A vertical shaft combined with vacuum method dewatering test device and method for saturated soil with air pockets

By designing a vertical shaft with saturated soil containing air pockets combined with a vacuum method dewatering test device, the problem that the existing system cannot handle saturated soil containing closed air pockets is solved, and the effective dewatering and safety issues of closed air pockets are controlled. .

CN111721918BActive Publication Date: 2024-10-18ZHEJIANG UNIV OF TECH
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202010606491.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-29
Publication Date
2024-10-18
Estimated Expiration
2040-06-29

AI Technical Summary

Technical Problem

The existing indoor large-scale precipitation model test system cannot effectively simulate and process saturated soil containing closed air pockets. In particular, it cannot reveal the impact of vacuuming on the diffusion and precipitation effects of closed air pockets during the precipitation process, resulting in the inability to effectively control the tunnel. Safety issues such as excavation and deep foundation construction.

Method used

A combined vacuum method dewatering test device for shafts with saturated soil containing air pockets was designed, including a test chamber, a water injection system, a gas injection system, a water pumping system, a vacuum system and a monitoring system. By simulating the siltation and diffusion of a closed air pocket zone , combined with the vacuum method to implement precipitation, and monitor the pore pressure, water level and gas changes of the soil.

Benefits of technology

It achieves effective precipitation of saturated soil containing closed air pockets, reveals the influence of vacuum degree on the diffusion and precipitation effects of closed air pockets, and provides means to prevent and control geotechnical engineering safety issues.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111721918B_ABST
    Figure CN111721918B_ABST
Patent Text Reader

Abstract

A vertical shaft combined vacuum method dewatering test device for saturated soil with air pockets includes a test box and a water injection system, a gas injection system, a water pumping system, a vacuum system and a monitoring system connected to the test box; the water injection system supplies water to the test soil from bottom to top to obtain a saturated test soil; the gas injection system simulates the generation of gas in the saturated test soil; the water pumping system pumps water from the test soil for dewatering the test soil; the vacuum system is used to change the pore pressure boundary of the soil to generate a vacuum degree in the test box. The present invention also provides a test method for a vertical shaft combined vacuum method dewatering test device for saturated soil with air pockets. During the water injection, gas injection, vacuum and vertical shaft dewatering tests, the present invention can simulate and analyze the dewatering effects under different closed air pocket conditions and different dewatering schemes by monitoring the soil pressure, settlement, water level, pore pressure and water content of the test soil as well as the water pumping amount, gas pumping amount and vacuum degree.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of vertical shaft combined vacuum method dewatering test, and in particular to a vertical shaft combined vacuum method dewatering test device and method for saturated soil with air pockets. Background Art

[0002] In the field of geotechnical engineering, there are saturated soils with closed air pockets, such as high-organic saturated soft soil foundations and high-water-level landfills. For saturated soft soils with high organic matter content, methane formed by the degradation of organic matter will accumulate inside them. The presence of these closed gases will have a significant impact on the safety of tunnel excavation, deep foundation construction, etc. There is a common problem of high leachate water levels in landfills. Landfill gas formed by the degradation of degradable garbage will also accumulate inside the landfill below the water level. The presence of these landfill gases will aggravate the problems of instability and sliding of the pile, groundwater and soil pollution, and the inability to effectively collect landfill gas caused by high leachate water levels. Therefore, it is necessary to precipitate the saturated soil containing closed air pockets, eliminate or reduce the accumulation of closed air pockets, and thus prevent and control the above-mentioned geotechnical engineering problems.

[0003] The indoor large-scale model test system provides a good way to study the precipitation mechanism and application of saturated soil with closed air pockets. At present, the indoor large-scale precipitation model test systems are all for saturated soil without closed air pockets, and there is a lack of indoor large-scale precipitation model test systems for saturated soil with closed air pockets. In addition, considering the mutual influence between the precipitation process and the development process of the closed air pocket, it is necessary to reveal the influence of vacuum extraction on accelerating the diffusion of the closed air pocket and improving the precipitation effect in the above test. Therefore, the above test system is required to have the function of simulating the accumulation and diffusion of the closed air pocket and implementing precipitation in combination with the vacuum method. Summary of the invention

[0004] In order to overcome the above problems, the present invention provides a device and method for testing dewatering of saturated soil with air pockets in a vertical shaft combined with a vacuum method.

[0005] The first aspect of the present invention provides a vacuum method dewatering test device for a vertical shaft of saturated soil with air pockets, comprising a test box, a water injection system, a gas injection system, a water pumping system, a vacuum pumping system and a monitoring system;

[0006] The test box is a sealed box, and the test soil is contained in the test box; the lower part of the two side walls of the test box is respectively provided with an air injection hole and a water injection hole, the upper part of the two side walls of the test box is respectively symmetrically provided with a first overflow hole and a second overflow hole, and the top surface of the test box is provided with an air extraction hole, a water extraction hole and a wire outlet hole;

[0007] The water injection system is connected to the test box through the water injection hole to supply water to the test soil from bottom to top to obtain a saturated test soil; the gas injection system is connected to the test box through the gas injection hole to simulate the generation of gas in the saturated test soil; the water pumping system is connected to the test box through the water pumping hole to pump water from the test soil for test soil dewatering; the vacuum system is connected to the test box through the gas pumping hole to change the soil pore pressure boundary to generate a vacuum in the test box;

[0008] The water injection system comprises a water injection bucket, a water injection network is arranged at the bottom of the test box, the water injection network is connected to the water injection bucket through a water injection pipe, a water injection valve is arranged on the water injection pipe, and a first overflow valve and a second overflow valve are respectively installed on the first overflow hole and the second overflow hole;

[0009] The gas injection system includes a gas blowing fan, a gas injection pipe network is provided at the bottom of the test box, and the gas injection pipe network is located above the water injection pipe network; the gas injection pipe network is connected to the gas blowing fan through the gas injection pipe; a gas injection valve, a first pressure gauge, a first regulating valve, and a first gas flow meter are provided in sequence from the end of the gas injection pipe close to the test box to the end far from the test box;

[0010] The pumping system includes a peristaltic pump. A vertical shaft is provided in the test box, and the vertical shaft is vertically buried in the test soil. The vertical shaft is connected to the water suction end of the peristaltic pump through a pumping pipe, and the water outlet end of the peristaltic pump is connected to the water injection bucket through a pipeline.

[0011] The vacuum system comprises an exhaust fan and a Y-shaped exhaust pipe, the Y-shaped exhaust pipe is composed of a first branch pipe, a second branch pipe and a main pipe; the exhaust fan is connected to the end of the first branch pipe, and is connected to the test box through the exhaust pipe, the first branch pipe is provided with an exhaust valve; the second branch pipe is provided with an exhaust valve and a second gas flow meter, the exhaust valve is located near the main pipe; the main pipe is provided with an exhaust valve, a second pressure gauge, and a second regulating valve in sequence from one end close to the test box to the end far from the test box;

[0012] The monitoring system includes a first pressure gauge, a first gas flow meter, a second gas flow meter, a second pressure gauge, a strain-type soil pressure box, a strain-type pore water pressure sensor, a soil moisture sensor TDR and a multi-channel data acquisition instrument. The strain-type soil pressure box, the strain-type pore water pressure sensor and the soil moisture sensor TDR are respectively buried in the test soil body of the test box, and the strain-type soil pressure box, the strain-type pore water pressure sensor and the soil moisture sensor TDR are connected to the multi-channel data acquisition instrument through a signal transmission line.

[0013] Furthermore, the test box includes a box body with an open top and a hollow interior, and a top cover, the box body is composed of surrounding side panels and a bottom plate; a rubber pad is provided between the top cover and the box body, and the top cover and the box body are connected by bolts and are sealed.

[0014] Furthermore, the water injection network is arranged in a field shape, and the plane where the water injection network is located is parallel to the plane where the bottom of the test box is located; through holes are arranged on the pipe wall of the water injection network, and the outer side of the pipe wall of the water injection network is wrapped with geotextile to prevent the test soil from entering the interior of the water injection network.

[0015] Furthermore, the gas injection network is arranged in a cross shape, and the plane where the gas injection network is located is parallel to the plane where the bottom of the test box is located; through holes are arranged on the pipe wall of the gas injection network, and the outer side of the pipe wall of the gas injection network is wrapped with geotextile to prevent the test soil from entering the interior of the gas injection network.

[0016] Furthermore, the vertical shaft includes an inner tube, the top of which is connected to a pumping nozzle for connecting to a pumping pipe, and an outer tube is sleeved on the outside of the inner tube; the bottom of the outer tube is closed, the tube wall of the outer tube is evenly distributed with through holes, and the outer side of the tube wall of the outer tube includes a geotextile for test soil to enter the vertical shaft.

[0017] Furthermore, the bottom end of the inner tube is 10 mm higher than the bottom end of the outer tube.

[0018] Furthermore, a sealing member is provided in the outlet hole, and a fine hole for the signal transmission line to pass through is provided in the sealing member.

[0019] A second aspect of the present invention provides a test method for a vertical shaft combined with a vacuum method dewatering test device for saturated soil with air pockets, comprising the following steps:

[0020] Step 1: first set up a water injection network at the bottom of the test box, then fill the test box with soil in layers and compact it layer by layer; set up an air injection network at a set height, and set up a vertical shaft against the side wall of the test box. After the arrangement is completed, continue to fill the soil until it is completed; the strain-type soil pressure box, the strain-type pore water pressure sensor and the soil moisture sensor TDR are placed in the pre-designed position during the soil filling process; the signal transmission lines of the strain-type soil pressure box, the strain-type pore water pressure sensor and the soil moisture sensor TDR pass through the seal of the outlet hole, cover the top cover, and use the test box bolts to tightly connect the top cover to the box body, and the signal transmission lines that pass through are connected to the multi-channel data acquisition instrument;

[0021] Step 2, let it stand for 24 hours, and then record the initial readings of each monitoring instrument; after the initial readings are recorded, fill the water filling bucket with water; open the water filling valve, the first overflow valve and the second overflow valve, and continue to fill the water filling bucket with water to maintain the water level of the water filling bucket. At the same time, the water in the water filling bucket is injected into the soil through the water filling pipe network; the excess water in the soil body that is higher than the set height will be discharged from the first overflow valve and the second overflow valve. When water flows out of the first overflow valve and the second overflow valve, it indicates that the water filling is finished. At this time, stop filling the water filling bucket. The water level in the water filling bucket will be consistent with the water level height in the soil body. Observe the scale on the inner wall of the water filling bucket to obtain the water level height in the soil body; when the water filling is finished, close the water filling valve, close the first overflow valve and the second overflow valve, and empty the remaining water in the water filling bucket;

[0022] Step 3: After the water injection is completed, the soil is saturated; the soil is left to stand for 48 hours, during which time the vacuum valve, the second regulating valve, the vacuum valve and the vacuum fan in the vacuum system are opened, a higher vacuum degree is set through the second regulating valve, and the test box is vacuumed to saturate the test soil; the vacuum is continuously pumped during the standing period, and the vacuum degree is measured by the second pressure gauge;

[0023] Step 4: After the test soil is saturated, close the valves and exhaust fans opened in the vacuum system; conduct a simulated ordinary shaft dewatering treatment test including a closed air bag with saturated foundation test. The test requires opening the first regulating valve, injection valve, exhaust valve, second regulating valve, exhaust valve and blowing fan in the gas injection system first, and setting the required injection rate through the first regulating valve. The gas is injected into the test soil through the gas injection pipeline network, and the gas exhausted from the test soil will be discharged from the exhaust valve and exhaust valve and collected; the first gas flow meter measures the gas injection volume, the gas injection rate is calculated by the gas injection volume combined with the gas injection time, the first pressure gauge measures the gas injection pressure, the second pressure gauge measures the exhaust pressure, and the second gas flow meter measures the collected exhaust volume; after the gas injection is completed, close the first regulating valve and the gas injection valve, let it stand for a period of time according to the test needs, and close the exhaust valve after the standing is completed;

[0024] Step 5: First open the vacuum valve, the second regulating valve, the vacuum valve and the vacuum fan in the vacuum system, set the required vacuum degree through the second regulating valve, and evacuate the test chamber; at the same time, start the peristaltic pump to pump water from the shaft, and the pumped water is discharged into the water injection bucket for collection;

[0025] Step 6: Repeat steps 1-5 and set the required gas injection rate and vacuum degree for the next level in step 5 until the test is completed.

[0026] The beneficial effects of the present invention are:

[0027] (1) The water injection system can be equipped with overflow valves at different heights on the side wall of the test chamber as required, and the requirements for controlling the injection water level can be achieved by opening these valves.

[0028] (2) The gas injection system can be set to different gas injection modes, including different gas injection pressures and injection rates, and can measure the pressure and volume of the exhaust gas.

[0029] (3) The pumping system can be set at different pumping rates and can measure the amount of water pumped during shaft dewatering.

[0030] (4) The vacuum system can be set to different vacuum levels. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a structural diagram of the test chamber.

[0032] Figure 2 It is a system schematic diagram of the present invention.

[0033] Figure 3 It is a schematic diagram of the internal system of the test chamber.

[0034] Figure 4 It is a structural diagram of the water injection network.

[0035] Figure 5 It is a structural diagram of the gas injection network.

[0036] Figure 6 It is a schematic diagram of the structure of the shaft.

[0037] Description of reference numerals: test box 1; top cover 1-1; test box bolt 1-2; side plate 1-3; bottom plate 1-4; air injection hole 1-5; water injection hole 1-6; first overflow hole 1-7; second overflow hole 1-8; water extraction hole 1-9; air extraction hole 1-10; outlet hole 1-11; rubber pad 1-12; water injection system 2; water injection valve 2-1; water injection network 2-2; water injection pipe 2-3; water injection bucket 2-4; first overflow valve 2-5; second overflow valve 2-6; air injection system 3; gas injection valve 3-1; gas injection network 3-2; gas injection pipe 3-3; first regulating valve 3-4; air blowing fan 3-5; exhaust valve 3-6; pumping system 4; water pumping pipe 4-1; shaft 4-2; peristaltic pump 4-3; vacuum system 5; air extraction valve 5-1; second regulating valve 5-2; air extraction pipe 5-3; air extraction valve 5-4; air extraction fan 5-5; first pressure gauge 6-1; first gas flow meter 6-2; second gas flow meter 6-3; second pressure gauge 6-4. DETAILED DESCRIPTION

[0038] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0041] Referring to the attached drawings, a vertical shaft combined vacuum method precipitation test device containing a closed air bag with saturated soil includes a test box 1, a water injection system 2, an air injection system 3, a water pumping system 4, a vacuum system 5 and a monitoring system 6;

[0042] The test box 1 is a sealed box, and the test soil is contained in the test box 1; the test box 1 comprises a box body with an open top and a hollow interior and a top cover 1-1, and the box body is composed of four side panels 1-3 and a bottom plate 1-4; a rubber pad 1-12 is arranged between the top cover 1-1 and the box body, and the top cover 1-1 and the box body are connected and sealed by the test box bolts 1-2; the lower part of the two side walls of the test box 1 is respectively provided with an air injection hole 1-5 and a water injection hole 1-6, the upper part of the two side walls of the test box 1 is respectively symmetrically provided with a first overflow hole 1-7 and a second overflow hole 1-8, and the top cover 1-1 is provided with an air extraction hole 1-10, a water extraction hole 1-9 and a wire outlet hole 1-11;

[0043] The water injection system 2 is connected to the test box 1 through the water injection holes 1-6, and supplies water to the test soil from bottom to top to obtain a saturated test soil; the gas injection system 3 is connected to the test box 1 through the gas injection holes 1-5 to simulate the generation of gas in the saturated test soil; the pumping system 4 is connected to the test box 1 through the pumping holes 1-9 to pump water from the test soil for test soil precipitation; the vacuum system 5 is connected to the test box 1 through the pumping holes 1-10 to change the soil pore pressure boundary to generate a vacuum in the test box;

[0044] The water injection system 2 includes a water injection bucket 2-4, and a water injection network 2-2 is provided at the bottom of the test box 1. The water injection network 2-2 is arranged in a field shape, and the plane where the water injection network 2-2 is located is parallel to the plane where the bottom surface of the test box 1 is located; through holes are arranged on the pipe wall of the water injection network 2-2, and the outer side of the pipe wall of the water injection network 2-2 is wrapped with a geotextile to prevent the test soil from entering the water injection network 2-2; the water injection network 2-2 is connected to the water injection bucket 2-4 through the water injection pipe 2-3, and the water injection pipe 2-3 is provided with a water injection valve 2-1, and the first overflow hole 1-7 and the second overflow hole 1-8 are respectively installed with a first overflow valve 2-5 and a second overflow valve 2-6;

[0045] The gas injection system 3 includes a blowing fan 3-5, and a gas injection network 3-2 is provided at the bottom of the test box 1, and the gas injection network 3-2 is located above the water injection network 2-2; the gas injection network 3-2 is arranged in a cross shape, and the plane where the gas injection network 3-2 is located is parallel to the plane where the bottom surface of the test box 1 is located; through holes are arranged on the pipe wall of the gas injection network 3-2, and the outer side of the pipe wall of the gas injection network 3-2 is wrapped with a geotextile to prevent the test soil from entering the gas injection network 3-2; the gas injection network 3-2 is connected to the blowing fan 3-5 through the gas injection pipe 3-3; the gas injection valve 3-1, the first pressure gauge 6-1, the first regulating valve 3-4, and the first gas flow meter 6-2 are arranged in sequence along the upper edge of the gas injection pipe 3-3 from the end close to the test box 1 to the end away from the test box 1;

[0046] The pumping system 4 includes a peristaltic pump 4-3, a vertical shaft 4-2 is provided in the test box 1, and the vertical shaft 4-2 is vertically buried in the test soil; the vertical shaft 4-2 includes an inner tube 4-2-2, the top of the inner tube 4-2-2 is connected to a pumping nozzle 4-2-3 for connecting to the pumping pipe 4-1, the outer side of the inner tube 4-2-2 is sleeved with an outer tube 4-2-1, and the bottom end of the inner tube 4-2-2 is about 10mm higher than the bottom end of the outer tube 4-2-1; the bottom of the outer tube 4-2-1 is closed, the tube wall of the outer tube 4-2-1 is evenly distributed with through holes, and the outer side of the tube wall of the outer tube 4-2-1 includes a geotextile for the test soil to enter the vertical shaft 4-2; the vertical shaft 4-2 is connected to the water suction end of the peristaltic pump 4-3 through the pumping pipe 4-1, and the water outlet end of the peristaltic pump 4-3 is connected to the water injection bucket 2-4 through a pipeline;

[0047] The vacuum system 5 includes an exhaust fan 5-5 and a Y-shaped exhaust pipe 5-3, the Y-shaped exhaust pipe 5-3 is composed of a first branch pipe, a second branch pipe and a main pipe; the exhaust fan 5-5 is connected to the end of the first branch pipe, and is connected to the test box 1 through the exhaust pipe 5-3, and the first branch pipe is provided with an exhaust valve 5-4; the second branch pipe is provided with an exhaust valve 3-6 and a second gas flow meter 6-3, and the exhaust valve 3-6 is located near the main pipe; the main pipe is provided with an exhaust valve 5-1, a second pressure gauge 6-4, and a second regulating valve 5-2 in sequence from one end close to the test box 1 to the end away from the test box 1;

[0048] The monitoring system includes a first pressure gauge 6-1, a first gas flow meter 6-2, a second gas flow meter 6-3, a second pressure gauge 6-4, a strain type soil pressure box, a strain type pore water pressure sensor, a soil moisture sensor TDR and a multi-channel data acquisition instrument. The strain type soil pressure box, the strain type pore water pressure sensor and the soil moisture sensor TDR are respectively buried in the test soil of the test box 1. The strain type soil pressure box, the strain type pore water pressure sensor and the soil moisture sensor TDR are connected to the multi-channel data acquisition instrument through a signal transmission line. A sealing member is provided in the outlet hole 1-11, and a fine hole for the signal transmission line to pass through is provided in the sealing member.

[0049] The test method of the vertical shaft combined vacuum method dewatering test device for saturated soil with air pockets includes the following steps:

[0050] Step 1, first set the water injection network 2-2 at the bottom of the test box 1, then fill the test box 1 in layers and compact it layer by layer; set the air injection network 3-2 at the set height position, and set the vertical shaft 4-2 against the side wall of the test box, and then continue to fill the soil until it is completed; the strain type soil pressure box, the strain type pore water pressure sensor and the soil moisture sensor TDR are placed in the pre-designed position during the soil filling process; the signal transmission lines of the strain type soil pressure box, the strain type pore water pressure sensor and the soil moisture sensor TDR pass through the seal of the outlet hole 1-11, cover the top cover 1-1, and use the test box bolts 1-2 to tightly connect the top cover 1-1 to the box body, and the signal transmission lines that pass through are connected to the multi-channel data acquisition instrument;

[0051] Step 2, let it stand for 24 hours, and then record the initial readings of each monitoring instrument; after the initial readings are recorded, fill water into the water filling bucket 2-4; open the water filling valve 2-1, the first overflow valve 2-5 and the second overflow valve 2-6, and continue to fill water into the water filling bucket 2-4 to maintain the water level of the water filling bucket 2-4, and at the same time, the water in the water filling bucket 2-4 is injected into the soil through the water filling pipe network 2-2; the excess water in the soil that is higher than the set height will flow out of the first overflow valve 2-5 and the second overflow valve 2-6. The water valve 2-6 is discharged. When water flows out from the first overflow valve 2-5 and the second overflow valve 2-6, it indicates that the water filling is finished. At this time, stop filling water into the water filling bucket 2-4. The water level in the water filling bucket will be consistent with the water level in the soil. Observe the scale on the inner wall of the water filling bucket 2-4 to obtain the water level in the soil. When the water filling is finished, close the water filling valve 2-1, close the first overflow valve 2-5 and the second overflow valve 2-6, and empty the remaining water in the water filling bucket 2-4.

[0052] Step 3, after the water injection is completed, the soil is saturated; the soil is left to stand for 48 hours, during which the vacuum valve 5-1, the second regulating valve 5-2, the vacuum valve 5-4 and the exhaust fan 5-5 in the vacuum system 5 are opened, a higher vacuum degree is set through the second regulating valve 5-2, and the test box 1 is vacuumed to saturate the test soil; the vacuuming is continued during the standing period, and the vacuum degree is read by the second pressure gauge 6-4;

[0053] Step 4: After the test soil is saturated, close the valves and exhaust fan 5-5 in the vacuum system 5; conduct a simulated ordinary shaft dewatering treatment test including a closed air bag with saturated foundation. The test requires opening the first regulating valve 3-4, the injection valve 3-1, the exhaust valve 5-1, the second regulating valve 5-2, the exhaust valve 3-6 and the blowing fan 3-5 in the gas injection system 3, and setting the required gas injection rate through the first regulating valve 3-4. The gas is injected into the test soil through the gas injection pipe network 3-2. The gas discharged from the soil will be discharged from the air extraction valve 5-1 and the exhaust valve 3-6 and collected; the first gas flow meter 6-2 measures the gas injection volume, the gas injection rate is calculated by the gas injection volume and the gas injection time, the first pressure gauge 6-1 measures the gas injection pressure, the second pressure gauge 6-4 measures the exhaust pressure, and the second gas flow meter 6-3 measures the collected exhaust volume; after the gas injection is completed, close the first regulating valve 3-4 and the gas injection valve 3-1, let it stand for a period of time according to the test needs, and close the exhaust valve 3-6 after the standing is completed;

[0054] Step 5, first open the exhaust valve 5-1, the second regulating valve 5-2, the exhaust valve 5-4 and the exhaust fan 5-5 in the vacuum system 5, set the required vacuum degree through the second regulating valve 5-2, and evacuate the test box 1; at the same time, start the peristaltic pump 4-3 to pump water from the shaft 4-2, and the pumped water is discharged into the water injection bucket 2-4 for collection;

[0055] Step 6: Repeat steps 1-5 and set the required gas injection rate and vacuum degree for the next level in step 5 until the test is completed.

[0056] To simulate the vertical shaft combined vacuum method (different vacuum degrees) to treat the saturated foundation test containing closed air bags, all previous operations of opening the cover, filling, burying sensors, closing the cover and injecting water into the saturated soil must be repeated; the test requires opening the regulating valve 3-4, the injection valve 3-1, the exhaust valve 5-1, the second regulating valve 5-2, the exhaust valve 3-6 and the blowing fan 3-5 in the gas injection system 3, and setting the required gas injection rate through the first regulating valve 3-4. The gas is injected into the soil through the gas injection pipe network 3-2, and the gas exhausted from the soil will be discharged from the exhaust valve 5-1 and the exhaust valve 3-6 and collected; the first gas flow meter 6-2 can measure the gas injection volume, and the gas injection rate can be calculated by combining the gas injection volume with the gas injection rate. The time is calculated, the first pressure gauge 6-1 can measure the injection pressure, the second pressure gauge 6-4 can measure the exhaust pressure, and the second gas flow meter 6-3 can measure the collected exhaust volume; after the injection is completed, close the first regulating valve 3-4 and the injection valve 3-1, let it stand for a period of time according to the test needs, and close the exhaust valve 3-6 after the standing is completed; repeat the previous vacuum and pumping operations to complete a set of tests; it is necessary to repeat all the previous operations of opening the cover, filling the soil, burying the sensor, closing the cover and injecting water to saturate the soil, in order to set the required injection rate for the next level and set the required vacuum degree for the next level through the second regulating valve 5-2, and then pump water from the shaft 4-2; repeat the above steps until the test is completed.

[0057] In the above test process, the data of the strain type soil pressure box, the strain type pore water pressure sensor and the soil moisture sensor TDR are recorded by a multi-channel data acquisition instrument, and the changes in soil pressure, water level, pore pressure and water content can be obtained; by opening the top cover 1-1 of the test box 1, the soil settlement after the test can be directly measured; the change in the pumping volume can be measured by the amount of water collected by the water injection bucket 2-4; the difference between the monitoring readings of the first gas flow meter 6-2 and the second gas flow meter 6-3 under a certain group of tests is the pumping volume during the precipitation process.

[0058] Precipitation tests were carried out on saturated soil containing closed air pockets through ordinary vertical shafts and vertical shaft combined vacuum method (with different vacuum degrees). Combined with the monitoring of soil pressure, settlement, water level, pore pressure and water content as well as pumping volume, air extraction volume and vacuum degree during the test, the influence of vacuum degree on accelerating the diffusion of closed air pockets and improving the precipitation effect under different closed air pocket occurrence patterns was simulated and analyzed.

[0059] The contents described in the embodiments of this specification are merely an enumeration of the implementation forms of the inventive concept. The protection scope of the present invention should not be regarded as limited to the specific forms described in the embodiments. The protection scope of the present invention also extends to equivalent technical means that can be conceived by those skilled in the art based on the inventive concept.

Claims

1. A vertical shaft combined vacuum method dewatering test device with air pockets and saturated soil, characterized by: It comprises a test chamber (1), a water injection system (2), a gas injection system (3), a water pumping system (4), a vacuum pumping system (5) and a monitoring system; The test box (1) is a sealed box body, and the test box (1) contains test soil. The lower parts of the two side walls of the test box (1) are respectively provided with air injection holes (1-5) and water injection holes (1-6), the upper parts of the two side walls of the test box (1) are respectively symmetrically provided with first overflow holes (1-7) and second overflow holes (1-8), and the top surface of the test box is provided with air extraction holes (1-10), water extraction holes (1-9) and wire outlet holes (1-11). The water injection system (2) is connected to the test box (1) through the water injection holes (1-6) to supply water to the test soil from bottom to top to obtain a saturated test soil; the gas injection system (3) is connected to the test box (1) through the gas injection holes (1-5) to simulate the generation of gas in the saturated test soil; the water pumping system (4) is connected to the test box (1) through the water pumping holes (1-9) to pump water from the test soil for dewatering the test soil; the vacuum system (5) is connected to the test box (1) through the gas pumping holes (1-10) to change the soil pore pressure boundary to generate a vacuum in the test box; The water injection system (2) comprises a water injection bucket (2-4), a water injection network (2-2) is provided at the bottom of the test box (1), the water injection network (2-2) is connected to the water injection bucket (2-4) via a water injection pipe (2-3), a water injection valve (2-1) is provided on the water injection pipe (2-3), and a first overflow valve (2-5) and a second overflow valve (2-6) are respectively installed on the first overflow hole (1-7) and the second overflow hole (1-8); The gas injection system (3) comprises a gas blowing fan (3-5); a gas injection network (3-2) is provided at the bottom of the test box (1); the gas injection network (3-2) is located above the water injection network (2-2); the gas injection network (3-2) is connected to the gas blowing fan (3-5) via a gas injection pipe (3-3); a gas injection valve (3-1), a first pressure gauge (6-1), a first regulating valve (3-4), and a first gas flow meter (6-2) are provided in sequence on the upper edge of the gas injection pipe (3-3) from one end close to the test box (1) to the end far from the test box (1); The pumping system (4) comprises a peristaltic pump (4-3); a vertical shaft (4-2) is provided in the test box (1); the vertical shaft (4-2) is vertically buried in the test soil; the vertical shaft (4-2) is connected to the water suction end of the peristaltic pump (4-3) via a pumping pipe (4-1); and the water outlet end of the peristaltic pump (4-3) is connected to the water injection bucket (2-4) via a pipeline; The vacuum system (5) comprises an exhaust fan (5-5) and a Y-shaped exhaust pipe (5-3), wherein the Y-shaped exhaust pipe (5-3) is composed of a first branch pipe, a second branch pipe and a main pipe; the exhaust fan (5-5) is connected to the end of the first branch pipe and is connected to the test box (1) through the exhaust pipe (5-3); the first branch pipe is provided with an exhaust valve (5-4); the second branch pipe is provided with an exhaust valve (3-6) and a second gas flow meter (6-3), wherein the exhaust valve (3-6) is located near the main pipe; and the main pipe is provided with an exhaust valve (5-1), a second pressure gauge (6-4) and a second regulating valve (5-2) in sequence from the end near the test box (1) to the end far from the test box (1); The monitoring system comprises a first pressure gauge (6-1), a first gas flow meter (6-2), a second gas flow meter (6-3), a second pressure gauge (6-4), a strain-type soil pressure box, a strain-type pore water pressure sensor, a soil moisture sensor TDR and a multi-channel data acquisition instrument, wherein the strain-type soil pressure box, the strain-type pore water pressure sensor and the soil moisture sensor TDR are respectively buried in the test soil body of the test box (1), and the strain-type soil pressure box, the strain-type pore water pressure sensor and the soil moisture sensor TDR are connected to the multi-channel data acquisition instrument via a signal transmission line; The water injection network (2-2) is arranged in a field shape, and the plane where the water injection network (2-2) is located is parallel to the plane where the bottom surface of the test box (1) is located; through holes are arranged on the pipe wall of the water injection network (2-2), and the outer side of the pipe wall of the water injection network (2-2) is wrapped with a geotextile to prevent the test soil from entering the water injection network (2-2); The gas injection pipe network (3-2) is arranged in a cross shape, and the plane where the gas injection pipe network (3-2) is located is parallel to the plane where the bottom surface of the test box (1) is located; through holes are arranged on the pipe wall of the gas injection pipe network (3-2), and the outer side of the pipe wall of the gas injection pipe network (3-2) is wrapped with a geotextile to prevent the test soil from entering the gas injection pipe network (3-2); The vertical shaft (4-2) comprises an inner tube (4-2-2), the top end of the inner tube (4-2-2) is connected to a water pumping nozzle (4-2-3) for connecting to a water pumping pipe (4-1), and the outer side of the inner tube (4-2-2) is sleeved with an outer tube (4-2-1); the bottom of the outer tube (4-2-1) is closed, the tube wall of the outer tube (4-2-1) is evenly distributed with through holes, and the outer side of the tube wall of the outer tube (4-2-1) comprises a geotextile for preventing test soil from entering the vertical shaft (4-2); A sealing member is provided in the wire outlet hole (1-11), and a fine hole for the signal transmission wire to pass through is provided in the sealing member.

2. The vertical shaft combined vacuum method dewatering test device for saturated soil with air pockets as claimed in claim 1 is characterized by: The test box (1) comprises a box body with an open top and a hollow interior, and a top cover, wherein the box body is composed of surrounding side panels (1-3) and a bottom plate (1-4); a rubber pad (1-12) is provided between the top cover (1-1) and the box body, and the top cover (1-1) and the box body are connected by bolts and are sealed.

3. The vertical shaft combined vacuum method dewatering test device for saturated soil with air pockets as claimed in claim 1 is characterized by: The bottom end of the inner tube (4-2-2) is 10 mm higher than the bottom end of the outer tube (4-2-1).

4. A test method based on the vertical shaft combined vacuum method dewatering test device for saturated soil with air pockets as described in any one of claims 1 to 3, characterized in that: The steps include: Step 1: firstly, set a water injection network (2-2) at the bottom of the test box (1), then fill the test box (1) with soil in layers and compact it layer by layer; set a gas injection network (3-2) at a set height, and set a vertical shaft (4-2) against the side wall of the test box, and then continue to fill the soil until it is completed after the arrangement is completed; The strain type soil pressure box, the strain type pore water pressure sensor and the soil moisture sensor TDR are placed in a pre-designed position during the soil filling process; the signal transmission lines of the strain type soil pressure box, the strain type pore water pressure sensor and the soil moisture sensor TDR are passed through the seal of the outlet hole (1-11), the top cover (1-1) is covered, and the top cover (1-1) is tightly connected to the box body with the test box bolts (1-2), and the passed signal transmission lines are connected to the multi-channel data acquisition instrument; Step 2, first let it stand for 24 hours, and then record the initial readings of each monitoring instrument; after the initial readings are recorded, fill the water filling bucket (2-4) with water; open the water filling valve (2-1), the first overflow valve (2-5) and the second overflow valve (2-6), and continue to fill the water filling bucket (2-4) to maintain the water level of the water filling bucket (2-4), and at the same time, the water in the water filling bucket (2-4) is injected into the soil body through the water filling pipe network (2-2); excess water in the soil body that is higher than the set height will flow out from the first overflow valve (2-5) and the second overflow valve (2-6). The water valve (2-6) is discharged. When water flows out from the first overflow valve (2-5) and the second overflow valve (2-6), it indicates that the water filling is finished. At this time, the water filling into the water filling bucket (2-4) is stopped. The water level in the water filling bucket will be consistent with the water level in the soil. The water level in the soil is obtained by observing the scale on the inner wall of the water filling bucket (2-4). When the water filling is finished, the water filling valve (2-1) is closed, the first overflow valve (2-5) and the second overflow valve (2-6) are closed, and the remaining water in the water filling bucket (2-4) is emptied; Step 3: After the water injection is completed, the soil is saturated; the soil is allowed to stand for 48 hours, during which time the exhaust valve (5-1), the second regulating valve (5-2), the exhaust valve (5-4) and the exhaust fan (5-5) in the vacuum system (5) are opened, a higher vacuum degree is set through the second regulating valve (5-2), and the test chamber (1) is evacuated to saturate the test soil; the vacuum is continuously evacuated during the standing period, and the vacuum degree is read by the second pressure gauge (6-4); Step 4: After the test soil is saturated, close the valves and exhaust fan (5-5) in the vacuum system (5); conduct a simulated ordinary shaft dewatering treatment test including a closed air bag with saturated foundation. The test requires first opening the first regulating valve (3-4), the injection valve (3-1), the exhaust valve (5-1), the second regulating valve (5-2), the exhaust valve (3-6) and the blowing fan (3-5) in the gas injection system (3), setting the required gas injection rate through the first regulating valve (3-4), and injecting the gas into the test soil through the gas injection pipe network (3-2). The gas exhausted from the test soil will be exhausted from the exhaust valve (5-1) and the exhaust valve (3-6) and collected; the first gas flow meter (6-2) measures the gas injection volume, the gas injection rate is calculated by the gas injection volume combined with the gas injection time, the first pressure gauge 6-1 measures the gas injection pressure, the second pressure gauge (6-4) measures the exhaust pressure, and the second gas flow meter (6-3) measures the collected exhaust volume; after the gas injection is completed, close the first regulating valve (3-4) and the gas injection valve (3-1), let it stand for a period of time according to the test requirements, and close the exhaust valve (3-6) after the standing is completed; Step 5, first open the exhaust valve (5-1), the second regulating valve (5-2), the exhaust valve (5-4) and the exhaust fan (5-5) in the vacuum system (5), set the required vacuum degree through the second regulating valve (5-2), and evacuate the test chamber (1); at the same time, start the peristaltic pump (4-3) to pump water from the shaft (4-2), and the pumped water is discharged into the water injection bucket (2-4) for collection; Step 6: Repeat steps 1-5 and set the required gas injection rate and vacuum degree for the next stage in step 5 until the test is completed.

Citation Information

Patent Citations

  • Gas injection type vacuum precipitation method

    CN101215833A

  • Rapid saturation device for geotechnical model test

    CN104062218A

  • Gas pumping-injecting interactive type foundation pit precipitation system and precipitation method thereof

    CN105442624A

  • Soft foundation treatment test device for stimulating vacuum joint gas injection

    CN105862936A

  • Vacuum pre-loading combined electric process test apparatus and test method thereof

    CN105929132A