Turnover prefabricated road system

By adopting a turnaround prefabricated road system at the construction site, and integrating temporary roads and pipe trenches with prefabricated components and embedded T-shaped anchors, the problems of difficulty in demolition of temporary roads and pipe trenches and unconsolidation of water and power lines in traditional construction are solved. , realize efficient and safe construction and management.

CN112796189BActive Publication Date: 2024-11-15CHINA CONSTR SEVENTH ENG DIVISION CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110127749.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-29
Publication Date
2024-11-15
Estimated Expiration
2041-01-29

AI Technical Summary

Technical Problem

Temporary roads and trench structures at traditional construction sites require a lot of civil construction, which is difficult to remove and affects the construction period and cost. The water and power lines are not arranged in a coordinated manner, which is easy to damage and malfunction, which may lead to safety accidents.

Method used

The turnaround prefabricated road system is adopted, including temporary road slabs, drainage ditches and comprehensive pipe trenches. It is assembled and built by prefabricated components, integrates the hydropower system, and uses embedded T-shaped anchors and pipeline brackets to simplify the construction and demolition process.

Benefits of technology

It improves construction efficiency and safety, reduces construction costs and environmental impact, simplifies pipeline installation, reduces failure risks, and realizes the aesthetics and standardized management of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112796189B_ABST
    Figure CN112796189B_ABST
Patent Text Reader

Abstract

The present invention discloses a revolvable assembled road system, which includes a temporary road plate, a first support and a second support supported below the left and right edges of the temporary road plate, a drainage ditch and an integrated pipe trench, the top surfaces of the drainage ditch and the integrated pipe trench are at the same height as the top surface of the temporary road plate, the lower end of the integrated pipe trench is embedded in the foundation, the drainage ditch is composed of a plurality of drainage ditch sections connected together; the integrated pipe trench includes a plurality of integrated pipe trench sections connected in sequence and a pipeline support arranged on the inner side of the integrated pipe trench section. The revolvable assembled road system of the present invention adopts assembled components and is assembled and built at the construction site. The assembly has a high degree of mechanization, a short construction period, little impact on the surrounding environment and traffic, is easy to dismantle at a later stage, and can be reused, which can greatly reduce the cost of the temporary road system; it lays water and electricity lines through the integrated pipe trench, integrates the on-site drainage, water supply, and power supply systems into the road system, which is conducive to the safety and standardization of the construction site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of infrastructure, and in particular to a temporary road system at a construction site. Background Art

[0002] Traditional construction roads and integrated pipeline trenches are mostly reinforced concrete structures or brick structures. Such structures require a lot of civil construction. After the project is completed, these temporary roads and pipelines need to be dismantled, which has a great impact on the project schedule and cost.

[0003] At present, in temporary water and electricity projects at construction sites, temporary water and electricity lines are mostly arranged independently, and underground pipelines still use the traditional buried or overhead laying methods, failing to form a complete system. This has resulted in problems such as messy on-site pipeline layout, easy damage, difficult turnover, frequent failures, and even possible production safety accidents caused by pipeline failures. Summary of the invention

[0004] In view of this, the present invention provides a turnover assembled road system to solve the problem in the prior art that temporary roads and pipe trenches at construction sites are reinforced concrete structures or brick structures, which require a large amount of civil construction and are troublesome to dismantle subsequently, which has a great impact on the project schedule and cost, as well as to solve the technical problem that the water and electricity lines at the construction site are buried or overhead, which is unfavorable and messy, prone to damage and failure, and even safety accidents.

[0005] The revolving assembled road system of the present invention comprises a plurality of temporary road plates, a first support and a second support placed on the foundation and supported respectively below the left and right edges of the temporary road plates, a drainage ditch arranged on the first support or the second support, and a comprehensive pipe ditch arranged beside the drainage ditch, wherein the top surfaces of the drainage ditch and the comprehensive pipe ditch are at the same height as the top surface of the temporary road plates, and the lower end of the comprehensive pipe ditch is embedded in the foundation;

[0006] The drainage ditch is composed of a number of drainage ditch sections connected together;

[0007] The integrated pipe trench comprises a plurality of integrated pipe trench sections which are connected in sequence and a pipeline support arranged on the inner side of the integrated pipe trench sections. A cover plate is arranged on the top surface of the integrated pipe trench.

[0008] Furthermore, the integrated pipe trench section is made of concrete, a base plate is provided on an inner side of the integrated pipe trench section, a T-shaped anchor pre-buried in the integrated pipe trench section is welded on one side of the base plate, a bolt hole is also provided on the base plate, a T-shaped bolt is provided in the bolt hole, and the head of the T-shaped bolt is buried in the integrated pipe trench section;

[0009] The pipeline support comprises a transverse support rod arranged parallel to the groove width direction and a connecting plate connected to the end plate of the transverse support rod. The connecting plate is passed through a T-shaped bolt, and a nut for fixing the connecting plate is arranged on the T-shaped bolt.

[0010] Furthermore, trapezoidal grooves are arranged on the top surfaces of the first support and the second support, and trapezoidal blocks matching the trapezoidal grooves are arranged on the bottom surfaces of the left and right sides of the temporary road plate.

[0011] Furthermore, the ends of two adjacent integrated pipe trench sections are butt-jointed by bolts.

[0012] Furthermore, the temporary road slab is an SP slab made of concrete and steel strands embedded in the concrete.

[0013] Beneficial effects of the present invention:

[0014] 1. The present invention can be used as a turnover assembled road system, which adopts assembled components and is assembled and built on the construction site. The assembly is highly mechanized, the construction period is short, the impact on the surrounding environment and traffic is small, and a large amount of road foundation treatment work is not required. Only the soil near the bottom of the support needs to be treated. The road surface does not need to be poured and maintained on site. The construction progress is fast, it is also convenient for later dismantling, and it can be reused, which can greatly reduce the cost of the temporary road system.

[0015] 2. The present invention can be used as a revolving assembled road system. It lays water and electricity lines through a comprehensive pipe trench, integrates the on-site drainage, water supply, and power supply systems into the road system, facilitates unified management, and is beneficial to the beauty, safety, and standardization of the construction site. At the same time, the comprehensive pipe trench is also composed of assembled components, which can also reduce the construction workload, save construction costs, and speed up the construction progress.

[0016] 3. The present invention is a revolving assembled road system. The pipeline supports in the integrated pipe trench are connected by a base plate pre-buried in the integrated pipe trench section and T-shaped bolts. There is no need to drill holes on the side of the integrated pipe trench section. The installation of the pipeline supports will not affect the life of the main structure of the pipe trench. The pipeline support installation efficiency is high, and there is no noise pollution problem in the installation of the integrated pipe trench. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of a turnable assembled road system;

[0018] Figure 2 It is a structural schematic diagram of the comprehensive pipe trench;

[0019] Figure 3 This is a schematic diagram of the docking of adjacent integrated trench sections. DETAILED DESCRIPTION

[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0021] As shown in the figure, the turnaround prefabricated road system in this embodiment includes a plurality of temporary road slabs 1, a first support 3 and a second support 4 placed on a foundation 2 and supported respectively under the left and right edges of the temporary road slabs, a drainage ditch 5 arranged on the first support or the second support, and an integrated pipe ditch arranged next to the drainage ditch, wherein the top surfaces of the drainage ditch and the integrated pipe ditch are at the same height as the top surface of the temporary road slabs, and the lower end of the integrated pipe ditch is embedded in the foundation.

[0022] The drainage ditch is composed of a plurality of drainage ditch sections connected together.

[0023] The integrated pipe trench comprises a plurality of integrated pipe trench sections 6 which are connected in sequence and a pipeline support 7 which is arranged on the inner side of the integrated pipe trench sections. A cover plate 8 is arranged on the top surface of the integrated pipe trench.

[0024] The temporary road slab in this embodiment is an SP slab made of concrete and steel strands embedded in the concrete. Of course, in different embodiments, the temporary road slab may also be a structural slab of this type.

[0025] In this embodiment, the revolving assembled road system adopts assembled components and is assembled and built at the construction site. The assembly mechanization degree is high, the construction period is short, the impact on the surrounding environment and traffic is small, and there is no need for a large amount of road foundation treatment work. Only the soil near the support needs to be treated. The road surface does not need to be cast on site and concrete is maintained. The construction progress is fast, and it is also convenient for later demolition. It can be reused, which can greatly reduce the cost of the temporary road system. During the construction process, rubber sheets can be set between the drainage ditch and the temporary road plate and between adjacent drainage ditch sections for filling. And in the specific implementation, corresponding to the curved part of the road, the first bearing, the second bearing, the temporary road plate and the drainage ditch section corresponding to the bending angle can be pre-made according to the design to meet the assembly requirements of the turning part; or a number of turning unit blocks with small angle bending (including the first bearing turning unit block, the second bearing turning unit block, the temporary road plate turning unit block and the drainage ditch section turning unit block) can be prefabricated, and the transition of the turning part can be achieved by increasing or decreasing the turning unit blocks.

[0026] In this embodiment, the revolving assembled road system is used to lay water and electricity lines through the integrated pipe trench, and the on-site drainage, water supply, and power supply systems are integrated into the road system, which is convenient for unified management and is conducive to the beauty, safety, and standardization of the construction site. At the same time, the integrated pipe trench is also composed of assembled components, which can also reduce the construction workload, save construction costs, and speed up the construction progress.

[0027] As an improvement to the above embodiment, the integrated pipe trench section is made of concrete, and a base plate 9 is arranged on an inner side surface of the integrated pipe trench section. A T-shaped anchor 10 pre-buried in the integrated pipe trench section is welded on one side surface of the base plate. Bolt holes are also arranged on the base plate, and T-shaped bolts 11 are arranged in the bolt holes. The heads of the T-shaped bolts are buried in the integrated pipe trench section.

[0028] The pipeline support 7 includes a transverse support rod 71 arranged parallel to the groove width direction and a connecting plate 72 connected to the end plate of the transverse support rod. The connecting plate is passed through a T-shaped bolt, and a nut 12 for fixing the connecting plate is provided on the T-shaped bolt.

[0029] The length of the integrated pipe trench section in this improvement is about 1.2 meters, which can be directly assembled on site, with high construction efficiency. The temporary pipe trench is easy to disassemble and can be reused, which can greatly save costs. In specific implementation, a connecting hole 13 can also be set on the upper side of the end of the integrated pipe trench section, and the bolt 14 can be inserted into the connecting hole to connect two adjacent integrated pipe trench sections, thereby improving the reliability of the integrated pipe trench assembly structure.

[0030] In this improvement, the pipeline support is connected by a base plate and T-shaped bolts pre-buried in the integrated trench section, and there is no need to drill holes on the side of the trench section. The installation of the pipeline support will not affect the life of the main structure of the trench. The pipeline support has high installation efficiency and there is no noise problem during installation.

[0031] As an improvement to the above embodiment, trapezoidal grooves are provided on the top surfaces of the first and second supports, and trapezoidal blocks 15 cooperating with the trapezoidal grooves are provided on the bottom surfaces of the left and right sides of the temporary road plate. By cooperating between the trapezoidal blocks and the trapezoidal grooves, the structural stability of the temporary road system can be improved.

[0032] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. The recyclable assembled road system is characterized by: It comprises a plurality of temporary road slabs, a first support and a second support placed on the foundation and supported respectively below the left and right sides of the temporary road slabs, a drainage ditch arranged on the first support or the second support, and a comprehensive pipe ditch arranged beside the drainage ditch, wherein the top surfaces of the drainage ditch and the comprehensive pipe ditch are at the same height as the top surface of the temporary road slabs, and the lower end of the comprehensive pipe ditch is embedded in the foundation; The drainage ditch is composed of a number of drainage ditch sections connected together; The integrated pipe trench comprises a plurality of integrated pipe trench sections which are connected in sequence and a pipeline support arranged on the inner side of the integrated pipe trench sections. A cover plate is arranged on the top surface of the integrated pipe trench.

2. The recyclable assembled road system according to claim 1 is characterized in that: The integrated pipe trench section is made of concrete, and a base plate is arranged on one inner side of the integrated pipe trench section, and a T-shaped anchor pre-buried in the integrated pipe trench section is welded on one side of the base plate, and a bolt hole is also arranged on the base plate, and a T-shaped bolt is arranged in the bolt hole, and the head of the T-shaped bolt is buried in the integrated pipe trench section; The pipeline support comprises a transverse support rod arranged parallel to the groove width direction and a connecting plate connected to the end plate of the transverse support rod. The connecting plate is passed through a T-shaped bolt, and a nut for fixing the connecting plate is arranged on the T-shaped bolt.

3. The recyclable assembled road system according to claim 1 is characterized in that: Trapezoidal grooves are arranged on the top surfaces of the first support and the second support, and trapezoidal blocks matching the trapezoidal grooves are arranged on the bottom surfaces of the left and right sides of the temporary road plate.

4. The recyclable assembled road system according to claim 1 is characterized in that: The ends of two adjacent integrated pipe trench sections are butt-jointed by bolts.

5. The recyclable assembled road system according to claim 1 is characterized in that: The temporary road slab is an SP slab made of concrete and steel strands embedded in the concrete.