Ash discharging device and ash discharging method for settling chamber of circulating fluidized bed boiler

By designing an automated ash discharge device in the circulating fluidized bed boiler, and using components such as DCS control systems and Roots blowers, the problem of environmental pollution and high investment in ash discharge in the settling chamber has been solved. Automatic ash discharge and sealed collection have been realized, reducing costs. cost and pollution.

CN111649321BActive Publication Date: 2024-10-18HUBEI DONGFANG CHEM IND
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010723965.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-24
Publication Date
2024-10-18
Estimated Expiration
2040-07-24

AI Technical Summary

Technical Problem

The existing circulating fluidized bed boiler settling chamber ash removal technology has the problems of large environmental pollution and high investment costs, which is particularly disadvantageous when the boiler room space is small.

Method used

An ash removal device including a boiler convection heating surface, a flue shaft, an ash discharge duct, a cut-off valve, a resistance thermometer, an electric ball valve, a paddle level switch, a compressed air purge pipe and a Roots blower is designed. The DCS control system realizes automatic ash discharge, avoiding manual ash discharge and the use of external equipment.

Benefits of technology

It realizes automated and unmanned discharge of ash in the boiler settling chamber, reduces investment costs, avoids environmental pollution, and improves the economy and practicality of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111649321B_ABST
    Figure CN111649321B_ABST
Patent Text Reader

Abstract

The present invention relates to an ash discharge device and ash discharge method for a circulating fluidized bed boiler settling chamber, the device comprises a boiler convection heating surface and a flue shaft connected thereto, two rows of boiler settling chambers are arranged at the bottom of the boiler convection heating surface, the bottom of each boiler settling chamber is connected to the flue shaft through a settling chamber ash discharge device, a rotary-type material level switch is also installed at the bottom of the boiler settling chamber, the settling chamber ash discharge device comprises an ash discharge conduit and a shut-off valve, a thermal resistance thermometer and an electric ball valve arranged on the ash discharge conduit, the side wall of the ash discharge conduit is also connected to a compressed air purge pipe, the lower part of the flue shaft is connected to a dust collector through the flue, and the flue shaft settling chamber is provided with a gasification air plate for ash purge, and the air source of the gasification air plate comes from a Roots blower. The ash discharge device for the circulating fluidized bed boiler settling chamber proposed in the present application can realize the closed automatic discharge of dust in the boiler settling chamber, and does not generate secondary pollution during use, and has good economy and practicality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of ash removal in a boiler settling chamber, and in particular to an ash removal device and an ash removal method for a circulating fluidized bed boiler settling chamber. Background Art

[0002] At the end of the 20th century, a circulating fluidized bed combustion technology that combines many advantages such as wide fuel adaptability, high combustion efficiency, strong variable operating condition capability, low smoke pollutant content, and good comprehensive utilization of ash and slag has been widely used in China.

[0003] During the operation of the circulating fluidized bed boiler, the high-temperature flue gas flushes the superheater, convection tube bundle and other boiler convection heating surfaces for heat exchange. The larger particles in the flue gas will fall into the settling chamber at the bottom of the convection heating surface under the action of gravity to form ash. The ash in the settling chamber of the boiler convection heating surface needs to be cleaned regularly, otherwise it is easy to cause uneven heating of the convection heating surface of the circulating fluidized bed boiler, and it is very easy to cause flue gas deviation. The existing boiler convection heating surface settling chamber ash cleaning generally adopts manual ash discharge or external additional silo pump and ash conveying device, which causes environmental pollution or excessive investment costs, especially for the small boiler room. Summary of the invention

[0004] In order to overcome the above-mentioned deficiencies of the prior art, the present invention proposes an ash discharge device and an ash discharge method for a circulating fluidized bed boiler settling chamber, which solve the technical problems of large environmental pollution and high investment cost in the existing boiler settling chamber ash discharge.

[0005] The present invention is achieved through the following technical solutions:

[0006] A ash discharge device for a settling chamber of a circulating fluidized bed boiler, comprising a boiler convection heating surface and a flue shaft connected thereto, a front boiler settling chamber and a rear boiler settling chamber are arranged at the bottom of the boiler convection heating surface, the bottoms of the front boiler settling chamber and the rear boiler settling chamber are connected to the flue shaft through a settling chamber ash discharge device, a rotary paddle material level switch is also installed at the bottom of the front boiler settling chamber and the rear boiler settling chamber, the settling chamber ash discharge device comprises an ash discharge conduit and a shut-off valve, a thermal resistance thermometer and an electric ball valve arranged on the ash discharge conduit, the rotary paddle material level switch is interlocked with the electric ball valve, the side wall of the ash discharge conduit is also connected to a compressed air purge pipe, the compressed air purge pipe is provided with an electric ball valve, the bottom of the flue shaft is provided with a flue shaft settling chamber, and the flue shaft is connected to a dust collector through the flue;

[0007] The flue shaft settling chamber is provided with a gasification air plate for ash purging, a second thermal resistance thermometer is provided on the gasification air plate, and the gasification air plate is connected to a Roots blower.

[0008] Furthermore, the rotary paddle level switch, electric ball valve 1, electric ball valve 2, thermal resistance thermometer 1, thermal resistance thermometer 2, and Roots blower are all connected to a DCS control system.

[0009] Furthermore, the electric ball valve 1 is interlocked with the boiler primary fan and the boiler induced draft fan, and the boiler primary fan and the boiler induced draft fan are also connected to the DCS control system.

[0010] Furthermore, a wind cap is welded on the gasification wind plate.

[0011] Furthermore, the convection heating surface of the boiler includes a superheater, a convection tube and a lower steam drum, and an air preheater is installed in the flue shaft.

[0012] Furthermore, a grid plate is installed at the inlet of each boiler settling chamber.

[0013] Furthermore, the ash discharge duct is provided with a duckbill diffusion nozzle at one end located in the flue shaft.

[0014] A method for discharging ash from an ash discharging device of a settling chamber of a circulating fluidized bed boiler, specifically comprising the following steps:

[0015] S1: When ash discharge operation is required, the electric ball valve connected to the front row boiler settling chamber is opened to discharge ash. The compressed air purge pipe works for t2 seconds to purge the ash discharge conduit every t1 seconds of ash discharge operation. This cycle repeats. When the rotary purge level switch at the bottom of the front row boiler settling chamber monitors that the boiler settling chamber is at a low material level or when the temperature measured by the thermal resistance thermometer installed on the ash discharge conduit is higher than T1℃, the electric ball valve that controls the front row boiler settling chamber to perform ash discharge operation is closed.

[0016] S2: Once the electric ball valve for controlling the ash discharge of the rear boiler settling chamber is opened, repeat the above S1 operation to control the ash discharge of the rear boiler settling chamber until the ash discharge of all boiler settling chambers is completed;

[0017] S3: When the temperature of the thermal resistance thermometer installed on the flue shaft settling chamber is lower than T2℃, the Roots blower is turned on to carry out the ash removal operation in the flue shaft settling chamber. When the Roots blower is started and stops after t3 seconds, the ash removal operation is completed.

[0018] Furthermore, after the Roots blower is turned on in step S3, the air supplied by the Roots blower enters the gasification air plate for air distribution, and then is blown into the flue shaft settling chamber through the wind hood, lifting the ash at the bottom of the flue shaft settling chamber so that it is sucked into the dust collector by the boiler induced draft fan.

[0019] Furthermore, the rotary paddle level switch, electric ball valve 1, electric ball valve 2, thermal resistance thermometer 1, thermal resistance thermometer 2, and Roots blower are connected to a DCS control system. When performing ash discharge operations, the automatic ash discharge button on the DCS control system is started, and the DCS control system controls and completes the operations described in S1-S3.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] The ash discharge device for the settling chamber of a circulating fluidized bed boiler proposed by the present invention can automatically convey the ash collected in the settling chamber of the boiler to a dust collector for disposal by reasonably arranging the combustion system of the boiler body, realize the automatic discharge and closed collection of the ash in the settling chamber of the boiler, and does not require additional conveying equipment such as a silo pump and a material sealing pump. The one-time investment is low, and no secondary pollution is generated during use. The economic and practical performance is good, and the problems of manual ash discharge in the settling chamber of the boiler or environmental pollution or excessive investment costs caused by the external addition of a silo pump and an ash conveying device are effectively solved.

[0022] The DCS control system is used to control ash discharge, which realizes automatic ash discharge in the settling chamber of the circulating fluidized bed boiler and automatic shutdown after ash discharge. The entire operation is automated and unmanned. At the same time, the entire ash discharge process is visualized and monitored in the DCS system control terminal in the boiler automatic control room. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a structural schematic diagram of an ash discharge device of a circulating fluidized bed boiler settling chamber of the present invention;

[0024] Figure 2 It is a schematic structural diagram of the ash discharge device in the settling chamber of the present invention.

[0025] In the figure:

[0026] 1. Superheater; 2. Convection pipe; 3. Lower drum; 4. Front boiler settling chamber; 5. Rear boiler settling chamber; 6. Ash discharge pipe; 7. Shut-off valve; 8. Thermal resistance thermometer 1; 9. Electric ball valve 1; 10. Rotary level switch; 11. Electric ball valve 2; 12. Flue shaft; 13. Air preheater; 14. Gasification air plate; 15. Roots blower; 16. Grid plate; 17. Duckbill diffusion nozzle; 18. Thermal resistance thermometer 2; 19. Ash discharge duct; 20. Compressed air purge pipe; 21. Flue shaft settling chamber; 22. Dust collector; 23. Ash discharge device in settling chamber; 24. Flue; 25. Boiler convection heating surface; 26. Wind cap. DETAILED DESCRIPTION

[0027] Examples are shown to specifically illustrate certain embodiments of the present invention, and should not be construed as limiting the scope of the present invention. The disclosed content of the present invention can be improved from materials, methods and reaction conditions at the same time, and all these improvements should fall within the spirit and scope of the present invention.

[0028] like Figure 1-2 As shown, an ash discharge device for a circulating fluidized bed boiler settling chamber comprises a boiler convection heating surface 25 and a flue shaft 12 arranged on one side of the boiler convection heating surface 25. The bottom of the boiler convection heating surface 25 is provided with two front and rear rows of a front boiler settling chamber 4 and a rear boiler settling chamber 5. The bottoms of the front boiler settling chamber 4 and the rear boiler settling chamber 5 are both connected to the flue shaft 12 through a settling chamber ash discharge device 23. A rotary paddle material level switch 10 is also installed at the lower part of the front boiler settling chamber 4 and the rear boiler settling chamber 5. The settling chamber ash discharge device 23 comprises an ash discharge conduit 19 and a ash discharge conduit 19 arranged on the ash discharge conduit 19. The shut-off valve 7, the thermal resistance thermometer 8 and the electric ball valve 9, the paddle-rotor level switch 10 is interlocked with the electric ball valve 9, the side wall of the ash discharge duct 19 is also connected with a compressed air purge pipe 20, the compressed air purge pipe 20 is provided with an electric ball valve 11, the flue shaft settling chamber 21 is connected to the flue 24, the flue 24 is connected to the dust collector 22, the flue shaft settling chamber 21 is arranged with a gasification air plate 14, the gasification air plate 14 is equipped with a thermal resistance thermometer 18, the gasification air plate 14 is equipped with a wind cap 26 for ash purging, and the gasification air plate 14 is connected to a Roots blower 15.

[0029] The front boiler settling chamber 4 is connected to one end of the ash discharge conduit 19 through the ash discharge pipe 6, and the other end of the ash discharge conduit 19 extends into the flue shaft 12; similarly, the rear boiler settling chamber 5 is also connected to the flue shaft 12 through the same structure. The ash accumulated at the bottom of the front boiler settling chamber 4 and the rear boiler settling chamber 5 is introduced into the flue shaft 12 through the ash discharge pipe 6 and the ash discharge conduit 19, and the Roots blower 15 evenly distributes air to the flue shaft settling chamber 21 through the gasification wind plate 14, and lifts the ash in the flue shaft settling chamber 21 so that it is sucked into the dust collector 22 for treatment by the boiler induced draft fan.

[0030] The shut-off valve 7 is used to cut off the ash discharge of the ash discharge conduit 19 under abnormal conditions, the thermal resistance thermometer 8 is used to determine whether the ash discharge is completed, the electric ball valve 9 is used to ensure that the ash discharge operation is automatically opened or closed according to the control requirements, the compressed air purge pipe 20 is used to regularly purge the ash discharge conduit 19 during the ash discharge process to prevent the ash discharge conduit 19 from being blocked, and the compressed air purge pipe 20 is installed with an electric ball valve 11 to periodically send compressed air into the compressed air purge pipe 20 during the ash discharge process;

[0031] The gasification air plate 14 of the flue shaft settling chamber 21 is used to evenly distribute air to the bottom of the flue shaft settling chamber 21 , and a thermal resistance thermometer 18 is installed on the gasification air plate 14 to determine the amount of ash deposited in the flue shaft settling chamber 21 .

[0032] The rotary paddle level switch 10 is interlocked with the electric ball valve 9. When the ash discharge in the front boiler settling chamber 4 or the rear boiler settling chamber 5 reaches a low level, a low level alarm signal can be issued in time, thereby interlocking the electric ball valve 9 in the ash discharge duct 19 of the boiler settling chamber to close and stop the ash discharge operation of the front boiler settling chamber 4 or the rear boiler settling chamber 5.

[0033] In this embodiment, the rotary paddle level switch 10, electric ball valve 1 9, electric ball valve 2 11, thermal resistance thermometer 1 8, thermal resistance thermometer 2 18, and Roots blower 15 are all connected to a DCS control system. Automatic ash discharge is achieved through the control of the DCS control system.

[0034] In this embodiment, the electric ball valve 9 is interlocked with the boiler primary fan and the boiler induced draft fan, and the boiler primary fan and the boiler induced draft fan are also connected to the DCS control system; if any one of the boiler primary fan and the boiler induced draft fan is out of operation, the electric ball valve 9 cannot be opened and the automatic ash discharge is closed; only when the boiler primary fan and the boiler induced draft fan are working at the same time, the electric ball valve 9 can be opened normally and the automatic ash discharge is turned on.

[0035] In this embodiment, a hood is welded on the gasification air plate 14, and the gasification air plate 14 is connected to the Roots blower 15 through the hood; the hood accelerates the parallel wind blown by the Roots blower 15 and converts it into a vertical air flow from bottom to top, so as to lift the ash in the flue shaft settling chamber 21.

[0036] In this embodiment, the boiler convection heating surface 25 includes a superheater 1, a convection tube 2 and a lower steam drum 3, and an inspection door 12 and an air preheater 13 are provided above the flue shaft settling chamber 21.

[0037] In this embodiment, the entrances of the front boiler settling chamber 4 and the rear boiler settling chamber 5 are respectively installed with grid plates 16 to prevent larger-sized refractory bricks, refractory castables and debris from clogging the ash discharge pipe 6 or ash discharge conduit 19 of the settling chamber.

[0038] In this embodiment, the ash discharge duct 19 is provided with a duckbill diffusion nozzle 17 at one end located in the flue shaft settling chamber 21, which is used to diffuse the ash discharged from the front boiler settling chamber 4 and the rear boiler settling chamber 5 to prevent ash accumulation in the flue shaft settling chamber 21.

[0039] An automatic ash discharge method for an ash discharge device of a settling chamber of a circulating fluidized bed boiler specifically comprises the following steps:

[0040] S1: Press the "automatic ash discharge in the settling chamber" function key in the DCS control system, the system enters automatic ash discharge, the electric ball valve 9 connected to the front row boiler settling chamber 4 is opened, and ash discharge is carried out. The ash discharge operation is carried out every 60 seconds, and the electric ball valve 11 installed on the compressed air purge pipe 20 works for 10 seconds to purge the ash discharge conduit 19, and the cycle is repeated. When the rotary paddle level switch 10 at the bottom of the front row boiler settling chamber 4 monitors that the front row boiler settling chamber 4 is at a low material level or when the temperature measured by the thermal resistance thermometer 8 installed on the ash discharge conduit 19 is higher than 200°C, the electric ball valve 9 for controlling the ash discharge operation of the front row boiler settling chamber 4 is closed;

[0041] S2: After the electric ball valve 9 connected to the front row boiler settling chamber 4 is closed for 120 seconds, the electric ball valve 9 installed on the ash discharge conduit 19 of the rear row boiler settling chamber 5 is opened for ash discharge operation. The ash discharge operation is performed every 60 seconds. The electric ball valve 11 installed on the compressed air purge pipe 20 works for 10 seconds to purge the ash discharge conduit 19. This cycle is repeated. When the rotary paddle level switch 10 at the lower part of the rear row boiler settling chamber 5 monitors that the rear row boiler settling chamber 5 is at a low material level or when the temperature measured by the thermal resistance thermometer 8 installed on the ash discharge conduit 19 is higher than 200°C, the electric ball valve 9 that controls the rear row boiler settling chamber 5 to perform ash discharge operation is closed until the ash discharge of the rear row boiler settling chamber 5 is completed;

[0042] S3: When the electric ball valve 9 for controlling the ash discharge of the rear boiler settling chamber 5 is closed for 300 seconds, and when the temperature of the thermal resistance thermometer 18 installed on the flue shaft settling chamber 21 is lower than 120°C, the Roots blower 15 is automatically interlocked to perform the ash purging operation in the flue shaft settling chamber 21. When the Roots blower 15 is stopped after 120 seconds of starting, the automatic ash discharge operation is completed;

[0043] S4: When the rotary level switch 10 indicates a low material level, the system issues a voice alarm, the Roots blower 15 starts the system voice alarm, and when the temperature measured by the resistance thermometer 8 installed on the ash discharge duct 19 of the front boiler settling chamber 4 and the rear boiler settling chamber 5 is higher than 200°C, a voice alarm is issued to prompt the operator.

[0044] In this embodiment, after the Roots blower 15 is turned on in step S3, the air supplied by the Roots blower 15 enters the gasification wind plate 14 for air distribution, and then is blown into the flue shaft settling chamber 21 through the wind hood 26, lifting the ash at the bottom of the flue shaft settling chamber 21 so that it is sucked into the dust collector 22 by the boiler induced draft fan.

[0045] A manual ash discharge method for an ash discharge device in a settling chamber of a circulating fluidized bed boiler, specifically comprising the following steps:

[0046] S1: When ash discharge is required, the electric ball valve 9 connected to the front row boiler settling chamber 4 is manually opened to discharge ash. The electric ball valve 11 installed on the compressed air purge pipe 20 works for 10 seconds to purge the ash discharge conduit 19 every 60 seconds. This cycle continues. When the rotary purge level switch 10 at the bottom of the front row boiler settling chamber 4 monitors that the front row boiler settling chamber 4 is at a low material level or when the temperature measured by the thermal resistance thermometer 8 installed on the ash discharge conduit 19 is higher than 200°C, the electric ball valve 9 for the front row boiler settling chamber 4 for ash discharge is closed;

[0047] S2: Manually open the electric ball valve 9 installed on the ash discharge conduit 19 of the rear boiler settling chamber 5 to perform ash discharge operation. The ash discharge operation is performed every 60 seconds. The electric ball valve 11 installed on the compressed air purge pipe 20 works for 10 seconds to purge the ash discharge conduit 19. This cycle repeats. When the rotary paddle level switch 10 at the lower part of the rear boiler settling chamber 5 monitors that the rear boiler settling chamber 5 is at a low material level or when the temperature measured by the thermal resistance thermometer 8 installed on the ash discharge conduit 19 is higher than 200°C, the operator manually closes the electric ball valve 9 that controls the ash discharge operation of the rear boiler settling chamber 5. At this point, the ash discharge of the front boiler settling chamber 4 and the rear boiler settling chamber 5 is completed.

[0048] S3: When the temperature of the thermal resistance thermometer 18 installed on the flue shaft settling chamber 21 is lower than 120°C, the Roots blower 15 is manually turned on to perform the soot blowing operation in the flue shaft settling chamber 21. When the Roots blower 15 is turned on and then stopped 120 seconds later, the manual soot discharge operation is completed.

[0049] The ash in the front boiler settling chamber 4 and the rear boiler settling chamber 5 is discharged into the flue shaft 12 at the bottom of the air preheater 13 through the ash discharge duct 19 of the settling chamber, and enters the boiler dust collector 22 with the boiler flue gas flow for collection and disposal. During the process, in order to prevent flue gas short circuit during ash discharge, a rotary level switch 10 and a thermal resistance thermometer 8 are used as judgment devices. At the same time, in order to prevent the discharged ash from accumulating in the flue shaft settling chamber 21 at the bottom of the air preheater 13, a Roots blower 15 and the manufactured flue shaft settling chamber 21 air distribution system are used to achieve ash discharge.

[0050] In summary, the ash discharge device of the present application is arranged within the original boiler body combustion system, has a compact structure, and realizes the closed discharge and automatic / manual discharge of the ash in the settling chamber of the circulating fluidized bed boiler, while solving the problems of environmental pollution or excessive investment costs caused by manual ash discharge in the settling chamber or the addition of external silo pumps and ash conveying devices.

[0051] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. An ash discharge device for a circulating fluidized bed boiler settling chamber, comprising a boiler convection heating surface (25) and a flue shaft (12) connected to the boiler convection heating surface (25), wherein a front row boiler settling chamber (4) and a rear row boiler settling chamber (5) are arranged at the bottom of the boiler convection heating surface (25), characterized in that: The bottoms of the front row boiler settling chamber (4) and the rear row boiler settling chamber (5) are both connected to the flue shaft (12) through a settling chamber ash discharge device (23). Rotary paddle level switches (10) are also installed at the bottoms of the front row boiler settling chamber (4) and the rear row boiler settling chamber (5). The settling chamber ash discharge device (23) includes an ash discharge conduit (19), a shutoff valve (7) arranged on the ash discharge conduit (19), and a thermal resistance thermometer. One (8) and an electric ball valve one (9), the rotary paddle type material level switch (10) is interlocked with the electric ball valve one (9), the side wall of the ash discharge conduit (19) is also connected to a compressed air purge pipe (20), the compressed air purge pipe (20) is provided with an electric ball valve two (11), the bottom of the flue shaft (12) is provided with a flue shaft settling chamber (21), and the flue shaft (12) is connected to a dust collector (22) through a flue (24); The flue shaft settling chamber (21) is provided with a gasification air plate (14) for purging accumulated ash, a second thermal resistance thermometer (18) is provided on the gasification air plate (14), and the gasification air plate (14) is connected to a Roots blower (15); The rotary paddle level switch (10), the electric ball valve 1 (9), the electric ball valve 2 (11), the thermal resistance thermometer 1 (8), the thermal resistance thermometer 2 (18), and the Roots blower (15) are all connected to a DCS control system; A wind cap (26) is welded to the gasification wind plate (14).

2. The ash discharge device for a circulating fluidized bed boiler settling chamber according to claim 1, characterized in that: The electric ball valve 1 (9) is interlocked with the boiler primary fan and the boiler induced draft fan, and the boiler primary fan and the boiler induced draft fan are also connected to the DCS control system.

3. The ash discharge device for a circulating fluidized bed boiler settling chamber according to claim 1, characterized in that: The boiler convection heating surface (25) comprises a superheater (1), a convection tube (2) and a lower steam drum (3), and an air preheater (13) is installed in the flue shaft (12).

4. The ash discharge device for a circulating fluidized bed boiler settling chamber according to claim 1, characterized in that: The entrances of the front row boiler settling chamber (4) and the rear row boiler settling chamber (5) are respectively provided with grid plates (16).

5. The ash discharge device for a circulating fluidized bed boiler settling chamber according to claim 1, characterized in that: The ash discharge duct (19) is provided with a duckbill type diffusion nozzle (17) at one end located in the flue shaft (12).

6. An ash discharging method for an ash discharging device of a settling chamber of a circulating fluidized bed boiler according to any one of claims 1 to 5, characterized in that: The specific steps include: S1: When ash discharge operation is required, the electric ball valve (9) connected to the front boiler settling chamber (4) is opened to discharge ash. The compressed air purge pipe (20) works for t2 seconds to purge the ash discharge conduit (19) every t1 seconds of the ash discharge operation. This cycle repeats. When the rotary purge level switch (10) at the bottom of the front boiler settling chamber (4) monitors that the boiler settling chamber (4) is at a low material level or when the temperature measured by the thermal resistance thermometer (8) installed on the ash discharge conduit (19) is higher than T1°C, the electric ball valve (9) for the front boiler settling chamber (4) for ash discharge operation is controlled to close. S2: Open the electric ball valve 1 (9) for controlling the ash discharge of the rear boiler settling chamber (5), and repeat the above S1 operation to control the ash discharge of the rear boiler settling chamber (5) until the ash discharge of all boiler settling chambers is completed; S3: When the temperature of the thermal resistance thermometer 2 (18) installed on the flue shaft settling chamber (21) is lower than T2°C, the Roots blower (15) is turned on to perform the ash removal operation in the flue shaft settling chamber (21). When the Roots blower (15) is turned on and then stopped t3 seconds later, the ash removal operation is completed.

7. The ash discharging method of the ash discharging device of the settling chamber of a circulating fluidized bed boiler according to claim 6, characterized in that: After the Roots blower (15) is turned on in step S3, the air supplied by the Roots blower (15) enters the gasification air plate (14) for air distribution, and then is blown into the flue shaft settling chamber (21) through the wind cap (26), lifting the ash at the bottom of the flue shaft settling chamber (21) so that it is sucked into the dust collector (22) by the boiler induced draft fan.

8. The ash discharging method of the ash discharging device of the settling chamber of a circulating fluidized bed boiler according to claim 6, characterized in that: The rotary paddle level switch (10), the electric ball valve 1 (9), the electric ball valve 2 (11), the thermal resistance thermometer 1 (8), the thermal resistance thermometer 2 (18), and the Roots blower (15) are connected to a DCS control system. When the ash discharge operation is performed, the automatic ash discharge button on the DCS control system is activated, and the DCS control system controls to complete the operations described in S1-S3.

Citation Information

Patent Citations

  • Ash discharging device of circulating fluidized bed boiler settling chamber

    CN212408639U