A method for preventing and controlling water inrush in mining subsidence areas using the pillarless caving method

Through three-dimensional modeling and dynamic predictive numerical models combined with drone measurements, the amount of rainfall in the surface collapse pit was determined, and a water interception and diversion system was designed to solve the problem of water inrush in the surface collapse area in the bottom-column caving method, and realize the control of mining work. Effective flood control on the entire area reduces the risk of water inrush.

CN112818504BActive Publication Date: 2024-10-01NANJING MEISHAN METALLURGY DEV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911123402.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-16
Publication Date
2024-10-01
Estimated Expiration
2039-11-16

AI Technical Summary

Technical Problem

The existing technology cannot effectively predict and prevent the water inrush problem in the surface collapse area in the bottom column caving method, which makes the mining working face prone to water inrush and well flooding accidents.

Method used

Surpac three-dimensional modeling software and Mintab software were used to establish a surface collapse model and a dynamic prediction numerical model. Combined with drone photogrammetry and water balance theory, the inflow volume and runoff channels of rainfall collection in the surface collapse pit were determined, and a water interception and diversion system was designed to Intercept water before it reaches mining operations to reduce the amount of water.

Benefits of technology

By accurately predicting the amount of water flowing from surface rainfall into underground wells, effective water interception projects can be designed to reduce the risk of water inrush at the mining face, improve the accuracy and efficiency of flood control projects, and save project costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112818504B_ABST
    Figure CN112818504B_ABST
Patent Text Reader

Abstract

The invention relates to a method for preventing and controlling water inrush in a goaf subsidence area by a pillarless caving method, which is specifically as follows: step 1: using Surpac three-dimensional modeling software to establish a surface subsidence underground goaf area model and an original surface DTM model, step 2: determining the subsidence center axis, step 3: section cutting and data collection, step 4: establishing a dynamic prediction numerical model, step 5: using a GPS static method to establish image control markers in the surface subsidence area, step 6: superimposing a surface subsidence pit topographic map with underground structure distribution and mining status, step 7: establishing a rainfall infiltration parameter calculation formula, step 8: determining a maximum daily rainstorm infiltration rate, step 9: using a rainstorm daily maximum infiltration rate k value obtained in step 8, and step 10: according to the predicted water inflow, reasonably predicting the maximum daily water inflow of surface rainfall water entering the underground through the subsidence pit, and effectively intercepting the water above the mining operation level, introducing most of the water in the goaf area into a main drainage system, and preventing underground water disasters.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method, in particular to a method for preventing and controlling water inrush in a goaf subsidence area by a bottom-pillar-free caving method, and belongs to the technical field of mine surface subsidence treatment. Background Art

[0002] The pillarless staged caving method is to carry out end extrusion blasting and ore release under the overburden. The overburden layer drops with the release of the end ore, and then a void is generated on the upper part of the overburden. As the mining work proceeds, the roof spans and the exposed area gradually expands. When the tensile stress in the center of the roof exceeds the tensile strength of the rock, the rock is destroyed and the roof begins to collapse. With the continuous mining, the collapse continues to develop and gradually spreads to the surface, causing surface collapse. The collapse of the surface changes the permeability of the surrounding rock above the ore body, becoming a skylight for surface precipitation to enter the well. With the expansion of the scope of surface collapse and the increase of the catchment area, the surface rainfall water enters the well in a short period of time through the collapse pit, which is easy to cause water inrush and flooding accidents at the mining face. In order to solve the above technical problems, technicians in this field are constantly trying new solutions, but the solutions of the existing technology are not ideal. Summary of the invention

[0003] The present invention aims at the problems existing in the prior art and provides a method for preventing and controlling water inrush in a mined-out subsidence area by the pillarless caving method. The technical scheme reasonably predicts the amount of water and runoff channels of surface rainfall entering the well through the subsidence pit, and effectively intercepts the water before it reaches the mining face, thereby reducing the amount of water entering the mining face and reducing the risk of water inrush in the mining face.

[0004] In order to achieve the above object, the technical solution of the present invention is as follows: a method for preventing and controlling water inrush in a mining subsidence area by a pillarless caving method, the method comprising the following steps:

[0005] Step 1: Use Surpac 3D modeling software to build a model of the underground goaf area with a surface collapse of at least 10 years and the original surface DTM model, and then place the collapse boundary lines at different times on the original surface DTM model to obtain the 3D models of the collapse boundaries in different years.

[0006] Step 2: Determine the collapse center axis. The center of the plane projection of the surface collapse boundary line is used as the plane projection point of the collapse center. The plane coordinates of the collapse center axis are obtained by converting the ACAD graphics of the collapse boundary line into a line file under the SURPAC environment, and then using the line file creation function of the SURPAC software to achieve it. The plane coordinates of the center point are read to determine the collapse center axis at that time.

[0007] Step 3: Section cutting and data collection. After merging the underground goaf model and collapse boundary model at the same time, the section cutting is performed with the collapse center point as the vertical axis at an increment of 10° azimuth to obtain the section at a certain time period and a certain direction. After the section is converted into two dimensions, the collapse angle A, the maximum span L of the goaf area and the maximum thickness H of the goaf area are measured.

[0008] Step 4: Establish a dynamic prediction numerical model, use Mintab software to perform probability analysis on the collected data L, H and A, determine whether the data meets the normal distribution law, perform regression analysis on the premise that the data meets the normal distribution, establish a regression equation, determine the dynamic prediction numerical model, and obtain the numerical relationship between the surface collapse angle and underground mining: A = 13.526 * L / H + 40.720, Step 5: Use the GPS static method to establish image control markers in the surface collapse area, use drones to perform close-range photogrammetry of the surface collapse pit, and establish a three-dimensional model consistent with the mine coordinate system. Finally, obtain the surface collapse pit topographic map and determine the location distribution of the landing funnel in the collapse pit.

[0009] Step 6: Overlay the surface collapse pit topography with the underground structure distribution and mining status to determine the location of the channel where the surface collapse water migrates into the underground.

[0010] Step 7: Use water balance theory to establish a calculation formula for rainfall infiltration parameters.

[0011] The mine water balance equation is: Q = △Q + Q1 + Q2

[0012] Where: △Q—rainfall infiltration (m 3 ),

[0013] Q—Mine drainage (m 3 ),

[0014] Q1—Water consumption for underground mine production (m 3 ),

[0015] Q2—Dynamic and static reserves (m 3 ),

[0016] Q, Q1, and Q2 are daily statistical observation data of the mine. As known data, the △Q value can be obtained. The rainfall infiltration parameter calculation formula is established based on the correlation between the collapse area, catchment area, rainfall, and infiltration rate. (k is the daily infiltration rate, N is the number of days of infiltration, M1+M2 is the collapsed catchment area, ∑Y is the rainfall),

[0017] Step 8: Determine the maximum daily rainstorm infiltration rate. Select the rainfall process data with obvious rainfall infiltration between 1990 and 2018. The calculation results are between 6% and 12%. Based on the trend analysis, the maximum daily rainstorm infiltration rate is determined to be 8%. The N value is determined to be (2 to 3 days) by analyzing the duration of the drainage peak.

[0018] Using the numerical relationship formula between the surface collapse angle and underground mining obtained in step 4, the boundary range of surface collapse within 5 years is predicted based on the mining plan (5 years), and flood diversion and drainage projects in the ground collapse area are designed and constructed to reduce the amount of surface water entering the collapse pit.

[0019] Step 9: Using the maximum infiltration rate k value of the rainstorm obtained in step 8, and applying the formula Q = k.Hp.F, according to the three levels of rainstorm volume 100mm, 150mm, and 200m (the catchment area adopts the final collapse area of ​​the mine design), calculate the maximum daily water inflow value Q (k-infiltration rate, Hp-daily rainstorm volume, F-collapse catchment area) of the set rainstorm value.

[0020] Step 10: Based on the predicted water inflow, arrange and construct a water interception and diversion system project that matches the predicted water inflow in the abandoned tunnel connected to the goaf above the mining operation level.

[0021] The specific project of water interception and diversion system is as follows: after the horizontal mining of the mining operation is completed, all abandoned tunnels leading to the goaf are closed with brick walls 10m away from the front of the mining operation, and drainage holes are reserved at the bottom of the tunnel closure wall near the water inflow channel. According to step 9, the predicted water inflow of three levels of 100mm, 150mm, and 200mm rainstorms are set at the position corresponding to the tunnel of the main drainage system in this layer. The drainage holes with the construction hole elevation parallel to the tunnel bottom plate, the construction hole elevation 20cm higher than the tunnel bottom plate, and the hole elevation 50cm higher than the tunnel bottom plate are constructed. The number and aperture of each level of drainage holes are determined according to the predicted water inflow. Finally, the tunnels where the water interception project is constructed are closed with walls in all channels leading to other layers and shafts to ensure that the gushing water enters the main drainage system through the drainage holes.

[0022] The time range for model establishment must be limited to the period between the occurrence of surface collapse and the cessation of underground mining. The changes in the collected data are only valid when used in step 4 to establish a dynamic prediction numerical model.

[0023] This study is only applicable to underground mines that use the pillarless staged caving method to predict the prevention and control of water inrush from surface rainfall entering the mine through the collapse pit during medium-deep mining after surface collapse. It is not applicable to peers with different mining methods. Newly established mines with the same mining method can use this solution for water prevention and control during medium-deep mining.

[0024] Through the determination of the dynamic numerical relationship between surface subsidence and underground mining, the maximum infiltration parameters on rainstorm days and the channels through which surface rainfall runoff migrates into the underground through the subsidence pit, this scheme can reasonably predict the maximum daily inflow of surface rainfall runoff into the underground through the subsidence pit, and effectively intercept it above the mining operation level, diverting most of the water in the empty area into the main drainage system to prevent underground water disasters.

[0025] Compared with the prior art, the present invention has the following advantages: 1) Profile drawing method: Traditional profile drawing is done manually in a two-dimensional environment, which is labor-intensive, inefficient, and the drawn profiles are limited. This solution uses three-dimensional modeling and setting of arbitrary azimuth profile cutting in a three-dimensional environment to complete the drawing of a large number of profiles in a short time and obtain underground mining and surface subsidence data in any direction. Compared with traditional profile drawing, the drawing efficiency is high and the collected data is richer and more comprehensive. 2) Determination of the central axis of subsidence: In the past, the change of subsidence angle during mining was understood on the original geological exploration profile or the position of the subsidence center was roughly determined, and then the profile was manually drawn. The geological exploration profile is basically arranged according to the strike and inclination of the ore body. Most of the profiles do not pass through the subsidence center. At the same time, the subsidence center develops dynamically with the change of mining. Therefore, the subsidence angle data obtained in the above two situations are basically apparent inclination angles. This scheme dynamically determines the center of the surface collapse. By reasonably determining the central axis of the collapse, it can ensure that the obtained collapse angle is the true inclination angle, avoiding the error caused by collecting apparent inclination data. 3) Determine the numerical relationship between surface collapse and underground mining: This scheme determines the numerical relationship between surface collapse and underground mining. It can predict the collapse angle according to the mining relationship in different directions, and then inversely predict the surface collapse boundary at a certain time, reasonably design the location of surface flood control projects, and save engineering costs. 4) Determine the water migration channel: In the past, the measurement of mining surface collapse mainly used rock movement observation or GPS positioning of visible surface cracks to circle the outer boundary of the collapse. The interior of the collapse area that cannot be reached by personnel is always a measurement blind spot. The internal terrain changes cannot be grasped at all. The channel for the collapse pit to collect water into the underground can only be estimated roughly. 5) This scheme uses drone photography technology to measure mining surface collapse pits, which can obtain detailed collapse pit topographic maps and accurately locate the water runoff and migration channels in the pit. This scheme adopts a multi-level control method to prevent the leakage holes from being blocked: design a closed wall with a water release function to control the outflow velocity of the water, prevent the water from flowing through a large amount of mud and sand to block the leakage holes, and design filter devices with different elevations and different orifices to prevent all leakage holes from being blocked. Ensure long-term, effective, and automatic drainage of the leakage holes, realize effective diversion of water above the mining working face, and reduce the risk of water inrush at the mining working face. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 :Surface collapse pit DTM (falling funnel distribution)

[0027] Figure 2 : Schematic diagram of the cut-off section above the mining face

[0028] Figure 3 : Schematic diagram of closed wall structure

[0029] Figure 4 : Drain hole anti-clogging device 1,

[0030] Figure 5 : Drain hole anti-clogging device 2.

[0031] In the figure: 1- collapse pit water diversion collapse funnel, 2- loose covering rock layer in the goaf collapse area, 3- surrounding rock, 4- drainage hole, 5- drainage hole anti-clogging device (1), 6- drainage hole anti-clogging device (2), 7- mining working face, 8- closed wall, 9- abandoned tunnel, 10- main drainage system tunnel. DETAILED DESCRIPTION

[0032] In order to deepen the understanding of the present invention, the present embodiment is described in detail below with reference to the accompanying drawings.

[0033] Example 1: See Figure 1 , Figure 2 , a method for preventing and controlling water inrush in a mining subsidence area by a pillarless caving method, the method comprising the following steps:

[0034] Step 1: Use Surpac 3D modeling software to build a model of the underground goaf area with surface collapse for at least 10 years and the original surface DTM model, then place the collapse boundary lines at different times on the original surface DTM model to obtain the 3D models of the collapse boundaries in different years.

[0035] Step 2: Determine the collapse center axis. The center of the plane projection of the surface collapse boundary line is used as the plane projection point of the collapse center. The plane coordinates of the collapse center axis are obtained by converting the ACAD graphics of the collapse boundary line into a line file under the SURPAC environment, and then using the line file creation function of the SURPAC software to achieve it. The plane coordinates of the center point are read to determine the collapse center axis at that time.

[0036] Step 3: Section cutting and data collection. After merging the underground goaf model and collapse boundary model at the same time, the section cutting is performed with the collapse center point as the vertical axis at an increment of 10° azimuth to obtain the section at a certain time period and a certain direction. After the section is converted into two dimensions, the collapse angle A, the maximum span L of the goaf area and the maximum thickness H of the goaf area are measured.

[0037] Step 4: Establish a dynamic prediction numerical model, use Mintab software to perform probability analysis on the collected data L, H and A, determine whether the data meets the normal distribution law, perform regression analysis on the premise that the data meets the normal distribution law, establish a regression equation, determine the dynamic prediction numerical model, and obtain the numerical relationship between the surface collapse angle and underground mining: A = 13.526 * L / H + 40.720, Step 5: Use the GPS static method to establish image control markers in the surface collapse area, use drones to perform close-range photogrammetry of the surface collapse pit, and establish a three-dimensional model consistent with the mine area coordinate system. Finally, obtain the surface collapse pit topographic map and determine the collapse pit. Figure 1 and Figure 2 The location distribution of the landing funnel shown in 1 is as follows:

[0038] Step 6: Overlay the surface collapse pit topography with the underground structure distribution and mining status to determine Figure 2 The middle arrow shows the channel where the surface collapse water migrates into the well.

[0039] Step 7: Use water balance theory to establish a calculation formula for rainfall infiltration parameters.

[0040] The mine water balance equation is: Q = △Q + Q1 + Q2

[0041] Where: △Q—rainfall infiltration (m 3 ),

[0042] Q—Mine drainage (m 3 ),

[0043] Q1—Water consumption for underground mine production (m 3 ),

[0044] Q2—Dynamic and static reserves (m 3 ),

[0045] Q, Q1, and Q2 are daily statistical observation data of the mine. As known data, the △Q value can be obtained. The rainfall infiltration parameter calculation formula is established based on the correlation between the collapse area, catchment area, rainfall, and infiltration rate. (k is the daily infiltration rate, N is the number of days of infiltration, M1+M2 is the collapsed catchment area, ∑Y is the rainfall),

[0046] Step 8: Determine the maximum daily rainstorm infiltration rate. Select the rainfall process data with obvious rainfall infiltration between 1990 and 2018. The calculation results are between 6% and 12%. Based on the trend analysis, the maximum daily rainstorm infiltration rate is determined to be 8%. The N value is determined to be (2 to 3 days) by analyzing the duration of the drainage peak.

[0047] Using the numerical relationship formula between the surface collapse angle and underground mining obtained in step 4, the boundary range of surface collapse within 5 years is predicted based on the mining plan (5 years), and flood diversion and drainage projects in the ground collapse area are designed and constructed to reduce the amount of surface water entering the collapse pit.

[0048] Step 9: Using the maximum infiltration rate k value of the rainstorm obtained in step 8, and applying the formula Q = k.Hp.F, according to the three levels of rainstorm volume 100mm, 150mm, and 200m (the catchment area adopts the final collapse area of ​​the mine design), calculate the maximum daily water inflow value Q (k-infiltration rate, Hp-daily rainstorm volume, F-collapse catchment area) of the set rainstorm value.

[0049] Step 10: Based on the predicted water inflow, arrange and construct a water interception and diversion system project that matches the predicted water inflow in the abandoned tunnel connected to the goaf above the mining operation level.

[0050] Water interception and diversion system engineering: Figure 2 In the abandoned tunnel after the horizontal mining operation shown in Figure 9, 10m away from the front of the mining, Figure 2 The brick wall shown in Figure 8 will lead to Figure 2 All abandoned tunnels in the goaf shown in Figure 2 are closed. Figure 2 The bottom of the tunnel enclosing wall near the water-gushing channel indicated by the middle arrow is reserved Figure 3 The drain hole is shown. Figure 2 The abandoned tunnel after the mining operation is completed as shown in Figure 9 Figure 2 At the location corresponding to the main drainage system lane shown in Figure 10, set the predicted water inflow of three levels of rainstorm volume, 100mm, 150mm, and 200mm, according to step 9. Figure 2 The hole elevation shown in 5 is parallel to the tunnel floor. Figure 2 The hole elevation shown in Figure 6 is 20cm higher than the tunnel floor. Figure 2 The drainage holes shown in Figure 11 have an opening elevation 50 cm higher than the tunnel floor. The number and diameter of the drainage holes at each level are determined according to the predicted water inflow. Finally, the tunnels where the water interception project is constructed are walled and closed in all passages leading to other layers and shafts to ensure that the water inflow enters the main drainage system through the drainage holes, reducing Figure 2 The risk of water inrush at the mining operation level shown in Figure 7.

[0051] The time range for model establishment must be limited to the period between the occurrence of surface collapse and the cessation of underground mining. The changes in the collected data are only valid when used in step 4 to establish a dynamic prediction numerical model.

[0052] This study is only applicable to underground mines that use the pillarless staged caving method to predict the prevention and control of water inrush from surface rainfall entering the mine through the collapse pit during medium-deep mining after surface collapse. It is not applicable to peers with different mining methods. Newly established mines with the same mining method can use this solution for water prevention and control during medium-deep mining.

[0053] The interception system engineering above the mining face is mainly composed of Figure 2 The enclosing wall shown in Figure 8 and Figure 2 The drainage holes shown in 4 are composed of a group of drainage holes with different orifice heights. Figure 2 The goaf shown in 2 is Figure 2 Set up between the abandoned lanes shown in 9 Figure 3 The enclosed wall shown in the figure has a brick-concrete structure as the main body, and a certain number of drainage holes are reserved at the bottom of the enclosed wall. The purpose of setting up the enclosed wall is to control the speed of water flowing into the abandoned tunnel from the empty area and to prevent a large amount of sediment from pouring into the tunnel from the empty area to block the drainage holes. A certain number of drainage holes are set in the abandoned tunnel (the number of drainage holes is set according to the amount of water gushing out), and the height of the drainage holes is set in grades according to the hole elevation being parallel to the tunnel bottom plate, the hole elevation being 20cm higher than the tunnel bottom plate, and the hole elevation being 50cm higher than the tunnel bottom plate. An anti-blocking device is installed at the hole mouth. There are two types of anti-blocking devices, one is Figure 4 The steel casing shown has a waterproof mesh welded to one end and a waterproof mesh welded to the other end. Figure 5 The steel filter pipe shown in the figure has a water barrier welded on one end. The drainage hole with the hole elevation parallel to the tunnel floor is used Figure 4 The steel casing shown in the figure has a waterproof mesh welded on one end, and the drainage holes with the hole elevation 20cm higher than the tunnel bottom plate and the hole elevation 50cm higher than the tunnel bottom plate are used Figure 5 A water-blocking net is welded at one end of the steel filter pipe shown.

[0054] The above scheme determines the numerical relationship between surface collapse and underground mining, and quantifies the relationship between collapse angle and mining indicators. In the mining process, the collapse angle provided by the design institute is consistently used as the basis for predicting the scope of surface collapse to guide the design of ground land expropriation and phased flood control projects. The collapse angle provided by the design institute is the collapse angle in the final stable state after the end of mining, and it is a unified angle determined roughly by region. The actual surface collapse is related to the scope of underground mining activities. The collapse angles in various directions are constantly developing and changing with space. It is unreasonable to use the designed collapse angle as the design basis for the phased flood control project of the mine. This project determines the numerical relationship between surface collapse and underground mining. The collapse angle can be predicted according to the mining relationship in different directions, and then the surface collapse boundary at a certain time can be inverted and predicted, so as to reasonably design the location of the surface flood control project and save engineering costs.

[0055] Effective interception is carried out above the mining operation level, and a multi-level control method for preventing the blockage of the drainage holes is designed to introduce most of the water in the empty area into the main drainage system, reducing the water inrush and wind collapse of the mining face. In the past, the drainage holes constructed in the mining process would lose their drainage function due to blockage a few years after the end of the stratified mining. The collected water can only fall with the decline of the mining face. After all the water is discharged from the mining face, a water pump is installed to drain the water. The area with severe water seepage can only temporarily stop operations. This scheme designs a multi-level control method to prevent the blockage of the drainage holes, designs a closed wall with a water release function to control the outflow rate of the collected water, prevents the water from flowing through a large amount of mud and sand to block the drainage holes, and designs different elevations and different orifice filter devices to prevent all the drainage holes from being blocked. Ensure long-term, effective and automatic drainage of the drainage holes, realize effective diversion of water above the mining face, and reduce the risk of water inrush in the mining face.

[0056] It should be noted that the above embodiments are not intended to limit the protection scope of the present invention, and equivalent changes or substitutions made on the basis of the above technical solutions all fall within the protection scope of the claims of the present invention.

Claims

1. A method for preventing and controlling water inrush in a mining subsidence area by using a pillarless caving method, characterized in that: The method comprises the following steps: Step 1: Use Surpac 3D modeling software to build a model of the underground goaf area with a surface collapse of at least 10 years and the original surface DTM model, and then place the collapse boundary lines at different times on the original surface DTM model to obtain the 3D models of the collapse boundaries in different years. Step 2: Determine the central axis of collapse, Step 3: Sectioning and data collection, Step 4: Establish a dynamic prediction numerical model, Step 5: Use the GPS static method to establish image control markers in the surface collapse area. Step 6: Overlay the surface collapse pit topography with the underground structure distribution and mining status to determine the location of the channel where the surface collapse water migrates into the underground. Step 7: Use water balance theory to establish a calculation formula for rainfall infiltration parameters. Step 8: Determine the maximum daily rainstorm infiltration rate. Step 9: Use the maximum daily rainstorm infiltration rate k value obtained in step 8 and the formula q = k*Hp*F to calculate the maximum daily water inflow value q for the set rainstorm value, k-maximum daily rainstorm infiltration rate, Hp-daily rainstorm amount, F-collapse catchment area, Step 10: Based on the predicted water inflow, arrange and construct a water interception and diversion system project that matches the predicted water inflow in the abandoned tunnel connected to the goaf above the mining operation level.

2. The method for preventing and controlling water inrush in a mining subsidence area by using a pillarless caving method according to claim 1, characterized in that: The step 2: determining the collapse center axis, taking the center of the plane projection of the surface collapse boundary line as the plane projection point of the collapse center, obtaining the plane coordinates of the collapse center axis by converting the collapse boundary line ACAD drawing into a line file under the SURPAC environment, and then using the line file creation function of the SURPAC software to achieve it, reading the plane coordinates of the center point, and determining the collapse center axis.

3. The method for preventing and controlling water inrush in a mining subsidence area by using a pillarless caving method according to claim 1, characterized in that: In step 3, the section cutting and data collection are carried out, after merging the underground goaf area model and the collapse boundary model at the same time, with the collapse center point as the vertical axis, the section cutting is carried out at an azimuth increment of 10° to obtain the section at a certain time period and a certain orientation. After the section is converted into two dimensions, the collapse angle A, the maximum span L of the goaf area and the maximum thickness H of the goaf area are measured.

4. The method for preventing and controlling water inrush in a mining subsidence area by using a pillarless caving method according to claim 3, characterized in that: The step 4 establishes a dynamic prediction numerical model, uses Mintab software to perform probability analysis on the collected data L, H and A, determines whether the data satisfies the normal distribution law, performs regression analysis on the premise that the data satisfies the normal distribution, establishes a regression equation, determines the dynamic prediction numerical model, and obtains the numerical relationship between the surface collapse angle and underground mining: A=13.526*L / H+40.

720.

5. The method for preventing and controlling water inrush in a mining subsidence area by using a pillarless caving method according to claim 1, characterized in that: The step 5 uses the GPS static method to establish image control markers in the surface collapse area, uses a drone to perform close-range photogrammetry of the surface collapse pit, establishes a three-dimensional model consistent with the mine area coordinate system, and finally obtains a topographic map of the surface collapse pit to determine the location distribution of the landing funnel in the collapse pit.

6. The method for preventing and controlling water inrush in a mining subsidence area by using a pillarless caving method according to claim 1, characterized in that: Step 7: Using water balance theory, establish a rainfall infiltration parameter calculation formula. The mine water balance equation is: Q = △Q + A + B Where: △Q—rainfall infiltration, unit is m 3 , Q—mine drainage volume, in m 3 , A—Water consumption for underground mine production, unit: m 3 , B—dynamic and static reserves, in m 3 , Q, A, and B are the daily statistical observation data of the mine. As the known data, the △Q value can be obtained. According to the correlation between the collapse area, catchment area, rainfall and daily infiltration rate, the calculation formula of rainfall infiltration parameters is established. M is the daily infiltration rate, N is the number of days of infiltration, F is the collapsed catchment area, and ∑Y is the rainfall.

7. The method for preventing and controlling water inrush in a mining subsidence area by using a pillarless caving method according to claim 6, characterized in that: In step 8, the maximum daily rainstorm infiltration rate is determined by selecting rainfall process data with relatively obvious rainfall infiltration between 1990 and 2018. The calculation result is between 6% and 12%. According to the trend analysis, the maximum daily rainstorm infiltration rate is determined to be 8%. The duration of the drainage peak is analyzed to determine that the N value is 2 to 3 days. The numerical relationship formula between the surface collapse angle and underground mining obtained in step 4 is used to predict the boundary range of surface collapse within 5 years based on the mining plan. The flood interception and drainage project in the ground collapse area is designed and constructed to reduce the amount of surface water entering the collapse pit.

8. The method for preventing water inrush in a mining subsidence area by using a pillarless caving method according to claim 1, characterized in that: The step 9 uses the maximum daily rainstorm infiltration rate k value obtained in step 8, and applies the formula q=k*Hp*F. According to the three levels of rainstorm volume of 100mm, 150mm and 200mm, the catchment area adopts the final collapse area of ​​the mine design, and calculates the maximum daily water inflow value q for the set rainstorm value, where k is the maximum daily rainstorm infiltration rate, Hp is the daily rainstorm volume, and F is the collapse catchment area.

9. The method for preventing and controlling water inrush in a mining subsidence area by using a pillarless caving method according to claim 1, characterized in that: The step 10 water interception and diversion system engineering is specifically as follows: the water interception and diversion system engineering is specifically as follows: after the horizontal mining operation is completed, all abandoned tunnels leading to the goaf are closed with brick walls 10m away from the front of the mining operation, drainage holes are reserved at the bottom of the tunnel closed wall near the water gushing channel, and the predicted water gushing volume of three levels of 100mm, 150mm, and 200mm for heavy rain is set according to step 9 at the position corresponding to the tunnel of the main drainage system in this layer, and the drainage holes with the construction hole elevation parallel to the tunnel bottom plate, the construction hole elevation 20cm higher than the tunnel bottom plate, and the hole elevation 50cm higher than the tunnel bottom plate are constructed. The number and aperture of the drainage holes of each level are determined according to the predicted water gushing volume. Finally, the tunnel where the water interception project is constructed is walled and closed in all channels leading to other layers and shafts to ensure that the gushing water enters the main drainage system through the drainage holes.