An assembled wall horizontal joint connection structure with I-beams

By adopting prefabricated wall horizontal joint connection structure with I-steel in the building, the problems of low working efficiency and insufficient structural stability caused by integrated casting in existing building technologies are solved, and higher structural stability, safety and operating efficiency are achieved.

CN112112314BActive Publication Date: 2025-06-13XIAN GAOFENG STEEL STRUCTURE CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011083628.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-12
Publication Date
2025-06-13
Estimated Expiration
2040-10-12

AI Technical Summary

Technical Problem

In the existing construction technology, integrated casting leads to prolonging working hours of staff, low work efficiency, and incomplete fixed structures, and stable functions need to be improved.

Method used

The prefabricated wall horizontal joint connection structure with I-shaped steel is adopted to form a stable connection structure through the first shear wall, fixed plate, L-shaped limit plate, limit block, support column and other components, which improve structural stability and safety, and simplify operation and reduce working time through the limit column and extrusion block and other components.

Benefits of technology

It improves structural stability and safety, simplifies operating procedures, reduces the working time and workload of staff, improves work efficiency and service life, and reflects the practicality of prefabricated installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112112314B_ABST
    Figure CN112112314B_ABST
Patent Text Reader

Abstract

The present invention discloses an assembled wall horizontal joint connection structure with an I-beam, which includes a first shear wall, a first fixing plate, an L-shaped limiting plate, a limiting block, a threaded hole, a first bolt, a fixing nut, a support column, a second fixing plate, an I-beam and a wall panel. An installation hole is formed on one side of the wall panel, an installation clamping column is fixedly connected to the other side of the wall panel, a reinforcing bar is fixedly connected to the surface of the wall panel, and a second shear wall is fixedly connected to one end of the reinforcing bar. The main advantage of the present invention is to provide an assembled wall horizontal joint connection structure with an I-beam. This device provides a stable connection structure. During assembly, the operator installs the first fixing plate on the first shear wall, and the operator tightly connects the first fixing plate and the first shear wall through the second clamping column, improving the structural stability. Moreover, the limiting column is convenient to install, reducing the working time of the operator and improving the working efficiency of the operator.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wall equipment, and particularly to an assembled wall horizontal joint connection structure with an I-beam. Background Technique

[0002] With the continuous development and progress of new building technologies and materials, prefabricated buildings have been widely used. In many countries with developed building industrialization, prefabricated buildings have undergone long-term experiments and applications. Modern prefabricated building products can highly integrate various functions of buildings, and the forms and components of buildings are very delicate. In China, with a large construction demand and a fast construction speed, it is very necessary to develop prefabricated buildings. Then, the requirements for the node structures of prefabricated structures are getting higher and higher. Prefabricated structures require I-beams. I-beams are also called steel beams and are long steel bars with an I-shaped cross-section. I-beams are divided into ordinary I-beams and light I-beams, which are steel sections with an I-shaped cross-section.

[0003] Most of the existing building technologies are carried out integrally by pouring. Pouring will increase the working time of workers, resulting in a decrease in work efficiency. It is not very convenient to operate, and the fixing structure is not perfect enough, and the stability function needs to be improved. Therefore, improving and modifying the above problems has become an urgent problem to be solved currently. Summary of the Invention

[0004] (1) Technical Problems to be Solved

[0005] Aiming at the deficiencies of the prior art, the present invention provides an assembled wall horizontal joint connection structure with an I-beam, which solves the problems raised in the above background technique.

[0006] (2) Technical Solutions

[0007] To achieve the above object, the present invention is realized by the following technical solutions: An assembled wall horizontal joint connection structure with an I-beam, including a first shear wall, one side of the first shear wall is fixedly connected with a first fixing plate, the top end of the first fixing plate is fixedly connected with an L-shaped limiting plate, one side of the L-shaped limiting plate is fixedly connected with a limiting block, a threaded hole is opened on one side of the limiting block, a first bolt is movably connected inside the threaded hole, one end of the first bolt is fixedly connected with a fixing nut, the bottom end of the first fixing plate is fixedly connected with a support column, one end of the support column is fixedly connected with a second fixing plate, the top end of the second fixing plate is fixedly connected with an I-beam, one side of the I-beam is fixedly connected with a wall panel, an installation hole is opened on one side of the wall panel, an installation clamping column is fixedly connected on the other side of the wall panel, a steel bar is fixedly connected on the surface of the wall panel, one end of the steel bar is fixedly connected with a second shear wall, one side of the second shear wall is fixedly connected with an installation plate, an installation groove is opened on the surface of the installation plate, and the bottom end of the second shear wall is fixedly connected with a base.

[0008] Optionally, a limiting column is fixedly connected to the bottom end of the second fixing plate.

[0009] Optionally, a fixing seat is fixedly connected to one end of the limiting column.

[0010] Optionally, a pressing block is fixedly connected to one side of the inner wall of the fixing seat.

[0011] Optionally, a pressing plate is fixedly connected to one side of the pressing block.

[0012] Optionally, an installation ring is fixedly connected to the bottom end of the L-shaped limiting plate, holes are opened on the surface of the installation ring, and a second bolt is movably connected inside the holes.

[0013] Optionally, a first clamping column is fixedly connected to the bottom end of the installation ring.

[0014] Optionally, a second clamping column is fixedly connected to one side of the first fixing plate.

[0015] Optionally, a waterproof layer is provided on one side of the first shear wall, and a moisture-proof and anti-corrosion layer is provided inside the first shear wall.

[0016] (III) Beneficial effects

[0017] The present invention provides an assembled wall horizontal joint connection structure with an I-beam, having the following

[0018] beneficial effects:

[0019] The main advantage of the present invention is to provide an assembled wall horizontal joint connection structure with an I-beam. This device provides a stable connection structure. During assembly, the operator installs the first fixing plate on the first shear wall. The operator tightly connects the first fixing plate and the first shear wall through the second clamping column, improving the structural stability. Subsequently, the operator installs the support column, which provides a stable force between the first fixing plate and the second fixing plate, making the plates more stable and ensuring the safety of the device. The L-shaped limiting plate stabilizes the I-beam, and the limiting block can mutually fix the L-shaped limiting plate and the first fixing plate, ensuring the stable installation of the I-beam. The limiting column ensures the mutual fixation of the structure between the second fixing plate and the base, and the limiting column is convenient to install, reducing the working time of the operator and improving the working efficiency of the operator.

[0020] Compared with the traditional assembled wall horizontal joint connection structure with an I-beam, this device can be more conveniently used according to the needs of users. For example, the steel bar rod stabilizes the structure between the first shear wall, the wall panel, and the second shear wall, which is beneficial for the later pouring by the operator. The extrusion block and the extrusion plate tightly connect the limiting column. The operator inserts the first clamping column into the first fixing plate to stabilize it. The waterproof layer and the moisture-proof and anti-corrosion layer can improve the waterproof effect and the anti-corrosion and moisture-proof effect of the first shear wall and the second shear wall, increasing the service life, improving the overall practical efficiency. The installation holes and the installation clamping columns enable the entire device to be assembled and installed, which is relatively convenient and simple to operate, greatly reducing the original in-situ casting operation and reducing the workload of the operator, reflecting the overall practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic structural diagram of the present invention;

[0022] Figure 2 It is a schematic structural diagram of the first shear plate of the present invention;

[0023] Figure 3 It is a schematic cross-sectional view of the fixed seat structure of the present invention;

[0024] Figure 4 It is a schematic structural diagram of the first fixing plate of the present invention;

[0025] Figure 5 It is a schematic structural diagram of the L-shaped limiting plate of the present invention;

[0026] Figure 6 It is a schematic structural diagram of the limiting block of the present invention.

[0027] In the figure: 1. First shear wall; 2. First fixing plate; 3. L-shaped limiting plate; 4. Limiting block; 5. First bolt; 6. Support column; 7. Second fixing plate; 8. I-beam; 9. Wall panel; 10. Installation hole; 11. Installation clamping column; 12. Steel bar; 13. Second shear wall; 14. Installation plate; 15. Installation groove; 16. Base; 17. Limiting column; 18. Fixed seat; 19. Extrusion block; 20. Extrusion plate; 21. Installation ring; 22. First clamping column; 23. Second clamping column; 24. Waterproof layer; 25. Moisture-proof and anti-corrosion layer. Detailed implementation manners

[0028] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all of the embodiments.

[0029] Please refer to Figures 1 to 6, the present invention provides a technical solution: an assembled wall horizontal joint connection structure with I-beams, including a first shear wall 1. The first shear wall 1 is a wall that can withstand horizontal loads and vertical loads caused by wind loads or seismic actions, preventing structural shear failure. A waterproof layer 24 is provided on one side of the first shear wall 1, and a moisture-proof and anti-corrosion layer 25 is provided inside the first shear wall 1. A first fixing plate 2 is fixedly connected to one side of the first shear wall 1. A second clamping column 23 is fixedly connected to one side of the first fixing plate 2. An L-shaped limiting plate 3 is fixedly connected to the top of the first fixing plate 2. An installation ring 21 is fixedly connected to the bottom of the L-shaped limiting plate 3. A hole is provided on the surface of the installation ring 21, and a second bolt is movably connected inside the hole. A first clamping column 22 is fixedly connected to the bottom of the installation ring 21. A limiting block 4 is fixedly connected to one side of the L-shaped limiting plate 3. A threaded hole is provided on one side of the limiting block 4, and a first bolt 5 is movably connected inside the threaded hole. A fixing nut is fixedly connected to one end of the first bolt 5. A support column 6 is fixedly connected to the bottom of the first fixing plate 2. One end of the support column 6 is fixedly connected to a second fixing plate 7. A limiting column 17 is fixedly connected to the bottom of the second fixing plate 7. One end of the limiting column 17 is fixedly connected to a fixing seat 18. One side of the inner wall of the fixing seat 18 is fixedly connected to a pressing block 19. A pressing plate 20 is fixedly connected to one side of the pressing block 19. An I-beam 8 is fixedly connected to the top of the second fixing plate 7. A wall panel 9 is fixedly connected to one side of the I-beam 8. An installation hole 10 is provided on one side of the wall panel 9. An installation clamping column 11 is fixedly connected to the other side of the wall panel 9. A steel bar rod 12 is fixedly connected to the surface of the wall panel 9. One end of the steel bar rod 12 is fixedly connected to a second shear wall 13. An installation plate 14 is fixedly connected to one side of the second shear wall 13. An installation groove 15 is provided on the surface of the installation plate 14. A base 16 is fixedly connected to the bottom of the second shear wall 13. During assembly, the operator installs the first fixing plate 2 onto the first shear wall 1. The operator tightly connects the first fixing plate 2 and the first shear wall 1 through the second clamping column 23, improving the structural stability. Subsequently, the operator installs the support column 6, and the support column 6 provides a stable force between the first fixing plate 2 and the second fixing plate 7, making the plates more stable and ensuring the safety of the equipment. The L-shaped limiting plate 3 stabilizes the I-beam 8, and the limiting block 4 can mutually fix the L-shaped limiting plate 3 and the first fixing plate 2, ensuring the stable installation of the I-beam 8. The limiting column 17 ensures the mutual fixation of the structure between the second fixing plate 7 and the base 16, and the limiting column 17 is easy to install, reducing the working time of the operator and improving the working efficiency of the operator. The steel bar rod 12 stabilizes the structure between the first shear wall 1, the wall panel, and the second shear wall 13, which is beneficial for the subsequent pouring by the operator. The pressing block 19 and the pressing plate 20 tightly connect the limiting column 17. The operator inserts the first clamping column 22 into the first fixing plate 2 to stabilize it. The waterproof layer 24 and the moisture-proof and anti-corrosion layer 25 can improve the waterproof effect and the anti-corrosion and moisture-proof effect of the first shear wall 1 and the second shear wall 13, increasing the service life.To improve the overall practical efficiency, the installation holes 10 and installation clamping columns 11 enable the entire device to be assembled and installed, which is relatively convenient to install, has simple operation, greatly reduces the original in-situ casting operation, reduces the workload of operators, and reflects the overall practicality. In the specific implementation manners of the present disclosure, the detailed descriptions of known functions and known components are omitted. To ensure the compatibility of the device, the operating means adopted are consistent with the parameters of market instruments.

[0030] In summary, for the prefabricated wall horizontal joint connection structure with I-beams, during use and assembly, the operator installs the first fixing plate 2 on the first shear wall 1. The operator tightly connects the first fixing plate 2 and the first shear wall 1 through the second clamping column 23, improving the structural stability. Subsequently, the operator installs the support column 6, and the support column 6 provides a stable force between the first fixing plate 2 and the second fixing plate 7, making the plates more stable and ensuring the safety of the device. The L-shaped limiting plate 3 stabilizes the I-beam 8, and the limiting block 4 can fix the L-shaped limiting plate 3 and the first fixing plate 2 to each other, ensuring that the I-beam 8 can be stably installed. The limiting column 17 ensures the mutual fixation of the structure between the second fixing plate 7 and the base 16, and the limiting column 17 is convenient to install, reducing the working time of the operator and improving the working efficiency of the operator. The reinforcing bar 12 stabilizes the structure between the first shear wall 1, the wall panel, and the second shear wall 13, which is beneficial for the subsequent pouring operation by the operator. The extrusion block 19 and the extrusion plate 20 tightly connect the limiting column 17. The operator inserts the first clamping column 22 into the first fixing plate 2 to stabilize it. The waterproof layer 24 and the moisture-proof and anti-corrosion layer 25 can improve the waterproof effect and the moisture-proof and anti-corrosion effect of the first shear wall 1 and the second shear wall 13, increasing the service life, improving the overall practical efficiency. The installation holes 10 and installation clamping columns 11 enable the entire device to be assembled and installed, which is relatively convenient to install, has simple operation, greatly reduces the original in-situ casting operation, reduces the workload of operators, and reflects the overall practicality.

[0031] The above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art within the technical scope disclosed by the present invention, according to the technical solution and inventive concept of the present invention, making equivalent substitutions or changes should be covered within the protection scope of the present invention.

Claims

1. An assembled wall horizontal joint connection structure with an I-beam, including a first shear wall (1), Characterized in that: One side of the first shear wall (1) is fixedly connected with a first fixing plate (2), the top of the first fixing plate (2) is fixedly connected with an L-shaped limiting plate (3), one side of the L-shaped limiting plate (3) is fixedly connected with a limiting block (4), a threaded hole is opened on one side of the limiting block (4), a first bolt (5) is movably connected inside the threaded hole, one end of the first bolt (5) is fixedly connected with a fixing nut, the bottom end of the first fixing plate (2) is fixedly connected with a support column (6), one end of the support column (6) is fixedly connected with a second fixing plate (7), the top of the second fixing plate (7) is fixedly connected with an I-beam (8), one side of the I-beam (8) is fixedly connected with a wall panel (9), an installation hole (10) is opened on one side of the wall panel (9), the other side of the wall panel (9) is fixedly connected with an installation clamping column (11), a steel bar rod (12) is fixedly connected to the surface of the wall panel (9), one end of the steel bar rod (12) is fixedly connected with a second shear wall (13), one side of the second shear wall (13) is fixedly connected with an installation plate (14), an installation groove (15) is opened on the surface of the installation plate (14), and the bottom end of the second shear wall (13) is fixedly connected with a base (16); The bottom end of the second fixing plate (7) is fixedly connected with a limiting column (17); One end of the limiting column (17) is fixedly connected with a fixing seat (18); One side of the inner wall of the fixing seat (18) is fixedly connected with a pressing block (19); One side of the pressing block (19) is fixedly connected with a pressing plate (20); The bottom end of the L-shaped limiting plate (3) is fixedly connected with an installation ring (21), holes are opened on the surface of the installation ring (21), and a second bolt is movably connected inside the holes.

2. The assembled wall horizontal joint connection structure with an I-beam according to claim 1, Characterized in that: The bottom end of the installation ring (21) is fixedly connected with a first clamping column (22).

3. The assembled wall horizontal joint connection structure with an I-beam according to claim 1, Characterized in that: One side of the first fixing plate (2) is fixedly connected with a second clamping column (23).

4. The assembled wall horizontal joint connection structure with an I-beam according to claim 1, Characterized in that: A waterproof layer (24) is arranged on one side of the first shear wall (1), and a moisture-proof and anti-corrosion layer (25) is arranged inside the first shear wall (1).

Citation Information

Patent Citations

  • Fabricated wall surface horizontal joint connecting structure with I-shaped steel

    CN213682644U