Shallow buried tunnel excavation support system and construction method
By using pre-grouting reinforced advanced support and precisely controlled duct installation during the construction of shallow underground excavation tunnels, combined with temporary sealing of water injection bags and a large-volume water spray cavity support system in the tunnel vault, the slow construction speed was solved and poor support effects, achieving efficient and safe tunnel construction.
Patent Information
- Application Number
- CN202011494577.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-17
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2040-12-17
AI Technical Summary
The problems of shallow buried underground tunnel excavation and support include slow construction speed, poor support effect, slow installation speed and poor accuracy of pipe sheds and small conduits, poor sealing effect, and poor integrity of the surrounding rock of the cavity.
Pre-grouting is used to reinforce the advanced support, the steel arch frame can adjust the inclination of the pipe shed opening guide device, the through-section steel section pipe inclination adjustment device, the water injection bag string grout temporary sealing device and the tunnel vault large-volume water spray space cavity support system , including components such as steel arches, long pipe sheds, small conduits, temporary steel sleeve arches, steel mesh frames, and drainage pipes. By accurately controlling the inclination and installation position of the pipe sheds and conduits, grouting reinforcement and temporary blocking are performed. Improve the integrity of surrounding rock.
It significantly improves the construction speed and effect, ensures the safety and reliability of the construction quality, reduces the project cost, effectively prevents the relaxation and deformation of the surrounding rock, and improves the integrity of the vault surrounding rock.
Smart Images

Figure CN112502746B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering, and in particular to an excavation support system and a construction method for a shallow buried dark excavated tunnel. Background Art
[0002] With the rapid development of urban construction in my country, due to the expansion of cities and the relief of urban traffic pressure. In recent years, the construction of urban tunnels has been increasing. Due to the restrictions on land use and the fact that most of them are located in prosperous areas and close to dense buildings or residential areas, various complex geological tunnels are increasing, and the safety of tunnel construction has received more and more attention from the society. The construction of tunnels through broken zones, loose zones, and soft strata is difficult, with high construction risks and poor safety. Safely and quickly passing through such unfavorable geological areas and effectively controlling the surface subsidence caused by the construction process and the impact on surrounding structures, the requirements for technical solutions, construction organizations and construction personnel are very high. In the construction of soft surrounding rock tunnels, if the arch collapse caused by geological mutations, water softening of unstable muddy interlayers in the surrounding rock, or soft and broken surrounding rock is not handled properly during construction, it will leave hidden dangers in the engineering quality and bring safety hazards to the tunnel in the use stage. Therefore, under the principle of "safety, speed, quality assurance, and economy", how to deal with the large-volume water cavity of the arch in tunnel construction is particularly important.
[0003] The construction of mountain tunnel entrances and exits faces complex entrance environments, large investment amounts, and high requirements for personnel operation and coordinated use of machinery. Therefore, it is particularly important to speed up the excavation speed in the construction of mountain highway tunnels, reasonably allocate labor and machinery resources, reduce project costs, and ensure rapid construction and safe entry and exit while ensuring quality and safety.
[0004] In view of this, in view of the shortcomings of previous shallow buried dark tunnel excavation and support construction, such as slow speed, poor support effect, slow and poor accuracy of pipe rack and small duct installation, poor sealing effect and poor integrity of cavity surrounding rock, there is an urgent need for a new shallow buried dark tunnel excavation and support construction method to improve construction efficiency, improve construction quality and ensure safe and reliable construction quality. Summary of the invention
[0005] The purpose of the present invention is to provide a shallow buried dark tunnel excavation support system and construction method, aiming to solve the current technical problems of slow construction speed, poor support effect, slow installation speed and poor accuracy of pipe racks and small ducts, poor sealing effect and poor integrity of cavity surrounding rock in shallow buried dark tunnel excavation support.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0007] Shallow buried tunnel excavation support system, including pre-grouting reinforcement advance support, steel arch frame adjustable inclination pipe shed hole guide device, through steel section conduit inclination adjustment device, water injection bag slurry temporary plugging device and tunnel vault large volume water sprinkling cavity support system;
[0008] The pre-grouting reinforcement advance support includes a steel arch frame, a long pipe shed and a small conduit; the steel arch frame is arranged to match the contour of the concrete tunnel; the long pipe shed and the small conduit are positioned from the outside to the inside and pass through the steel arch frame to achieve inward penetration into the arch top for subsequent grouting;
[0009] The steel arch frame adjustable inclination pipe shed orifice guide device comprises a fixed base 1, a collar, a guide tube and a lifting rod; the fixed base 1 is installed on the steel arch frame; one end of the guide tube is positioned on the fixed base 1 through a fixed bracket, and the other end is connected to the lifting rod through the fixed bracket to achieve lifting;
[0010] The device for adjusting the inclination of the through-section steel conduit comprises a second fixed base, a fixed disc, a square frame and a telescopic device; the fixed disc is mounted on the second fixed base through a fixed rod; two telescopic devices are positioned on the fixed disc; the telescopic rods of the telescopic device are respectively positioned and connected to the two ends of the square frame to achieve the inclination adjustment of the square frame;
[0011] The temporary plugging device for the water injection bag slurry leakage comprises a water injection bag, a water outlet, an opening and closing valve, a water inlet and a pumping pipe; the water outlet is arranged at one end of the water injection bag; the opening and closing valve is arranged at the water outlet; the water inlet is arranged at a position opposite to the water outlet, and the pumping pipe is installed at the water inlet;
[0012] The large-volume water-sprinkling cavity support system for the tunnel vault includes a temporary steel arch, connecting steel bars, a steel mesh, a drainage pipe, an expansion plate, a scaffolding and a temporary support; the temporary steel arch is arranged at the lower part of the steel arch frame and is connected as a whole by connecting steel bars; the steel mesh is arranged at the lower part of the cavity body, and a drainage pipe is arranged thereon; an expansion plate is installed on the top of the scaffolding to support the cavity body, and the bottom is supported on the temporary steel arch; one end of the temporary support supports the scaffolding, and the other end is connected to the steel mesh.
[0013] As a further improvement of the present invention, the front end of the small conduit is a steel pipe structure with a closed cone head; the small conduit has grouting holes evenly distributed circumferentially; the rear end of the small conduit is also provided with an iron hoop for connecting a reserved grouting stop section and a grouting equipment.
[0014] As a further improvement of the present invention, the lifting rod also includes a lifting control handle and a lifting sleeve; the lifting sleeve is connected to the base plate and fixed to the fixed base by screws; the lifting rod can be lifted and lowered by the lifting control handle in the lifting sleeve.
[0015] As a further improvement of the present invention, the telescopic device includes an automatic telescopic rod and a telescopic control button; one end of the automatic telescopic rod is fixed to a fixed disc, and the telescopic control button is installed in the automatic telescopic rod; both ends of the square frame are fixed to the automatic telescopic rod.
[0016] As a further improvement of the present invention, the water-filled bladder is a three-dimensional bladder made of rubber material.
[0017] As a further improvement of the present invention, the tunnel vault large-volume water sprinkling cavity support system also includes a pumping pipe and a small duct; the small duct is arranged outside the cavity body, and the pumping pipe extends into the cavity body from the bottom.
[0018] The shallow buried tunnel excavation support system and construction method include the following steps:
[0019] S1. Construction preparation: fully familiarize yourself with the drawings, do a good job of on-site traffic control, be familiar with the location of on-site pipelines, protect the area around the site, and prepare for the entry of construction machinery and materials;
[0020] S2. Steel arch installation: The arch is processed on site, centrally stacked, and installed manually and mechanically;
[0021] S3. Installation of the pipe-roof hole guide device: The steel arch frame is erected according to the contour of the concrete tunnel, the fixed base 1 is installed on the steel arch frame, the collar is fixed to the fixed base 1 through a fixed bracket, the lifting sleeve is connected to the bottom plate and fixed to the fixed base through screws, the lifting rod can be lifted and lowered in the lifting sleeve through the lifting control handle, one end of the guide pipe is fixed with a collar, and the other end is connected to the lifting rod through a fixed bracket, and the direction can be adjusted by lifting;
[0022] S4. Installation of the catheter inclination adjustment device: The fixed disc is installed on the fixed base 2 through the fixed rod, one end of the automatic telescopic rod is fixed to the fixed disc, and the telescopic control button is installed in the automatic telescopic rod; both ends of the square frame are fixed on the automatic telescopic rod;
[0023] S5. Construction of long pipe shed and small conduit: The long pipe shed and small conduit are installed at the designated position according to the pipe shed hole guide device and the conduit inclination adjustment device;
[0024] S6. Grouting construction: After the inspection of pipeline and machinery conditions, use a double-liquid grouting machine to carry out grouting construction;
[0025] S7. Temporary plugging construction: The water injection bag is a three-dimensional bag made of rubber material. The water outlet is set at one end of the water injection bag, the opening and closing valve is set at the water outlet, the water inlet is installed at the opposite position of the water outlet, and the pumping pipe is installed at the water inlet; the temporary plugging device for slurry leakage in the water injection bag is to directly plug the place where the slurry leaks after grouting;
[0026] S8. Construction of large-volume water-sprinkling cavity support system for tunnel vault: small conduits are set outside the cavity, temporary steel arches are arranged at the bottom of the steel arch frame, connected as a whole by connecting steel bars, steel mesh frames are set at the bottom of the cavity, and drainage pipes are set on them. An expansion plate is installed on the top of the scaffolding to support the cavity, and the bottom is supported on the temporary steel arch. One end of the temporary support supports the scaffolding, and the other end is connected to the steel mesh frame. The pumping pipe extends from the bottom of the cavity;
[0027] S9. Dismantling of steel arch frame and monitoring and measurement.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] The present application adopts long pipe shed and small conduit pre-grouting reinforcement advance support, sets up long pipe shed and small conduit grouting support, has good reinforcement effect and is easy to control the grouting quality; by setting an adjustable inclination pipe shed hole guide device and a conduit inclination adjustment device installed and fixed on the steel arch frame, the inclination and installation position of the pipe shed and the conduit can be accurately controlled, the construction speed is fast and the effect is significant; by using water-injected bag slurry stringing for temporary sealing and installing a large-volume water-spraying cavity support system for the tunnel arch, it can effectively prevent the surrounding rock from loosening and deformation, improve the integrity of the arch surrounding rock, and play a good role in blocking and draining pore water. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. It is obvious that the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0031] Figure 1 It is a schematic diagram of the pre-grouting reinforcement advance support structure;
[0032] Figure 2 It is a schematic diagram of the structure of the small catheter;
[0033] Figure 3 It is a schematic diagram of the structure of the pipe shed hole guide device;
[0034] Figure 4 is a top view of the structure of the catheter inclination adjustment device;
[0035] Figure 5 It is a schematic diagram of the structure of a temporary plugging device for water-injected bag slurry leakage;
[0036] Figure 6 It is a schematic diagram of the tunnel vault large-volume water-sprinkling cavity support system architecture;
[0037] Figure 7It is a schematic diagram of the initial cavity support construction structure of the large-volume water-spraying cavity support system of the tunnel vault;
[0038] Figure 8 It is a schematic diagram of the construction structure of the cavity backfilling concrete of the tunnel vault large-volume water-spraying cavity support system;
[0039] Fig. 9 It is a flowchart of the construction process of the large-volume water-sprinkling cavity support system of the tunnel vault;
[0040] Description of the numbers in the figure:
[0041] 1. Pre-grouting reinforcement and advanced support; 11. Steel arch frame; 12. Long pipe shed; 13. Small conduit; 2. Steel arch frame with adjustable inclination pipe shed hole guide device; 21. Fixed base 1; 22. Ring; 23. Guide pipe; 24. Lifting rod; 241. Lifting control handle; 242. Lifting sleeve; 25. Fixed bracket; 3. Through-section steel conduit inclination adjustment device; 31. Fixed base 2; 32. Fixed disc; 33. Square frame; 34. Telescopic device 341. Automatic telescopic rod; 342. Telescopic control button; 35. Fixed rod; 4. Temporary blocking device for water injection bag slurry leakage; 41. Water injection bag; 42. Water outlet; 43. Opening and closing valve; 44. Water inlet; 45. Pumping pipe; 5. Large-volume water-spraying cavity support system for tunnel vault; 51. Temporary steel sleeve arch; 52. Connecting steel bars; 53. Steel grid; 54. Drain pipe; 55. Enlarged plate; 56. Scaffolding; 57. Temporary support; 6. Concrete tunnel. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] Combined with Figures 1 to 9 The present invention provides a shallow buried dark excavation tunnel excavation support system and construction method, aiming to solve the current technical problems of slow construction speed, poor support effect, slow installation speed and poor accuracy of pipe racks and small ducts, poor sealing effect and poor integrity of cavity surrounding rock in shallow buried dark excavation tunnel excavation support.
[0044] Specifically, the shallow buried tunnel excavation support system includes pre-grouting reinforcement advance support 1, steel arch frame adjustable inclination pipe shed hole guide device 2, through steel section conduit inclination adjustment device 3, water injection bag slurry temporary plugging device 4 and tunnel arch large volume water sprinkling cavity support system 5;
[0045] The pre-grouting reinforcement advance support 1 includes a steel arch frame 11, a long pipe shed 12 and a small conduit 13; the steel arch frame 11 is arranged to match the contour of the concrete tunnel 6; the long pipe shed 12 and the small conduit 13 are positioned from the outside to the inside and pass through the steel arch frame 11, so as to penetrate into the arch top and then perform grouting;
[0046] The steel arch frame adjustable inclination pipe shed hole guide device 2 comprises a fixed base 21, a collar 22, a guide tube 23 and a lifting rod 24; the fixed base 21 is installed on the steel arch frame 11; one end of the guide tube 23 is positioned on the fixed base 21 through a fixed bracket 25, and the other end is connected to the lifting rod 24 through the fixed bracket 25 to achieve lifting;
[0047] The through-section steel pipe inclination adjustment device 3 comprises a second fixed base 31, a fixed disc 32, a square frame 33 and a telescopic device 34; the fixed disc 32 is mounted on the second fixed base 31 via a fixed rod 35; two telescopic devices 34 are positioned on the fixed disc 32; the telescopic rods of the telescopic devices 34 are respectively positioned and connected to the two ends of the square frame 33, so as to realize the inclination adjustment of the square frame 33;
[0048] The water injection bag slurry cross-blocking temporary blocking device 4 comprises a water injection bag 41, a water outlet 42, an opening and closing valve 43, a water inlet 44 and a pumping pipe 45; the water outlet 42 is arranged at one end of the water injection bag 41; the opening and closing valve 43 is arranged at the position of the water outlet 42; the water inlet 44 is arranged at a position opposite to the water outlet 42, and the pumping pipe 45 is installed at the water inlet 44;
[0049] The large-volume water-sprinkling cavity support system 5 of the tunnel vault includes a temporary steel arch 51, connecting steel bars 52, a steel mesh 53, a drainage pipe 54, an expansion plate 55, a scaffolding 56 and a temporary support 57; the temporary steel arch 51 is arranged at the lower part of the steel arch frame 11 and is connected as a whole by connecting steel bars 52; the steel mesh 53 is arranged at the lower part of the cavity body, and a drainage pipe 54 is arranged thereon; an expansion plate 55 is installed on the top of the scaffolding 56 to support the cavity body, and the bottom is supported on the temporary steel arch 51; one end of the temporary support 57 supports the scaffolding 56, and the other end is connected to the steel mesh 53.
[0050] Furthermore, the front end of the small conduit 13 is a steel pipe structure with a closed cone head 131; the small conduit 13 is evenly distributed with grouting holes 132 in the circumferential direction; the rear end of the small conduit 13 is also provided with a reserved grouting stop section 133 and an iron hoop 134 for connecting the grouting equipment.
[0051] Furthermore, the collar 22 is fixed to one end of the fixed base 21 through a fixed bracket 25.
[0052] Furthermore, the lifting rod 24 also includes a lifting control handle 241 and a lifting sleeve 242; the lifting sleeve is connected to the base plate and fixed to the other end of the fixed base 21 by screws; the lifting rod 24 can be lifted and lowered by the lifting control handle 241 in the lifting sleeve.
[0053] Furthermore, the telescopic device 34 includes an automatic telescopic rod 341 and a telescopic control button 342; one end of the automatic telescopic rod 341 is fixed to the fixed disc 32, and the telescopic control button 342 is installed in the automatic telescopic rod 341; both ends of the square frame 33 are fixed to the automatic telescopic rod 341.
[0054] Furthermore, the water-filled bladder 41 is a three-dimensional bladder made of rubber material.
[0055] Furthermore, the tunnel vault large-volume water sprinkling cavity support system 5 also includes a pumping pipe 45 and a small conduit 13; the small conduit 13 is arranged outside the cavity body, and the pumping pipe 45 extends into the cavity body from the bottom.
[0056] The shallow buried tunnel excavation support system and construction method include the following steps:
[0057] S1. Construction preparation: fully familiarize yourself with the drawings, do a good job of on-site traffic control, be familiar with the location of on-site pipelines, protect the area around the site, and prepare for the entry of construction machinery and materials;
[0058] S2. Installation of steel arch frame 11: The arch frame is processed on site, centrally stacked, and installed manually and mechanically;
[0059] S3. Installation of the pipe shed opening guide device: The steel arch frame 11 is erected according to the contour of the concrete tunnel 6, the fixed base 21 is installed on the steel arch frame 11, the collar 22 is fixed to the fixed base 21 through the fixed bracket 25, the lifting sleeve is connected to the bottom plate, and is fixed to the other end of the fixed base 21 by screws, the lifting rod 24 can be lifted and lowered in the lifting sleeve by the lifting control handle 241, one end of the guide tube 23 is fixed with the collar 22, and the other end is connected to the lifting rod 24 through the fixed bracket 25, and the direction can be adjusted by lifting;
[0060] S4. Installation of the catheter inclination adjustment device: the fixed disc 32 is installed on the fixed base 2 31 through the fixed rod 35, one end of the automatic telescopic rod 341 is fixed to the fixed disc 32, and the telescopic control button 342 is installed in the automatic telescopic rod 341; both ends of the square frame 33 are fixed on the automatic telescopic rod 341;
[0061] S5, construction of the long pipe shed 12 and the small conduit 13: the long pipe shed 12 and the small conduit 13 are set at designated positions according to the pipe shed hole guide device and the conduit inclination adjustment device;
[0062] S6. Grouting construction: After the inspection of pipeline and machinery conditions, use a double-liquid grouting machine to carry out grouting construction;
[0063] S7, temporary plugging construction: the water injection bag 41 is a three-dimensional bag made of rubber material, the water outlet 42 is arranged at one end of the water injection bag 41, the opening and closing valve 43 is arranged at the position of the water outlet 42, the water inlet 44 is arranged at the opposite position of the water outlet 42, and the pumping pipe 45 is installed at the water inlet 44; the water injection bag slurry leakage temporary plugging device 4 is to directly plug the place where the slurry leaks after grouting;
[0064] S8. Construction of large-volume water-spraying cavity support system 5 for tunnel vault: small conduit 13 is set outside the cavity, temporary steel arch 51 is arranged at the lower part of steel arch frame 11, connected as a whole by connecting steel bars 52, steel mesh frame 53 is set at the lower part of the cavity, and drainage pipe 54 is set thereon, expansion plate 55 is installed on the top of scaffold 56 to support the cavity, and the bottom is supported on temporary steel arch 51, one end of temporary support 57 supports scaffold 56, and the other end is connected to steel mesh frame 53, and pumping pipe 45 extends from the bottom of the cavity;
[0065] S9, steel arch 11 removal and monitoring measurement.
[0066] The present application adopts long pipe shed and small conduit pre-grouting reinforcement advance support, sets up long pipe shed and small conduit grouting support, has good reinforcement effect and is easy to control the grouting quality; by setting an adjustable inclination pipe shed hole guide device and a conduit inclination adjustment device installed and fixed on the steel arch frame, the inclination and installation position of the pipe shed and the conduit can be accurately controlled, the construction speed is fast and the effect is significant; by using water-injected bag slurry stringing for temporary sealing and installing a large-volume water-spraying cavity support system for the tunnel arch, it can effectively prevent the surrounding rock from loosening and deformation, improve the integrity of the arch surrounding rock, and play a good role in blocking and draining pore water.
[0067] The process of this application is simple to operate, the construction efficiency and precision are improved, the high-altitude operation time is reduced, and no special equipment is required; less equipment and personnel are required, the labor intensity is low, and the site occupancy is small; the project cost is reduced; this method has achieved good results in the construction of engineering example projects, and has wide promotion and application value under similar conditions, and the economic and social benefits are very obvious.
[0068] For the completed initial support adjacent to the cavity, a temporary steel arch sleeve is set to lock the initial support and radial small duct grouting reinforcement is performed to form a safe working area for the cavity section construction; on this basis, arch frames and auxiliary scaffolding supports are set one by one for the cavity sprinkling section to form a containment shell and discharge the fissure water of the surrounding rock; finally, the cavity is backfilled with concrete and grouting is performed to make it dense to form an overall load-bearing shell, thereby ensuring the safety of subsequent excavation and support construction.
[0069] The construction method of the tunnel vault large-volume water-sprinkling cavity support system includes the following steps:
[0070] Construction preparation: measurement and setting out, first determine the tunnel centerline, determine the elevation, and then determine the longitudinal position of the steel frame; the plane of the steel frame must be perpendicular to the tunnel centerline;
[0071] Add temporary I-beam arch frame: The unit steel frames transported to the site are stacked in units, and the cross-sectional dimensions are checked before installation to ensure that the steel frames are correctly installed. Before installing the arch foot or wall foot, the loose slag under the pad is removed and the steel frame is placed on the original hard rock. In the weak area, the steel plate or channel steel is used. Each frame is arranged and set up under the original steel arch frame, one by one, and steel wedges or wooden wedges are used to wed tightly to ensure the stability of the steel arch frame;
[0072] Use safety helmet to pre-grout small conduit to reinforce the cavity enclosure: measure and lay out, mark the designed hole position, drill with a rock drill, the hole diameter should be more than 10mm larger than the designed conduit diameter, and the hole depth and external insertion angle must meet the design requirements. External insertion angle: The value should take into account the length of the small conduit 13, the spacing of the steel frame, and the cross-sectional height of the steel frame. Generally, the external insertion angle is 10°~15° (30°~50° is adjusted within the collapse range to ensure that the collapse section is not empty), which can be adjusted according to actual conditions; the small conduit 13 is laid out according to the center elevation of the outer contour of the arch and the hole spacing, and the red circle is used as a mark to control the spacing of the small conduit 13; before drilling and installing the small conduit 13, the small conduit 13 is inserted into the hole according to the design requirements, or the small conduit 13 is directly punched into the upper part or belly of the steel frame with a rock drill; the small conduit 13 is installed by the hole-leading method, the drilling direction should be straight, the drilling diameter and the grouting pipe diameter are matched, and are not greater than 50mm; after the small conduit 13 is constructed and installed, the grouting valve and pipeline are installed, and the grouting adopts cement and water glass double liquid slurry;
[0073] The cavity is sealed with shotcrete and drainage pipes are pre-buried: for the steel pipes that are forcibly driven in, the accumulated materials in the pipes should be flushed out first, and then grouting should be carried out; the grouting sequence is from bottom to top, and the cement slurry is stirred with a mixer; the double liquid slurry uses a grouting pump to inject cement-water glass double liquid slurry.
[0074] Temporary support and safety shed are set up for the vault cavity: After the construction of the safety helmet is completed, the containment shell is constructed. In the safe range directly below the temporary steel arch sleeve, manual and mechanical coordination is used to remove the loose stones in the vault cavity;
[0075] After the danger is eliminated, the cavity section is sealed with C20 shotcrete. At the same time, according to the principle of combining dredging and blocking, an annular permeable pipe is buried to divert water to the drainage ditch. After the cavity rock surface is sealed with shotcrete, the water outlet is observed. For the parts with small water flow, the pre-buried annular permeable pipe is used to divert the seepage water to the drainage ditch. The pipe is installed behind the arch frame or on the steel mesh, and the principle of convenient fixing is adopted to form a full-section permeable pipe.
[0076] When the water flow is large, the auxiliary support steel pipe is used to drain the drainage pipe to the initial support, and then the annular drainage pipe is wrapped and fixed on the initial support with waterproof board to drain to the tunnel longitudinal drainage pipe;
[0077] After the cavity section is closed, the excavation trolley and the steel arch frame that has been constructed in the previous cycle are used to set up a scaffolding to provide auxiliary support and reinforcement for the cavity rock surface. The scaffolding is made of materials such as steel and steel pipes based on the principles of safety and convenient construction. The length is cut according to the needs of on-site construction, with the principle of quickly resisting the cavity rock. During the construction of the scaffolding, one end is welded to the steel arch frame and the other end is close to the rock surface. If the contact surface area of the rock surface end is too small, a steel plate can be welded on the scaffolding or the end of the steel pipe to increase the contact area;
[0078] Temporary support and safety shed are set up for the arch cavity: starting from the cavity section, the initial steel arch frame is installed one by one. The steel arch frame adopts I20b I-beam with a spacing of 50cm; when installing the steel arch frame, the arch foot position of the arch frame is first fixed and supported, and the connection is slightly inclined to the safe working area, so that the workers are in the safe working area when connecting the steel arch frame. After the connection is completed, the arch frame is adjusted to the designed position; after each I-beam is installed, the steel arch frame is used to reinforce the collapsed top surface with auxiliary support of the shed. While the auxiliary support of the shed is oblique, after the I-beam is installed vertically, the auxiliary support of the shed is also required to be vertically vertical;
[0079] Under the safety shed, reinforce the support frame by frame and build the containment shell: the I-beams are connected longitudinally with Φ22 connecting bars, with a circumferential spacing of 1.0m and a plum blossom shape arrangement, and Φ8 steel mesh is set on the I-beams with a mesh hole spacing of 10cm*10cm; after installing 1-2 frames, immediately use C20 shotcrete with a thickness of not less than 25cm to connect the I-beams, steel mesh, longitudinal connecting bars, and steel pipe supports to build a safety shell to form a safe working area for the construction of the lower frame; at the same time, pre-embed two φ125 pumped concrete pipes and one φ42 grouting pipe, with the outlet of the grouting pipe 20cm away from the arch top. After the concrete is backfilled, the grouting pipe is used to grout the cavity; after the I-beam and shell building cycle operation is completed, immediately set up monitoring and measurement points, set up 2 sections, and 3 points on each section, and strengthen observation, keep records, and process the measurement data in a timely manner to guide the construction and ensure construction safety;
[0080] After the safety shell is formed, radial grouting anchors or small pipes are applied: After the safety shell is formed as a whole and close to the face, a small grouting pipe 13 is installed at the arch waist and arch foot of each steel arch frame of the cavity for reinforcement. The small pipe 13 at the arch waist is 5m long, with a circumferential and longitudinal spacing of 0.4m*0.5m, and the small pipe 13 at the arch foot is 4m long, with a circumferential and longitudinal spacing of 0.4m*0.5m; after the construction and grouting of the small grouting pipes 13 at the arch waist and arch foot are completed, radial system anchors are applied to the collapsed cavity section one by one. The anchors are Φ22 drug coil anchors, with a circumferential spacing of 0.75m and a longitudinal spacing of 1.0m. During the construction of the radial system anchors, strengthen monitoring and measurement, and strengthen the observation of the deformation of the arch frame and surrounding rock;
[0081] Fill the cavity with pumped concrete grouting: When constructing the shell of the cavity section, the laboratory retains C20 shotcrete test blocks. After the test shows that the shotcrete shell reaches more than 70% of the design strength, the cavity is filled with pumped concrete. The concrete filling is carried out in layers, that is, it is constructed in two times. A layer of concrete is filled and filled after solidification. During the filling process, monitoring and measurement are strengthened, and deformation of the arch frame and surrounding rock are observed. If any abnormality is found, construction is stopped immediately and treatment measures are taken before construction. Confirm that the rock surface is closed, the face and backfill concrete are tightly bonded, and there is no obvious leakage or runaway of slurry. Waterproof C25 concrete should be used for filling, and the slump should be controlled between 12-18cm. After the concrete filling is completed and solidified into a whole with the auxiliary supporting steel pipe scaffolding, grouting treatment is carried out to seal the gaps and concrete shrinkage and voids, and complete the cavity section treatment.
[0082] After the construction of the invert is completed, the temporary arch frame will be dismantled: During the backfill process, the surveying personnel use the total station to strengthen the monitoring of the tunnel arch sinking to prevent the steel frame from deforming due to excessive backfill of concrete at one time and invading the boundary of the secondary lining; strengthen the monitoring and measurement of the initial support deformation, and after the arch cavity treatment is completed and the slurry consolidation strength reaches the design strength, the initial support needs to form a closed loop as soon as possible, and the invert and secondary lining should be constructed as soon as possible. After the construction of the invert is completed, the temporary steel arch sleeve can be dismantled.
[0083] In the step of adding temporary I-beam arch frames, Φ22 connecting bars are used to connect the steel arch frames. The length of the connecting bars is 1m, the circumferential spacing is 1m, and they are arranged in a plum blossom shape. Φ22 scissors diagonal braces are set every 1m. After the construction of the temporary steel arch frame is completed, monitoring and measurement points are immediately set up, with 5 points on each section. Observations are strengthened at a frequency of twice a day, and records are kept. The measurement data is processed in a timely manner to guide the construction and ensure construction safety.
[0084] In the construction steps of the advance grouting small conduit (safety helmet), the specifications of the small conduit 13 are: the diameter of the hot-rolled seamless steel pipe is φ42mm, and plum blossom-shaped holes are drilled on the pipe wall every 10 to 20cm, the diameter of the hole is φ6 to 8mm, the tail length is 100cm without drilling, and the length L=4-7.0m; the small conduit 13 is 40cm apart in the annular direction on the arch frame, arranged in an alternating manner, the front end is processed into a cone, and the tail is welded to the steel arch frame to increase the common support effect; the external insertion angles of the small pipe are 10°-15° and 30°-50° in the cavity area, and the construction is controlled to prevent air leakage.
[0085] Cement and water glass double liquid slurry grouting parameters: water-cement ratio of cement slurry 0.8:1--1:1; volume ratio of cement slurry to water glass 1:0.5--1:0.8; water glass modulus 2.4--3.4, Baume degree 22--40 degrees, grouting pressure 0.5--1.5Mpa, diffusion radius 0.3--0.5m. Grouting is carried out at intervals between holes, the water-cement ratio is gradually reduced, and the grouting pressure is gradually increased.
[0086] In the grouting step, after the installation of the small conduit 13 is completed, a double-liquid grouting machine with a calibrated pressure gauge should be used to conduct a water pressure test, and the grouting parameters should be determined according to the design and test results. Grouting pressure: generally 0.5-1.5MPa, the slurry must fill the gaps around the steel pipe and the surroundings; the cement slurry is prepared by a mixing station and transported to the site by a tank truck. When preparing cement slurry or diluting water glass slurry, foreign matter should be prevented from mixing. The prepared slurry must be filtered before use, and the slurry should be injected within the specified time; the slurry sequence is from bottom to top, the slurry is first thin and then thick, the grouting volume is first large and then small, and the grouting pressure is from small to large. Grouting end standard: when the pressure reaches the designed grouting final pressure and stabilizes for 10-15min, and the grouting volume reaches more than 80% of the designed grouting volume, the grouting of the hole can be ended; if the slurry process is interrupted for some reason, the grouting should be resumed as soon as possible. In order to prevent excessive deformation of the surrounding rock during grouting, the grouting sequence adopts the method of alternate grouting sections and alternate grouting holes in each section. During grouting, a dedicated person is assigned to be responsible for it, keep grouting records, monitor the grouting volume, grouting pressure and deformation of the surrounding areas at any time, strengthen monitoring and measurement, and stop construction immediately if large deformation is found.
[0087] This method systematically introduces the construction technology, personnel and mechanical organization of large-volume water-sprinkling cavities in tunnel vaults. The advanced small duct, shell-making and concrete filling construction in this method are fast, convenient, safe and reliable, which speeds up the construction progress and saves the construction cost. Taking Tudiling Tunnel as an example, the cavity shell-making and concrete filling construction saves about 180,000 yuan in construction cost. At the same time, this method provides a reliable reference basis and technical indicators for cavity backfilling construction with tight construction period, broken surrounding rock, large cavity volume and water sprinkling and seepage. The novel method technology will promote the progress of highway tunnel construction technology, with obvious social and environmental benefits.
[0088] Because the construction of safety helmet, containment shell and backfill is convenient, easy to control quality, has good pre-support effect, safety and effectiveness, fast construction progress, few interference factors, little damage to the environment, conducive to civilized construction, and various limited resources can be better utilized, it can ensure the integrity of surrounding existing facilities and the safety of residents' lives and property. It speeds up construction efficiency and produces good economic benefits. At the same time, this method complies with and meets the relevant requirements of the state on building energy-saving projects.
[0089] It should be noted that some parts not described in detail in the present invention belong to the well-known technology in the art, or can be directly purchased from the market, and those skilled in the art can obtain them without creative work. The specific connection method is extremely widely used in this art or in daily life, and will not be described in detail here.
[0090] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0091] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0092] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0093] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0094] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0095] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. Shallow buried tunnel excavation support system, characterized by: It includes pre-grouting reinforcement advance support, steel arch frame adjustable inclination pipe shed hole guide device, through steel section conduit inclination adjustment device, water injection bag slurry temporary plugging device and tunnel vault large volume water sprinkling cavity support system; The pre-grouting reinforcement advance support includes a steel arch frame, a long pipe shed and a small conduit; the steel arch frame is arranged to match the contour of the concrete tunnel; the long pipe shed and the small conduit are positioned from the outside to the inside and pass through the steel arch frame to achieve inward penetration into the arch top for subsequent grouting; The steel arch frame adjustable inclination pipe shed orifice guide device comprises a fixed base 1, a collar, a guide tube and a lifting rod; the fixed base 1 is installed on the steel arch frame; one end of the guide tube is positioned on the fixed base 1 through a fixed bracket, and the other end is connected to the lifting rod through the fixed bracket to achieve lifting; The device for adjusting the inclination of the through-section steel conduit comprises a second fixed base, a fixed disc, a square frame and a telescopic device; the fixed disc is mounted on the second fixed base through a fixed rod; two telescopic devices are positioned on the fixed disc; the telescopic rods of the telescopic device are respectively positioned and connected to the two ends of the square frame to achieve the inclination adjustment of the square frame; The temporary plugging device for the water injection bag slurry leakage comprises a water injection bag, a water outlet, an opening and closing valve, a water inlet and a pumping pipe; the water outlet is arranged at one end of the water injection bag; the opening and closing valve is arranged at the water outlet; the water inlet is arranged at a position opposite to the water outlet, and the pumping pipe is installed at the water inlet; The tunnel vault large-volume water-sprinkling cavity support system includes a temporary steel arch, connecting steel bars, a steel mesh, a drainage pipe, an expansion plate, a scaffolding and a temporary support; the temporary steel arch is arranged at the lower part of the steel arch frame and is connected as a whole by connecting steel bars; the steel mesh is arranged at the lower part of the cavity body, and a drainage pipe is arranged thereon; an expansion plate is installed on the top of the scaffolding to support the cavity body, and the bottom is supported on the temporary steel arch; one end of the temporary support supports the scaffolding, and the other end is connected to the steel mesh; The front end of the small conduit is a steel pipe structure with a closed cone head; the small conduit has grouting holes evenly distributed around the circumference; the rear end of the small conduit is also provided with an iron hoop for connection with a reserved grouting stop section and grouting equipment; The lifting rod also includes a lifting control handle and a lifting sleeve; the lifting sleeve is connected to the bottom plate and fixed to the fixed base by screws; the lifting rod can be lifted and lowered by the lifting control handle in the lifting sleeve.
2. The shallow buried dark excavation tunnel excavation support system according to claim 1 is characterized in that: The telescopic device comprises an automatic telescopic rod and a telescopic control button; one end of the automatic telescopic rod is fixed to a fixed disc, and the telescopic control button is installed in the automatic telescopic rod; and both ends of the square frame are fixed to the automatic telescopic rod.
3. The shallow buried dark excavation tunnel excavation support system according to claim 1 is characterized by: The water-filled bladder bag is a three-dimensional bladder bag made of rubber material.
4. The shallow buried dark excavation tunnel excavation support system according to claim 1 is characterized in that: The tunnel vault large-volume water-spraying cavity support system also includes a pumping pipe and a small conduit; the small conduit is set outside the cavity body, and the pumping pipe extends into the cavity body from the bottom.
5. A shallow buried dark excavation tunnel excavation support system and construction method, based on the shallow buried dark excavation tunnel excavation support system according to any one of claims 1 to 4, characterized in that: The following steps are involved: S1. Construction preparation: fully familiarize yourself with the drawings, do a good job of on-site traffic control, be familiar with the location of on-site pipelines, protect the area around the site, and prepare for the entry of construction machinery and materials; S2. Steel arch installation: The arch is processed on site, centrally stacked, and installed manually and mechanically; S3. Installation of the pipe-roof hole guide device: The steel arch frame is erected according to the contour of the concrete tunnel, the fixed base 1 is installed on the steel arch frame, the collar is fixed to the fixed base 1 through a fixed bracket, the lifting sleeve is connected to the bottom plate and fixed to the fixed base through screws, the lifting rod can be lifted and lowered in the lifting sleeve through the lifting control handle, one end of the guide pipe is fixed with a collar, and the other end is connected to the lifting rod through a fixed bracket, and the direction can be adjusted by lifting; S4. Installation of the catheter inclination adjustment device: The fixed disc is installed on the fixed base 2 through the fixed rod, one end of the automatic telescopic rod is fixed to the fixed disc, and the telescopic control button is installed in the automatic telescopic rod; both ends of the square frame are fixed on the automatic telescopic rod; S5. Construction of long pipe shed and small conduit: The long pipe shed and small conduit are installed at the designated position according to the pipe shed hole guide device and the conduit inclination adjustment device; S6. Grouting construction: After the inspection of pipeline and machinery conditions, use a double-liquid grouting machine to carry out grouting construction; S7. Temporary plugging construction: The water injection bag is a three-dimensional bag made of rubber material. The water outlet is set at one end of the water injection bag, the opening and closing valve is set at the water outlet, the water inlet is installed at the opposite position of the water outlet, and the pumping pipe is installed at the water inlet; the temporary plugging device for slurry leakage in the water injection bag is to directly plug the place where the slurry leaks after grouting; S8. Construction of large-volume water-sprinkling cavity support system for tunnel vault: small conduits are set outside the cavity, temporary steel arches are arranged at the bottom of the steel arch frame, connected as a whole by connecting steel bars, steel mesh frames are set at the bottom of the cavity, and drainage pipes are set on them. An expansion plate is installed on the top of the scaffolding to support the cavity, and the bottom is supported on the temporary steel arch. One end of the temporary support supports the scaffolding, and the other end is connected to the steel mesh frame. The pumping pipe extends from the bottom of the cavity; S9. Dismantling of steel arch frame and monitoring and measurement.
Citation Information
Patent Citations
Construction method for excavating water-rich shallow underground excavation tunnel
CN104165056A
Shallow underground excavation unsymmetrial loading tunnel roof caving in-hole forepoling method
CN110318762A
Construction method of shallow-buried large-section underground excavated rectangular tunnel
CN111997624A
Tunnel grouting supporting structure
CN211549728U
Excavation supporting system for shallow-buried excavation tunnel
CN214062993U