Composite support and erection method of cast-in-place box girder for super-high passable curve in mountainous area

By designing a cast-in-place box beam combination bracket in mountainous ultra-high-pass-saving curve in the bridge construction, ensuring that the column bracket components are equal, solving the problem of excessive length of Bere beams, and achieving full use of load-bearing performance and improving bracket stability Effect.

CN112411343BActive Publication Date: 2024-11-15ROAD & BRIDGE INT CO LTD +1
0 Cites 0 Cited by

Patent Information

Application Number
CN202011372461.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-30
Publication Date
2024-11-15
Estimated Expiration
2040-11-30

Smart Images

  • Figure CN112411343B_ABST
    Figure CN112411343B_ABST
Patent Text Reader

Abstract

The present application discloses a combined support and erection method of a super-high curve cast-in-place box girder for mountainous areas. The combined support comprises: a column support assembly fixed on the side of a pier, the column support assembly is perpendicular to the tangent of the curve section between adjacent piers, a Bailey beam is vertically fixed on the upper end of the column support assembly, a distribution beam is fixed on the upper end of the Bailey beam, and a bowl buckle support assembly is fixed on the upper end of the distribution beam. In the related art of the present application, the distances between column supports located on adjacent piers are not equal, resulting in different lengths of Bailey beams installed on the column supports, and the problem of not being able to fully utilize the bearing performance of the Bailey beams.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of bridge construction, and more specifically, to a composite support and erection method for a super-high, passable curved cast-in-place box girder in mountainous areas. Background Art

[0002] Cast-in-place beams are a common design form in bridge engineering, and are mostly used in curved line designs. Since the maximum erection distance of traditional buckle brackets is recommended to be 24m according to the specifications, a new bracket design form is required for the erection of cast-in-place box beam brackets with a height of more than 24m, and according to the project traffic requirements, normal vehicle traffic needs to be guaranteed at the brackets. Chinese patent, CN110593110A, a cast-in-place support for box beams suitable for curves and longitudinal and transverse slopes and its construction method, discloses a cast-in-place support for box beams suitable for curves and longitudinal and transverse slopes and its construction method, and specifically discloses that the present invention provides a cast-in-place support for box beams suitable for curves and longitudinal and transverse slopes and its construction method, wherein the cast-in-place support for box beams includes components such as column supports and bowl-hook type full-chamber supports, the column supports are arranged along the extension curve of the bridge, the bowl-hook type full-chamber supports include multiple unit supports, the unit supports are overlapped with each other along the extension direction of the bridge, and the upper and lower ends of the bowl-hook type full-chamber supports are respectively provided with adjustable brackets for adjusting the height; the construction method includes: S1: making column supports; S2: making bowl-hook type full-chamber supports; S3: making surface support plates and connecting buried pipe piles; S4: burying buried pipe piles; S5: installing column supports; S6: installing pile top crossbeams, Bailey frames and distribution beams. S7: installing bowl-hook type full-chamber supports; S8: installing top beams; S9: installing pads. Although this patent solves the problem of ensuring the support is unobstructed, the spacing between the column supports located on adjacent piers is not equal, so the Bailey beams installed on the column supports are of different lengths. In this case, the Bailey beams that meet the longest spacing are generally used for installation. Therefore, for the short-spacing part, the length of the Bailey beam is too long, resulting in the inability to fully utilize the bearing capacity of the Bailey beam.

[0003] With regard to the problem in the related art that the spacing between column supports located at adjacent piers is not equal, the length of the Bailey beam is too long for the short spacing part, and the bearing performance of the Bailey beam cannot be fully utilized, no effective solution has been proposed so far. Summary of the invention

[0004] The main purpose of the present application is to provide a composite support and erection method for a super-high curved cast-in-place box girder in mountainous areas, so as to solve the problem that the spacing between the column supports located on adjacent piers in the related technology is not equal, and for the short-spacing part, the length of the Bailey beam is too long and the bearing performance of the Bailey beam cannot be fully utilized.

[0005] In order to achieve the above-mentioned purpose, the present application provides a composite support for a super-high curve cast-in-place box girder for ensuring smooth passage in mountainous areas. The composite support for a super-high curve cast-in-place box girder for ensuring smooth passage in mountainous areas includes: a column support assembly fixedly mounted on the side of a pier, the column support assembly being perpendicular to the tangent of the curve section between adjacent piers, a Bailey beam being vertically fixedly mounted on the upper end of the column support assembly, a distribution beam being fixedly mounted on the upper end of the Bailey beam, and a bowl-hook support assembly being fixedly mounted on the upper end of the distribution beam.

[0006] Further, the column support assembly is perpendicular to the tangent line of the midpoint of the curved section between adjacent piers.

[0007] Furthermore, the column support assembly includes a plurality of steel pipe columns fixed on the sides of the piers and a first load-bearing beam fixed on the upper ends of the steel pipe columns, the first load-bearing beam is perpendicular to the tangent of the midpoint of the curved section between adjacent piers, and the Bailey beam is vertically fixed on the first load-bearing beam.

[0008] Furthermore, the lower end of the steel pipe column is fixed on the cap of the pier column.

[0009] Furthermore, the column support assemblies located on both sides of the pier are fixedly connected by a second load-bearing beam.

[0010] Furthermore, the second load-bearing beam is fixedly connected to the first load-bearing beam via an inclined third load-bearing beam.

[0011] Furthermore, a limiting member is transversely arranged between the steel tube column and the box beam pier, wherein a first end of the limiting member is fixedly connected to the steel tube column, and a second end of the limiting member is abuttingly connected to the pier.

[0012] Furthermore, a limiting steel bar is welded to the upper end of the steel pipe column, and the first load-bearing beam is welded to the limiting steel bar.

[0013] Furthermore, the bowl-hook bracket assembly includes a bowl-hook type scaffolding, on which a channel steel is inverted, the upper end of the channel steel is paved with square timber, the upper end of the square timber is paved with bamboo plywood, and a bowl-shaped surface is formed.

[0014] Furthermore, the spacing between the steel pipe columns is 270cm, and the steel pipe columns are installed with clamps, channel steel flat joints, and diagonal braces for welding connection.

[0015] According to another aspect of the present application, a method for erecting a combined support for a super-high, passable curved cast-in-place box girder in a mountainous area is provided, comprising the following steps:

[0016] Obtaining a curved section of a box girder between adjacent piers, and obtaining a tangent line of the curved section;

[0017] Set up column support assemblies perpendicular to the tangent line at both ends of the tangent line;

[0018] A Bailey beam is set up on the column support assembly, wherein the Bailey beam is perpendicular to the column support assembly;

[0019] A distribution beam is set on the Bailey beam, and a bowl buckle bracket assembly is set on the distribution beam.

[0020] Furthermore, the tangent line is a tangent line with the midpoint of the curve segment as the tangent point.

[0021] In the embodiment of the present application, a column bracket assembly is fixedly mounted on the side of the pier, the column bracket assembly is perpendicular to the tangent of the curved section between adjacent piers, a Bailey beam is vertically fixedly mounted on the upper end of the column bracket assembly, a distribution beam is fixedly mounted on the upper end of the Bailey beam, and a bowl-hook bracket assembly is fixedly mounted on the upper end of the distribution beam. The position of the column bracket assembly can be determined according to the linearity of the curved section between adjacent piers, so that the two column bracket assemblies of adjacent piers are equidistant, and multiple groups of Bailey beams of the same length can be installed on the column bracket assembly, thereby achieving the technical effect of fully utilizing the bearing capacity of the Bailey beam, and further solving the problem in the related art that the spacing between the column brackets located at adjacent piers is not equal, and for the short spacing part, the length of the Bailey beam is too long, and the bearing performance of the Bailey beam cannot be fully utilized. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:

[0023] Figure 1 is a schematic diagram of a top view structure according to an embodiment of the present application;

[0024] Figure 2 is another schematic diagram of a top view structure according to an embodiment of the present application;

[0025] Figure 3 is a schematic diagram of a side view structure according to an embodiment of the present application;

[0026] Figure 4 is a schematic diagram of the main structure according to an embodiment of the present application;

[0027] Among them, 1 is the pedestal, 2 is the column bracket assembly, 21 is the steel pipe column, 22 is the first load-bearing beam, 3 is the pier, 4 is the third load-bearing beam, 5 is the second load-bearing beam, 6 is the distribution beam, 7 is the Bailey beam, 9 is the bowl-hook scaffolding, 10 is the inverted channel steel, 11 is the bamboo plywood, and 12 is the square wood. DETAILED DESCRIPTION

[0028] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0029] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so as to describe the embodiments of the present application described herein.

[0030] In this application, the terms "upper", "lower", "inner", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0031] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.

[0032] In addition, the terms "disposed", "provided with", "connected", "fixed" and the like should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to the specific circumstances.

[0033] In addition, the term "plurality" shall mean two or more.

[0034] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0035] like Figures 1 to 4As shown, the embodiment of the present application provides a combined support for a super-high and smooth curved cast-in-place box girder in a mountainous area, and the combined support for a super-high and smooth curved cast-in-place box girder in a mountainous area comprises: a column support assembly 2 fixedly arranged on the side of a pier 3, the column support assembly 2 is perpendicular to the tangent of the curved section between adjacent piers 3, a Bailey beam 7 is vertically fixedly arranged on the upper end of the column support assembly 2, a distribution beam 6 is fixedly arranged on the upper end of the Bailey beam 7, and a bowl buckle support assembly ( Figure 1 not shown).

[0036] The column support assembly 2 can adopt the support structure in the related art. The present embodiment improves the installation position of the column support assembly 2. Specifically, the column support assembly 2 is installed on the side of the pier 3 of the box beam. The specific position is perpendicular to the tangent of the curved section between adjacent piers 3, so that the column support assembly 2 is inclined relative to the pier 3. Since the column support assemblies 2 on the opposite sides of the adjacent piers 3 are perpendicular to the same tangent, the spacing between the two is equal, that is, the two column support assemblies 2 respectively constitute the left and right sides of the rectangle, and the column support assemblies 2 located on both sides of the pier 3 are also the left and right sides of the isosceles trapezoid, and the Bailey beam 7 fixed on the column support assembly 2 constitutes the upper and lower sides of the rectangle. Therefore, the length of the Bailey beam 7 is matched with the spacing between the two column support assemblies 2, and the bearing performance of the Bailey beam 7 can be fully utilized. The distribution beam 6 and the bowl buckle support assembly can both adopt the structure in the related art, which will not be repeated here. This embodiment solves the problem in the related art that the distances between column supports located on adjacent piers 3 are not equal, resulting in the Bailey beams 7 installed on the column supports being of different lengths and the bearing performance of the Bailey beams 7 cannot be fully utilized.

[0037] like Figures 1 to 4 As shown, the column support assembly 2 is perpendicular to the tangent line of the midpoint of the curved section between adjacent piers 3, which can make the entire support structure more stable.

[0038] like Figures 1 to 4 As shown, the column support assembly 2 includes a plurality of steel pipe columns 21 fixed on the side of the pier 3 and a first load-bearing beam 22 fixed on the upper end of the steel pipe column 21. The first load-bearing beam 22 is perpendicular to the tangent of the midpoint of the curved section between adjacent piers 3, and the Bailey beam 7 is vertically fixed on the first load-bearing beam 22. The column support assemblies 2 located on both sides of the pier 3 are fixedly connected by the second load-bearing beam 5, and the second load-bearing beam 5 is fixedly connected to the first load-bearing beam 22 by the third load-bearing beam 4 arranged obliquely, so that the column support assemblies 2 on both sides of the pier 3 are connected as a whole.

[0039] The lower end of the steel pipe column 21 is fixed on the pedestal 1 of the pier 3, making full use of the favorable conditions of the design of the pedestal 1, and setting the steel pipe column 21 on the top surface of the existing pedestal 1 to improve the load-bearing capacity and economy and save the space for the support. The steel pipe column 21 adopts Φ609×16mm steel pipes, 5 are arranged in a row, and the spacing is 270cm. The steel pipe column 21 adopts the standardized segments made by professional manufacturers, the maximum segment is 6m, and both ends are equipped with flanges. The steel pipe pile is installed with a clamp and welded to the [20a channel steel flat joint and diagonal brace. The flat joint adopts a zigzag shape, and a simple platform is set up on the flat joint as an operating platform for the extension of the steel pipe column 21.

[0040] The first load-bearing beam 22 and the second load-bearing beam 5 both use double-leg I36a I-beams as load-bearing crossbeams. The Bailey beam 7 uses double-row single-layer unreinforced Bailey beams 7, with a spacing of 45cm between the two outer Bailey beams 7 and a spacing of 90cm between the middle group of Bailey beams 7. The lateral connection of the Bailey beam 7 is fixed with 45 and 90 flower racks to prevent lateral instability. The center spacing between the groups of Bailey beams 7 is 180cm, and the two adjacent groups of Bailey beams 7 are bolted together by L10 angle steel scissor braces to ensure the overall structural stability of the Bailey beam 7.

[0041] The distribution beam 6 is made of I14 I-beam, with a spacing of 4×60cm at the middle crossbeam position in the mid-span and 90cm at the other positions. Due to the large arc of the ramp bridge, the spacing of the distribution beam 6 in the transition section at the top of pier 3 is arranged at 60cm.

[0042] like Figures 1 to 4 As shown, a limiter is transversely arranged between the steel tube column 21 and the box beam pier 3, the first end of the limiter is fixedly connected to the steel tube column 21, and the second end is in contact with the pier 3. The limiter is used to connect the steel tube column 21 and the pier 3, so as to withstand the lateral force and increase the stability of the bracket. A limiter steel bar is welded to the upper end of the steel tube column 21, and the first load-bearing beam 22 is welded to the limiter steel bar to improve the structural stability of the first load-bearing beam 22.

[0043] like Figures 1 to 4 As shown, the bowl-hook bracket assembly includes a bowl-hook scaffold 9, on which a channel steel 10 is inverted, the upper end of the channel steel is paved with square wood 12, and the upper end of the square wood 12 is paved with bamboo plywood 11 to form a bowl-shaped surface.

[0044] Cup-hook scaffolding 9 includes steel pipe: steel pipe specifications Supported on I14 I-beam distribution beam 6. Longitudinal spacing: The spacing is 60cm at the middle transverse diaphragm in the box girder span, and the rest are 90cm. Transverse spacing: All are 90cm, the longitudinal and transverse spacing under the flange plate of the box girder on the pier top side are 60cm, and crossbars: one is set every 120cm from bottom to top, sweeping rods: steel pipe fastener-type sweeping rods are set longitudinally and transversely at the bottom of the vertical poles, diagonal braces: 5 groups of scissor braces are set on the longitudinal single-row vertical poles, one column is arranged every 4 rows, and a total of 5 columns, among which the angle between the diagonal brace of the encrypted section of the middle transverse diaphragm in the box girder span and the horizontal direction is 40°, and the angle of the rest parts is 48°; 3 groups of scissor braces are set on the transverse single-row vertical poles, one column is arranged every 3 rows, and a total of 7 columns.

[0045] The bottom mold bowl bracket has an inverted channel steel arranged longitudinally on the top support, and 10×10cm square wood 12 is laid horizontally on the upper part, with a spacing of 30cm, and then 1.5cm thick bamboo plywood 11 is laid to form a template system. To prevent leakage, 5mm thick double-sided tape is pasted between the template joints. A positioning steel bar is set on the inverted channel steel to fix the position of the square wood 12.

[0046] In order to control the linear shape of the cast-in-place box girder, the wing plate formwork and side formwork are made of double-layer 10×10cm square wood 12 arranged vertically and horizontally and 1.5cm thick bamboo plywood 11. The bottom of the square wood 12 is supported by a bowl-hook scaffolding 9, and the scaffolding steel pipe is supported on the I14 distribution beam 6.

[0047] like Figures 1 to 4 As shown, according to another aspect of the present application, a method for erecting a combined support for a super-high curve cast-in-place box girder in a mountainous area is provided, comprising the following steps:

[0048] Obtain a curved section of the box girder between adjacent piers 3, and obtain a tangent line of the curved section, the tangent line being a tangent line with the midpoint of the curved section as the tangent point;

[0049] Set up column support assemblies 2 perpendicular to the tangent line at both ends of the tangent line;

[0050] A Bailey beam 7 is set up on the column support assembly 2, and the Bailey beam 7 is perpendicular to the column support assembly 2;

[0051] A distribution beam 6 is set up on the Bailey beam 7, and a bowl buckle bracket assembly is set up on the distribution beam 6.

[0052] During the erection of the column support assembly 2, the steel pipe column 21 is installed first. The steel pipe column 21 is formed by splicing Φ609×16mm standard steel pipe sections, and the two ends of the steel pipe section are equipped with flanges. The segment lengths of 1m, 3m, and 6m are used according to the height of the pier 3. The flange at the bottom of the steel pipe section and the concrete expansion foundation are used. For expansion bolt connection, the bolt should be anchored in the foundation not less than 20cm.

[0053] The connection between steel pipe sections is made by flange connection. The thickness of flange weld shall not be less than the thickness of parent material. 16 δ10mm stiffening plates with size of 70mm×200mm are arranged at equal intervals at the steel pipe joints for reinforcement. 16 10.9 grade M20 high-strength bolts are used to connect the flanges. After the steel pipe column 21 is installed, pay attention to accurately measure the column top elevation to ensure that the top elevations of each steel pipe in the same joint are consistent. The plane position deviation of the steel pipe is controlled within 3cm, and the verticality is controlled within 1%.

[0054] After the construction of the steel pipe column 21 is completed, the construction of the clamps, flat joints, and pile-top bearing beams between the steel pipe columns 21 is immediately carried out. The steel pipe columns 21 are welded together by tower cranes and automobile cranes in conjunction with manual [20a channel steel flat joints and clamps installed on the steel pipe columns 21. First, the flat joints and clamp positions are measured and laid out on the steel pipe columns 21. The technicians measure the length of the flat joints between the piles and cut the materials in the back field, and simultaneously install the clamps and process the diagonal braces and pile-top bearing beams.

[0055] Use a truck crane to suspend the flat joints and diagonal braces. After they are in place, the welders weld the flat joints and diagonal braces. On-site technicians check the quality of the welds in time, and erect the load-bearing beams after they are qualified. The truck crane suspends the load-bearing beams to the measured and set-out position and then installs them. Workers install the load-bearing beam limiter on the top flange of the steel pipe column 21 and weld the load-bearing beam to the limiter.

[0056] Then the Bailey beam 7 is installed and limited, and the components of the Bailey beam 7 are transported to the bridge site by a transport vehicle and assembled on site. The Bailey assembly is carried out in groups, and one group of Baileys is assembled each time, and the Bailey pieces are connected by support frames.

[0057] A set of 12m span double row Bailey beams 7 weighs about 2.2t and is installed on the load-bearing beam using a car hanger. The Bailey beam 7 is 90° to the load-bearing beam. Measurement and layout are carried out on the 2I36a load-bearing beam to determine the exact position of the Bailey frame. At the same time, rubber gaskets are set, and then the Bailey beam 7 is hoisted into place. The Bailey beam 7 limit device is welded with [10 channel steel.

[0058] Then the distribution beam 6 is laid. The tower crane and the truck crane are used to install the I10 distribution beam 6. The spacing of the I10 cross beams is 120cm. After all the distribution beams 6 are laid, the top of the distribution beam 6 is longitudinally connected with the bracket in the gap of the upper plate buckle bracket. The steel bars are fixed by welding and evenly arranged in 5 rows to prevent the I10 distribution beam 6 from overturning, and finally the bowl-hook bracket assembly is erected.

[0059] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Within the spirit and principle of the present application, any modification, equivalent replacement, improvement, etc. made shall be included in the protection scope of the present application.

Claims

1. A super-high curve cast-in-place box girder composite support in mountainous areas, characterized in that: It comprises: a column support assembly fixedly mounted on the side of the pier, the column support assembly is perpendicular to the tangent of the curved section between adjacent piers, a Bailey beam is vertically fixedly mounted on the upper end of the column support assembly, a distribution beam is fixedly mounted on the upper end of the Bailey beam, and a bowl buckle support assembly is fixedly mounted on the upper end of the distribution beam; The column support assembly is perpendicular to the tangent line of the midpoint of the curved section between adjacent piers; The bowl-hook bracket assembly comprises a bowl-hook scaffolding, on which a channel steel is inverted, square wood is laid on the upper end of the channel steel, and bamboo plywood is laid on the upper end of the square wood to form a bowl-shaped surface.

2. According to the combined support for super-high and safe curved cast-in-place box girders in mountainous areas in claim 1, the column support assembly comprises a plurality of steel pipe columns fixed on the sides of the piers and a first load-bearing beam fixed on the upper ends of the steel pipe columns, the first load-bearing beam being perpendicular to the tangent of the midpoint of the curved section between adjacent piers, and the Bailey beam being vertically fixed on the first load-bearing beam.

3. According to the combined support for super-high curved cast-in-place box beams in mountainous areas in claim 2, the lower end of the steel pipe column is fixed on the pedestal of the pier column.

4. According to the combined support for super-high curved cast-in-place box girders in mountainous areas as described in claim 2, the column support assemblies located on both sides of the pier are fixedly connected by a second load-bearing beam.

5. According to the super-high curve cast-in-place box girder composite support for mountainous areas as claimed in claim 4, the second load-bearing beam is fixedly connected to the first load-bearing beam by a third load-bearing beam which is arranged obliquely.

6. According to the combined support for super-high and curve-proof cast-in-place box beams in mountainous areas in claim 2, a limiting member is transversely arranged between the steel pipe column and the box beam pier, a first end of the limiting member is fixedly connected to the steel pipe column, and a second end is in contact with the pier.

7. A method for erecting a combined support for a super-high curve cast-in-place box girder in a mountainous area as claimed in any one of claims 1 to 6, characterized in that: The steps include: Obtaining a curved section of a box girder between adjacent piers, and obtaining a tangent line of the curved section; The tangent line is a tangent line with the midpoint of the curve segment as the tangent point; Set up column support assemblies perpendicular to the tangent line at both ends of the tangent line; A Bailey beam is set up on the column support assembly, wherein the Bailey beam is perpendicular to the column support assembly; A distribution beam is set on the Bailey beam, and a bowl buckle bracket assembly is set on the distribution beam.