Bulk material supply equipment for chip placement machine

By designing the bulk material supply equipment of the patch machine, the bulk material is neatly arranged and supplied to the patch machine in groups, the problems of complex processes, high costs and waste of materials in the existing technology are solved, and the patch process is simplified and the efficiency is improved.

CN111573233BActive Publication Date: 2025-04-08SHENZHEN HENGXINSHENG ELECTRONIC EQUIP CO LTD

Patent Information

Application Number
CN202010421645.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-18
Publication Date
2025-04-08
Estimated Expiration
2040-05-18

AI Technical Summary

Technical Problem

Existing patch components need to be mounted on the circuit board through tape reel, packaging, unplugging, and material pushing processes, resulting in increased processes, high costs, low efficiency and waste of tape braiding materials.

Method used

A bulk material supply equipment of a patch machine is designed, including a feeding mechanism, a disc transfer mechanism, a cross-transport mechanism, a robot, a discharge mechanism and a control mechanism, which can neatly arrange the bulk materials and supply them to the patch machine in groups to avoid the waste of tape knitting materials.

Benefits of technology

The patching process is simplified, the patching cost is reduced, the bulk material supply efficiency is improved, and the waste of tape braiding materials is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111573233B_ABST
    Figure CN111573233B_ABST
Patent Text Reader

Abstract

A bulk material supply device for a chip placement machine, which relates to the technical field of electronic component assembly equipment. It includes: a frame, a loading mechanism, a disc transfer mechanism, a cross-transport mechanism, a manipulator, a discharging mechanism and a control mechanism; the loading mechanism is arranged on the frame and is located on one side of the frame; the disc transfer mechanism is installed on the frame; the cross-transport mechanism is installed on the frame, one end of the cross-transport mechanism is docked with the disc transfer mechanism, and the other end is docked with the manipulator; one end of the manipulator is fixedly installed on the frame; one end of the discharging mechanism is fixedly installed on the frame, and the other end extends to a side away from the frame to dock with the discharging port of the chip placement machine; the control mechanism is used to control the loading mechanism, the disc transfer mechanism, the cross-transport mechanism, the manipulator and the discharging mechanism to work sequentially. The bulk material supply device adopting the above technical solution has the advantages of simple patch process, low patch cost and high bulk material supply efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electronic component assembly equipment, and in particular to bulk material supply equipment for a chip mounter. Background Art

[0002] With the advancement of electronic technology and the rapid development of the electronic product manufacturing industry, the processing technology of mounting electronic components on circuit boards is increasingly being adopted by many electronic manufacturers.

[0003] At present, most SMD components are packaged in the form of tape and reel. When in use, the electronic components packaged in the tape are sent to the placement head in a certain order by a special feeder to be extracted. Before use, the bag must be unpacked, the material must be pushed, the position must be aligned, and the bag must be sealed, which brings inconvenience to the SMD operation. After use, the material of the tape cannot be recycled, which is not only costly but also wastes materials.

[0004] Therefore, existing patch components cannot be directly mounted on the circuit board after being fed and sorted from bulk materials, but need to go through the processes of winding, packaging, unwinding, and pushing before being mounted on the circuit board. This process increases the number of patch steps, increases the cost of patching, reduces work efficiency, and also causes waste of tape materials. Therefore, it needs to be improved. Summary of the invention

[0005] The object of the present invention is to provide a bulk material supply device for a chip placement machine in view of the defects and shortcomings of the prior art, which can not only arrange bulk components neatly and feed them to the chip placement machine in groups after the neat arrangement, thus avoiding the waste of braiding materials, but also transport the whole group of bulk materials through the set cross-conveying mechanism, thereby greatly improving the supply efficiency of the bulk material supply device, and has the advantages of simple chip placement process, low chip placement cost and high bulk material supply efficiency.

[0006] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a bulk material supply device for a placement machine, comprising: a frame, a loading mechanism, a disc transfer mechanism, a cross-conveyance mechanism, a manipulator, a discharging mechanism and a control mechanism; the loading mechanism is arranged on the frame and located on one side of the frame, and the loading mechanism is used to arrange the bulk materials neatly and send them to the disc transfer mechanism; the disc transfer mechanism is installed on the frame, and the disc transfer mechanism is used to transfer the bulk materials transported by the loading mechanism to the cross-conveyance mechanism; the cross-conveyance mechanism is installed on the frame, one end of the cross-conveyance mechanism is connected to the disc transfer mechanism, and the other end is connected to the manipulator, and the cross-conveyance mechanism is used to receive the bulk materials transferred by the disc transfer mechanism and arrange the bulk materials neatly into groups The robot is fixedly mounted on the frame at one end, and the other end is fixedly mounted on the discharging mechanism. The robot is used to synchronously transport the whole group of bulk materials that are neatly arranged into groups to the discharging mechanism; the discharging mechanism is fixedly mounted on the frame at one end, and the other end extends to a side away from the frame to dock with the feeding place of the placement machine. The discharging mechanism is used to transport the bulk materials transported by the robot to the feeding place of the placement machine according to the requirements of the placement machine; the control mechanism is connected with the loading mechanism, the disc transfer mechanism, the cross-transport mechanism, the robot and the discharging mechanism, and the control mechanism is used to control the loading mechanism, the disc transfer mechanism, the cross-transport mechanism, the robot and the discharging mechanism to work sequentially.

[0007] Furthermore, the cross-transport mechanism includes: a transport frame fixedly mounted on the bearing surface of the frame; a first slide rail fixedly mounted on the transport frame on a side away from the bearing surface; a second slide rail fixedly mounted on the transport frame on a side close to the disc transfer mechanism; a first transport device slidably mounted on the first slide rail and capable of moving back and forth between the manipulator and the disc transfer mechanism, for receiving the bulk materials transferred by the disc transfer mechanism and arranging the bulk materials neatly into groups and then transporting them to the material-picking location of the manipulator; a second transport device slidably mounted on the second slide rail and capable of moving back and forth between the manipulator and the disc transfer mechanism a second conveying device between the mechanisms, used for receiving the bulk materials transferred by the disc transfer mechanism and arranging the bulk materials neatly into groups and then conveying them to the material picking place of the robot, the second conveying device and the first conveying device cross-convey the bulk materials transferred by the disc transfer mechanism; a first driving device arranged on the conveying frame close to the discharging mechanism side and assembled with the first conveying device, used for driving the first conveying device to move back and forth; and a second driving device arranged on the conveying frame close to the discharging mechanism side and assembled with the second conveying device, used for driving the second conveying device to move back and forth.

[0008] Furthermore, the first conveying device includes: a first sliding block assembled with the first slide rail and capable of sliding along the first slide rail; a first mounting plate having a portion assembled with the first sliding block on a side away from the first slide rail and another portion assembled with the first driving device, the first mounting plate driving the first sliding block to slide under the drive of the first driving device; and a first component carrier fixedly mounted on the first mounting plate on a side away from the first driving device and used for receiving bulk materials transferred by the disc transfer mechanism to achieve neat arrangement of the bulk materials.

[0009] Furthermore, the first driving device includes: a first electric motor whose main body is fixedly mounted on the conveying frame near the side of the feeding mechanism; a first screw rod fixedly assembled with the power output shaft of the first motor and capable of moving synchronously with the power output shaft, the first screw rod being parallel to the first slide rail; a first bearing seat fixedly mounted on the conveying frame and used for rotatably assembling the first screw rod to fix the first screw rod; and a first driving block which is sleeved on the first screw rod and cooperates with the first screw rod and can reciprocate along the axial direction of the first screw rod when the first screw rod rotates.

[0010] Furthermore, a clearance groove is provided on the conveying rack, and the second conveying device includes: a second sliding block assembled with the second slide rail and capable of sliding along the second slide rail; a second mounting plate, a part of which is assembled with the second sliding block on the side away from the second slide rail, and the other part passes through the clearance groove and is assembled with the second driving device, and the second mounting plate drives the second sliding block to slide under the drive of the second driving device; a second component carrier is arranged on the side of the second mounting plate away from the second sliding block, and is used to receive the bulk materials transferred by the disc transfer mechanism to achieve neat arrangement of the bulk materials, and the first component carrier and the second component carrier cross-transport bulk components; and an adjusting cylinder, a main body of which is fixedly installed on the second mounting plate, a power output end of which is fixedly assembled with the second component carrier, and is used to adjust the height of the second component carrier to achieve cross-transportation.

[0011] Furthermore, a fixed plate is arranged between the second component carrier and the adjusting cylinder, and two groups of sensors connected to the control mechanism are arranged between the fixed plate and the adjusting cylinder body, and are respectively a first sensor and a second sensor. The first sensor is used to sense the height position of the second component carrier at both ends of the second slide rail, and the second sensor is used to sense the height position of the second component carrier during transportation.

[0012] Furthermore, the second driving device includes: a second motor whose main body is fixedly mounted on the conveying frame near the side of the feeding mechanism; a second screw rod fixedly assembled with the power output shaft of the second motor and capable of moving synchronously with the power output shaft, the second screw rod being parallel to the second slide rail; a second bearing seat fixedly mounted on the conveying frame and used for rotatably assembling the second screw rod to fix the second screw rod; and a second driving block which is sleeved on the second screw rod and cooperates with the second screw rod and can reciprocate along the axial direction of the second screw rod when the second screw rod rotates.

[0013] Furthermore, the first component carrier and the second component carrier are both provided with placement holes for placing bulk components, and a plurality of the placement holes are provided, and the plurality of the placement holes are arranged in a linear manner with equal intervals.

[0014] Furthermore, the discharging mechanism includes: a belt conveyor body; a plurality of third component carriers fixedly mounted on the belt of the belt conveyor and capable of moving synchronously with the belt, for receiving a whole group of components sucked by the robot from the cross-transport mechanism and conveying the whole group of components to the feed position of the placement machine; and a sensing element, one part of which is arranged at the discharging end of the belt conveyor body and the other part is arranged on the third component carrier. When detecting that the third component carrier arrives at the discharging end, the sensing element is used to send a detection signal to the control mechanism so that the control mechanism can control the feeding of the bulk material supply device of the placement machine.

[0015] Furthermore, the feeding mechanism is a vibrating plate, and a buffer for caching bulk materials is provided on one side of the vibrating plate.

[0016] After adopting the above technical scheme, the beneficial effect of the present invention is: after using the above-mentioned placement machine bulk material supply equipment, the bulk material to be placed on the placement machine can be placed on the vibration plate, and the buffered bulk material is placed on the buffer to add when there is a lack of bulk material in the vibration plate. After the bulk materials enter the vibration plate, the vibration plate arranges them neatly and sends them to the disc transfer mechanism. The disc transfer mechanism places the bulk materials one by one in the placement holes on the first component carrier or the second component carrier, and the corresponding first transfer device and the second transfer device cross-send the bulk materials to the manipulator. The manipulator transfers the bulk materials on the first component carrier or the second component carrier as a group to the third component carrier of the discharging mechanism, and finally sends the neatly arranged components on the third component carrier to the feed port of the placement machine through the belt conveyor body, so as to realize the bulk material supply of the placement machine. The bulk material supply equipment for the placement machine set in this way breaks the feeding method of the traditional placement machine, avoids the waste of braiding materials, reduces the cost of placement, improves the efficiency of placement, simplifies the placement process, and has the advantages of simple placement process, low placement cost and high bulk material supply efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0018] Figure 1 It is a schematic diagram of the overall structure of this embodiment;

[0019] Figure 2 is a schematic diagram of the first structure of the cross-transport mechanism in this embodiment;

[0020] Figure 3 is a schematic diagram of a second structure of the cross-transport mechanism in this embodiment;

[0021] Figure 4 is a schematic structural diagram of the second conveying device in the cross conveying mechanism of this embodiment;

[0022] Figure 5 Schematic diagram of the structure of the manipulator and the discharging mechanism in this embodiment;

[0023] Figure 6 It is a schematic diagram of the structure of the feeding mechanism and the disc transfer mechanism in this embodiment.

[0024] Explanation of the reference numerals: 1. frame; 2. loading mechanism; 3. disc transfer mechanism; 4. cross transport mechanism; 5. manipulator; 6. discharging mechanism; 7. control mechanism; 8. supporting foot; 9. universal wheel; 10. transport frame; 11. first slide rail; 12. second slide rail; 13. first transport device; 14. second transport device; 15. first driving device; 16. second driving device; 17. first slider; 18. first mounting plate; 19. first component carrier; 20. first motor; 21. first screw rod; 22. first bearing seat; 23. first driving block; 24. clearance groove; 25. second slider; 26. second mounting plate; 27. first Binary component carrier; 28. Adjusting cylinder; 29. ​​Fixing plate; 30. First sensor; 31. Second sensor; 32. Second motor; 33. Second screw rod; 34. Second bearing seat; 35. Second driving block; 36. First anti-slip assembly; 37. Second anti-slip assembly; 38. Left anti-slip block; 39. Right anti-slip block; 40. Third sensor; 41. Fourth sensor; 42. Placement hole; 43. Drag chain; 44. Belt conveyor body; 45. Third component carrier; 46. Sensor; 47. Buffer; 48. Transfer rack; 49. Transfer nozzle; 50. Support rack; 51. Robot arm; 52. Material picking nozzle; 53. Feeding channel. DETAILED DESCRIPTION

[0025] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0026] This specific embodiment is only an explanation of the present invention, and it is not a limitation of the present invention. After reading this specification, those skilled in the art can make non-creative modifications to this embodiment as needed, but as long as it is within the scope of the claims of the present invention, it is protected by the patent law.

[0027] This embodiment relates to a bulk material supply device for a placement machine, such as Figure 1-6 As shown, it includes: a frame 1, a loading mechanism 2, a disc transfer mechanism 3, a cross-transportation mechanism 4, a manipulator 5, a discharging mechanism 6 and a control mechanism 7.

[0028] Specifically, Figure 1-6As shown, the loading mechanism 2 is arranged on the frame 1 and is located on one side of the frame 1. The loading mechanism 2 is used to arrange the bulk materials neatly and send them to the disc transfer mechanism 3. The disc transfer mechanism 3 is installed on the frame 1. The disc transfer mechanism 3 is used to transfer the bulk materials transported by the loading mechanism 2 to the cross-transport mechanism 4. The cross-transport mechanism 4 is installed on the frame 1. One end of the cross-transport mechanism 4 is connected to the disc transfer mechanism 3, and the other end is connected to the manipulator 5. The cross-transport mechanism 4 is used to receive the bulk materials transported by the disc transfer mechanism 3 and arrange the bulk materials neatly into groups and then send them to the manipulator 5. One end of the manipulator 5 is fixedly installed on the frame 1, and the other end is fixedly installed on the discharge mechanism 6. The manipulator 5 is used to synchronously transport the whole group of bulk materials neatly arranged into groups to the discharge mechanism 6. One end of the discharge mechanism 6 is fixedly installed on the frame 1, and the other end extends to the side away from the frame 1 to dock with the discharge port of the placement machine. The discharging mechanism 6 is used to transport the bulk materials transported by the manipulator 5 to the feeding place of the SMT machine according to the requirements of the SMT machine. The control mechanism 7 is connected to the feeding mechanism 2, the disc transfer mechanism 3, the cross-transport mechanism 4, the manipulator 5 and the discharging mechanism 6. The control mechanism 7 is used to control the feeding mechanism 2, the disc transfer mechanism 3, the cross-transport mechanism 4, the manipulator 5 and the discharging mechanism 6 to work in sequence.

[0029] In this embodiment, the frame 1 is L-shaped as a whole, and six support legs 8 are provided at the bottom of the frame 1, which are used to support the frame 1 when the frame 1 is in use. At the same time, four universal wheels 9 are also provided at the bottom of the frame 1. When the bulk material supply device needs to be moved or adjusted in position, the frame 1 is supported by the universal wheels 9, thereby facilitating the movement or position adjustment of the bulk material supply device.

[0030] Furthermore, if Figure 2-4 As shown, the cross transport mechanism 4 includes: a transport frame 10 , a first slide rail 11 , a second slide rail 12 , a first transport device 13 , a second transport device 14 , a first driving device 15 and a second driving device 16 .

[0031] Specifically, the transport rack 10 is fixedly mounted on the bearing surface of the frame 1 by fastening screws. And the transport rack 10 spans between the disc transfer mechanism 3 and the manipulator 5. The first slide rail 11 is fixedly mounted on the transport rack 10 away from the bearing surface (top) by fastening screws. The second slide rail 12 is fixedly mounted on the transport rack 10 near the disc transfer mechanism 3 by fastening screws. The first transport device 13 is slidably mounted on the first slide rail 11, and the first transport device 13 can move back and forth between the manipulator 5 and the disc transfer mechanism 3. The first transport device 13 is used to receive the bulk materials transported by the disc transfer mechanism 3, and arrange the bulk materials neatly into groups and then transport them to the material-retrieving location of the manipulator 5. The second transport device 14 is slidably mounted on the second slide rail 12, and the second transport device 14 can move back and forth between the manipulator 5 and the disc transfer mechanism 3. The second transport device 14 is used to receive the bulk materials transported by the disc transfer mechanism 3, and arrange the bulk materials neatly into groups and then transport them to the material-retrieving location of the manipulator 5. The first driving device 15 is disposed on the conveying frame 10 near the discharging mechanism 6, and the first driving device 15 is assembled with the first conveying device 13. The first driving device 15 is used to drive the first conveying device 13 to move back and forth. The second driving device 16 is disposed on the conveying frame 10 near the discharging mechanism 6, and the second driving device 16 is assembled with the second conveying device 14. The second driving device 16 is used to drive the second conveying device 14 to move back and forth.

[0032] It should be noted that the second conveying device 14 and the first conveying device 13 cross-convey the bulk materials transferred by the disc transfer mechanism 3. When the first conveying device 13 is located at one end of the disc transfer mechanism 3, the second conveying device 14 is located at the material-taking location of the manipulator 5. When the first conveying device 13 slides from the side of the disc transfer mechanism 3 to the side of the manipulator 5, the second conveying device 14 slides from the side of the manipulator 5 to the side of the disc transfer mechanism 3. When the first conveying device 13 and the second conveying device 14 meet midway, the second conveying device 14 can adjust its position under the control of the control mechanism 7, thereby realizing cross-conveyance of bulk materials. The provision of two conveying devices can greatly improve the conveying efficiency of the cross-conveyance mechanism 3, thereby improving the supply efficiency of the bulk material supply equipment.

[0033] Furthermore, if Figure 2-4As shown, the first conveying device 13 includes: a first slider 17, a first mounting plate 18 and a first component carrier 19. The first slider 17 is assembled with the first slide rail 11 and can slide along the first slide rail 11. A part of the first mounting plate 18 is fixedly assembled with the first slider 17 on the side away from the first slide rail 11 by screws, and another part of the first mounting plate 18 is fixedly assembled with the first driving device 15 by fastening screws. The first mounting plate 18 drives the first slider 17 to slide along the first slide rail 11 under the drive of the first driving device 15. The first component carrier 19 is fixedly mounted on the first mounting plate 18 on the side away from the first driving device 15 by fastening screws. The first component carrier 19 is used to receive the bulk materials transported by the disc transport mechanism 3, so as to realize neat arrangement of the bulk materials.

[0034] Furthermore, if Figure 2-4 As shown, the first driving device 15 includes: a first motor 20, a first screw rod 21, a first bearing seat 22 and a first driving block 23. The main body of the first motor 20 is fixedly mounted on the conveying frame 10 near the side (left side) of the feeding mechanism 2. The first screw rod 21 is fixedly assembled with the power output shaft of the first motor 20, and the first screw rod 21 can move synchronously with the power output shaft. The first screw rod 21 is arranged parallel to the first slide rail 11. The first bearing seat 22 is fixedly mounted on the conveying frame 10. The first bearing seat 22 is used for the first screw rod 21 to be rotatably assembled, thereby fixing the first screw rod 21, improving the coaxiality of the first screw rod 21 during rotation, and ensuring the stability of the rotation of the first screw rod 21. The first driving block 23 is sleeved on the first screw rod 21 and cooperates with the first screw rod 21. When the first screw rod 21 rotates, the first driving block 23 can reciprocate along the axial direction of the first screw rod 21.

[0035] Preferably, if Figure 2-4 As shown, two first bearing seats 22 are provided, one of which is fixedly mounted on the conveying frame 10 by fastening screws near the first motor 20. The other is fixedly mounted on the conveying frame 10 by fastening screws near one end of the manipulator 5.

[0036] Furthermore, if Figure 2-4 As shown, a clearance slot 24 is opened on the transport rack 10 , and the second transport device 14 includes: a second slide block 25 , a second mounting plate 26 , a second component carrier 27 and an adjusting cylinder 28 .

[0037] The second slider 25 is assembled with the second slide rail 12 and can slide along the second slide rail 12. A part of the second mounting plate 26 is assembled with the side of the second slider 25 away from the second slide rail 12 by fastening screws. Another part of the second mounting plate 26 is assembled with the second driving device 16 through the clearance groove 24. The second mounting plate 26 drives the second slider 25 to slide under the drive of the second driving device 16. The second component carrier 27 is arranged on the side of the second mounting plate 26 away from the second slider 25. The second component carrier 27 is used to receive the bulk materials transported by the disc transport mechanism 3, so as to achieve neat arrangement of the bulk materials. The first component carrier 19 and the second component carrier 27 cross-transport bulk components. The main body of the adjusting cylinder 28 is fixedly mounted on the second mounting plate 26, and the power output end of the adjusting cylinder 28 is fixedly assembled with the second component carrier 27. After the adjusting cylinder 28 receives the control signal sent by the control mechanism 7, the adjusting cylinder 28 is used to adjust the height of the second component carrier 27, so as to achieve cross-transportation.

[0038] Preferably, if Figure 2-4 As shown, a fixing plate 29 is provided between the second component carrier 27 and the adjusting cylinder 28. Two sets of sensing sheets are provided on the fixing plate 29, and two sets of sensing bodies connected to the control mechanism 7 are provided on the main body of the adjusting cylinder 28. The two sets of sensing sheets and the two sets of sensing bodies correspond to form two sets of sensors, and the two sets of sensors are respectively a first sensor 30 and a second sensor 31. The first sensor 30 is used to sense the height position of the second component carrier 27 at both ends of the second slide rail 12. The second sensor 31 is used to sense the height position of the second component carrier 27 during transportation.

[0039] It should be noted that when the second component carrier 27 is located at the two ends of the second slide rail 12, the control mechanism 7 controls the regulating cylinder 28 to raise the height of the second component carrier 27 until the sensing body of the first sensor 30 senses the sensing sheet and stops. When the second component carrier 27 is not located at the two ends of the second slide rail 12, the control mechanism 7 controls the regulating cylinder 28 to lower the height of the second component carrier 27 until the sensing body of the second sensor 31 senses the sensing sheet and stops. Thus, the first component carrier 19 and the second component carrier 27 can smoothly cross-transport bulk materials.

[0040] Furthermore, if Figure 2-4As shown, the second driving device 16 includes: a second motor 32, a second screw rod 33, a second bearing seat 34 and a second driving block 35. The main body of the second motor 32 is fixedly mounted on the conveying frame 10 near the side of the feeding mechanism 2. The second screw rod 33 is fixedly assembled with the power output shaft of the second motor 32, and the second screw rod 33 can move synchronously with the power output shaft. The second screw rod 33 is arranged parallel to the second slide rail 12. The second bearing seat 34 is fixedly mounted on the conveying frame 10, and the second bearing seat 34 is used for the second screw rod 33 to be rotatably assembled, thereby fixing the second screw rod 33, improving the coaxiality of the second screw rod 33 when rotating, and ensuring the stability of the rotation of the second screw rod 33. The second driving block 35 is sleeved on the second screw rod 33 and cooperates with the second screw rod 33. When the second screw rod 33 rotates, the second driving block 35 can reciprocate along the axial direction of the second screw rod 33.

[0041] Preferably, if Figure 2-4 As shown, two second bearing seats 34 are provided, one of which is fixedly mounted on the conveying frame 10 by fastening screws near the second motor 32. The other is fixedly mounted on the conveying frame 10 by fastening screws near one end of the manipulator 5.

[0042] Preferably, if Figure 2-4 As shown, first anti-slip components 36 are provided at both ends of the first slide rail 11. The first anti-slip components 36 are fixedly mounted on the transport frame 10, and the first anti-slip components 36 are used to prevent the first slider 17 from detaching from the first slide rail 11. Second anti-slip components 37 are provided at both ends of the second slide rail 12. The second anti-slip components 37 are fixedly mounted on the transport frame 10, and the second anti-slip components 37 are used to prevent the second slider 25 from detaching from the second slide rail 12. The first anti-slip components 36 and the second anti-slip components 37 both include: a left anti-slip block 38 and a right anti-slip block 39. The left anti-slip block 38 is fixedly mounted on the transport frame 10 and is located on one side of the disc transfer device. The right anti-slip block 39 is fixedly mounted on the transport frame 10 and is located on one side of the manipulator 5.

[0043] Preferably, if Figure 2-4As shown, a third sensor 40 is provided between the first driving block 23 and the transport frame 10, and a fourth sensor 41 is provided between the second driving block 35 and the transport frame 10. The sensing bodies of the third sensor 40 and the fourth sensor 41 are both provided with two pieces, one of which is located on one side of the disc transfer mechanism 3, and the other is located at the terminal end of the slide rail. The first driving block 23 is provided with a sensing sheet of the third sensor 40, and the third sensor 40 is used to sense the position of the first transport device 13 on the first slide rail 11. The second driving block 35 is provided with a sensing sheet of the fourth sensor 41, and the fourth sensor 41 is used to sense the position of the second transport device 14 on the second slide rail 12. The control mechanism 7 is used to receive the sensing signals of the first sensor 30, the second sensor 31, the third sensor 40 and the fourth sensor 41, and control the first motor, the second motor and the regulating cylinder 28 to operate sequentially according to the sensing signals, so as to realize the cross-transportation of the first component carrier 19 and the second component carrier 27.

[0044] Preferably, if Figure 2-4 As shown, both the first component carrier 19 and the second component carrier 27 are provided with placement holes 42 for placing bulk components, and a plurality of placement holes 42 are provided, and the plurality of placement holes 42 are arranged in a linear manner with equal spacing. Specifically, 17 placement holes 42 are provided. In other embodiments, the number of placement holes 42 can also be 15, 16, and so on.

[0045] Preferably, if Figure 2-4 As shown, a drag chain 43 is fixedly installed on the second mounting plate 26 by fastening screws. The drag chain 43 is used to facilitate the routing of the connecting line between the cross-transport mechanism 4 and the control mechanism 7.

[0046] Furthermore, if Figure 5 As shown, the discharging mechanism 6 includes: a belt conveyor body, a third component carrier 45 and a sensor 46. The third component carrier 45 is fixedly mounted on the belt of the belt conveyor. The third component carrier 45 can move synchronously with the belt. The third component carrier 45 is used to receive the whole group of components sucked by the robot 5 from the cross-transport mechanism 4, and transport the whole group of components to the feeding place of the placement machine. A part of the sensor 46 is arranged at the discharging end of the belt conveyor body, and another part of the sensor 46 is arranged on the third component carrier 45. When detecting that the third component carrier 45 arrives at the discharging end, the sensor 46 is used to send a detection signal to the control mechanism 7, so that the control mechanism 7 can control the feeding of the bulk material supply device of the placement machine.

[0047] Preferably, if Figure 6As shown, the feeding mechanism 2 is a vibrating plate, and a buffer 47 for caching bulk materials is provided on one side of the vibrating plate. A feeding channel 53 is provided between the vibrating plate and the round plate transfer mechanism 3. The feeding channel 53 is connected to the outlet of the vibrating plate, and the feeding channel 53 is used to feed materials to the round plate transfer mechanism 3. Since the vibrating plate is an existing product, it is not described in detail in this embodiment.

[0048] Preferably, an air pump and air compressor (not shown in this embodiment) is provided in the frame 1, and the air pump and air compressor are connected to the control mechanism 7, the disc transfer mechanism 3 and the manipulator 5. The disc transfer mechanism 3 is fixedly mounted on the bearing surface of the frame 1 through the transfer frame 48. A transfer nozzle 49 is provided on the disc transfer mechanism 3. The transfer nozzle 49 is connected to the air compressor, which absorbs bulk components through the negative pressure principle and transfers them to the placement holes 42 of the first component carrier 19 and the second component carrier 27, thereby realizing the transfer and arrangement of bulk components.

[0049] Preferably, if Figure 5 As shown, the manipulator 5 is fixed by a support frame 50, and one end of the support frame 50 is fixedly assembled with the support surface of the frame 1, and the other end is fixedly assembled with the frame of the belt conveyor body. The manipulator 51 is slidably mounted on the support frame 50, and a material pickup nozzle 52 is provided on the manipulator 51 near the bulk material side. The material pickup nozzle 52 is connected to the air compressor, which absorbs bulk material components through the negative pressure principle, and simultaneously transfers the bulk material components on the first component carrier 19 or the second component carrier 27 to the third component carrier 45. The manipulator 51 is driven by a screw slider mechanism, and a detection element is provided on the manipulator 5, which is used to detect the position information of the manipulator 51, and send the position information to the control mechanism 7, so that the control mechanism 7 can control the overall orderly operation of the equipment.

[0050] The working principle of this embodiment is roughly as follows: after using the above-mentioned bulk material supply equipment for the placement machine, the bulk material to be placed on the placement machine can be placed on the vibration plate, and the buffered bulk material can be placed on the buffer 47 to be added when there is a lack of bulk material in the vibration plate. After the bulk materials enter the vibration disk, the vibration disk arranges them neatly and sends them to the disc transfer mechanism 3. The disc transfer mechanism 3 places the bulk materials one by one in the placement holes 42 on the first component carrier 19 or the second component carrier 27, and the corresponding first transfer device and the second transfer device cross-send the bulk materials to the manipulator 5. The manipulator 5 transfers the bulk materials on the first component carrier 19 or the second component carrier 27 as a group to the third component carrier 45 of the discharge mechanism 6, and finally sends the neatly arranged components on the third component carrier 45 to the feed port of the placement machine through the belt conveyor body, so as to realize the bulk material supply of the placement machine. The bulk material supply equipment for the placement machine set in this way breaks the feeding method of the traditional placement machine, avoids the waste of braiding materials, reduces the cost of placement, improves the efficiency of placement, simplifies the placement process, and has the advantages of simple placement process, low placement cost and high bulk material supply efficiency.

[0051] The above is only used to illustrate the technical solution of the present invention rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the present invention by ordinary technicians in this field should be included in the scope of the claims of the present invention as long as they do not depart from the spirit and scope of the technical solution of the present invention.

Claims

1. A bulk material supply device for a chip mounter, characterized in that: include: A frame (1), a loading mechanism (2), a disc transfer mechanism (3), a cross-transport mechanism (4), a manipulator (5), a discharging mechanism (6) and a control mechanism (7); The feeding mechanism (2) is arranged on the frame (1) and located on one side of the frame (1), and the feeding mechanism (2) is used to arrange the bulk materials in an orderly manner and send them to the disc transfer mechanism (3); The disc transfer mechanism (3) is installed on the frame (1), and the disc transfer mechanism (3) is used to transfer the bulk material conveyed by the loading mechanism (2) to the cross-transport mechanism (4); The cross-transport mechanism (4) is installed on the frame (1), one end of the cross-transport mechanism (4) is docked with the disc transfer mechanism (3), and the other end is docked with the manipulator (5), and the cross-transport mechanism (4) is used to receive the bulk materials transferred by the disc transfer mechanism (3) and arrange the bulk materials neatly into groups and then send them to the manipulator (5); One end of the manipulator (5) is fixedly mounted on the frame (1), and the other end is fixedly mounted on the discharging mechanism (6), and the manipulator (5) is used to synchronously transport the entire group of bulk materials neatly arranged into groups to the discharging mechanism (6); One end of the discharging mechanism (6) is fixedly mounted on the frame (1), and the other end extends to a side away from the frame (1) to dock with the feed of the placement machine. The discharging mechanism (6) is used to transport the bulk material transported by the manipulator (5) to the feed of the placement machine according to the requirements of the placement machine. The control mechanism (7) is connected to the loading mechanism (2), the disc transfer mechanism (3), the cross-transport mechanism (4), the robot (5) and the discharging mechanism (6), and the control mechanism (7) is used to control the loading mechanism (2), the disc transfer mechanism (3), the cross-transport mechanism (4), the robot (5) and the discharging mechanism (6) to work sequentially.

2. The bulk material supply device for a chip mounter according to claim 1, characterized in that: The cross-transport mechanism (4) comprises: A transport rack (10) fixedly mounted on the bearing surface of the frame (1); A first slide rail (11) fixedly mounted on the transport frame (10) at a side away from the bearing surface; A second slide rail (12) fixedly mounted on the transport frame (10) and close to a side of the disc transfer mechanism (3); a first conveying device (13) slidably mounted on the first slide rail (11) and capable of moving back and forth between the manipulator (5) and the disc transfer mechanism (3), and used for receiving the bulk materials transferred by the disc transfer mechanism (3) and arranging the bulk materials neatly into groups before conveying them to the material taking location of the manipulator (5); a second conveying device (14) slidably mounted on the second slide rail (12) and capable of moving back and forth between the manipulator (5) and the disc transfer mechanism (3), for receiving the bulk materials transferred by the disc transfer mechanism (3) and arranging the bulk materials neatly into groups and then conveying them to the material taking location of the manipulator (5); the second conveying device (14) and the first conveying device (13) cross-convey the bulk materials transferred by the disc transfer mechanism (3); a first driving device (15) disposed on the conveying frame (10) close to the discharging mechanism (6) and assembled with the first conveying device (13) and used for driving the first conveying device (13) to move back and forth; and A second driving device (16) is arranged on the conveying frame (10) close to the discharge mechanism (6) and assembled with the second conveying device (14) and is used to drive the second conveying device (14) to move back and forth.

3. The bulk material supply device for a chip mounter according to claim 2, characterized in that: The first conveying device (13) comprises: a first sliding block (17) assembled with the first sliding rail (11) and capable of sliding along the first sliding rail (11); a first mounting plate (18) having a portion mounted on a side of the first sliding block (17) away from the first sliding rail (11) and another portion mounted on the first driving device (15), wherein the first mounting plate (18) drives the first sliding block (17) to slide under the drive of the first driving device (15); and A first component carrier (19) is fixedly mounted on the first mounting plate (18) at a side away from the first driving device (15) and is used to receive the bulk materials transferred by the disc transfer mechanism (3) to achieve neat arrangement of the bulk materials.

4. The bulk material supply device for a chip mounter according to claim 3, characterized in that: The first driving device (15) comprises: The main body is fixedly mounted on a first motor (20) on a side of the transport frame (10) close to the loading mechanism (2); a first screw rod (21) fixedly mounted on a power output shaft of the first motor (20) and capable of moving synchronously with the power output shaft, wherein the first screw rod (21) is parallel to the first slide rail (11); a first bearing seat (22) fixedly mounted on the transport frame (10) and used for rotationally assembling the first screw rod (21) to fix the first screw rod (21); and A first driving block (23) is sleeved on the first screw rod (21) and cooperates with the first screw rod (21), and can reciprocate along the axial direction of the first screw rod (21) when the first screw rod (21) rotates.

5. The bulk material supply device for a chip mounter according to claim 4, characterized in that: The transport frame (10) is provided with a clearance groove (24), and the second transport device (14) comprises: a second sliding block (25) assembled with the second sliding rail (12) and capable of sliding along the second sliding rail (12); a second mounting plate (26) having a portion assembled with the second slider (25) on a side away from the second slide rail (12) and another portion passing through the clearance groove (24) and assembled with the second driving device (16), wherein the second mounting plate (26) drives the second slider (25) to slide under the drive of the second driving device (16); a second component carrier (27) disposed on the side of the second mounting plate (26) away from the second slider (25) and used for receiving the bulk materials transferred by the disc transfer mechanism (3) to achieve neat arrangement of the bulk materials, the first component carrier (19) and the second component carrier (27) cross-transporting bulk components; and The main body is fixedly mounted on the second mounting plate (26), the power output end is fixedly assembled with the second component carrier (27), and an adjusting cylinder (28) is used to adjust the height of the second component carrier (27) to achieve cross-transportation.

6. The bulk material supply device for chip mounter according to claim 5, characterized in that: A fixing plate (29) is arranged between the second component carrier (27) and the regulating cylinder (28), and two groups of sensors connected to the control mechanism (7) are arranged between the fixing plate (29) and the main body of the regulating cylinder (28), and are respectively a first sensor (30) and a second sensor (31), wherein the first sensor (30) is used to sense the height position of the second component carrier (27) at both ends of the second slide rail (12), and the second sensor (31) is used to sense the height position of the second component carrier (27) during transportation.

7. The bulk material supply device for a chip mounter according to claim 6, characterized in that: The second driving device (16) comprises: A second motor (32) is fixedly mounted on the transport frame (10) on a side close to the loading mechanism (2); a second screw rod (33) fixedly mounted on a power output shaft of the second motor (32) and capable of moving synchronously with the power output shaft, wherein the second screw rod (33) is parallel to the second slide rail (12); a second bearing seat (34) fixedly mounted on the transport frame (10) and used for rotationally assembling the second screw rod (33) to fix the second screw rod (33); and A second driving block (35) is sleeved on the second screw rod (33) and cooperates with the second screw rod (33), and can reciprocate along the axial direction of the second screw rod (33) when the second screw rod (33) rotates.

8. The bulk material supply device for a chip mounter according to claim 7, characterized in that: The first component carrier (19) and the second component carrier (27) are both provided with placement holes (42) for placing bulk components, a plurality of the placement holes (42) are provided, and the plurality of the placement holes (42) are arranged in a linear pattern at equal intervals.

9. The bulk material supply device for a chip mounter according to any one of claims 1 to 8, characterized in that: The discharging mechanism (6) comprises: Belt conveyor body; A plurality of third component carriers (45) fixedly mounted on the belt of the belt conveyor and capable of synchronously moving with the belt, used to receive the entire group of components sucked by the robot (5) from the cross-transport mechanism (4) and transport the entire group of components to the feed position of the placement machine; and A sensing element (46) is partially arranged at the discharge end of the belt conveyor body and the other part is arranged on the third component carrier (45). When detecting that the third component carrier (45) reaches the discharge end, the sensing element (46) is used to send a detection signal to the control mechanism (7) so that the control mechanism (7) controls the bulk material supply device of the placement machine to feed the material.

10. The bulk material supply device for a chip mounter according to claim 9, characterized in that: The feeding mechanism (2) is a vibrating plate, and a buffer (47) for buffering bulk materials is provided on one side of the vibrating plate.

Citation Information

Patent Citations

  • Bulk material supply equipment of chip mounter

    CN212607880U

Cited By

  • Bulk material supply equipment of chip mounter

    CN120529575A