Management device, management method and storage medium
The vehicle usage status information is obtained through the management device, and the feature quantity model is used to select suitable secondary batteries, which solves the problem of battery mismatch after changes in vehicle demand, realizes the matching of battery and vehicle demand, extends battery life and improves usage efficiency .
Patent Information
- Application Number
- CN202010389996.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-06-03
- Filing Date
- 2020-05-09
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-05-09
AI Technical Summary
After the needs of vehicle users change, the prior art is difficult to provide secondary batteries suitable for new needs, resulting in the need to purchase a new vehicle or the battery life is extended but does not meet user needs.
The management device obtains information related to the vehicle usage status, uses the feature quantity model to select and recommend a suitable secondary battery, and regularly updates the recommendations to adapt to the changes in demand based on the user's predetermined usage form and battery usage status information.
It provides a secondary battery suitable for user needs, reduces unnecessary vehicle replacement, extends battery life and improves battery usage efficiency.
Smart Images

Figure CN112036922B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a management device, a management method and a program. Background Art
[0002] Users have various needs for vehicles, and therefore, a system for selecting a combination of vehicle components that matches the needs of vehicle users has been proposed (see Japanese Patent Application Laid-Open No. 2003-242329).
[0003] In addition, for an electric vehicle that drives a motor using power stored in a battery mounted on the vehicle, a system for managing the deterioration state of the battery is proposed to avoid the battery being unusable during the rental period of the electric vehicle. In addition, in the system, a mode is proposed for detecting the deterioration state of the battery and replacing the battery or the vehicle based on the degree of deterioration of the detected battery (see Japanese Patent Laid-Open No. 2013-77054).
[0004] Yet, in the prior art, when the user's demand changes after the purchase of the vehicle, it is necessary to buy a new vehicle to replace the old vehicle. In addition, the prior art is for the purpose of extending the life of the battery, and sometimes replacing the vehicle for this purpose is not suitable for the user's demand. Summary of the invention
[0005] The present invention has been made in consideration of such circumstances, and one of its objects is to provide a management device, a management method, and a program capable of providing secondary batteries that meet the needs of users.
[0006] In order to solve the above problems and achieve the above objects, the present invention adopts the following means.
[0007] (1): A management device according to one embodiment of the present invention comprises: an acquisition unit, which acquires vehicle usage status information related to the usage status of a vehicle; and a processing unit, which acquires the characteristic quantity by applying the vehicle usage status information to a model that outputs the characteristic quantity when the vehicle usage information is input, and based on the acquired characteristic quantity, selects and recommends a secondary battery to be installed in the vehicle for which the vehicle usage status information has been acquired from secondary batteries that can be installed in the vehicle and store electric power for driving.
[0008] (2): Based on the scheme of (1) above, the vehicle usage status information may also include user-issued information obtained from the user, wherein the user-issued information is information indicating the usage form of the vehicle envisioned by the user, or the usage form of the vehicle experienced by the user.
[0009] (3): Based on the above-mentioned solution (1) or (2), the vehicle use status information may include battery use status information related to the use status of the secondary battery.
[0010] (4): Based on any one of the above schemes (1) to (3), the processing unit may select and prompt the secondary battery from the available secondary batteries at at least one of the times when the vehicle is purchased, at every prescribed period after the vehicle is purchased, and when the vehicle usage status information changes.
[0011] (5) In the above-mentioned scheme (2), the information sent by the user may be a questionnaire survey result obtained by conducting a questionnaire survey on the user.
[0012] (6): A management method according to one embodiment of the present invention enables a management device to perform the following processing: obtain vehicle usage status information related to the usage status of a vehicle; obtain the characteristic quantity by applying the vehicle usage status information to a model that outputs a characteristic quantity when the vehicle usage information is input; and based on the obtained characteristic quantity, select and recommend a secondary battery to be installed in the vehicle for which the vehicle usage status information has been obtained from secondary batteries that can be installed in the vehicle and store electric power for driving.
[0013] (7): The storage medium of one embodiment of the present invention is a computer-readable non-temporary storage medium and stores a program, wherein the program causes the computer of the management device to perform the following processing: obtain vehicle usage status information related to the usage status of the vehicle; obtain the characteristic quantity by applying the vehicle usage status information to a model that outputs the characteristic quantity when the vehicle usage information is input; and based on the obtained characteristic quantity, select and recommend a secondary battery to be installed in the vehicle for which the vehicle usage status information has been obtained from secondary batteries that can be installed in the vehicle and store electric power for driving.
[0014] According to the above aspects (1) to (7), a battery is selected based on the acquired information on the usage state of the vehicle, so that a secondary battery suitable for the needs of the user can be provided.
[0015] According to the above-mentioned aspect (2), the battery is selected based on the acquired information on the state of use of the vehicle by the user, so that the secondary battery can be provided according to the user's planned use or changes in the environment.
[0016] According to the above-mentioned aspect (3), the storage battery is selected based on the acquired information on the usage state of the secondary battery, so that the secondary battery can be provided according to the change in the way the storage battery is used.
[0017] According to the above-mentioned aspect (4), information is acquired at the time of purchase and at predetermined intervals, so that when the needs of the user change, a secondary battery suitable for the needs of the user can be provided.
[0018] According to the above-mentioned aspect (5), a questionnaire survey is conducted, so that a secondary battery that meets the urgent needs of users can be provided. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a diagram showing an example of the configuration and usage environment of a secondary battery operation system including the management device according to the embodiment.
[0020] Figure 2 This is a diagram showing the rentable battery information stored in the storage unit according to the embodiment.
[0021] Figure 3 It is a diagram showing an example of a vehicle use state recognition model according to an embodiment.
[0022] Figure 4 It is a diagram showing an example of a battery usage status recognition model according to an embodiment.
[0023] Figure 5 This is a diagram showing an example of a radar chart used when selecting a storage battery that matches the needs of a user according to the embodiment.
[0024] Figure 6 It is a diagram showing an example of changes in the characteristics of the rental storage battery according to the embodiment.
[0025] Figure 7 This is a flowchart of a process performed by the secondary battery operation system according to the embodiment. DETAILED DESCRIPTION
[0026] Hereinafter, the management device, management method and program of the present invention will be described with reference to the accompanying drawings. In the following description, the vehicle is an electric vehicle equipped with a secondary battery or an electric vehicle capable of replacing the secondary battery. However, as long as the vehicle is equipped with a secondary battery capable of storing electricity from the outside and supplying electricity for driving, it may be a hybrid vehicle or a fuel cell vehicle. In addition, the vehicle may also be a four-wheeled vehicle, a three-wheeled vehicle, a straddle-type vehicle, an electric assisted bicycle, a tiller, a management machine, a walking assistance device, a kickboard, etc. equipped with or capable of replacing a secondary battery.
[0027] [Overall structure]
[0028] Figure 1 1 is a diagram showing an example of the configuration and usage environment of a secondary battery operation system 1 including a management device 20 according to the present embodiment. Figure 1 As shown, the secondary battery operation system 1 includes a management device 20, a power operator 40, at least one vehicle 50 (50-1, 50-2, ...), and at least one power supply device 60 (60-1, 60-2, ...). It should be noted that in the following description, when one of the vehicles 50-1, 50-2, ... is not identified, it is referred to as the vehicle 50. In addition, when one of the power supply devices 60-1, 60-2, ... is not identified, it is referred to as the power supply device 60. In addition, the secondary battery operation system 1 may also include at least one building 70 (70-1, 70-2, ...). In addition, when one of the building 70-1, 70-2, ... is not identified, it is referred to as the building 70.
[0029] Reference Figure 1 The following will explain an example of the use environment and use of the secondary battery application system 1. First, when a user purchases a vehicle 50, the user answers a questionnaire at a sales store of the vehicle 50, for example. The questionnaire includes survey contents such as the user's age, gender, address, expected weekly driving time, whether married or single, etc. The questionnaire result is information sent by the user on the status of using the vehicle (vehicle use status information), indicating the user's planned use status or use status of the vehicle 50. The person in charge of the sales store inputs the questionnaire result to the power supply device 60 installed in the sales store. The management device 20 selects the recommended battery 501 (secondary battery) used in the vehicle 50 based on the questionnaire result, and sends the selection result to the power supply device 60. Thus, the management device 20 recommends a battery 501 that is suitable for the needs of the user when the vehicle 50 is purchased. In this case, the battery 501 is a battery that is rented for a fee. In addition, the usage fee of the battery 501 is, for example, a monthly payment. Then, the person in charge selects and recommends the vehicle 50 based on the questionnaire results, and recommends the battery 501 presented to the power supply device 60 .
[0030] Moreover, after the purchase of the vehicle 50, the user visits the sales store, for example, every two years. Then, the power supply device 60 installed in the sales store obtains the battery use status information (vehicle use status information) indicating the use status of the storage battery 501 mounted on the vehicle 50 used by the user, and sends the obtained battery use status information to the management device 20. It should be noted that the questionnaire survey may be conducted again after two years have passed after the purchase. In this case, the power supply device 60 may also send the questionnaire survey results to the management device 20. The management device 20 recommends the storage battery 501 that is suitable for the user's needs at that time again based on the battery use status information received from the power supply device 60. Alternatively, the management device 20 recommends the storage battery 501 that is suitable for the user's needs at that time again based on the battery use status information received from the power supply device 60 and the questionnaire survey results. It should be noted that, for example, when the vehicle 50 is purchased, the user is given user identification information for identifying the user. In addition, the vehicle 50 is given vehicle identification information for identifying the vehicle. Furthermore, battery identification information for identifying the storage battery 501 is given to the storage battery 501 .
[0031] It should be noted that the power supply device 60 is installed, for example, at a sales store of the vehicle 50 or a building 70 (for example, a home, a company where the user works, a lodging place used by the user, a charging station, etc.) used by the user of the vehicle 50. The user connects the vehicle 50 to the power supply device 60 when returning home, for example.
[0032] In addition, the power supply device 60 is connected to the power operator 40 via a power transmission line 80. The management device 20 is connected to the power supply device 60 via a network NW. In addition, the vehicle 50 is connected to the power supply device 60 via a cable 85. It should be noted that the cable 85 is a power supply cable and may also have a signal line. In addition, the cable 85 has at least a connection plug connected to the vehicle 50. Alternatively, the cable 85 may also superimpose a signal in the power supply cable. It should be noted that the network NW includes, for example, the Internet, WAN (Wide Area Network), LAN (Local Area Network), a provider device, a wireless base station, etc.
[0033] The user operates the vehicle 50 or the power supply device 60 to select whether to operate the V2G (Vehicle to Grid) system or the V2H (Vehicle to Home) system, for example.
[0034] The V2G system is a system that transfers power between the power system including the commercial power grid and the vehicle. In the V2G system, when the vehicle 50 is not used as a mobile unit, the battery 501 mounted on the vehicle 50 is used as a power storage device. Therefore, bidirectional power transfer is performed between the vehicle participating in the V2G and the power system. In this case, the management device 20 controls the supply of power to the vehicle 50 via the power supply device 60, and controls the transfer of power between the power system including the commercial power grid and the vehicle 50.
[0035] The V2H system is a system that exchanges power between a house or the like and a vehicle. In the V2H system, power stored in a battery 501 mounted on a vehicle 50 is supplied to a house and used at home. In this case, the management device 20 controls the supply of power to the vehicle 50 via the power supply device 60, and controls the exchange of power between the building 70 and the vehicle 50.
[0036] [Electricity Operator 40]
[0037] The power operator 40 includes power plants that generate electricity using energy such as thermal power, wind power, nuclear power, or sunlight, and supplies electricity to, for example, allocated areas. It should be noted that the area here can be arbitrarily specified, and the area can be specified, for example, in units of administrative divisions such as prefectures, cities, towns, and villages, or in units of the jurisdiction of substations. The power operator 40 sends instructions for charging and discharging the battery 501 mounted on the vehicle 50 to the management device 20 via the network NW based on power needs. It should be noted that, Figure 1 The example shown is an example of a region, and the power operator 40 is an example.
[0038] [Management device 20]
[0039] The management device 20 includes an acquisition unit 201, a processing unit 202, a first recognition unit 203, a second recognition unit 204, an output unit 205, and a storage unit 210. In addition, the storage unit 210 includes a vehicle use state recognition model storage unit 211, a battery use state recognition model storage unit 212, and a battery information storage unit 213. It should be noted that the storage unit 210 can be connected to the management device 20 via a network NW.
[0040] The management device 20 communicates with at least one power supply device 60 via the network NW. The management device 20 selects a battery 501 suitable for the needs of the user at the time of purchase of the vehicle 50 based on the rentable battery information related to the rentable battery 501 stored in the storage unit 210 and the questionnaire results. That is, the management device 20 selects a battery 501 recommended to be mounted on the vehicle 50, and recommends the selected battery 501 recommended to be mounted on the vehicle 50 via the power supply device 60. The management device 20 selects a battery 501 suitable for the needs of the user at that time based on the rentable battery information related to the rentable battery 501 stored in the storage unit 210 and the rental battery information related to the rented battery 501 obtained from the vehicle 50. It should be noted that the rentable battery information stored in the storage unit 210 and the rental battery information obtained from the vehicle 50 will be described later. The management device 20 transmits the information related to the selected battery 501 to the power supply device 60 via the network NW. In addition, the management device 20 communicates with the power company 40 via the network NW. The management device 20 manages power based on information sent from the power company 40. The management device 20 manages the charging and discharging of the battery 501 of the vehicle 50 connected to the power supply device 60 to charge the battery 501 or supply power from the vehicle 50 to the power system.
[0041] The acquisition unit 201 acquires user identification information and questionnaire results from the power supply device 60 via the network NW, and outputs the acquired user identification information and questionnaire results to the processing unit 202. The acquisition unit 201 acquires vehicle identification information, battery identification information, and battery usage status information from the power supply device 60 via the network NW, and outputs the acquired vehicle identification information, battery identification information, and battery usage status information to the processing unit 202. The acquisition unit 201 receives a request from the power company 40 via the network NW. The request received from the power company 40 is, for example, a request to supply power to the power system or a request to stop supplying power to the power system. The acquisition unit 201 outputs the request acquired from the power company 40 to the processing unit 202.
[0042] The processing unit 202 obtains the user identification information and the questionnaire results output by the acquisition unit 201, and causes the storage unit 210 to store the obtained user identification information and the questionnaire results. The processing unit 202 selects a battery 501 that is suitable for the needs of the user when the vehicle 50 is purchased based on the vehicle usage status feature quantity output by the first recognition unit 203 and the rentable battery information stored in the storage unit 210. The processing unit 202 assigns the user identification information to the selected selection result and outputs it to the output unit 205. It should be noted that the processing unit 202 associates the vehicle identification information and the battery identification information with the user identification information when renting the battery 501, for example, and stores them. In addition, the processing unit 202 obtains the vehicle identification information, the battery identification information, and the battery usage status information output by the acquisition unit 201, and causes the storage unit 210 to store the obtained vehicle identification information, the battery identification information, and the battery usage status information. The processing unit 202 reselects a storage battery 501 that matches the needs of the user after the purchase of the vehicle 50 based on at least one of the vehicle usage state characteristic quantity output by the first recognition unit 203 and the storage battery usage state characteristic quantity output by the second recognition unit 204, and the rentable battery information stored in the storage unit 210. The processing unit 202 adds the vehicle identification information to the selected selection result and outputs it to the output unit 205. In addition, the processing unit 202 generates a control instruction for the vehicle 50 operating V2G in a manner of supplying power to the power system based on the request obtained from the power company 40 output by the acquisition unit 201. The processing unit 202 adds the vehicle identification information to the generated control instruction and outputs it to the output unit 205.
[0043] The first recognition unit 203 inputs the questionnaire survey results stored in the storage unit 210 to the vehicle use state recognition model stored in the vehicle use state recognition model storage unit 211, and outputs the vehicle use state feature quantity. It should be noted that the vehicle use state feature quantity will be described later. The first recognition unit 203 outputs the obtained vehicle use state feature quantity to the processing unit 202.
[0044] The second recognition unit 204 inputs the battery usage status information stored in the storage unit 210 to the battery usage status recognition model stored in the battery usage status recognition model storage unit 212, and outputs the battery usage status feature quantity. It should be noted that the battery usage status feature quantity will be described later. The second recognition unit 204 outputs the obtained battery usage status feature quantity to the processing unit 202.
[0045] The output unit 205 transmits the selection result with the user identification information output by the processing unit 202 to the power supply device 60 via the network NW. Alternatively, the output unit 205 transmits the selection result with the vehicle identification information output by the processing unit 202 to the power supply device 60 via the network NW. Alternatively, the output unit 205 transmits the control instruction with the vehicle identification information output by the processing unit 202 to the power supply device 60 connected to the vehicle 50 having the vehicle identification information via the network NW.
[0046] The storage unit 210 stores the questionnaire results in association with the user identification information. The storage unit 210 stores the battery usage status information in association with the battery identification information.
[0047] The vehicle usage state recognition model storage unit 211 stores the vehicle usage state recognition model used when obtaining the vehicle usage state feature quantity. It should be noted that the vehicle usage state recognition model can also be stored by the first recognition unit 203. It should be noted that the vehicle usage state recognition model is produced by machine learning using a model such as a neural network and supervised data.
[0048] The battery usage state recognition model storage unit 212 stores the battery usage state recognition model used when obtaining the battery usage state feature quantity. It should be noted that the battery usage state recognition model can also be stored by the second recognition unit 204. It should be noted that the battery usage state recognition model is produced by machine learning using a model such as a neural network and supervised data.
[0049] The battery information storage unit 213 stores rentable battery information. The rentable battery information is information related to the rentable storage battery 501, including, for example, SOC-OCV (State Of Charge-Open Circuit Voltage) characteristics, internal resistance, capacity, usage time, price, new, used, etc. It should be noted that SOC refers to the charging rate. In addition, OCV refers to the open circuit voltage.
[0050] [Power supply device 60]
[0051] The power supply device 60 includes a power supply communication unit 601 , a power supply control unit 602 , a power supply operation unit 603 , and a power supply output unit 604 .
[0052] The power supply device 60 communicates with the management device 20 via the network NW. The power supply device 60 is connected to the power supply line 80. The power supply device 60 is connected to the vehicle 50 via the cable 85. The power supply device 60 sends the questionnaire result input by operating the power supply operation unit 603 to the management device 20 via the network NW. It should be noted that the questionnaire result includes the name of the user, etc. The power supply device 60 obtains the vehicle identification information, battery identification information and battery use status information output by the vehicle 50 via the cable 85. The power supply device 60 sends the obtained vehicle identification information, battery identification information and battery use status information to the management device 20 via the network NW. The power supply device 60 receives the user identification information and the selection result received from the management device 20 via the network NW, and displays the received selection result. In addition, when the user selects to perform V2G operation, the power supply device 60 controls the charging of the power from the power system to the storage battery 501 mounted on the vehicle 50 and controls the supply of the power stored in the storage battery 501 to the power system based on the control instruction received from the management device 20. Furthermore, when the user selects to perform the V2H operation, the power supply device 60 is controlled so as to supply the power stored in the battery 501 mounted on the vehicle 50 to the building 70 .
[0053] The power communication unit 601 receives the control instruction sent by the management device 20 via the network NW, and outputs the received control instruction to the power control unit 602. The power communication unit 601 obtains the vehicle identification information, battery identification information, and battery usage status information output by the vehicle 50, and outputs the obtained vehicle identification information, battery identification information, and battery usage status information to the power control unit 602. The power communication unit 601 sends the questionnaire survey results output by the power control unit 602 to the management device 20 via the network NW. The power communication unit 601 sends the vehicle identification information, battery identification information, and battery usage status information output by the power control unit 602 to the management device 20 via the network NW.
[0054] The power control unit 602 obtains the operation result output by the power operation unit 603, and outputs the obtained operation result to the power communication unit 601 so as to be sent to the management device 20. It should be noted that the operation result includes the questionnaire result. In addition, the operation result may also include information indicating whether to participate in V2G operation or V2H operation. The power control unit 602 obtains the vehicle identification information, battery identification information and battery use status information output by the power communication unit 601, and outputs the obtained vehicle identification information, battery identification information and battery use status information to the power communication unit 601 with the management device 20 as the transmission destination. The power control unit 602 obtains the selection result output by the power communication unit 601. The power control unit 602 generates an image of the obtained selection result, and outputs the generated image to the power output unit 604. In addition, the power control unit 602 obtains the control instruction output by the power communication unit 601. Based on the obtained control instruction, the power control unit 602 controls the charging of power from the power system to the storage battery 501 mounted on the vehicle 50, and controls the supply of power stored in the storage battery 501 to the power system. It should be noted that the power supply control unit 602 detects that the power supply control unit 602 is connected to the vehicle 50 via the cable 85 based on, for example, a change in the voltage of the cable 85 .
[0055] The power operation unit 603 is, for example, a touch panel sensor and detects an operation result of an operation performed by a user of the power supply device 60 , and outputs the detected operation result to the power control unit 602 .
[0056] The power output unit 604 is, for example, an image display device. The power output unit 604 displays the image output by the power control unit 602. The displayed image is information related to the storage battery 501 (monthly payment amount, capacity of the storage battery 501, etc.) suitable for the needs of the user. It should be noted that the power output unit 604 can also be a printing device.
[0057] [Vehicle 50]
[0058] The vehicle 50 includes a battery 501, a vehicle control unit 502, a motor 503, a sensor 504, a vehicle storage unit 505, and a vehicle communication unit 506. The vehicle 50 includes an inverter, a transmission, wheels, and the like, which are not shown.
[0059] The battery 501 is a secondary battery such as a lithium ion battery, etc. The battery 501 stores electric power under the control of the vehicle control unit 502 and discharges the stored electric power.
[0060] The vehicle control unit 502 obtains the detection value (current value, voltage value, etc.) output by the sensor 504, for example, at every predetermined period. The vehicle control unit 502 uses the obtained current value, voltage value and temperature to calculate the SOC-OCV characteristics of the battery 501, the internal resistance of the battery 501 and the capacity of the battery 501 at every predetermined period. The vehicle control unit 502 stores the calculated SOC-OCV characteristics, internal resistance and capacity as battery usage status information in the vehicle storage unit 505. When the vehicle control unit 502 is connected to the power supply device 60 via the cable 85, the vehicle control unit 502 reads the vehicle identification information and the battery identification information stored in the vehicle storage unit 505. The vehicle control unit 502 outputs the vehicle identification information, the battery identification information and the battery usage status information to the vehicle communication unit 506. The vehicle control unit 502 controls the charging of electric power to the battery 501 according to the control of the power supply device 60. Alternatively, the vehicle control unit 502 controls the power supply device 60 so as to output the electric power stored in the battery 501 to the power supply device 60 according to the control of the power supply device 60 .
[0061] The motor 503 rotates the wheels according to the control of the vehicle control unit 502 using the electric power supplied from the battery 501 .
[0062] The sensor 504 includes, for example, a current sensor that detects the current flowing through the battery 501 and a voltage sensor that detects the voltage of the battery 501. The sensor 504 outputs the detected value to the vehicle control unit 502.
[0063] The vehicle storage unit 505 stores vehicle identification information and battery identification information. In addition, the vehicle storage unit 505 stores battery use status information. It should be noted that, when the storage battery 501 has a storage unit, the storage battery 501 may store the battery identification information.
[0064] When the vehicle 50 is connected to the power supply device 60 via the cable 85 , the vehicle communication unit 506 outputs the vehicle identification information, the battery identification information, and the battery use status information output by the vehicle control unit 502 to the power supply device 60 via the cable 85 .
[0065] [House Building 70]
[0066] The building 70 is, for example, a store where the vehicle 50 is sold, a user's home, a company where the user works, a lodging place used by the user, a charging station, etc. The building 70 is equipped with, for example, household appliances, lighting equipment, etc. It should be noted that the building 70 receives power supply from the power system, or receives power from the vehicle 50 via the power supply device 60. Switching between them is performed by, for example, the power supply device 60.
[0067] It should be noted that the components of the processing unit 202, the first identification unit 203 and the second identification unit 204 of the management device 20 are implemented by, for example, a hardware processor such as a CPU (Central Processing Unit) executing a program (software). Alternatively, the power control unit 602 of the power supply device 60 is implemented by a hardware processor such as a CPU executing a program (software). Alternatively, the vehicle control unit 502 of the vehicle 50 is implemented by a hardware processor such as an ECU (Electronic Control Unit) or a CPU executing a program (software). The processing unit 202 or the power control unit 602, or a part or all of the vehicle control unit 502 can be implemented by hardware (including circuitry) such as LSI (Large Scale Integration), ASIC (Application Specific Integrated Circuit), FPGA (Field-Programmable Gate Array), GPU (Graphics Processing Unit), or can be implemented by the coordinated cooperation of software and hardware. The program can be pre-stored in a storage device such as an HDD (Hard Disk Drive) or a flash memory (a storage device having a non-temporary storage medium), or can be stored in a removable storage medium such as a DVD or CD-ROM (a non-temporary storage medium), and installed by mounting the storage medium on a drive device.
[0068] Furthermore, the power supply device 60 may include the above-mentioned management device 20 .
[0069] [Battery rental information]
[0070] Next, an example of the rentable battery information stored in the storage unit 210 will be described. Figure 2 FIG. 2 is a diagram showing the rentable battery information stored in the storage unit 210 of the present embodiment. Figure 2 As shown, the storage unit 210 stores information related to the storage battery for each battery identification information. The information related to the storage battery 501 includes, for example, SOC-OCV characteristics, internal resistance, capacity, price (monthly cost), new product, used product, etc. It should be noted that, Figure 2 The rentable battery information shown is only an example and is not limited thereto. The rentable battery information may include information such as weight, appearance when the battery is used, and time of use.
[0071] [Vehicle usage status recognition model]
[0072] Next, an example of a vehicle usage state recognition model will be described. Figure 31 is a diagram showing an example of a vehicle use state recognition model according to the present embodiment. Figure 3 The input to the vehicle usage status recognition model in the example shown is the input questionnaire survey results, for example, the input is the scheduled driving time during a week, residence and family composition, and the vehicle usage status feature quantity (y1, y2, ..., y100) is obtained. It should be noted that Figure 3 The number of intermediate layers, weight coefficients, and vehicle usage status feature quantities shown are examples and are not limited thereto. In addition, the number of inputs to the model is not limited thereto and may be two or more of the scheduled travel time, residence, and family composition. In addition, V2G operation schedule, V2H operation schedule, etc. may also be input to the model.
[0073] [Battery usage status recognition model]
[0074] Next, an example of a battery usage status recognition model will be described. Figure 4 It is a diagram showing an example of a battery usage status recognition model according to the present embodiment. Figure 4 The input to the battery usage status recognition model in the example shown is the input of the battery usage status information, such as the input of the SOC-OCV characteristics, internal resistance and capacity, and the model for obtaining the battery usage status characteristic quantities (y1, y2, ..., y100). It should be noted that Figure 4 The number of intermediate layers, weight coefficients, and the number of battery usage state feature quantities shown are examples and are not limited thereto. In addition, the number of inputs to the model is not limited thereto, and may be two or more of the SOC-OCV characteristics, internal resistance, and capacity. In addition, the power-on time of the battery 501, the ambient temperature of the battery 501, etc. may also be input to the model.
[0075] [Selection of storage battery 501 suitable for user's needs]
[0076] Next, an example of a method of selecting the storage battery 501 suitable for the needs of the user will be described. Figure 5 FIG. 2 is a diagram showing an example of a radar chart used when selecting a storage battery 501 suitable for the needs of the user according to the present embodiment. Figure 5, A to F of the radar chart are vehicle use state feature quantities obtained by the vehicle use state recognition model. The processing unit 202 of the management device 20 represents the vehicle use state feature quantity obtained by the vehicle use state recognition model by a radar chart, and selects a battery 501 suitable for the user's needs from the rentable batteries 501 stored in the battery information storage unit 213 according to its shape. In this way, in this embodiment, the processing unit 202 selects a battery 501 suitable for the user's needs based on the scheduled use state or use state of the vehicle 50. It should be noted that the processing unit 202 is not limited to the radar chart, and the vehicle use state feature quantity may be represented by a scatter chart, a bubble chart, etc., and the battery 501 suitable for the user's needs may be selected based on its shape. Alternatively, the processing unit 202 may input the vehicle use state feature quantity to the model for selecting the battery 501 suitable for the user's needs, and select the battery 501 suitable for the user's needs.
[0077] Figure 6 1 is a diagram showing an example of changes in the characteristics of the rental battery 501 according to this embodiment. Figure 6 As shown, the SOC-OCV characteristics, internal resistance, and capacity of the battery 501 change according to the charge and discharge of the battery 501 and the power supply time. In addition, these changes are also affected by the deviation of the characteristics of the battery 501 and the deviation of the temperature of the environment in which it is used. Figure 6 In the figure, battery A is a battery in which the SOC-OCV characteristics, internal resistance, and capacity have not changed. Battery B is a battery in which the internal resistance has changed and is deteriorating. Battery C is a battery in which the capacity has changed and is deteriorating. Battery D is a battery in which the SOC-OCV characteristics have changed and is deteriorating.
[0078] [Processing steps of battery operation system]
[0079] Next, an example of a process procedure performed by the secondary battery operation system 1 will be described. Figure 7 This is a flowchart of the process performed by the secondary battery operation system 1 according to the present embodiment.
[0080] The power control unit 602 of the power supply device 60 determines whether the questionnaire result can be obtained (step S1 ).
[0081] Next, when the questionnaire result can be obtained, the power supply control unit 602 obtains the user identification information and the questionnaire result via the cable 85 and the power supply communication unit 601 (step S2 ).
[0082] Next, the power supply control unit 602 transmits the user identification information and the questionnaire result to the management device 20 via the network NW (step S3).
[0083] Next, the processing unit 202 of the management device 20 acquires the user identification information and the questionnaire result transmitted from the power supply device 60 via the network NW and the acquisition unit 201 (step S4 ).
[0084] Next, when the questionnaire result is successfully obtained or when the questionnaire result cannot be obtained, the power supply control unit 602 of the power supply device 60 detects whether the vehicle 50 is connected to the power supply device 60 via a cable (step S5 ).
[0085] Next, when it is detected that the vehicle 50 is connected to the power supply device 60 , the power supply control unit 602 obtains the vehicle identification information, the battery identification information, and the battery use state information from the vehicle 50 via the cable (step S6 ).
[0086] Next, the power supply control unit 602 transmits the vehicle identification information, the battery information, and the battery use status information to the management device 20 via the network NW (step S7).
[0087] Next, the processing unit 202 of the management device 20 acquires the vehicle identification information, the battery information, and the battery use status information transmitted from the power supply device 60 via the network NW and the acquisition unit 201 (step S8 ).
[0088] When the questionnaire survey results can be obtained and the connection between the vehicle 50 and the power supply device 60 is not detected, the processing unit 202 obtains the vehicle usage state characteristic quantity by inputting the obtained questionnaire survey results into the vehicle usage state model. Next, the processing unit 202 represents the vehicle usage state characteristic quantity by, for example, a radar chart, and selects the battery 501 that best meets the needs of the user at the time of purchase from the rentable batteries based on the shape of the radar chart. Next, the processing unit 202 assigns user identification information to the selection result and sends it to the power supply device 60 via the acquisition unit 201 and the network NW. When the questionnaire survey results can be obtained and the connection between the vehicle 50 and the power supply device 60 is detected, the processing unit 202 obtains the vehicle usage state characteristic quantity by inputting the obtained questionnaire survey results into the vehicle usage state model. Next, the processing unit 202 obtains the battery usage state characteristic quantity by inputting the obtained battery usage state information into the battery usage state recognition model. Next, the processing unit 202 uses the vehicle usage state feature quantity obtained by the vehicle usage state model and the battery usage state feature quantity obtained by the battery usage state recognition model, for example, based on the shape of the radar chart, to select the best battery 501 for the user's needs at that time from the rentable batteries. Next, the processing unit 202 adds vehicle identification information to the selection result and sends it to the power supply device 60 via the acquisition unit 201 and the network NW. When the questionnaire survey results cannot be obtained and it is detected that the vehicle 50 is connected to the power supply device 60, the processing unit 202 obtains the battery usage state feature quantity by inputting the obtained battery usage state information to the battery usage state recognition model. Next, the processing unit 202 uses the battery usage state feature quantity obtained by the battery usage state recognition model, for example, based on the shape of the radar chart, to select the best battery 501 for the user's needs at that time from the rentable batteries. Next, the processing unit 202 adds vehicle identification information to the selection result and sends it to the power supply device 60 via the acquisition unit 201 and the network NW (step S9).
[0089] The power control unit 602 of the power supply device 60 obtains the selection result sent by the management device 20 via the network NW and the power communication unit 601. Next, the processing unit 202 generates an image of the obtained selection result and outputs the generated image to the power output unit 604 to present the storage battery 501 that best meets the user's needs (step S10).
[0090] As described above, in this embodiment, the user visits the sales store and answers the questionnaire when purchasing the vehicle 50. Then, the management device 20 selects and presents the best battery 501 for the user's needs at the time of purchasing the vehicle 50 from the batteries available for rent based on the vehicle usage status, i.e., the questionnaire results.
[0091] In addition, in the present embodiment, after the purchase of the vehicle 50, the user visits the sales store, for example, every two years. And when the vehicle 50 is connected to the power supply device 60, the management device 20 obtains the vehicle usage status, that is, the battery usage status information. In addition, when the answer to the questionnaire survey is obtained again at this time point, the management device 20 also obtains the questionnaire survey result. And, based on at least one of the questionnaire survey result and the rental battery information, the management device 20 selects and presents the best storage battery 501 for the needs of the user at that time point from the rental batteries.
[0092] It should be noted that, in the above example, the management device 20 sends the selection result to the power supply device 60, but the present invention is not limited thereto. The management device 20 may also send the selection result to a terminal (not shown) such as a smartphone or tablet terminal of the user. Furthermore, the terminal may display and prompt the selection result.
[0093] The timing for recommending the battery 501 may be at least one of when the vehicle 50 is purchased, every predetermined period after the vehicle 50 is purchased, or when the vehicle use status information changes.
[0094] It should be noted that the selection results related to the rentable batteries that are prompted may be multiple. In this case, the processing unit 202 of the management device 20 may select, for example, the top three and prompt the selected three. The top three proposals are, for example, a proposal with a higher rental fee than the one that is desired to have a slight safety factor, a proposal with no safety factor than the one that is desired, and a proposal with a lower rental fee than the one that is slightly lower than the desired performance. In this way, by prompting multiple proposed batteries 501, the user's options increase. In addition, when there are multiple batteries 501 installed in the vehicle 50, the processing unit 202 may select and prompt multiple batteries 501 with the same conditions.
[0095] It should be noted that, in the above example, an example of renting out the battery 501 is described, but the present invention is not limited to this. For example, the battery 501 may be a sold battery instead of a rented battery, or may be a monthly payment or other installment payment. Even in such a case, by confirming the usage status every two years, for example, the battery 501 can be replaced with the best battery at that time. It should be noted that, when selecting the battery 501, the monthly payment can be equal to the current fee, cheaper than the current fee, higher than the current fee, etc., so that the user can choose. Moreover, the management device 20 can also select the battery 501 that meets this condition.
[0096] It should be noted that, in the above example, an example of obtaining the use status of the vehicle 50 by conducting a questionnaire survey on the user is described, but the present invention is not limited to this. Alternatively, after the vehicle 50 is purchased, for example, the sensor 504 of the vehicle 50 detects the number of revolutions of the motor 503, etc. Alternatively, the vehicle control unit 502 may calculate the travel distance based on the number of revolutions and the indicated value, and time the operation time of the V2G, etc. The power supply device 60 may also obtain the user-generated information on the use status of these vehicles instead of the questionnaire survey results, and send the user-generated information to the management device 20.
[0097] As mentioned above, although the specific embodiment of the present invention is described using the embodiment, the present invention is not limited to such embodiment at all, and various modifications and substitutions can be added within the scope not departing from the gist of the present invention.
Claims
1. A management device, wherein: The management device comprises: an acquisition unit that acquires vehicle use status information related to the use status of the vehicle; and a processing unit that obtains the characteristic quantity by applying the vehicle use status information to a model that outputs the characteristic quantity when the vehicle use status information is input, and selects and recommends a secondary battery to be installed in the vehicle for which the vehicle use status information is obtained, from among secondary batteries that can be installed in the vehicle and store electric power for traveling, based on the obtained characteristic quantity, The vehicle usage status information includes user-generated information obtained from a user, wherein the user-generated information is information indicating a usage form of the vehicle envisioned by the user or a usage form of the vehicle experienced by the user. The user-sent information is a questionnaire survey result obtained by conducting a questionnaire survey on the user. The processing unit inputs the questionnaire results into the model to obtain the feature value, represents the obtained feature value in a radar chart, and selects the secondary battery based on the shape of the radar chart.
2. The management device according to claim 1, wherein: The questionnaire included weekly scheduled driving time, residence and household composition.
3. The management device according to claim 1, wherein: The vehicle use state information includes battery use state information related to a use state of the secondary battery.
4. The management device according to any one of claims 1 to 3, wherein: The processing unit selects and presents the secondary battery from available secondary batteries at at least one of when the vehicle is purchased, at every predetermined period after the vehicle is purchased, and when the vehicle use status information changes.
5. A management method, wherein: The management method enables the management device to perform the following processing: Obtaining vehicle usage status information related to the usage status of the vehicle; acquiring the feature quantity by applying the vehicle use state information to a model that outputs the feature quantity when the vehicle use state information is input; selecting and recommending, based on the acquired characteristic amount, a secondary battery to be mounted on the vehicle for which the vehicle usage status information has been acquired, from among secondary batteries that can be provided as secondary batteries that can be mounted on the vehicle and store electric power for traveling; as well as The vehicle usage status information includes user-generated information obtained from a user, wherein the user-generated information is information indicating a usage form of the vehicle envisioned by the user or a usage form of the vehicle experienced by the user. The user-sent information is a questionnaire survey result obtained by conducting a questionnaire survey on the user. The questionnaire results are input to the model to obtain the characteristic amount, the obtained characteristic amount is represented by a radar chart, and the secondary battery is selected based on the shape of the radar chart.
6. A storage medium which is a non-transitory storage medium readable by a computer and stores a program, wherein: The program causes the computer of the management device to perform the following processing: Obtaining vehicle usage status information related to the usage status of the vehicle; acquiring the feature quantity by applying the vehicle use state information to a model that outputs the feature quantity when the vehicle use state information is input; selecting and recommending, based on the acquired characteristic amount, a secondary battery to be mounted on the vehicle for which the vehicle usage status information has been acquired, from among secondary batteries that can be provided as secondary batteries that can be mounted on the vehicle and store electric power for traveling; as well as The vehicle usage status information includes user-generated information obtained from a user, wherein the user-generated information is information indicating a usage form of the vehicle envisioned by the user or a usage form of the vehicle experienced by the user. The user-sent information is a questionnaire survey result obtained by conducting a questionnaire survey on the user. The questionnaire results are input to the model to obtain the characteristic amount, the obtained characteristic amount is represented by a radar chart, and the secondary battery is selected based on the shape of the radar chart.
