is thinner than the traditional bridge deck, further enhances the strength of the bridge deck and reduces the deadweight of the bridge deck.
[0049] The steel box girder 2 of the present invention is simplified and has a simple structure. It is mainly composed of a bottom plate, two side webs, a middle web and a transverse diaphragm 22 , thereby reducing the deadweight of the steel box girder 2 .
[0050] The present invention also discloses a construction method of the above-mentioned steel-concrete composite bridge, comprising the following steps: S1: installing the designed structure to prefabricate the steel box girder 2 and the bridge deck 1 respectively, wherein the prefabricated bridge deck 1 just matches the top plate of the steel box girder 2;
[0051] S2: aligning the hollow rib 11 with the long strip opening, installing the bridge deck 1 to the upper surface of the top plate 23 of the steel box girder 2 to form a steel-concrete segment 100, and completing the assembly of multiple steel-concrete segments 100;
[0052] S3: Assembling the steel-concrete segments 100 to form a steel-concrete composite bridge.
[0053] Specifically, in step S1, several groups of first shear nails 24 are fixedly arranged on the upper surface of the top plate 23, and several shear grooves 13 for pouring concrete are opened in the panel body 12, and the positions of the first shear nails 24 correspond one by one to the shear grooves 13. The first shear nails 24 are used to fix the bridge deck 1 and the steel box girder 2 inside the steel-concrete segment 100.
[0054] In step S2, the plurality of shear grooves 13 of the bridge deck 1 are aligned one by one with the plurality of first shear nails 24 on the top plate 23, and the shear grooves 13 are poured with concrete to fix them. When the concrete solidifies, the manufacture of the steel-concrete segment 100 is completed.
[0055] Further, in step S1, a steel skeleton 15 is arranged inside the hollow rib 11 along its length direction; the steel skeleton 15 extends outward from the hollow rib 11; a horizontal diaphragm support plate 21 is arranged inside the steel box girder 2, and the diaphragm support plate 21 is located below the extended steel skeleton 15, and is used to support the poured concrete. A plurality of second shear nails 42 are installed on the upper surface of the diaphragm support plate 21, and the second shear nails 42 are used to fix two adjacent steel-concrete segments 100.
[0056] In step S3, each steel-concrete segment 100 is transported to the construction site, the diaphragm support plates 21 of two adjacent steel-concrete segments 100 are aligned one by one, the steel skeleton 15 and the second shear nails 42 on the diaphragm support plates 21 are poured with concrete to fix them, and the pouring and assembly are performed section by section until the installation of all steel-concrete segments 100 is completed.
[0057] The construction method of the steel-concrete composite bridge of the present invention makes the process of assembling the steel-concrete composite bridge with multiple steel-concrete segments 100 more convenient; when assembling any two adjacent steel-concrete segments 100, it is only necessary to pour concrete at the segment connection, and fix the steel skeleton 15 and the second shear nails 42 by covering them with concrete. Compared with the welding plus mechanical connection method of the traditional steel-concrete composite bridge, the steel-concrete composite bridge of the present invention reduces the workload of docking the steel-concrete segments 100, is convenient and quick to assemble, shortens the construction period, and improves the construction efficiency.
[0058] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0059] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0060] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A steel-concrete composite bridge, characterized in that: The steel-concrete composite bridge is formed by splicing a plurality of steel-concrete segments (100), each of which comprises a bridge deck (1) and a steel box girder (2); The top plate (23) of the steel box girder (2) is provided with a plurality of long strip openings along the longitudinal direction of the bridge; the bridge deck (1) comprises a deck body (12) and a plurality of hollow ribs (11) arranged below the deck body (12); the deck body (12) is fixedly arranged on the upper surface of the top plate (23), and the hollow ribs (11) are accommodated in the long strip openings; The hollow rib (11) contains a steel skeleton (15) arranged along its length direction; the end of the hollow rib (11) at the segment connection of two adjacent steel-concrete segments (100) is a connection end, and the steel skeleton (15) extends from the connection end; The steel box girder (2) further comprises a transverse diaphragm (22); The panel body (12), the hollow ribs (11) and the steel reinforcement frame (15) are integrally cast.
2. A steel-concrete composite bridge as claimed in claim 1, characterized in that: A plurality of groups of first shear studs (24) are arranged on the upper surface of the top plate (23), and a plurality of shear grooves (13) for pouring concrete are provided on the panel body (12), and each of the shear grooves (13) corresponds to a group of first shear studs (24).
3. A steel-concrete composite bridge as claimed in claim 2, characterized in that: The steel box girder (2) comprises a transverse support plate (21) fixedly arranged inside the steel box girder, wherein the transverse support plate (21) is horizontal and located below the connecting end; a plurality of second shear nails (42) are arranged on the upper surface of the transverse support plate (21); The diaphragm support plates (21) on both sides of any segment connection are aligned one by one, and two adjacent steel-concrete segments (100) are fixed by pouring concrete through the aligned steel skeletons (15) and second shear nails (42).
4. A steel-concrete composite bridge as claimed in claim 3, characterized in that: The transverse partition plate (22) supports and fixes the transverse partition support plate (21).
5. The steel-concrete composite bridge according to claim 3, characterized in that: The panel body (12) on both sides of the segment connection is provided with a plurality of tongue-and-groove grooves (14) for expanding the casting area, the tongue-and-groove grooves (14) are formed inwardly by the end surface of the panel body (12), and the tongue-and-groove grooves (14) on both sides of the segment connection are aligned one by one.
6. A steel-concrete composite bridge as claimed in claim 5, characterized in that: Each of the tongue-and-groove grooves (14) is roughened.
7. A construction method for a steel-concrete composite bridge as claimed in claim 1, characterized in that: The following steps are involved: S1: Prefabricate the steel box girder (2) and the bridge deck (1) respectively; S2: aligning the hollow rib (11) with the long strip opening, installing the bridge deck (1) to the upper surface of the top plate (23) of the steel box girder (2) to form a steel-concrete segment (100), and completing the assembly of multiple steel-concrete segments (100); S3: Assembling the steel-concrete segments (100) to form a steel-concrete composite bridge.
8. The construction method of the steel-concrete composite bridge as claimed in claim 7, characterized in that: In step S1, a plurality of groups of first shear studs (24) are fixedly arranged on the upper surface of the top plate (23), a plurality of shear grooves (13) for pouring concrete are opened on the panel body (12), and the position of each shear groove (13) corresponds to a group of first shear studs (24); In step S2, a plurality of shear grooves (13) of the bridge deck (1) are aligned one by one with a plurality of groups of first shear nails (24) on the top plate (23), and the shear grooves (13) are poured with concrete to be fixed.
9. The construction method of the steel-concrete composite bridge according to claim 8, characterized in that: In step S1, a steel frame (15) is arranged inside the hollow rib (11) along its length direction; the steel frame (15) extends outward from the hollow rib (11); a horizontal diaphragm support plate (21) is arranged inside the steel box girder (2), and the diaphragm support plate (21) is located below the extended steel frame (15); and a plurality of second shear nails (42) are installed on the upper surface of the diaphragm support plate (21); In step S3, each steel-concrete segment (100) is transported to the construction site, the transverse diaphragm support plates (21) of two adjacent steel-concrete segments (100) are aligned one by one, and the steel frame (15) and the second shear studs (42) on the transverse diaphragm support plates (21) are poured with concrete to fix them.