A method for predicting the day-ahead output of thermal power companies in an environment where both electricity and peak-shaving markets exist

By establishing a day-ahead production forecast model in thermal power enterprises, the problem of formulating production plans for thermal power enterprises in the coexistence of the power spot market and the peaking market is solved, the power output and income are increased, and a more scientific and reasonable production plan is achieved.

CN112613669BActive Publication Date: 2024-10-15STATE GRID LIAONING ECONOMIC TECHN INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011572870.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-23
Publication Date
2024-10-15
Estimated Expiration
2040-12-23

AI Technical Summary

Technical Problem

In the case of the coexistence of the electricity spot market and the peak shaving market, it is difficult for existing technology to effectively guide thermal power enterprises to formulate production plans for each period of the next day, resulting in insufficient heat storage during periods of low electricity prices, reduced peak shaving capacity of units, and high losses in peak shaving. compensate.

Method used

Establish a day-ahead output prediction method for thermal power enterprises in an environment where electric energy and peaking markets coexist. By obtaining system parameters, a day-ahead output prediction model is established. With the goal of maximizing the overall revenue of thermal power enterprises participating in the day-ahead spot market and deep peaking market, set Constraints, calculate comprehensive power output and expected revenue, and automatically formulate production plans for each period of the next day.

Benefits of technology

It improves the comprehensive power output of thermal power enterprises in the day-ahead spot market and deep peaking market, calculates the expected revenue, makes the production plan more scientific and reasonable, saves labor costs, and increases revenue.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112613669B_ABST
    Figure CN112613669B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for predicting the day-ahead output of a thermal power company in an environment where electric energy and peak-shaving markets coexist, including: obtaining system parameters; establishing a day-ahead output prediction model with the goal of maximizing the overall revenue value of the thermal power company participating in the day-ahead spot market and the deep peak-shaving market; setting constraints of the day-ahead output prediction model; inputting system parameters into the day-ahead output prediction model to obtain the comprehensive power output of the thermal power company in the day-ahead spot market and the deep peak-shaving market, and then calculating the expected revenue. The present invention calculates the expected revenue by calculating the comprehensive power output of the day-ahead spot market and the deep peak-shaving market, so that the thermal power company can automatically formulate production plans for each time period of the next day, saving labor costs, and the production plan is more scientific and reasonable than the traditional method, which increases the revenue.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of thermal power enterprise electric energy output prediction, and in particular to a method for predicting the day-ahead output of a thermal power enterprise in an environment where electric energy and peak-shaving markets coexist. Background Art

[0002] As the medium- and long-term electricity trading market gradually matures, my country is actively promoting the construction of the electricity spot market; in areas in the north where it is difficult to absorb wind and solar power, in order to encourage thermal power transformation and improve operational flexibility, some markets have retained the deep peak-shaving market in the early stages of the market. Formulating production plans for each period of the next day to maximize the benefits of participating in the day-ahead spot market and the deep peak-shaving market is of great significance to thermal power companies.

[0003] When the electricity spot market and the peak-shaving market coexist, the existing technology usually clears the day-ahead spot market first, and then clears the peak-shaving market if there is wind and solar curtailment or power rationing. However, for thermal power companies, the operation forecast in the day-ahead spot market will not only affect the company's profitability in this market, but also affect the profitability in the subsequent peak-shaving market. In particular, when thermal power companies are equipped with heat storage equipment, the existing technology prioritizes arranging the heat storage to release heat during the peak period of electricity prices in the day-ahead market to increase the unit's power generation capacity and obtain higher profits. This will result in insufficient heat storage during the low electricity price period, reduced peak-shaving capacity of the unit, and loss of high peak-shaving compensation. In the context of the two markets, the existing methods cannot effectively guide thermal power companies to formulate production plans for each period of the next day. Summary of the invention

[0004] The present invention provides a method for predicting the day-ahead output of a thermal power enterprise in an environment where the electric energy and peak-shaving markets coexist, so as to overcome the above technical problems.

[0005] The present invention provides a method for predicting the day-ahead output of a thermal power enterprise in an environment where electric energy and peak-shaving markets coexist, comprising:

[0006] Obtaining system parameters; the system parameters include: day-ahead spot market parameters, deep peak load regulation market parameters, and thermal power enterprise parameters;

[0007] A day-ahead production forecasting model is established with the goal of maximizing the overall revenue of thermal power companies participating in the day-ahead spot market and deep peak-shaving market.

[0008] Setting constraints of the day-ahead production forecasting model;

[0009] Inputting the system parameters into the day-ahead production prediction model to obtain the comprehensive power production of the thermal power enterprise in the day-ahead spot market and the deep peak-shaving market;

[0010] The expected profit of the thermal power company is calculated based on the comprehensive power output of the thermal power company in the day-ahead spot market and the deep peak-shaving market.

[0011] Furthermore, the day-ahead spot market parameters include: electricity prices in different time periods in the day-ahead market; the deep peak-shaving market parameters include: clearing prices of each level in the deep peak-shaving market, and unit electricity allocation prices in the deep peak-shaving market; the thermal power enterprise parameters include: unit operating parameters, unit coal consumption coefficient, and thermal load and heat storage tank parameters of the thermal power enterprise.

[0012] Furthermore, the objective function of the day-ahead production forecasting model is:

[0013]

[0014] In the formula, is the day-ahead market return, T is the forecast period, and τ is the time period length; is the total power generation of the thermal power enterprise in period t; is the coal consumption for power generation and heating of the thermal power enterprise during period t, which depends on the power generation and heating power of each unit in the plant during that period; ρ is the equivalent coal price; They represent the heat storage capacity of the enterprise's heat storage device at the beginning and end of the forecast period, and a HA is the thermal coal consumption rate of heat storage, represents the cost of the thermal storage used to meet the heating demand of the next day; To obtain peak market revenue, It is a Boolean value, reflecting the system's deep peak load demand in the next day's period t, 1 means required, 0 means not required; ΔP i e,t τ, They are respectively the actual amount of deep peak-shaving electricity that the thermal power company participates in the i-th gear during period t and the corrected shared electricity.

[0015] Furthermore, the constraint conditions of setting the day-ahead production forecasting model include:

[0016] The constraints include: constraints on traditional condensing units, constraints on condensing units with flexible low-pressure cylinder removal, constraints on condensing units after high back pressure transformation, operating constraints on heat storage tanks, heat balance constraints, coal consumption of thermal power companies and grid-connected power constraints;

[0017] The constraints of the traditional condensing unit are:

[0018]

[0019] In the formula, and are the power generation and heating power of the i-th extraction unit in period t; c v,iThe ratio of electricity loss to heat supply when steam is extracted for heating; c m,i is the electric-to-heat ratio when the i-th unit operates at the maximum steam extraction condition; is a constant; are the maximum and minimum electric power of the unit under pure condensing conditions; The maximum steam extraction heating power of the unit;

[0020] The constraints of the condensing unit that can be flexibly removed by the low-pressure cylinder are:

[0021]

[0022] in, and are respectively the generating power and heating power of the pth low-pressure cylinder removable unit in period t. Indicates the cylinder cutting status of the pth unit: 1 means the low-pressure cylinder is cut off, 0 means it is not cut off; and They respectively represent the combined heat and power supply power component and heating power component of the unit in the steam extraction and back pressure states (cut off the low-pressure cylinder); It is the increased heat output when the low-pressure cylinder is cut off while the steam intake of the unit remains unchanged;

[0023] The constraints of the pumping back pressure unit after the high back pressure transformation are:

[0024]

[0025] In the formula, and are the power generation and heating power of the jth back-type unit in period t; c m1,j 、c m2,j They are the electric-to-heat ratios when the unit is operating under pure back pressure conditions and maximum steam extraction conditions respectively; is the maximum and minimum power output of the jth unit under pure back pressure conditions; The maximum heating power of the unit;

[0026] The operating constraints of the thermal storage tank are:

[0027]

[0028] In the formula, the capacity of the heat storage equipment configured by the thermal power company is The heat storage efficiency in a single period is η HA The maximum heat storage and release powers are and is the stored heat in the heat storage tank during period t;

[0029] The heat balance constraint is:

[0030]

[0031] In the formula, Refers to the heat load borne by the thermal power enterprise during the period t.

[0032] The on-grid power of the thermal power enterprise:

[0033]

[0034] The coal consumption of thermal power enterprises:

[0035]

[0036] In the formula, a i 、b i 、c i are the coal consumption coefficients of the i-th extraction condensing unit; a j 、b j 、c j are the coal consumption coefficients of the jth extraction unit; n1, n2, n3 are the numbers of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction units included in the thermal power enterprise.

[0037] Furthermore, the constraint conditions for establishing the day-ahead production forecasting model also include:

[0038] The ramp rate constraint of the traditional condensing unit is:

[0039]

[0040] Where P up,i , P dn,i They represent the up and down climbing rates of the i-th condensing unit under pure condensing conditions respectively;

[0041] The climbing rate constraint of the condensing unit whose low-pressure cylinder can be flexibly removed is:

[0042]

[0043] Where P up,p , P dn,p They respectively indicate that the low-pressure cylinder can flexibly cut off the up and down climbing rates of the unit under pure condensing conditions;

[0044] The climbing rate constraint of the pumping back pressure unit after the high back pressure transformation is:

[0045]

[0046] In the formula,

[0047] The electric and thermal power of the jth back pressure unit in period t is converted to the electric power under pure back pressure condition with equal coal consumption. up,j , P dn,j They respectively represent the upward and downward climbing rates of the extraction steam unit modified with high back pressure.

[0048] The present invention first sets the system parameters of the day-ahead spot market, the deep peak-shaving auxiliary service market, and the thermal power company; then establishes a day-ahead production forecasting model, with the goal of maximizing the overall revenue value of the thermal power company participating in the day-ahead spot market and the deep peak-shaving market, and with the operation restrictions as constraints; then inputs the system parameters into the day-ahead production forecasting model to obtain the comprehensive power output of the thermal power company in the day-ahead spot market and the deep peak-shaving market, and finally calculates the expected revenue of the thermal power company through the expected comprehensive power output. The present invention calculates the expected revenue by calculating the comprehensive power output of the day-ahead spot market and the deep peak-shaving market, so that the thermal power company can automatically formulate the production plan for each time period of the next day, saving labor costs, and the production plan is more scientific and reasonable than the traditional method, which increases the revenue. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0050] Figure 1 is a flow chart of the method of the present invention;

[0051] Figure 2a This is a schematic diagram of the feasible operating range of the condensing unit;

[0052] Figure 2b It is a schematic diagram of the feasible operating range of the pumping back unit;

[0053] Figure 3a This is a schematic diagram of the feasible operating range of a 350MW extraction steam unit in a power plant;

[0054] Figure 3b This is a schematic diagram of the feasible operating range of a 350MW pumped-back unit in a power plant;

[0055] Figure 4 This is a schematic diagram of the day-ahead electricity price in the day-ahead market;

[0056] Figure 5a It is a schematic diagram of the optimal output prediction result of the thermal power enterprise in the present invention;

[0057] Figure 5b This is the heat balance diagram when the peak load market is not considered;

[0058] Figure 5c This is the heat balance diagram when considering the peaking market;

[0059] Figure 6 This is a comparison chart of the expected benefits between the prior art and this application. DETAILED DESCRIPTION

[0060] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] This embodiment provides a method for predicting the day-ahead output of a thermal power company in an environment where both the electricity energy and peak-shaving markets exist, including:

[0062] 101. Obtain system parameters; the system parameters include: day-ahead spot market parameters, deep peak load regulation market parameters, and thermal power enterprise parameters;

[0063] Specifically, the system parameters of the day-ahead spot market, deep peak-shaving auxiliary service market and thermal power enterprises are determined, including the day-ahead market price for each period of the next day, the clearing price of each tier in the deep peak-shaving market, the unit electricity allocation price in the deep peak-shaving market, the parameters of various units, the thermal load of thermal power enterprises and the relevant parameters of heat storage tanks;

[0064] Among them, the day-ahead spot market parameters include: the electricity price in each period of the day-ahead market; the deep peak-shaving market parameters include: the clearing price of each level in the deep peak-shaving market, and the unit electricity allocation price in the deep peak-shaving market; the thermal power enterprise parameters include: unit operating parameters, unit coal consumption coefficient, and thermal load and heat storage tank parameters of the thermal power enterprise.

[0065] (1) System parameters of thermal power enterprises

[0066] Assume that the thermal power company has 4 350MW extraction condensing heating units, among which Unit #1 is transformed into an extraction back pressure unit through high back pressure, and Unit #2 is transformed to have the ability to flexibly cut off the low pressure cylinder. The electric heating operation range and related parameters of each unit are as follows: Figure 3a and Figure 3b The unit operating parameters are shown in Table 1, and the unit coal consumption coefficient is shown in Table 2. The equivalent standard coal price is taken as 800 yuan / t.

[0067] Table 1 Unit operating parameters

[0068]

[0069] Table 2 Unit coal consumption coefficient

[0070]

[0071]

[0072] The thermal load of the thermal power company is 1386MW, which is about 80% of the maximum heating capacity of the unit in the plant. The heat storage capacity is 7200MW·h, and the maximum charging and discharging power is 900MW, which can meet the heat release demand for 8 hours. The heat release power can meet the compensation heat demand of the thermal power company when the operating point is reduced to the minimum output point under high heat load. The heat loss rate of the heat storage period is taken as 0.1%. Assume that the heat storage capacity in the initial period of heat storage is 3600MW·h, and there is no constraint on the heat storage capacity at the end of the cycle, which is determined according to demand.

[0073] (2) Day-ahead spot market data

[0074] The spot electricity price for each period is shown in Table 3. Figure 4 Assume that the system has a deep peak load demand during the period when the time-of-use electricity price is lower than 150 yuan / MWh (periods 2-4).

[0075] Table 3

[0076]

[0077] (3) Deep peak load regulation market data

[0078] The market data of deep peak load regulation is shown in Table 4. The base load rate of thermal power units participating in paid peak load regulation is 50%, the load rate range of the first tier of deep peak load regulation is 50% to 40%, and the quotation range is 0 to 400 yuan / MWh; the load rate range of the second tier is 40% to 0%, and the quotation range is 400 to 1000 yuan / MWh. The electricity correction coefficients k1, k2, and k3 for thermal power participation in sharing are 1, 1.5, and 2 respectively. The market clearing price is 400 yuan / MWh for the first tier and 600 yuan / MWh for the second tier.

[0079] Table 4

[0080]

[0081] 102. Establish a day-ahead production forecasting model with the goal of maximizing the overall revenue value of thermal power companies participating in the day-ahead spot market and deep peak-shaving market;

[0082] Specifically, a day-ahead production decision model for thermal power companies including traditional condensing units, condensing units with flexible low-pressure cylinder removal, condensing units after high back pressure transformation, and heat storage tanks was established; the day-ahead production decision model aims to maximize the overall profit value of thermal power companies participating in the day-ahead spot market and deep peak-shaving market, and its objective function is:

[0083]

[0084] In the formula, is the day-ahead market return, T is the forecast period, and τ is the time period length; is the total power generation of the thermal power enterprise in period t; is the coal consumption for power generation and heating of the thermal power enterprise during period t, which depends on the power generation and heating power of each unit in the plant during that period; ρ is the equivalent coal price; They represent the heat storage capacity of the enterprise's heat storage device at the beginning and end of the forecast period, and a HA is the thermal coal consumption rate of heat storage, represents the cost of the thermal storage used to meet the heating demand of the next day; To obtain peak market revenue, It is a Boolean value, reflecting the system's deep peak load demand in the next day's period t, 1 means required, 0 means not required; ΔP i e,t τ, They are respectively the actual amount of deep peak-shaving electricity that the thermal power company participates in the i-th gear during period t and the corrected shared electricity.

[0085] 103. Establishing constraint conditions for the day-ahead production forecasting model;

[0086] Specifically, the day-ahead production forecast model includes: heat supply balance constraints, operation constraints of traditional extraction condensing units, extraction condensing units with flexible low-pressure cylinder removal, extraction back pressure units after high back pressure transformation, heat storage tanks, and thermal power enterprises’ energy supply coal consumption and grid-connected power constraints;

[0087] Among them, the constraints of the traditional condensing unit are:

[0088]

[0089] The first and second rows of formulas in formula (2) constrain the range of the unit's electrical output, and the third row of formula constrains the range of the unit's thermal output.

[0090] In the formula, and are the power generation and heating power of the i-th extraction unit in period t; c v,i The ratio of electricity loss to heat supply when steam is extracted for heating; c m,i is the electric-to-heat ratio when the i-th unit operates at the maximum steam extraction condition; is a constant; are the maximum and minimum electric power of the unit under pure condensing conditions; The maximum steam extraction heating power of the unit;

[0091] The ramp rate constraint of the traditional condensing unit is:

[0092]

[0093] Where P up,i , P dn,i They represent the up and down climbing rates of the i-th condensing unit under pure condensing conditions respectively;

[0094] This constraint ensures that the traditional condensing unit operates at Figure 2a Traditional ABCD area.

[0095] The constraints of the condensing unit with flexible low-pressure cylinder removal are:

[0096]

[0097] The first row of formulas in formula (4) constrains the thermal output range of the unit in the non-cut-off state, the second row of formulas constrains the electrical output range of the unit in the non-cut-off state, the third and fourth row of formulas constrain the thermal output range of the unit in the cut-off state, the fifth row of formulas constrains the electrical output of the unit under a given thermal output in the cut-off state, the sixth row of formulas is the unit electrical output constraint, and the sixth row of formulas is the unit thermal output constraint.

[0098] in, and are respectively the generating power and heating power of the pth low-pressure cylinder removable unit in period t. Indicates the cylinder cutting status of the pth unit: 1 means the low-pressure cylinder is cut off, 0 means it is not cut off; and They respectively represent the combined heat and power supply power component and heating power component of the unit in the steam extraction and back pressure states (cut off the low-pressure cylinder); It is the increased heat output when the low-pressure cylinder is cut off while the steam intake of the unit remains unchanged;

[0099] The climbing rate constraint of the condensing unit with flexible low-pressure cylinder removal is:

[0100]

[0101] Where P up,p , P dn,p They respectively indicate that the low-pressure cylinder can flexibly cut off the up and down climbing rates of the unit under pure condensing conditions;

[0102] This constraint ensures that the extraction unit operates under Figure 2aThe traditional ABCD area shown or the B'C' line after cutting out the low pressure cylinder.

[0103] The constraints of the pumping back pressure unit after high back pressure transformation are:

[0104]

[0105] The first and second rows of formula (6) constrain the range of the unit's electrical output, and the third row of formula constrains the range of the unit's thermal output.

[0106] In the formula, and are the power generation and heating power of the jth back-type unit in period t; c m1,j 、c m2,j They are the electric-to-heat ratios when the unit is operating under pure back pressure conditions and maximum steam extraction conditions respectively; is the maximum and minimum power output of the jth unit under pure back pressure conditions; The maximum heating power of the unit;

[0107] The ramp rate constraint of the pumping unit after high back pressure transformation is:

[0108]

[0109] In the formula,

[0110] The electric and thermal power of the jth back pressure unit in period t is converted to the electric power under pure back pressure condition with equal coal consumption. up,j , P dn,j They respectively represent the upward and downward climbing rates of the extraction steam unit modified with high back pressure.

[0111] This constraint ensures that the pumping unit operates under Figure 2b The MNKL region is shown.

[0112] The operating constraints of the thermal storage tank are:

[0113]

[0114] The first and second rows of formula (8) constrain the heat storage and release power in period t to not exceed the maximum heat storage and release power, and the third row of formula constrains the heat storage in the heat storage tank to not exceed the heat storage energy.

[0115] In the formula, the capacity of the heat storage equipment configured by the thermal power company is The heat storage efficiency in a single period is η HA The maximum heat storage and release powers are and is the stored heat in the heat storage tank during period t;

[0116] Heat balance constraints:

[0117]

[0118] In the formula, Refers to the heat load borne by the thermal power enterprise during the period t.

[0119] Thermal power enterprises on-grid power:

[0120]

[0121] Coal consumption for thermal power enterprises:

[0122]

[0123] The first row of formula (11) defines the coal consumption of the extraction condensing unit; the second row of formula defines the coal consumption of the extraction back unit; the third row of formula defines the total energy supply coal consumption of the thermal power enterprise.

[0124] In the formula, a i 、b i 、c i are the coal consumption coefficients of the i-th extraction condensing unit; a j 、b j 、c j are the coal consumption coefficients of the jth extraction unit; n1, n2, n3 are the numbers of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction units included in the thermal power enterprise.

[0125] 104. Input the system parameters into the day-ahead production forecasting model to obtain the comprehensive power production of thermal power enterprises in the day-ahead spot market and deep peak-shaving market;

[0126] 105. The expected revenue of thermal power enterprises is calculated based on their comprehensive electricity production in the day-ahead spot market and deep peak-shaving market.

[0127] Specifically, the system parameters are input into the model to determine the optimal output of the thermal power company at each time period the next day. For this thermal power company, the optimal output decision curve for the next day, which only considers the day-ahead spot market and does not consider the deep peak-shaving market, is as follows: Figure 5a As shown by the hollow solid line in the figure, the optimal production decision curve for the next day considering both the day-ahead spot market and the deep peak-shaving market is as follows: Figure 5a As shown by the solid line in the figure, the corresponding heat balance diagram in the plant is as follows Figure 5b , Figure 5c shown.

[0128] The optimization solver is used to calculate the overall revenue of thermal power companies under given day-ahead spot market and deep peak-shaving market prices, such as Figure 6As shown in the figure, when the optimal production decision of the day-ahead spot market and the deep peak-shaving market is considered at the same time, the expected profit is 7.916 million yuan. When the optimal production decision of the deep peak-shaving market is not considered, only 7.584 million yuan of profit can be obtained from participating in the spot market.

[0129] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for predicting the day-ahead output of thermal power enterprises in an environment where both electricity and peak-shaving markets exist, characterized in that: include: Get system parameters; The system parameters include: day-ahead spot market parameters, deep peak load regulation market parameters and thermal power enterprise parameters; A day-ahead production forecasting model is established with the goal of maximizing the overall revenue of thermal power companies participating in the day-ahead spot market and deep peak-shaving market. Setting constraints of the day-ahead production forecasting model; Inputting the system parameters into the day-ahead production prediction model to obtain the comprehensive power production of the thermal power enterprise in the day-ahead spot market and the deep peak-shaving market; Calculate the expected revenue of the thermal power company through the comprehensive power output of the thermal power company in the day-ahead spot market and the deep peak-shaving market; The day-ahead spot market parameters include: electricity prices in each period of the day-ahead market; The deep peak-shaving market parameters include: the clearing price of each level in the deep peak-shaving market and the unit electricity allocation price in the deep peak-shaving market; The thermal power enterprise parameters include: unit operation parameters, unit coal consumption coefficient, and thermal load and heat storage tank parameters of the thermal power enterprise; the objective function of the day-ahead production prediction model is: In the formula, is the day-ahead market return, T is the forecast period, and τ is the time period length; is the total power generation of the thermal power enterprise in period t; is the coal consumption for power generation and heating of the thermal power enterprise during period t, which depends on the power generation and heating power of each unit in the plant during that period; ρ is the equivalent coal price; They represent the heat storage capacity of the enterprise's heat storage device at the beginning and end of the forecast period, and a HA Thermal storage coal consumption rate represents the cost of the thermal storage used to meet the heating demand of the next day; To obtain peak market revenue, It is a Boolean value, reflecting the system's deep peak load demand in the next day's period t, 1 means required, 0 means not required; ΔP i e,t τ, are respectively the actual deep peak load regulation power of the thermal power enterprise in the i-th gear during the t period and the corrected shared power; the constraint conditions for setting the day-ahead output forecasting model include: The constraints include: constraints on traditional condensing units, constraints on condensing units with flexible low-pressure cylinder removal, constraints on condensing units after high back pressure transformation, operating constraints on heat storage tanks, heat balance constraints, coal consumption of thermal power companies and grid-connected power constraints; The constraints of the traditional condensing unit are: In the formula, and are the power generation and heating power of the i-th extraction unit in period t; c v,i The ratio of electricity loss to heat supply when steam is extracted for heating; c m,i is the electric-to-heat ratio when the i-th unit operates at the maximum steam extraction condition; is a constant; are the maximum and minimum electric power of the unit under pure condensing conditions; The maximum steam extraction heating power of the unit; The constraints of the condensing unit that can be flexibly removed by the low-pressure cylinder are: in, and are the power generation and heating power of the pth low-pressure cylinder removable unit in period t, Indicates the cylinder cutting status of the pth unit: 1 means the low-pressure cylinder is cut off, 0 means it is not cut off; and They represent the combined heat and power generation power component and heating power component of the unit under steam extraction and back pressure conditions respectively. The back pressure condition is the operating condition of the condensing unit with the low-pressure cylinder removed; It is the increased heat output when the low-pressure cylinder is cut off while the steam intake of the unit remains unchanged; The constraints of the pumping back pressure unit after the high back pressure transformation are: In the formula, and are the power generation and heating power of the jth back-type unit in period t; c m1,j 、c m2,j They are the electric-to-heat ratios when the unit is operating under pure back pressure conditions and maximum steam extraction conditions respectively; is the maximum and minimum power output of the jth unit under pure back pressure conditions; The maximum heating power of the unit; The operating constraints of the thermal storage tank are: In the formula, the capacity of the heat storage equipment configured by the thermal power company is The heat storage efficiency in a single period is η HA The maximum heat storage and release powers are and is the stored heat in the heat storage tank during period t; The heat balance constraint: In the formula, Refers to the heat load borne by the thermal power enterprise during the period t. The on-grid power of the thermal power enterprise: The coal consumption of thermal power enterprises: In the formula, a i 、b i 、c i are the coal consumption coefficients of the i-th extraction condensing unit; a j 、b j 、c j are the coal consumption coefficients of the jth extraction unit; n1, n2, and n3 are the number of extraction units, extraction units with flexible removal of low-pressure cylinders, and extraction units included in the thermal power enterprise; the constraints for establishing the day-ahead production forecasting model also include: The ramp rate constraint of the traditional condensing unit is: Where P up,i , P dn,i They represent the up and down climbing rates of the i-th condensing unit under pure condensing conditions respectively; The climbing rate constraint of the condensing unit whose low-pressure cylinder can be flexibly removed is: Where P up,p , P dn,p They respectively indicate that the low-pressure cylinder can flexibly cut off the up and down climbing rates of the unit under pure condensing conditions; The climbing rate constraint of the pumping back pressure unit after the high back pressure transformation is: In the formula, P is the electric and thermal power of the jth back pressure unit in period t converted to the electric power under pure back pressure condition with equal coal consumption; up,j , P dn,j They respectively represent the upward and downward climbing rates of the extraction steam unit modified with high back pressure.