Wall plastering system
By designing a wall plastering system that automatically adjusts the distance between the car body and the plasterer, the problem that existing plastering machines cannot move the automatic plastering horizontally is solved, and the continuity and efficiency of plastering operations are improved.
Patent Information
- Application Number
- CN202011537163.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-12-23
- Publication Date
- 2025-06-06
- Estimated Expiration
- 2040-12-23
AI Technical Summary
Existing plastering machines cannot move horizontally and automatically plastering, and require frequent manual installation and positioning, resulting in poor operational continuity and low efficiency.
A wall plastering system was designed, including a flatbed truck, a slurry supply device and a slurry slurry slurry. The distance measuring sensor and a motor controller were used to automatically adjust the distance between the vehicle body and the slurry slurry and realize automatic mixing and conveying mortar, and ensure the continuity and flatness of the mortar layer during the slurry slurry.
It solves the problem that the plasterer cannot move the automatic plastering horizontally, improves the continuity and efficiency of plastering operations, and reduces the frequency of manual installation and adjustment.
Smart Images

Figure CN112647683B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a wall plastering device. Background Art
[0002] Wall plastering refers to the surface engineering of applying cement mortar, mixed mortar, etc. on the wall. Indoor and outdoor wall plastering is a work after the completion of building structure construction. Scientific plastering can play the role of moisture-proof, weather-proof, heat-insulating, etc., and prevent the building wall from being eroded by wind, rain, snow, etc.
[0003] In the prior art, wall plastering is usually done manually, with low construction efficiency and high labor intensity. In particular, outdoor wall plastering also poses a high safety risk. Therefore, it is necessary to develop an automatic equipment that can replace manual plastering.
[0004] The existing plastering machine moves up and down along the vertical guide rail in a fixed state. Before the operation, the position of the plastering machine needs to be manually positioned, installed and fixed. The plastering machine cannot be moved horizontally, and the operation flexibility is poor. After vertical plastering once, the plastering machine needs to be manually transferred horizontally, and then the plastering machine needs to be reinstalled and positioned before continuing the plastering operation. The plastering machine cannot operate continuously and automatically, and the work efficiency is low.
[0005] What kind of plastering device can move horizontally to spread the plaster and ensure the continuity and flatness of the mortar layer during the horizontal spreading process is also a technical problem that needs to be solved in the automatic plastering machine. Summary of the invention
[0006] In view of this, the purpose of the present invention is to provide a wall plastering system to solve the technical problems that the existing plastering machine cannot move horizontally for automatic plastering, requires frequent manual installation and positioning during the operation of the plastering machine, has poor operation continuity and low operation efficiency.
[0007] The wall plastering system of the present invention comprises a flatbed truck, the flatbed truck comprises a flatbed truck frame and a first wheel mechanism arranged at the bottom of the flatbed truck frame, the first wheel mechanism comprises a steering wheel mechanism arranged at the front end of the flatbed truck frame for adjusting the forward direction of the flatbed truck and a first driving wheel mechanism arranged at the bottom of the flatbed truck frame for driving the flatbed truck forward and backward;
[0008] The wall plastering system also includes a slurry supply device and a slurry plasterer;
[0009] The flatbed truck also includes a second wheel mechanism arranged at the bottom of the flatbed truck frame for adjusting the distance between the flatbed truck and the plastered wall, a first distance measuring sensor for detecting the distance between the front side of the flatbed truck frame and the plastered wall, a second distance measuring sensor for detecting the distance between the rear side of the flatbed truck frame and the plastered wall, a third distance measuring sensor for detecting the distance between the front end of the flatbed truck frame and the front wall when the flatbed truck moves forward, and a fourth distance measuring sensor for detecting the distance between the rear end of the flatbed truck frame and the rear wall when the flatbed truck moves backward, the second wheel mechanism includes a wheel frame arranged below the flatbed truck frame, a non-powered wheel arranged on one side of the wheel frame, a second driving wheel mechanism arranged on the other side of the wheel frame, and an electric cylinder group arranged on the flatbed truck frame for driving the wheel frame to rise and fall;
[0010] The wall plastering system also includes a first translation device, a lifting device, a second translation device and a motor controller;
[0011] The first translation device includes a lead screw and a guide rod arranged on the flat frame and parallel to the front-rear direction of the flat frame, a translation slide plate threadably matched with the lead screw and slidably matched with the guide rod, and a first motor arranged on the flat frame to drive the lead screw to rotate;
[0012] The lifting device comprises a vertical frame arranged on the translation slide, a vertical guide rail arranged on the translation slide and fixed on the vertical frame at the upper end, a lifting slide arranged on the vertical guide rail and slidingly cooperating with the vertical guide rail up and down, and a lifting power mechanism driving the lifting slide to move up and down along the vertical guide rail;
[0013] The second translation device includes a support plate arranged on the lifting slide, an electric push rod arranged on the support plate for adjusting the distance between the plastering device of the wall plastering system and the wall surface, and a fifth distance measuring sensor for detecting the distance between the plastering device and the wall surface to be plastered;
[0014] The first sensor, the second sensor, the third sensor, the fourth sensor and the fifth sensor are respectively connected to the signal input interface of the motor controller through wires, and the signal output interface of the motor controller is respectively connected to the control signal input terminals of the steering wheel mechanism, the first driving wheel mechanism, the electric cylinder group, the second driving wheel mechanism and the lifting power mechanism through wires;
[0015] The slurry supply device includes a mixing hopper, a stirrer arranged on the mixing hopper to stir the material in the mixing hopper, a gate valve connected to the bottom of the mixing hopper, a screw conveyor connected to the lower part of the gate valve for conveying mortar, and a slurry delivery pipe connected to the outlet of the screw conveyor, and the slurry supply device also includes a slurry distributor, the slurry distributor includes a transfer container arranged on the support plate of the second translation device and a plurality of material distribution pipes arranged on the transfer container, and the transfer container is connected to the outlet of the slurry delivery pipe;
[0016] The trowel device comprises a rectangular trough-shaped discharging trough, trowel plates arranged on the left and right sides of the discharging trough, and a plurality of feed pipe joints arranged at the rear end of the discharging trough and evenly arranged along the length direction of the discharging trough, the discharging trough is connected to the end of the electric push rod of the second translation device, the length direction of the discharging trough is parallel to the length direction of the vertical guide rail, and the feed pipe joints are connected to the distribution pipes in a one-to-one correspondence; the trowel plates comprise a lap plate connected to the side of the discharging trough, an inclined trowel plate connected to the lap plate in a troweling state and obliquely intersecting with the wall surface, a leveling trowel plate connected to the inclined trowel plate in a troweling state and parallel to the wall surface, a seam trowel plate connected to the inclined trowel plate and the lower end of the leveling trowel plate, a residual material baffle plate connected to the lower ends of the left and right seam trowel plates, and a side material flush cutting plate vertically arranged at the upper end of the leveling trowel plate, the side edges of the seam trowel plate are tilted to form a material guide edge; the seam trowel plate is located below the lower end of the discharging trough, and a residual material outlet is formed between the left and right seam trowel plates;
[0017] Furthermore, the lifting power mechanism includes a guide wheel arranged on the top of the frame, a second motor arranged on the translation slide, a groove wheel arranged at the end of the rotating shaft of the second motor, and a steel rope with one end fixed in the groove wheel and the other end connected to the lifting slide via the guide wheel.
[0018] Furthermore, the stand is composed of several sections connected by bolts, the vertical guide rail is cylindrical, and the vertical guide rail is composed of several sections connected by threads, and the support plate is fixed on the lifting slide plate by bolts.
[0019] Beneficial effects of the present invention:
[0020] The wall plastering system of the present invention can automatically adjust the distance between the body and the plastering device and the wall to ensure the continuous progress of the plastering operation, solves the problem that the existing plastering machine needs to be frequently installed and adjusted manually during the plastering operation, and can greatly improve the efficiency of the plastering operation.
[0021] The wall plastering system of the present invention can replace manual automatic mixing of mortar and automatic delivery of mortar to a plastering device, and can ensure that the mortar is evenly distributed in the length direction of the plastering device; during the transverse movement of the flatbed truck, the plastering device can evenly spit out the mortar on the wall surface, and the structure of the plastering device can ensure the continuity and flatness of the mortar layer and the joints of the upper and lower adjacent mortar layers during the transverse movement of the plastering device. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a three-dimensional structural diagram of the wall plastering system;
[0023] Figure 2 It is a three-dimensional structural diagram of the wall plastering system from another perspective;
[0024] Figure 3It is a schematic diagram of the bottom three-dimensional structure of the flatbed truck;
[0025] Figure 4 It is a schematic diagram of the three-dimensional structure of the spatula. DETAILED DESCRIPTION
[0026] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0027] The wall plastering system of this embodiment includes a flatbed vehicle, a slurry supply device and a slurry plasterer.
[0028] The flatbed vehicle comprises a flatbed vehicle frame 1 and a first wheel mechanism arranged at the bottom of the flatbed vehicle frame, wherein the first wheel mechanism comprises a steering wheel mechanism 2 arranged at the front end of the flatbed vehicle frame for adjusting the forward direction of the flatbed vehicle and a first driving wheel mechanism 3 arranged at the bottom of the flatbed vehicle frame for driving the flatbed vehicle forward and backward. The steering wheel mechanism in this embodiment comprises a bogie 201 hinged at the front end of the flatbed vehicle frame, a steering wheel 202 arranged on the bogie and an electric cylinder 204 for driving the bogie to rotate around an articulated shaft 203. Of course, in different embodiments, the steering wheel mechanism can also adopt other forms in the prior art. In this embodiment, the first driving wheel mechanism comprises a first driving wheel set 301, a third motor 302 and a first transmission gear set 303 for transmitting the power output by the third motor to the transmission shaft of the first driving wheel set. Of course, in different embodiments, the first driving wheel mechanism can also adopt other forms in the prior art.
[0029] In this embodiment, the flatbed truck also includes a second wheel mechanism arranged at the bottom of the flatbed frame for adjusting the distance between the flatbed truck and the plastered wall, a first distance measuring sensor 4 for detecting the distance between the front side of the flatbed frame and the plastered wall, a second distance measuring sensor 5 for detecting the distance between the rear side of the flatbed frame and the plastered wall, a third distance measuring sensor 6 for detecting the distance between the front end of the flatbed frame and the front wall when the flatbed truck moves forward, and a fourth distance measuring sensor 7 for detecting the distance between the rear end of the flatbed frame and the rear wall when the flatbed truck moves backward. The second wheel mechanism includes a wheel frame 8 arranged under the flatbed frame, a non-powered wheel 9 arranged on one side of the wheel frame, a second driving wheel mechanism 10 arranged on the other side of the wheel frame, and an electric cylinder group 11 arranged on the flatbed frame to drive the wheel frame to rise and fall. The electric cylinder group 11 in this embodiment is composed of four electric cylinders distributed in a rectangular shape. In this embodiment, the second drive wheel mechanism 10 includes a second drive wheel group 1001, a fourth motor 1002 and a second transmission gear group 1003 that transmits the power output by the fourth motor to the transmission shaft of the second drive wheel group. Of course, in different embodiments, the second drive wheel mechanism can also adopt other forms in the prior art.
[0030] The wall plastering system in this embodiment further includes a first translation device, a lifting device, a second translation device and a motor controller.
[0031] The first translation device includes a lead screw 12 and a guide rod 13 arranged on the flat frame and parallel to the front-rear direction of the flat frame, a translation slide 14 threadedly matched with the lead screw and slidably matched with the guide rod, and a first motor 15 arranged on the flat frame to drive the lead screw to rotate. In this embodiment, gear transmission is adopted between the first motor and the lead screw, and of course, other methods can be adopted to transmit power between the first motor and the lead screw in different embodiments.
[0032] The lifting device includes a stand 16 vertically arranged on the translation slide, a vertical guide rail 17 vertically arranged on the translation slide and fixed on the stand, a lifting slide 18 arranged on the vertical guide rail and slidingly matched with the vertical guide rail, and a lifting power mechanism driving the lifting slide to move up and down along the vertical guide rail. In this embodiment, the lifting power mechanism includes a guide wheel 19 arranged on the top of the stand, a second motor 20 arranged on the translation slide, a groove wheel 21 arranged at the end of the rotating shaft of the second motor, and a steel rope 22 with one end fixed in the groove wheel and the other end connected to the lifting slide via the guide wheel. In a specific implementation, a hook or a lock can be set at the end of the steel rope to facilitate connection with the lifting slide, and also to facilitate disassembly. In different embodiments, the lifting power mechanism can also adopt other forms in the prior art.
[0033] The second translation device includes a support plate 23 arranged on the lifting slide, an electric push rod 25 arranged on the support plate for adjusting the distance between the plasterer 24 of the wall plastering system and the wall, and a fifth distance measuring sensor 26 for detecting the distance between the plasterer and the plastered wall. The electric push rod is parallel to the width direction of the flatbed frame.
[0034] The first sensor, the second sensor, the third sensor, the fourth sensor and the fifth sensor are respectively connected to the signal input interface of the motor controller 27 through wires, and the signal output interface of the motor controller 27 is respectively connected to the control signal input ends of the steering wheel mechanism, the first driving wheel mechanism, the electric cylinder group, the second driving wheel mechanism and the lifting power mechanism through wires.
[0035] In this embodiment, the slurry supply device includes a mixing hopper 28, an agitator 29 arranged on the mixing hopper to stir the material in the mixing hopper, a gate valve 30 connected to the bottom of the mixing hopper, a screw conveyor 31 connected to the lower part of the gate valve for conveying mortar, and a slurry delivery pipe 32 connected to the outlet of the screw conveyor. The slurry supply device also includes a slurry separator, which includes a transfer container 33 arranged on the support plate of the second translation device and a plurality of material distribution pipes 34 arranged on the transfer container, and the transfer container is connected to the outlet of the slurry delivery pipe. In this embodiment, the agitator is composed of a motor and a stirring rod connected to the motor shaft. Of course, the agitator can select other forms in the prior art according to needs.
[0036] The slurry spreader 24 includes a rectangular trough-shaped discharge trough 241, slurry spreader plates 242 arranged on the left and right sides of the discharge trough, and a plurality of feed pipe joints 243 arranged at the rear end of the discharge trough and evenly arranged along the length direction of the discharge trough. The discharge trough is connected to the end of the electric push rod of the second translation device, and the length direction of the discharge trough is parallel to the length direction of the vertical guide rail. The feed pipe joints are connected to the distribution pipes one by one. The plastering plate 242 includes a lap plate 2421 connected to the side of the discharge chute, an inclined plastering plate 2422 connected to the lap plate and obliquely intersecting the wall in the plastering state, a leveling plastering plate 2423 connected to the inclined plastering plate and parallel to the wall in the plastering state, a seam plastering plate 2424 connected to the lower ends of the inclined plastering plate and the leveling plastering plate, a residual material baffle plate 2425 connected to the lower ends of the left and right seam plastering plates, and an edge material flush cutting plate 2426 vertically arranged on the upper ends of the leveling plastering plates, the side edges of the seam plastering plate are tilted to form a material guiding edge 2427; the seam plastering plate is located below the lower end of the discharge chute, and a residual material outlet 2428 is formed between the left and right seam plastering plates.
[0037] The working principle of the wall plastering system in this embodiment is as follows:
[0038] The position of the vehicle body and the position of the plastering device before plastering include the following steps:
[0039] The first step: place the flatbed car at a certain distance from the plastered wall, and then the motor controller controls the third motor 302 of the first driving wheel mechanism to drive the first driving wheel group 301 to make the flatbed car move forward. During the flatbed car's forward movement, the motor controller processes the detection data of the first sensor and the second sensor. If the distance difference between the front side and the rear side of the flatbed frame detected by the first sensor and the second sensor and the plastered wall is not within the set threshold range, it means that the forward direction of the flatbed car and the body of the flatbed car are not parallel to the plastered wall. In this case, the motor controller controls the electric cylinder 204 of the steering wheel mechanism to push the bogie 201 to rotate around the articulated shaft 203 to adjust the forward direction of the flatbed car until the distance difference between the front side and the rear side of the flatbed car detected by the first sensor and the second sensor and the plastered wall is within the set threshold range to ensure that the body of the flatbed car is parallel to the plastered wall. In addition, during the flatbed car's forward movement, the controller also determines whether the flatbed car will collide with the wall according to the detection values of the first sensor, the second sensor and the third sensor to ensure driving safety.
[0040] Step 2: When the flatbed vehicle is parallel to the plastered wall, the motor controller detects whether the distance between the side of the flatbed vehicle frame and the plastered wall is within the set threshold range according to the first sensor and the second sensor. If the measured distance is not within the set threshold range, the motor controller first controls the third motor to stop working, and then controls the telescopic rods of each electric cylinder in the electric cylinder group 11 to extend at the same time to raise the height of the flatbed vehicle frame so that the wheels of the first wheel mechanism are off the ground, and then controls the fourth motor 1002 of the second drive wheel mechanism 10 to drive the second drive wheel group 1001 so that the distance between the flatbed vehicle frame and the plastered wall is within the set threshold range. Then, the telescopic rods of each electric cylinder in the electric cylinder group 11 are controlled to retract at the same time so that the wheels of the first wheel mechanism are in contact with the ground again.
[0041] Step 3: The motor controller controls the electric push rod 25 to drive the plastering device 24 to move forward, so that the distance between the discharge port of the plastering device 24 and the plastered wall surface is within a set threshold range.
[0042] Through the above steps, the position of the vehicle body and the plastering device is adjusted to the set range, and then the motor controller can control the flatbed truck to move forward or backward to perform the plastering operation.
[0043] The mortar raw materials are manually poured into the mixing hopper 28 of the mortar supply device. After the raw materials are evenly stirred by the agitator, the gate valve is opened, and the mixed mortar enters the screw conveyor below. During the plastering operation, the mortar is sent from the screw conveyor to the transfer container of the mortar distributor through the mortar delivery pipe, and then sent to the discharging trough of the mortar spreader through the material distribution pipe. The mortar distributor ensures that the mortar is evenly distributed in the length direction of the discharging trough, thereby ensuring that the discharging trough of the mortar spreader 24 can evenly spit out the mortar and apply it to the wall surface.
[0044] When the third sensor detects that the distance between the front end of the flatbed truck and the front wall reaches the set threshold range during the forward movement of the flatbed truck, or when the fourth sensor detects that the distance between the rear end of the flatbed truck and the rear wall reaches the set threshold range during the backward movement of the flatbed truck, the motor controller first controls the first motor 15 of the first translation device to drive the screw 12 to rotate, so that the plastering device 24 moves from one end of the flatbed truck frame to the other end, thus completing a wall transverse plastering operation. After completing a wall transverse plastering operation, the motor controller controls the second motor 20 of the lifting power mechanism to drive the lifting slide plate to move up a set distance, so as to perform the next wall transverse plastering operation.
[0045] During the screeding process of the screeding plate of the screeding device, the excess will be discharged from the lower residual material outlet 2428 and the upper two edge material flush cutting plates 2426. The edge material flush cutting plate can cut the upper side edge of the mortar layer applied on the wall surface flush with the height, which is conducive to the overlap of the edge of the next section of mortar when the screeding device touches the upper section of mortar. In addition, since the screeding device is provided with a seam screed plate 2424, the seam screed plate squeezes the mortar at the seam when passing through the overlapping seam of the upper and lower sections of mortar, so that the seam can be healed and leveled. In addition, due to the existence of the guide edge 2427, the seam screed plate will not scratch the applied lower section of mortar layer when moving forward. At the same time, due to the existence of the residual material baffle plate 2425, the residual material baffle plate has a protective effect on the applied mortar layer on the lower side, so that the excess mortar overflows from the residual material outlet 2428 without causing extrusion damage to the applied mortar layer on the lower side.
[0046] The wall plastering system in this embodiment can automatically adjust the distance between the body and the plastering machine and the wall to ensure the continuous progress of the plastering operation. It solves the problem that the existing plastering machine needs to be frequently installed and adjusted manually during the plastering operation, and the problem that the existing plastering machine needs to be manually mixed with mortar and loaded, which can greatly improve the efficiency of the plastering operation.
[0047] As an improvement to the above embodiment, the stand is composed of several sections connected by bolts, the vertical guide rail is cylindrical, and the vertical guide rail is composed of several sections connected by threads, and the support plate is fixed on the lifting slide plate by bolts. This improvement makes the positioning and moving mechanism of the plastering machine detachable for easy transportation.
[0048] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.
Claims
1. A wall plastering system, comprising a flatbed truck, the flatbed truck comprising a flatbed truck frame and a first wheel mechanism arranged at the bottom of the flatbed truck frame, the first wheel mechanism comprising a steering wheel mechanism arranged at the front end of the flatbed truck frame for adjusting the forward direction of the flatbed truck and a first driving wheel mechanism arranged at the bottom of the flatbed truck frame for driving the flatbed truck forward and backward, Features: The wall plastering system also includes a slurry supply device and a slurry plasterer; The flatbed truck also includes a second wheel mechanism arranged at the bottom of the flatbed truck frame for adjusting the distance between the flatbed truck and the plastered wall, a first distance measuring sensor for detecting the distance between the front side of the flatbed truck frame and the plastered wall, a second distance measuring sensor for detecting the distance between the rear side of the flatbed truck frame and the plastered wall, a third distance measuring sensor for detecting the distance between the front end of the flatbed truck frame and the front wall when the flatbed truck moves forward, and a fourth distance measuring sensor for detecting the distance between the rear end of the flatbed truck frame and the rear wall when the flatbed truck moves backward, the second wheel mechanism includes a wheel frame arranged below the flatbed truck frame, a non-powered wheel arranged on one side of the wheel frame, a second driving wheel mechanism arranged on the other side of the wheel frame, and an electric cylinder group arranged on the flatbed truck frame for driving the wheel frame to rise and fall; The wall plastering system also includes a first translation device, a lifting device, a second translation device and a motor controller; The first translation device includes a lead screw and a guide rod arranged on the flat frame and parallel to the front-rear direction of the flat frame, a translation slide plate threadably matched with the lead screw and slidably matched with the guide rod, and a first motor arranged on the flat frame to drive the lead screw to rotate; The lifting device comprises a vertical frame arranged on the translation slide, a vertical guide rail arranged on the translation slide and fixed on the vertical frame at the upper end, a lifting slide arranged on the vertical guide rail and slidingly cooperating with the vertical guide rail up and down, and a lifting power mechanism driving the lifting slide to move up and down along the vertical guide rail; The second translation device includes a support plate arranged on the lifting slide, an electric push rod arranged on the support plate for adjusting the distance between the plastering device of the wall plastering system and the wall surface, and a fifth distance measuring sensor for detecting the distance between the plastering device and the wall surface to be plastered; The first distance measuring sensor, the second distance measuring sensor, the third distance measuring sensor, the fourth distance measuring sensor and the fifth distance measuring sensor are respectively connected to the signal input interface of the motor controller through wires, and the signal output interface of the motor controller is respectively connected to the control signal input terminals of the steering wheel mechanism, the first driving wheel mechanism, the electric cylinder group, the second driving wheel mechanism and the lifting power mechanism through wires; The slurry supply device includes a mixing hopper, a stirrer arranged on the mixing hopper to stir the material in the mixing hopper, a gate valve connected to the bottom of the mixing hopper, a screw conveyor connected to the lower part of the gate valve for conveying mortar, and a slurry delivery pipe connected to the outlet of the screw conveyor, and the slurry supply device also includes a slurry distributor, the slurry distributor includes a transfer container arranged on the support plate of the second translation device and a plurality of material distribution pipes arranged on the transfer container, and the transfer container is connected to the outlet of the slurry delivery pipe; The trowel device comprises a rectangular trough-shaped discharging trough, trowel plates arranged on the left and right sides of the discharging trough, and a plurality of feed pipe joints arranged at the rear end of the discharging trough and evenly arranged along the length direction of the discharging trough, the discharging trough is connected to the end of the electric push rod of the second translation device, the length direction of the discharging trough is parallel to the length direction of the vertical guide rail, and the feed pipe joints are connected to the material distribution pipes in a one-to-one correspondence; the trowel plates comprise a lap plate connected to the side of the discharging trough, an inclined trowel plate connected to the lap plate in a troweling state and obliquely intersecting with the wall surface, a leveling trowel plate connected to the inclined trowel plate in a troweling state and parallel to the wall surface, a seam trowel plate connected to the inclined trowel plate and the lower end of the leveling trowel plate, a residual material baffle plate connected to the lower ends of the left and right two seam trowel plates, and a side material flush cutting plate vertically arranged at the upper end of the leveling trowel plate, the side edge of the seam trowel plate is tilted to form a material guide edge; the seam trowel plate is located below the lower end of the discharging trough, and a residual material outlet is formed between the left and right two seam trowel plates; The lifting power mechanism comprises a guide wheel arranged on the top of the stand, a second motor arranged on the translation slide, a groove wheel arranged at the end of the rotating shaft of the second motor, and a steel rope with one end fixed in the groove wheel and the other end connected to the lifting slide via the guide wheel; The stand is composed of several sections connected by bolts, the vertical guide rail is cylindrical, and the vertical guide rail is composed of several sections connected by threads, and the support plate is fixed on the lifting slide plate by bolts.
Citation Information
Patent Citations
Wall plastering machine
CN214531758U