A pipe jacking machine and its construction technology under trenchless through hole and blind hole conditions

The pipe jacking machine with a movable frame and rotating power part, driven by a jacking cylinder and enhanced mechanical transmission, addresses inefficiencies by enabling rapid insertion and withdrawal of drill rods, improving construction efficiency and adaptability to diverse soil conditions.

CN112983455BActive Publication Date: 2024-12-31曲春林
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110325994.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-26
Publication Date
2024-12-31
Estimated Expiration
2041-03-26

AI Technical Summary

Technical Problem

Traditional pipe jacking machines face inefficiencies due to the need for manual debris removal, blockages during clay layer encounters, poor precision control in laying small diameter pipes, and prolonged operation intervals due to slow sliding speeds of the movable frame during guide or spiral drill rod insertion and withdrawal.

Method used

A pipe jacking machine with a movable frame driven by a jacking cylinder and a rotating power part, allowing for faster sliding speeds through a driving assembly, such as a chain or winch system, and enhanced load-bearing capabilities via bearings and hydraulic motors, enabling quick insertion and withdrawal of guide or spiral drill rods.

Benefits of technology

This design significantly shortens operation intervals and improves construction efficiency by allowing the movable frame to be quickly reset and advanced during the jacking process, while enhancing the machine's ability to handle large-diameter pipelines and various soil conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112983455B_ABST
    Figure CN112983455B_ABST
Patent Text Reader

Abstract

The present application relates to a pipe jacking machine and its construction process under the condition of trenchless through hole and blind hole, and relates to the field of pipe jacking machine, which includes a frame, a movable frame is slidably connected to the frame, a jacking cylinder for driving the movable frame to slide is arranged on the movable frame, a rotating power part is arranged on the movable frame, a guide drill rod or a spiral drill rod is installed on the rotating power part, a hole wall steel pipe is sleeved on the spiral drill rod, the rotating power part is used to drive the guide drill rod or the spiral drill rod to rotate, and a driving assembly for driving the movable frame to slide is also arranged on the frame, and the speed of the driving assembly driving the movable frame to slide is greater than the speed of the jacking cylinder driving the movable frame to slide. The present application has the effect of shortening the operation time interval of the pipe jacking machine and improving the construction efficiency of the pipe jacking machine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of pipe jacking machines, and in particular to a pipe jacking machine and a construction process thereof under trenchless through-hole and blind-hole conditions. Background Art

[0002] The traditional construction techniques of pipe jacking machines include the following: 1. A single oil cylinder drives the pipe jacking into the soil, and manual entry into the pipe is required to clean up the debris, which is extremely unsafe. 2. The power machine head is used for jacking, and the machine head moves with a spiral drill rod in front of it. The debris is discharged in the receiving pit. When encountering a clay layer, it is easy to block the power machine head and blind hole construction is impossible. 3. The pipe is laid using mud water balance or earth pressure balance jacking. In the laying of small diameter pipes, the precision control is poor. 4. The pipe is pushed into the pipe by a pipe jacking machine, and then a spiral drill rod is used to assist in excavation.

[0003] After the pipe jacking machine in item 4 pushes the pipe into the formation, the jacking cylinder needs to drive the movable frame to withdraw before the next guide drill rod or spiral drill rod is pushed in; if the guide drill rod or spiral drill rod needs to be pulled out from the formation, the jacking cylinder needs to drive the movable frame to slide forward and pull out the next guide drill rod or spiral drill rod after the guide drill rod or spiral drill rod is pulled out. In actual construction, affected by the resistance during the jacking process and in order to avoid damage to the guide drill rod or spiral drill rod during the jacking process or the pulling process, the sliding speed of the movable frame is set within a certain range, but this results in the movable frame withdrawing after pushing the guide drill rod or spiral drill rod and sliding forward after pulling out the guide drill rod or spiral drill rod too slowly, making the operation time interval of the pipe jacking machine too long, which seriously reduces the construction efficiency of the pipe jacking machine. Summary of the invention

[0004] In order to shorten the operation time interval of a pipe jacking machine and improve the construction efficiency of the pipe jacking machine, the present application provides a pipe jacking machine and a construction process thereof under non-excavation through-hole and blind-hole conditions.

[0005] In the first aspect, the present application provides a pipe jacking machine, which adopts the following technical solution:

[0006] A pipe jacking machine comprises a frame, a movable frame is slidably connected to the frame, a jacking cylinder is arranged on the movable frame for driving the movable frame to slide, a rotating power part is arranged on the movable frame, a guide drill rod or a spiral drill rod is installed on the rotating power part, a hole wall steel pipe is sleeved on the spiral drill rod, the rotating power part is used to drive the guide drill rod or the spiral drill rod to rotate, and a driving component for driving the movable frame to slide is also arranged on the frame, and the speed at which the driving component drives the movable frame to slide is greater than the speed at which the jacking cylinder drives the movable frame to slide.

[0007] By adopting the above technical scheme, during the jacking operation, the guide drill rod or spiral drill rod is installed on the rotating power part, and the jacking cylinder drives the movable frame to gradually slide forward on the frame, and drives the rotating power part to move forward with the movable frame, so that the guide drill rod or spiral drill rod is slowly pushed into the formation. At this time, the driving component drives the movable frame to slide backward on the frame. Since the speed at which the driving component drives the movable frame to slide is greater than the speed at which the jacking cylinder drives the movable frame to slide, the movable frame can be quickly reset, which is convenient for jacking the next guide drill rod or spiral drill rod. When it is necessary to jack the guide drill rod or When the spiral drill rod is retracted, the driving assembly drives the movable frame to slide forward quickly on the frame, so that the rotating power part is connected to the guide drill rod or spiral drill rod in the formation, and then the jacking cylinder drives the movable frame to gradually slide backward on the frame, and slowly pulls the guide drill rod or spiral drill rod out of the formation, so that the movable frame can be slowly pushed in and quickly retracted during the jacking of the guide drill rod or spiral drill rod, and at the same time, the movable frame can be slowly retracted and quickly pushed in during the retraction of the guide drill rod or spiral drill rod, which effectively shortens the operating time interval of the pipe jacking machine and improves the construction efficiency of the pipe jacking machine.

[0008] Optionally, the driving assembly includes a chain, a sprocket and a first driving member, two sprockets are provided, and the two sprockets are respectively rotatable along the sliding direction of the movable frame and connected to two ends of the frame, the chain is provided between the two sprockets and used in conjunction with the sprockets, the chain is fixedly connected to the movable frame, the first driving member is connected to one of the sprockets, and is used to drive the sprocket connected thereto to rotate.

[0009] By adopting the above technical solution, since leakage and the like often exist in the hydraulic transmission process, and there is a large flow resistance in the flow process of the liquid in the hydraulic transmission process, more energy loss is generated in the hydraulic process, resulting in a low efficiency of the hydraulic transmission, generally between 0.6-0.7. The efficiency of the mechanical transmission system is much greater than the efficiency of the hydraulic transmission system, wherein the average efficiency of the chain transmission is 0.96. The first driving member drives the sprocket connected to it to rotate, and the chain is transmitted between the two sprockets, so that the chain drives the movable frame to slide on the frame. At this time, the sliding speed of the movable frame driven by the chain on the frame is much greater than the sliding speed of the movable frame driven by the jacking cylinder on the frame, ensuring that the movable frame is quickly retreated during the jacking process of the guide drill rod or the spiral drill rod, and the movable frame is quickly pushed in during the withdrawal of the guide drill rod or the spiral drill rod, thereby improving the construction efficiency of the pipe jacking machine.

[0010] Optionally, the driving assembly includes a winch, a hook and a hanging ring, the winch is connected to the movable frame, the winch includes a drum and a second driving member for driving the drum to rotate, a pull rope is wound around the drum, the hook is fixedly set at one end of the pull rope, two hanging rings are provided, the two hanging rings are respectively fixedly connected to two ends of the frame along the sliding direction of the movable frame, and the hook and the hanging ring are used in combination.

[0011] By adopting the above technical scheme, when the driving component drives the movable frame to slide on the frame, the hook is hung on one of the hanging rings, and then the reel is driven to rotate through the second driving member, and the pull rope is continuously wound on the reel, thereby driving the movable frame to slide on the frame toward the end close to the hook. Since the efficiency of the mechanical transmission system is much greater than the efficiency of the hydraulic transmission system, at this time, the winch drives the sliding speed of the movable frame on the frame much faster than the sliding speed of the movable frame on the frame driven by the jacking cylinder, ensuring that the movable frame can be quickly retreated during the jacking process of the guide drill rod or the spiral drill rod, and the movable frame can be quickly pushed in during the withdrawal of the guide drill rod or the spiral drill rod, thereby improving the construction efficiency of the pipe jacking machine.

[0012] Optionally, the rotating power component is a first hydraulic motor, and a plurality of bearings for bearing axial force and a plurality of bearings for bearing radial force are installed on the output shaft of the first hydraulic motor, and the plurality of bearings for bearing axial force and the plurality of bearings for bearing radial force are staggered.

[0013] By adopting the above technical scheme, during the construction process, the guide drill rod or the spiral drill rod will be installed on the output shaft of the first hydraulic motor for jacking operation. Since the bearing for bearing axial force is installed on the output shaft of the first hydraulic motor, when the output shaft of the first hydraulic motor is subjected to thrust or tension along its axial direction, the output shaft of the first hydraulic motor will transfer the thrust or tension it receives to the bearing for bearing axial force. At this time, the bearing for bearing axial force can bear the thrust or tension it receives, thereby improving the axial load-bearing capacity of the output shaft of the first hydraulic motor; similarly, a bearing for bearing radial force is installed on the output shaft of the first hydraulic motor. When the output shaft of the first hydraulic motor is subjected to an offset force at any angle along its radial direction, the output shaft of the first hydraulic motor will transfer the offset force it receives to the bearing for bearing radial force. At this time, the bearing for bearing radial force can bear the offset force it receives, thereby improving the radial load-bearing capacity of the output shaft of the first hydraulic motor. Separately installing a bearing for bearing axial force and a bearing for bearing radial force on the output shaft of the first hydraulic motor not only enables the output shaft of the first hydraulic motor to have strong load-bearing capacity in both the axial and radial directions, but also enables the axial and radial load-bearing capacity of the output shaft of the first hydraulic motor to be adjusted separately. The staggered arrangement of several bearings for bearing axial force and several bearings for bearing radial force can balance the axial load-bearing capacity and radial load-bearing capacity of the output shaft of the first hydraulic motor, making the axial load-bearing capacity and radial load-bearing capacity of the output shaft of the first hydraulic motor more uniform in the axial direction of the output shaft of the first hydraulic motor, thereby effectively improving the construction performance of the pipe jacking machine, enabling the pipe jacking machine to carry out construction operations on large-diameter pipelines and meet the construction requirements of different formation conditions.

[0014] Optionally, the rotating power member includes a reduction gear box and a plurality of second hydraulic motors installed at the input end of the reduction gear box.

[0015] By adopting the above technical solution, several second hydraulic motors are installed on the reduction box, and several second hydraulic motors provide power to the output end of the reduction box at the same time, thereby effectively improving the load-bearing capacity of the rotating power part. For the same size of load, if a single hydraulic motor is used, it is necessary to ensure that the hydraulic motor has a sufficiently large displacement, and the load of the rotating power part is distributed to several second hydraulic motors through the reduction box. Each second hydraulic motor only needs to have a smaller displacement to meet the overall load-bearing performance of the rotating power part, and the use of a small-displacement second hydraulic motor makes it easy to manufacture the rotating power part, with low cost and better economic benefits.

[0016] Optionally, the rotating power member is slidably connected to the movable frame, the sliding direction of the rotating power member is the same as the sliding direction of the movable frame, and a replacement cylinder for driving the rotating power member to slide is fixedly provided on the rotating power member.

[0017] By adopting the above technical scheme, during the construction process, the replacement cylinder can drive the rotating power part to slide on the movable frame when it is extended and retracted, thereby expanding the movable range of the rotating power part relative to the frame, making the jacking and disassembly process of the guide drill rod and the spiral drill rod more convenient. At the same time, when the guide drill rod or the spiral drill rod is stuck in the formation, the replacement cylinder can drive the rotating power part to slide and drive the guide drill rod or the spiral drill rod to move back and forth in the formation, thereby getting rid of the stuck drill rod phenomenon.

[0018] Optionally, the conveying direction of the auger rod is opposite to the jacking direction.

[0019] By adopting the above technical solution, in the traditional construction method, when the auger rod is drilling forward in the formation, the conveying direction of the auger rod is the same as the jacking direction of the auger rod. In the clay soil, the power head connected to the rear of the auger rod is prone to blockage. The conveying direction of the auger rod is opposite to the jacking direction. When the auger rod is jacking forward in the formation, the slag in the steel pipe of the hole wall will be conveyed backward along the conveying direction of the auger rod, thereby avoiding blockage and jamming during the jacking process of the auger rod, making the jacking operation of the pipe jacking machine smoother.

[0020] Optionally, a positioning frame is slidably connected to the frame, and the sliding direction of the positioning frame is the same as the sliding direction of the movable frame. Both ends of the jacking cylinder in the telescopic direction are respectively fixedly connected to the movable frame and the positioning frame. A latch cylinder is fixedly arranged on the positioning frame. A plurality of latch holes are provided on the frame along the sliding direction of the positioning frame. A latch for being inserted into one of the latch holes is fixedly arranged on the latch cylinder. An indicator groove is provided on the positioning frame, and the length direction of the indicator groove is the same as the telescopic direction of the latch cylinder. An indicator strip fixedly connected to the piston rod of the latch cylinder is slidably connected in the indicator groove, and one end of the indicator strip extends to the outside of the positioning frame.

[0021] By adopting the above technical solution, since the positioning frame is slidably connected to the frame, the positioning frame can be slid to a suitable position on the frame during the construction process, and then the piston rod of the latch cylinder is extended to insert the latch on the latch cylinder into the latch hole on the frame. At this time, the positioning frame and the frame are relatively fixed, and then the piston rod of the jacking cylinder is extended and retracted, and the movable frame is driven to slide on the positioning frame, thereby effectively extending the sliding length of the movable frame on the frame and reducing the size of the frame. Before the driving component drives the movable frame to slide on the frame, the piston rod of the latch cylinder is retracted and the latch is pulled out of the latch hole. At this time, the driving component drives the movable frame and the positioning frame to slide on the frame at the same time, avoiding the latch being located in the latch hole and affecting the sliding process of the movable frame. When the piston rod of the latch cylinder is extended or retracted, the indicator strip will be driven to slide in the indicator groove. Since one end of the indicator strip extends to the outside of the positioning frame, the construction personnel can judge whether the latch is inserted into the latch hole by observing the position of the indicator strip in the indicator groove, thereby making the indicator strip indicate the position of the latch.

[0022] In the second aspect, the present application provides a construction process of a pipe jacking machine under trenchless through-hole conditions, which adopts the following technical solution:

[0023] A construction process of a pipe jacking machine under trenchless through-hole conditions comprises the following steps:

[0024] S1. Construction preparation: Dig a jacking pit and a receiving pit at both ends of the pre-installed pipeline position in the stratum, and hang the pipe jacking machine in the jacking pit;

[0025] S2. Guide drill rod jacking: The guide drill rod is installed on the rotating power part, and the jacking cylinder drives the movable frame to slowly slide forward on the frame, and the guide drill rod is pushed into the formation. At the same time, the rotating power part drives the guide drill rod to rotate in the formation, so that the guide drill rod is pushed into the formation. After a guide drill rod is pushed into the formation, the driving assembly drives the movable frame to quickly slide backward on the frame and reset. At this time, the next guide drill rod is installed on the rotating power part, and the previous operation is repeated until the front end of the guide drill rod enters the receiving pit;

[0026] S3. Soil removal by spiral drill rod: install the spiral drill rod on the rotating power part, make the front end of the spiral drill rod abut against or sleeve on the end of the guide drill rod, then sleeve the hole protection wall steel pipe on the outside of the spiral drill rod, make the hole protection wall steel pipe abut against the movable frame, and the jacking cylinder drives the movable frame to slowly slide forward on the frame, and make the hole protection wall steel pipe and the spiral drill rod be pushed into the formation. At the same time, the rotating power part drives the spiral drill rod to rotate in the formation, so that the spiral drill rod is pushed into the formation, and the slag in the hole protection wall steel pipe is discharged from the end close to the frame through the spiral drill rod. After an auger drill rod and a hole protection wall steel pipe are pushed into the formation, the driving assembly drives the movable frame to slide backward quickly on the frame and reset. At this time, the next spiral drill rod is installed on the rotating power part, and the two adjacent spiral drill rods are abutted, and then the previous operation is repeated until the front end of the hole protection wall steel pipe and spiral drill rod enter the receiving pit;

[0027] S4. Disassembly of the guide drill rod: As the spiral drill rod is pushed forward in the formation, the spiral drill rod pushes the guide drill rod forward and enters the receiving pit. At this time, the guide drill rod is lifted from the receiving pit and recovered. When the front end of the hole protection wall steel pipe and the spiral drill rod enter the receiving pit, the guide drill rod is completely recovered;

[0028] S5. Disassembly of the auger rod: When the front end of the borehole wall steel pipe and the auger rod enter the receiving pit, the jacking cylinder drives the movable frame to slide slowly backward on the frame, and the rotating power component drives the auger rod to be pulled out of the borehole wall steel pipe, and then the auger rod is removed from the rotating power component, and the driving assembly drives the movable frame to slide quickly forward on the frame, and the rotating power component is connected to the next auger rod, and the previous operation is repeated until all the auger rods are pulled out of the borehole wall steel pipe;

[0029] S6. Pipeline laying: Place the pipeline between the movable frame and the hole wall steel pipe, so that the two ends of the pipeline are respectively in contact with the hole wall steel pipe and the movable frame. The jacking cylinder drives the movable frame to slide forward slowly on the frame, and pushes the pipeline into the formation, and at the same time recovers the pushed hole wall steel pipe in the receiving pit. Then the driving component drives the movable frame to slide backward quickly on the frame and reset. At this time, place the next pipeline between the movable frame and the hole wall steel pipe, and make the two adjacent pipelines abut, and then repeat the previous operation until the front-end pipeline enters the receiving pit; all pipelines are laid.

[0030] By adopting the above technical scheme, when constructing under non-excavation through-hole conditions, the guide drill rod or the spiral drill rod is installed on the rotating power part, and then the jacking operation is gradually carried out through the jacking cylinder, and after jacking, the movable frame is quickly retreated and reset through the driving assembly, and then the next guide drill rod or spiral drill rod is jacked; when the spiral drill rod is disassembled, the spiral drill rod is gradually pulled out through the jacking cylinder, and then the movable frame is quickly advanced through the driving assembly, and then the next spiral drill rod is pulled out, thereby effectively shortening the operating time interval of the pipe jacking machine and improving the construction efficiency of the pipe jacking machine.

[0031] In a third aspect, the present application provides a construction process of a pipe jacking machine under non-trench blind hole conditions, which adopts the following technical solution:

[0032] A construction process of a pipe jacking machine under a non-trench blind hole condition comprises the following steps:

[0033] S1. Construction preparation: dig a jacking pit at one end of the pre-installed pipeline position in the stratum, and hang the pipe jacking machine in the jacking pit;

[0034] S2. Guide drill rod jacking: The guide drill rod is installed on the rotating power component, and the jacking cylinder drives the movable frame to slowly slide forward on the frame, and the guide drill rod is jacked into the formation. At the same time, the rotating power component drives the guide drill rod to rotate in the formation, so that the guide drill rod is jacked into the formation. After a guide drill rod is jacked into the formation, the driving component drives the movable frame to quickly slide backward on the frame and reset. At this time, the next guide drill rod is installed on the rotating power component, and the previous operation is repeated until the front end of the frontmost guide drill rod is located at the end of the pre-installed pipeline position away from the jacking pit;

[0035] S3, soil discharge by auger drill rod: install the auger drill rod on the rotating power part, and put the pipe on the outside of the auger drill rod so that the pipe abuts against the movable frame, and the jacking cylinder drives the movable frame to slide forward slowly on the frame, and the pipe and the auger drill rod are pushed into the formation, and at the same time, the rotating power part drives the auger drill rod to rotate in the formation, so that the auger drill rod is pushed into the formation, and the debris in the pipeline is discharged from the end close to the frame through the auger drill rod. After an auger drill rod and a pipe are pushed into the formation, the driving assembly drives the movable frame to slide backward quickly on the frame and reset, and then the next auger drill rod is installed on the rotating power part, and the two adjacent auger drill rods are abutted, and then the previous operation is repeated until the front end of the front auger drill rod is located at the end of the pre-installed pipeline position away from the jacking pit;

[0036] S4. Disassembly of the guide drill rod: The jacking cylinder drives the movable frame to slide slowly backward on the frame, and the rotating power component drives the guide drill rod to be pulled out from the formation, and then the guide drill rod is removed from the rotating power component. The driving assembly drives the movable frame to slide quickly forward on the frame, and the rotating power component is connected to the next guide drill rod, and the previous operation is repeated until all the guide drill rods are pulled out from the formation;

[0037] S5. Disassembly of auger rod: The jacking cylinder drives the movable frame to slide slowly backward on the frame, and the rotating power part drives the auger rod to be pulled out of the pipeline, and then the auger rod is removed from the rotating power part. The driving assembly drives the movable frame to slide quickly forward on the frame, and the rotating power part is connected to the next auger rod, and the previous operation is repeated until all the auger rods are pulled out of the pipeline. At this time, all the pipelines are laid in the formation, and the pipeline laying process is completed.

[0038] By adopting the above technical scheme, during the construction process under non-excavation blind hole conditions, the guide drill rod or spiral drill rod is first installed on the rotating power part, and then the jacking operation is gradually carried out through the jacking cylinder, and after the jacking, the movable frame is quickly retreated and reset through the driving assembly, and then the next guide drill rod or spiral drill rod is jacked; at the same time, after the guide drill rod or spiral drill rod is jacked, the guide drill rod or spiral drill rod is gradually pulled out of the formation through the jacking cylinder, and then the movable frame is quickly advanced through the driving assembly, and then the next guide drill rod or spiral drill rod is pulled out, thereby effectively shortening the operation time interval of the pipe jacking machine and improving the construction efficiency of the pipe jacking machine.

[0039] In summary, the present application includes at least one of the following beneficial technical effects:

[0040] 1. By setting the driving assembly, the movable frame can be pushed in slowly and retreated quickly during the jacking process of the guide drill rod or the spiral drill rod, and can be retreated slowly and pushed in quickly during the withdrawal process of the guide drill rod or the spiral drill rod, which effectively shortens the operation time interval of the pipe jacking machine and improves the construction efficiency of the pipe jacking machine;

[0041] 2. By arranging a plurality of bearings for bearing axial force and a plurality of bearings for bearing radial force on the output shaft of the first hydraulic motor, the axial and radial bearing capacity of the output shaft of the first hydraulic motor is effectively improved, and the construction performance of the pipe jacking machine is improved;

[0042] 3. By setting up a compensation oil cylinder, the rotating power part can be driven to slide on the movable frame, thereby expanding the movable range of the rotating power part relative to the frame, and at the same time, it can get rid of the drill sticking phenomenon when the guide drill rod or the spiral drill rod is stuck. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1is a schematic structural diagram of a pipe jacking machine according to Embodiment 1 of the present application;

[0044] Figure 2 It is a schematic diagram of the partial structure of the latch cylinder of Example 1 of the present application;

[0045] Figure 3 is a cross-sectional view of a first hydraulic motor according to Embodiment 1 of the present application;

[0046] Figure 4 along Figure 2 Sectional view along line AA;

[0047] Figure 5 It is a partial structural schematic diagram of the pipe jacking machine of Example 2 of the present application;

[0048] Figure 6 is a schematic diagram of a partial structure of a display drive component according to Embodiment 2 of the present application;

[0049] Figure 7 yes Figure 5 A partial enlarged view of the middle A;

[0050] Figure 8 It is a partial structural schematic diagram of the pipe jacking machine of Example 3 of the present application;

[0051] Fig. 9 It is a partial structural schematic diagram of the pipe jacking machine of Example 4 of the present application;

[0052] Fig.10 It is a partial structural schematic diagram of the pipe jacking machine of Example 5 of the present application;

[0053] Fig.11 It is a schematic diagram of the local structure of the display roller of Example 5 of the present application.

[0054] Description of the accompanying drawings: 1, frame; 11, guide rail beam; 111, latch hole; 12, electronic laser theodolite; 2, movable frame; 21, front top plate; 211, mounting hole; 22, rear vertical plate; 221, filling cylinder; 222, guide rod; 2221, guide sleeve; 223, perforation hole; 23, connecting plate; 231, roller; 3, positioning frame; 31, latch cylinder; 311, latch; 312, indicator strip; 32, indicator groove; 33, center hole; 4, jacking cylinder; 5, driving assembly; 51, chain; 52, sprocket; 53, step Inlet motor; 54, winch; 541, drum; 542, third hydraulic motor; 543, pull rope; 55, hook; 56, hanging ring; 6, rotating power part; 61, first hydraulic motor; 611, motor body; 612, output shaft; 6121, thrust roller bearing; 6122, deep groove ball bearing; 6123, cylindrical roller bearing; 6124, hollow hole; 62, reduction box; 63, second hydraulic motor; 7, guide drill rod; 71, inner hole; 711, light target; 712, guide drill bit; 8, spiral drill rod; 81, hole wall steel pipe. DETAILED DESCRIPTION

[0055] The following is combined with Figure 1-11 This application is described in further detail.

[0056] The embodiment of the present application discloses a pipe jacking machine.

[0057] Example 1

[0058] Reference Figure 1 A pipe jacking machine includes a frame 1, on which a movable frame 2 and a positioning frame 3 are arranged, the movable frame 2 is slidably connected to the frame 1, and a jacking cylinder 4 for driving the movable frame 2 to slide on the frame 1 is arranged between the movable frame 2 and the positioning frame 3. A driving assembly 5 for driving the movable frame 2 to slide on the frame 1 is also arranged between the frame 1 and the movable frame 2, and the speed at which the driving assembly 5 drives the movable frame 2 to slide is greater than the speed at which the jacking cylinder 4 drives the movable frame 2 to slide. Figure 1 and Figure 2 A rotating power member 6 is provided on the movable frame 2, a guide drill rod 7 or a spiral drill rod 8 is installed on the rotating power member 6, and a hole wall steel pipe 81 is sleeved on the spiral drill rod 8.

[0059] During the jacking operation, the guide drill rod 7 is first installed on the rotating power part 6, and the jacking cylinder 4 drives the movable frame 2 to slowly slide forward on the frame 1, so that the guide drill rod 7 is jacked forward in the formation. At the same time, the rotating power part 6 drives the guide drill rod 7 to rotate in the formation. When the guide drill rod 7 enters the formation, the driving assembly 5 drives the movable frame 2 to quickly withdraw and reset on the frame 1, and then the next guide drill rod 7 is jacked. When the guide drill rod 7 is jacked, the spiral drill rod 8 is installed on the rotating power part 6, and the hole wall steel pipe 81 is put on the spiral drill rod 8, and then the spiral drill rod 8 is jacked according to the same steps as the guide drill rod 7 jacking method, thereby effectively shortening the time for the movable frame 2 to withdraw during the jacking process of the guide drill rod 7 and the spiral drill rod 8, and improving the construction efficiency of the pipe jacking machine.

[0060] If it is necessary to pull out the guide drill rod 7 or the spiral drill rod 8 in the formation, the jacking cylinder 4 drives the movable frame 2 to slide slowly backward on the frame 1, and pulls the guide drill rod 7 or the spiral drill rod 8 out of the formation, and then the driving component 5 drives the movable frame 2 to slide forward quickly on the frame 1 and connect with the next guide drill rod 7 or spiral drill rod 8 in the formation, and then pulls out the next guide drill rod 7 or spiral drill rod 8, which effectively shortens the time for the movable frame 2 to slide forward during the pulling out process of the guide drill rod 7 and the spiral drill rod 8, thereby improving the construction efficiency of the pipe jacking machine.

[0061] Reference Figure 1 Guide rail beams 11 are fixedly arranged on both sides of the length direction of the top of the frame 1. The guide rail beams 11 are arranged horizontally. The length direction of the guide rail beams 11 is the same as the length direction of the frame 1. The movable frame 2 and the positioning frame 3 are arranged between the two guide rail beams 11 and are slidably connected to the guide rail beams 11. The sliding directions of the movable frame 2 and the positioning frame 3 are the same as the length direction of the guide rail beams 11.

[0062] Reference Figure 2The positioning frame 3 is located on the side of the movable frame 2 away from the jacking direction of the pipe jacking machine. The length direction of the positioning frame 3 is perpendicular to the length direction of the guide rail beam 11. Latch cylinders 31 are fixedly provided at both ends of the positioning frame 3. The telescopic direction of the latch cylinder 31 is the same as the length direction of the positioning frame 3. The piston rods of the two latch cylinders 31 are both facing the side away from each other. A latch 311 is fixedly provided on the piston rod of the latch cylinder 31. A plurality of latch holes 111 are opened along the length direction of the two guide rail beams 11 on the side where the two guide rail beams 11 are close to each other. The latches 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch holes 111 on the two guide rail beams 11. Two indicator grooves 32 are provided on the positioning frame 3, and the length direction of the indicator grooves 32 is the same as the extension and retraction direction of the latch cylinder 31. Indicator bars 312 are slidably connected in the two indicator grooves 32. The two indicator bars 312 are respectively fixedly connected to the piston rods of the two latch cylinders 31, and one end of the indicator bar 312 away from the latch cylinder 31 extends to the outside of the positioning frame 3.

[0063] When the jacking cylinder 4 drives the movable frame 2 to slide on the frame 1, the positioning frame 3 is first slid to a suitable position on the guide rail beam 11, so that the piston rods of the two latch cylinders 31 are extended, and the two latches 311 are respectively inserted into one of the latch holes 111 on the two guide rail beams 11, and at the same time, the indicator bar 312 is driven to slide in the indicator groove 32, so that the positioning frame 3 and the frame 1 are relatively fixed. At this time, the jacking cylinder 4 drives the movable frame 2 to slide on the frame 1, avoiding the positioning frame 3 from affecting the process of the jacking cylinder 4 driving the movable frame 2 to slide.

[0064] When the driving component 5 drives the movable frame 2 to slide on the frame 1, the piston rods of the two latch cylinders 31 are first contracted, and the two latches 311 are respectively pulled out from the latch holes 111 on the two guide rail beams 11, and the indicator bar 312 is driven to slide in the indicator groove 32. At this time, the driving component 5 drives the movable frame 2 to slide on the frame 1, and drives the jacking cylinder 4 and the positioning frame 3 to slide accordingly, so as to avoid the positioning frame 3 affecting the process of the driving component 5 driving the movable frame 2 to slide.

[0065] Reference Figure 1 and Figure 2The movable frame 2 includes a front top plate 21, a rear vertical plate 22 and a connecting plate 23. The front top plate 21 is located on the side of the rear vertical plate 22 away from the positioning frame 3. The front top plate 21 and the rear vertical plate 22 are both arranged perpendicular to the length direction of the frame 1. Both sides of the front top plate 21 and the rear vertical plate 22 are built on two guide rail beams 11. The front top plate 21 and the rear vertical plate 22 are both slidably connected to the guide rail beam 11, and the sliding directions of the front top plate 21 and the rear vertical plate 22 are in the same direction as the length direction of the guide roller beam. Similarly, a through hole 211 for inserting the guide drill rod 7 or the spiral drill rod 8 is opened on the front top plate 21; the connecting plate 23 and the rotating power member 6 are both located between the front top plate 21 and the rear vertical plate 22, and the rotating power member 6 is located at the center in the width direction of the frame 1. Two connecting plates 23 are provided, and are symmetrically arranged on both sides of the rotating power member 6. The connecting plate 23 is vertically arranged to the front top plate 21, and the two ends of the connecting plate 23 are fixedly connected to the front top plate 21 and the rear vertical plate 22 respectively.

[0066] There are two jacking cylinders 4, which are symmetrically arranged on both sides of the rotating power member 6. The extension and retraction direction of the jacking cylinder 4 is the same as the length direction of the guide rail crossbeam 11. The jacking cylinder 4 is penetrated on the rear baffle 22 and fixedly connected to the front baffle 21. The piston rod of the jacking cylinder 4 is fixedly connected to the positioning frame 3. When the positioning frame 3 is relatively fixed to the frame 1, the piston rod of the jacking cylinder 4 is extended and retracted. At this time, the jacking cylinder 4 will drive the front baffle 21 to approach or move away from the positioning frame 3, and the front baffle 21 drives the connecting plate 23 and the rear baffle 22 to slide on the frame 1, and at the same time drives the rotating power member 6 to push forward or withdraw backward, thereby realizing the driving effect of the jacking cylinder 4 on the sliding process of the movable frame 2.

[0067] Reference Figure 2 A horizontal guide rod 222 is fixedly arranged between the front top plate 21 and the rear vertical plate 22. The length direction of the guide rod 222 is the same as the length direction of the guide rail crossbeam 11. A guide sleeve 2221 is sleeved on the guide rod 222. The guide sleeve 2221 is slidably connected to the guide rod 222. The guide sleeve 2221 is fixedly connected to the rotating power member 6. A replacement oil cylinder 221 is arranged between the rotating power member 6 and the rear vertical plate 22. The extension direction of the replacement oil cylinder 221 is the same as the length direction of the guide rod 222. The replacement oil cylinder 221 is fixedly connected to the rear vertical plate 22, and the piston rod of the replacement oil cylinder 221 is fixedly connected to the rotating power member 6.

[0068] When the guide drill rod 7 or the spiral drill rod 8 gets stuck during the jacking process, the piston rod of the compensation cylinder 221 is extended and retracted, and the compensation cylinder 221 drives the rotating power part 6 to move between the front top plate 21 and the rear vertical plate 22, and drives the guide sleeve 2221 to slide on the guide rod 222, and at the same time drives the guide drill rod 7 or the spiral drill rod 8 to move in the formation, so as to eliminate the stuck drill rod.

[0069] Reference Figure 1The driving assembly 5 includes a chain 51, a sprocket 52 and a first driving member. Two sprockets 52 are provided. The two sprockets 52 are respectively located at the two ends of one of the guide rail beams 11 in the length direction and are rotatably connected to the guide rail beam 11; the chain 51 is arranged between the two sprockets 52 and used in conjunction with the sprockets 52. The chain 51 is fixedly connected to one of the connecting plates 23; the first driving member is used to drive one of the sprockets to rotate. In this embodiment, the first driving member is a stepper motor 53, which is fixedly arranged on the frame 1, and the output shaft 612 of the stepper motor 53 is coaxially arranged and fixedly connected to one of the sprockets 52.

[0070] During the jacking process, after the jacking cylinder 4 slowly pushes the guide drill rod 7 or the spiral drill rod 8 into the formation, the stepper motor 53 drives the sprocket 52 fixed thereto to rotate on the guide rail crossbeam 11, and causes the chain 51 to transmit between the two sprockets 52, while driving the other sprocket 52 to rotate synchronously. At this time, the chain 51 will drive the movable frame 2 to slide backward quickly on the frame 1, and cause the rotating power part 6 to withdraw and reset quickly; during the process of pulling out the guide drill rod 7 or the spiral drill rod 8, after the jacking cylinder 4 slowly pulls the guide drill rod 7 or the spiral drill rod 8 out of the formation, the stepper motor 53 drives the chain 51 to transmit between the two sprockets 52, and drives the movable frame 2 and the rotating power part 6 to slide forward quickly, thereby effectively shortening the operation time interval of the pipe jacking machine and improving the construction efficiency of the pipe jacking machine.

[0071] Reference Figure 2 and Figure 3 The rotating power part 6 is a first hydraulic motor 61, referring to Figure 3 The first hydraulic motor 61 includes a motor body 611, an output shaft 612 is arranged in the motor body 611, the output shaft 612 is rotatably connected to the motor body 611, and the motor body 611 is used to drive the output shaft 612 to rotate in the motor body 611. The output shaft 612 faces the side close to the front top plate 21, and two bearings for bearing axial force and two bearings for bearing radial force are installed on the output shaft 612, and the two bearings for bearing axial force and the two bearings for bearing radial force are staggered. The two bearings for bearing axial force are thrust roller bearings 6121, and the two bearings for bearing radial force are deep groove ball bearings 6122 and cylindrical roller bearings 6123 respectively.

[0072] When in use, the guide drill rod 7 or the spiral drill rod 8 is connected to the output shaft 612, and the motor body 611 drives the output shaft 612 to rotate inside the motor body 611, and drives the guide drill rod 7 or the spiral drill rod 8 to rotate. The two thrust roller bearings 6121 on the output shaft 612 can withstand the axial force exerted on the output shaft 612, and the deep groove ball bearing 6122 and the cylindrical roller bearing 6123 can withstand the radial force exerted on the output shaft 612, thereby effectively improving the axial bearing capacity and radial bearing capacity of the hydraulic motor output shaft 612, improving the construction performance of the pipe jacking machine, enabling the pipe jacking machine to carry out construction operations on large-diameter pipelines, and meeting the construction requirements of different formation conditions.

[0073] Reference Figure 4 , an inner hole 71 is coaxially provided in the guide drill rod 7, and the inner hole 71 passes through both ends of the guide drill rod 7. A guide drill bit 712 is installed at the end of the guide drill rod 7 away from the frame 1, and a light target 711 is installed in the end of the guide drill bit 712 close to the guide drill rod 7. The light target 711 is coaxially arranged with the guide drill rod 7. An electronic laser theodolite 12 with a camera is supported between the side of the positioning frame 3 away from the movable frame 2 and the rear top plate of the frame 1 through a tripod. The electronic laser theodolite 12 is located on the axis of the guide drill rod 7 and is used to receive the laser emitted by the light target 711. A hollow hole 6124 is coaxially provided on the output shaft 612 of the first hydraulic motor 61, and the hollow hole 6124 passes through the output shaft 612 of the first hydraulic motor 61. A through-hole 223 is provided on the rear vertical plate 22, and the through-hole 223 is coaxially arranged with the hollow hole 6124. A center hole 33 is provided on the positioning frame 3, and the center hole 33 is coaxially arranged with the hollow hole 6124. The laser emitted by the light target 711 successively passes through the inner hole 71, the hollow hole 6124, the through-hole 223 and the center hole 33 and irradiates the electronic laser theodolite 12.

[0074] During construction, the guide drill rod 7 is installed on the output shaft 612 of the first hydraulic motor 61, and the jacking cylinder 4 will push the guide drill rod 7 forward in the formation. During the jacking process, the light target 711 in the guide drill rod 7 will emit a laser, which passes through the inner hole 71, the hollow hole 6124, the perforation hole 223 and the center hole 33 in turn and shines on the electronic laser theodolite 12, and is transmitted to the display according to the signal line of the camera on the electronic laser theodolite 12. The construction personnel can judge whether the drilling route of the guide drill rod 7 is offset by observing the laser offset position displayed on the display, so that the jacking route of the guide drill rod 7 is clearer and more visual, which is convenient for correcting the drilling direction of the guide drill rod 7 and making the drilling trajectory constructed according to the designed route.

[0075] Reference Figure 1, the conveying direction of the auger rod 8 is opposite to the jacking direction. When the jacking cylinder 4 drives the auger rod 8 and the borehole wall steel pipe 81 to push forward in the stratum, the first hydraulic motor 61 drives the auger rod 8 to rotate in the borehole wall steel pipe 81, so that the slag in the borehole wall steel pipe 81 is discharged from the end close to the frame 1 along the conveying direction of the auger rod 8 under the action of the auger rod 8, avoiding the situation in which the power head drives the auger rod to discharge soil in front of the auger in the clay soil and causes the head to be blocked.

[0076] The implementation principle of Example 1 is as follows: during the jacking operation, the guide drill rod 7 or the spiral drill rod 8 is installed on the output shaft 612 of the first hydraulic motor 61, the latch cylinder 31 drives the latch 311 to be inserted into one of the latch holes 111, and then the piston rod of the jacking cylinder 4 is extended to make the movable frame 2 slowly slide forward on the frame 1, and push the guide drill rod 7 or the spiral drill rod 8 forward in the formation. When the guide drill rod 7 or the spiral drill rod 8 enters the formation, the piston rod of the latch cylinder 31 contracts and removes the latch 311 from the latch hole 111, and then the stepping motor 53 drives the chain 51 to transmit between the two sprockets 52, thereby driving the movable frame 2 to quickly withdraw and reset on the frame 1, and then The next guide drill rod 7 or spiral drill rod 8 is pushed in; when the guide drill rod 7 or spiral drill rod 8 in the formation is pulled out, the pushing cylinder 4 drives the movable frame 2 to slide slowly backward on the frame 1, and pulls out the guide drill rod 7 or spiral drill rod 8, then the piston rod of the latch cylinder 31 contracts, so that the latch 311 is taken out from the latch hole 111, and then the stepping motor 53 drives the chain 51 to transmit between the two sprockets 52, thereby driving the movable frame 2 to slide forward quickly on the frame 1 and connect with the next guide drill rod 7 or spiral drill rod 8 in the formation, and then pull out the next guide drill rod 7 or spiral drill rod 8, thereby effectively shortening the operation time interval of the pipe jacking machine and improving the construction efficiency of the pipe jacking machine.

[0077] Example 2

[0078] Reference Figure 5 and Figure 6 , the difference between this embodiment and embodiment 1 is that the driving assembly 5 includes a winch 54, a hook 55 and a hanging ring 56, the winch 54 is arranged on the positioning frame 3, the winch 54 includes a drum 541 and a second driving member, the drum 541 is cylindrical, the axial direction of the drum 541 is the same as the length direction of the positioning frame 3, and is rotatably connected to the positioning frame 3, the second driving member is used to drive the drum to rotate, in this embodiment, the second driving member is a third hydraulic motor 542, the third hydraulic motor 542 is fixedly connected to the positioning frame 3, the output shaft 612 of the third hydraulic motor 542 is coaxially arranged and fixedly connected to the drum 541, a pull rope 543 is wound around the drum 541, one end of the pull rope 543 is fixedly connected to the drum 541, and the other end is fixedly connected to the hook 55, refer to Figure 6 and Figure 7 There are two hanging rings 56 , which are respectively fixed at both ends of the frame 1 in the length direction and used in conjunction with the hook 55 .

[0079] During the jacking process, after the jacking cylinder 4 slowly pushes the guide drill rod 7 or the spiral drill rod 8 into the formation, the hook 55 is hung on the hanging ring 56 at the end of the frame 1 away from the jacking direction, and then the piston rod of the latch cylinder 31 is contracted, and the latch 311 is driven to be taken out from the latch hole 111. At this time, the third hydraulic motor 542 drives the drum 541 to rotate on the positioning frame 3. The drum 541 will continuously wind the pull rope 543 and drive the positioning frame 3 and the movable frame 2 to slide quickly on the frame 1 toward the end away from the jacking direction at the same time, and at the same time drive the rotating power part 6 to withdraw and reset quickly, and then the next guide drill rod 7 or spiral drill rod 8 is jacked, thereby effectively shortening the time for the movable frame 2 to withdraw during the jacking process of the guide drill rod 7 and the spiral drill rod 8, and improving the construction efficiency of the pipe jacking machine.

[0080] During the pulling out process of the guide drill rod 7 or the spiral drill rod 8, after the jacking cylinder 4 slowly pulls the guide drill rod 7 or the spiral drill rod 8 out of the formation, the hook 55 is hung on the hanging ring 56 on the frame 1 near the end of the jacking direction, and then the piston rod of the latch cylinder 31 is contracted, and the latch 311 is driven to be taken out from the latch hole 111. At this time, the third hydraulic motor 542 drives the reel 541 to rotate on the positioning frame 3, and the reel 541 will continuously wind the pull rope 543, and drive the positioning frame 3 and the movable frame 2 to slide quickly on the frame 1 toward the end near the jacking direction at the same time, and at the same time drive the movable frame 2 and the rotating power part 6 to slide forward quickly, and connect with the next guide drill rod 7 or spiral drill rod 8 in the formation, and then pull out the next guide drill rod 7 or spiral drill rod 8, which effectively shortens the time for the movable frame 2 to slide forward during the pulling out process of the guide drill rod 7 and the spiral drill rod 8, and improves the construction efficiency of the pipe jacking machine.

[0081] Example 3

[0082] Reference Figure 8 The difference between this embodiment and embodiment 1 is that the rotating power member 6 includes a reduction gearbox 62 and a second hydraulic motor 63. A plurality of second hydraulic motors 63 are provided. In this embodiment, there are four second hydraulic motors 63. The second hydraulic motor 63 is installed at the output end of the reduction gearbox 62. The input end of the reduction gearbox 62 faces the side close to the jacking direction. A hollow hole 6124 is opened at the center of the reduction gearbox 62. The hollow hole 6124 is coaxially arranged with the guide drill rod 7, and the hollow hole 6124 runs through both ends of the reduction gearbox 62.

[0083] When in use, the guide drill rod 7 or the spiral drill rod 8 is installed on the output end of the reduction box 62, and the reduction box 62 drives the guide drill rod 7 or the spiral drill rod 8 to rotate. The four second hydraulic motors 63 simultaneously provide power to the output end of the reduction box 62, thereby effectively improving the carrying capacity of the output end of the reduction box 62 and improving the construction performance of the pipe jacking machine.

[0084] Example 4

[0085] Reference Fig. 9 The difference between this embodiment and embodiment 2 is that the rotating power member 6 includes a reduction box 62 and a second hydraulic motor 63. A plurality of second hydraulic motors 63 are provided. In this embodiment, there are four second hydraulic motors 63. The second hydraulic motor 63 is installed at the input end of the reduction box 62. The output end of the reduction box 62 faces the side close to the jacking direction. A hollow hole 6124 is opened at the center of the reduction box 62. The hollow hole 6124 is coaxially arranged with the guide drill rod 7, and the hollow hole 6124 runs through both ends of the reduction box 62.

[0086] When in use, the guide drill rod 7 or the spiral drill rod 8 is installed on the output end of the reduction box 62, and the reduction box 62 drives the guide drill rod 7 or the spiral drill rod 8 to rotate. The four second hydraulic motors 63 simultaneously provide power to the output end of the reduction box 62, thereby effectively improving the carrying capacity of the output end of the reduction box 62 and improving the construction performance of the pipe jacking machine.

[0087] Example 5

[0088] Reference Fig.10 The difference between this embodiment and the second embodiment is that the extension direction of the two latch cylinders 31 is vertical, and the piston rods of the latch cylinders 31 face vertically downward. The top surfaces of the two guide rail beams 11 are provided with a plurality of latch holes 111 along their length direction, and the latches 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch holes 111 on the two guide rail beams 11. The vertical arrangement of the latch cylinders 31 can effectively reduce the width of the frame 1, making it easier for the pipe jacking machine to be constructed in a narrow space.

[0089] Reference Fig.10The movable frame 2 includes a front top plate 21, a rear vertical plate 22 and a connecting plate 23. The front top plate 21 is located on the side of the rear vertical plate 22 away from the positioning frame 3. The front top plate 21 and the rear vertical plate 22 are both arranged perpendicular to the length direction of the frame 1. The two sides of the front top plate 21 are respectively mounted on two guide rail beams 11 and are slidably connected to the guide rail beams 11. The sliding direction of the front top plate 21 is the same as the length direction of the guide roller beam; the connecting plate 23 and the rotating power member 6 are both located between the front top plate 21 and the rear vertical plate 22. The rear vertical plate 22 is fixedly connected to one end of the rotating power member 6 away from the front top plate 21. The rotating power member 6 is located at the center of the width direction of the frame 1. Two connecting plates 23 are provided, and are symmetrically arranged on both sides of the rotating power member 6. The connecting plate 23 is fixedly connected to the rear vertical plate 22.

[0090] Reference Fig.10 A replacement oil cylinder 221 is arranged between the front top plate 21 and the rear vertical plate 22. The extension direction of the replacement oil cylinder 221 is the same as the length direction of the guide rail cross beam 11. Two replacement oil cylinders 221 are arranged and symmetrically arranged on both sides of the rotating power part 6. The replacement oil cylinder 221 is fixedly connected to the front baffle 21, and the piston rod of the replacement oil cylinder 221 is fixedly connected to the rear baffle 22. Fig.11 The connecting plate 23 is rotatably connected to one side away from the rotating power member 6 with two rollers 231 . The two rollers 231 are respectively located above and below the guide rail beam 11 and are in rolling contact with the guide rail beam 11 .

[0091] When the piston rod of the compensation cylinder 221 is extended and retracted, it will drive the rotating power part 6 and the connecting plate 23 to slide on the frame 1 and approach or move away from the front top plate 21, and at the same time drive the two rollers 231 on the connecting plate 23 to roll on the upper and lower sides of the guide rail beam 11 respectively, guiding the sliding process of the rotating power part 6 and the connecting plate 23, so that the sliding process of the rotating power part 6 relative to the front top plate 21 is more stable.

[0092] Reference Fig.10 and Fig.11 There are four jacking oil cylinders 4, which are respectively located above and below the two guide rail beams 11. The telescopic direction of the jacking oil cylinder 4 is the same as the length direction of the guide rail beam 11. The jacking oil cylinder 4 is fixedly connected to the front baffle 21, and the piston rod of the jacking oil cylinder 4 is fixedly connected to the positioning frame 3. Arranging the jacking oil cylinder 4 on the upper and lower sides of the guide rail beam 11 can further reduce the width of the frame 1, which is convenient for the pipe jacking machine to be constructed in a narrow space.

[0093] The embodiment of the present application also discloses a construction process of a pipe jacking machine under non-trenching through-hole conditions.

[0094] Example 1

[0095] A construction process of a pipe jacking machine under trenchless through-hole conditions comprises the following steps:

[0096] S1. Construction preparation:

[0097] A jacking pit and a receiving pit are dug at both ends of the pre-installed pipeline position in the stratum, and the jacking machine is hung in the jacking pit and fixed to prevent the position of the jacking machine from shifting during the construction process. At the same time, the output shaft 612 of the first hydraulic motor 61 is directed toward the end close to the receiving pit.

[0098] S2, jacking of guide drill rod 7:

[0099] The guide drill rod 7 is mounted on the output shaft 612 of the first hydraulic motor 61, and the piston rods of the two latch cylinders 31 are extended, so that the latch pins 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch holes 111 on the two guide rail beams 11, and then the piston rod of the jacking cylinder 4 is extended and the movable frame 2 is pushed forward slowly on the frame 1, so that the guide drill rod 7 is pushed into the formation, and at the same time, the first hydraulic motor 61 drives the guide drill rod 7 to rotate in the formation, so that the guide drill rod 7 is in the formation. Pushing forward; when a guide drill rod 7 is pushed into the formation, the piston rods of the two latch cylinders 31 contract, so that the latch 311 is pulled out of the latch hole 111, and then the stepper motor 53 drives the sprocket 52 fixed with it to rotate, and the chain 51 is transmitted between the two sprockets 52, thereby driving the movable frame 2 to slide backward quickly on the frame 1 and reset. At this time, the next guide drill rod 7 is installed on the output shaft 612 of the first hydraulic motor 61, and the previous operation is repeated until the front end of the guide drill rod 7 enters the receiving pit.

[0100] S3, spiral drill rod 8 soil discharge:

[0101] The auger rod 8 is mounted on the output shaft 612 of the first hydraulic motor 61, and the hole protection wall steel pipe 81 is sleeved on the auger rod 8, so that the front end of the auger rod 8 abuts against the end of the guide drill rod 7 in front of it or is sleeved on the end of the guide drill rod 7, and the end of the hole protection wall steel pipe 81 away from the jacking direction abuts against the front baffle 21; then the latches 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch holes 111 on the two guide rail crossbeams 11, at this time, the jacking cylinder 4 drives the movable frame 2 to slide slowly forward on the frame 1, and the hole protection wall steel pipe 81 and the auger rod 8 are pushed into the formation, and at the same time the first hydraulic motor 61 drives the auger rod 8 rotates in the formation, so that the auger rod 8 is pushed into the formation, and the debris in the hole protection wall steel pipe 81 is discharged from the end close to the frame 1 through the auger rod 8; when an auger rod 8 is pushed into the formation, the piston rods of the two latch cylinders 31 contract, so that the latch 311 is pulled out from the latch hole 111, and the stepper motor 53 drives the chain 51 to transmit between the two sprocket wheels 52, and the movable frame 2 slides backward quickly on the frame 1 and resets, at this time, the next auger rod 8 is installed on the output shaft 612, and the two adjacent auger rods 8 are connected, and then the previous operation is repeated until the front end of the hole protection wall steel pipe 81 and the auger rod 8 enter the receiving pit.

[0102] S4. Disassembly of the guide drill rod 7:

[0103] As the auger rod 8 advances forward in the formation, it pushes the guide drill rod 7 forward and enters the receiving pit. At this time, the guide drill rod is lifted from the receiving pit and recovered. When the front end of the hole protection wall steel pipe 81 and the auger rod 8 enter the receiving pit, the guide drill rod is completely recovered.

[0104] S5. Disassembly of auger rod 8:

[0105] When the front end of the borehole wall steel pipe 81 and the auger rod 8 enter the receiving pit, the piston rods of the two latch cylinders 31 extend, so that the latches 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch holes 111 on the two guide rail crossbeams 11, and the jacking cylinder 4 drives the movable frame 2 to slide slowly backward on the frame 1, and the first hydraulic motor 61 drives the auger rod 8 to be pulled out from the borehole wall steel pipe 8, and then the auger rod 8 is removed from the first hydraulic motor 61; at this time, the piston rods of the two latch cylinders 31 shrink, so that the latch 311 is pulled out from the latch hole 111, and then the stepper motor 53 drives the chain 51 to transmit between the two sprockets 52, and drives the movable frame 2 to slide forward quickly on the frame 1, and connects the first hydraulic motor 61 to the next auger rod 8, and repeats the previous operation until all auger rods 8 are pulled out from the borehole wall steel pipe 8.

[0106] S6. Pipeline laying:

[0107] The pipeline is placed between the movable frame 2 and the hole wall steel pipe 81, so that one end of the pipeline abuts against the end of the hole wall steel pipe 81, and the other end abuts against the front baffle 21, and then the pins 311 on the piston rods of the two pin cylinders 31 are respectively inserted into one of the pin holes 111 on the two guide rail cross beams 11, and the jacking cylinder 4 drives the movable frame 2 to slowly slide forward on the frame 1, and push the pipeline into the formation, and at the same time, the pushed hole wall steel pipe is recovered in the receiving pit. Then the piston rods of the two pin cylinders 31 shrink, so that the pins 311 are pulled out from the pin holes 111, and the stepper motor 53 drives the chain 51 to transmit between the two sprocket wheels 52, and the movable frame 2 quickly slides backward on the frame 1 and resets, and the next pipeline is placed between the movable frame 2 and the hole wall steel pipe 81, and the two adjacent pipelines abut, and then the previous operation is repeated until the frontmost pipeline enters the receiving pit, and the pipeline is completely laid.

[0108] Example 2

[0109] The difference between this embodiment and embodiment 1 is that, after the jacking cylinder 4 slowly pushes the guide drill rod 7, the spiral drill rod 8 or the pipeline into the formation, the hook 55 is hung on the hanging ring 56 at the end of the frame 1 away from the jacking direction, and then the piston rod of the latch cylinder 31 is contracted, and the latch 311 is driven to be taken out from the latch hole 111. At this time, the third hydraulic motor 542 drives the reel 541 to rotate on the positioning frame 3, and the reel 541 will continuously wind the pull rope 543, and drive the positioning frame 3 and the movable frame 2 to slide backward quickly on the frame 1 and reset at the same time, and then the next guide drill rod 7 or spiral drill rod 8 is pushed in, thereby effectively shortening the time for the movable frame 2 to withdraw during the jacking process of the guide drill rod 7 and the spiral drill rod 8, and improving the construction efficiency of the pipe jacking machine.

[0110] During the disassembly of the auger rod 8, after the jacking cylinder 4 slowly pulls the auger rod 8 out of the formation, the hook 55 is hung on the hanging ring 56 on the frame 1 near the end of the jacking direction, and then the piston rod of the latch cylinder 31 is contracted, and the latch 311 is driven to be taken out from the latch hole 111. At this time, the third hydraulic motor 542 drives the drum 541 to rotate on the positioning frame 3. The drum 541 will continuously wind the pull rope 543 and drive the positioning frame 3 and the movable frame 2 to slide quickly on the frame 1 toward the end near the jacking direction at the same time, and at the same time drive the movable frame 2 and the rotating power part 6 to slide forward quickly and connect with the next auger rod 8 in the formation, and then pull out the next auger rod 8, which effectively shortens the time for the movable frame 2 to slide forward during the pulling out process of the auger rod 8, thereby improving the construction efficiency of the pipe jacking machine.

[0111] Example 3

[0112] The difference between this embodiment and embodiment 1 is that during the construction process, the guide drill rod 7 or the spiral drill rod 8 is installed on the output end of the reduction box 62, so that the reduction box 62 drives the guide drill rod 7 or the spiral drill rod 8 to rotate.

[0113] Example 4

[0114] The difference between this embodiment and embodiment 2 is that, during the construction process, the guide drill rod 7 or the spiral drill rod 8 is installed on the output end of the reduction box 62, so that the reduction box 62 drives the guide drill rod 7 or the spiral drill rod 8 to rotate.

[0115] The embodiment of the present application also discloses a construction process of a pipe jacking machine under non-trench blind hole conditions.

[0116] Example 1

[0117] A construction process of a pipe jacking machine under a non-trench blind hole condition comprises the following steps:

[0118] S1. Construction preparation:

[0119] A jacking pit is dug at one end of the pre-installed pipeline position in the stratum, the pipe jacking machine is hoisted in the jacking pit, and the pipe jacking machine is fixed.

[0120] S2, jacking of guide drill rod 7:

[0121] The guide drill rod 7 is mounted on the output shaft 612 of the first hydraulic motor 61, the piston rods of the two latch cylinders 31 are extended, and the latch pins 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch pin holes 111 on the two guide rail beams 11, and then the piston rod of the jacking cylinder 4 is extended and the movable frame 2 is pushed forward slowly on the frame 1, so that the guide drill rod 7 is pushed into the formation, and at the same time, the first hydraulic motor 61 drives the guide drill rod 7 to rotate in the formation, so that the guide drill rod 7 is pushed into the formation; when a After the guide drill rod 7 is pushed into the formation, the piston rods of the two latch cylinders 31 contract, so that the latch 311 is pulled out of the latch hole 111, and then the stepper motor 53 drives the sprocket 52 fixed thereto to rotate, and the chain 51 is transmitted between the two sprockets 52, thereby driving the movable frame 2 to slide backward quickly on the frame 1 and reset. At this time, the next guide drill rod 7 is installed on the output shaft 612 of the first hydraulic motor 61, and the previous operation is repeated until the front end of the frontmost guide drill rod 7 is located at the end of the pre-installed pipeline position away from the jacking pit.

[0122] S3, spiral drill rod 8 soil discharge:

[0123] The auger rod 8 is mounted on the output shaft 612 of the first hydraulic motor 61, and the pipe is sleeved on the auger rod 8, so that the front end of the auger rod 8 abuts against the end of the guide drill rod 7 in front of it or is sleeved on the end of the guide drill rod 7, and the end of the pipe away from the jacking direction abuts against the front baffle 21; then the latches 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch holes 111 on the two guide rail crossbeams 11, at this time, the jacking cylinder 4 drives the movable frame 2 to slide slowly forward on the frame 1, and the pipe and the auger rod 8 are pushed into the formation, and at the same time the first hydraulic motor 61 drives the auger rod 8 rotates in the formation, so that the auger rod 8 is pushed into the formation, and the debris in the pipeline is discharged from the end close to the frame 1 through the auger rod 8; when an auger rod 8 is pushed into the formation, the piston rods of the two latch cylinders 31 shrink, so that the latch 311 is pulled out from the latch hole 111, and the stepper motor 53 drives the chain 51 to transmit between the two sprocket wheels 52, and the movable frame 2 slides backward quickly on the frame 1 and resets, at this time, the next auger rod 8 is installed on the output shaft 612, and the two adjacent auger rods 8 are connected, and then the previous operation is repeated until the pipeline is laid to the predetermined position at the front end.

[0124] S4. Disassembly of the guide drill rod 7:

[0125] The piston rods of the two latch cylinders 31 extend out, so that the latch pins 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch pin holes 111 on the two guide rail beams 11, and the jacking cylinder 4 drives the movable frame 2 to slide slowly backward on the frame 1, so that the first hydraulic motor 61 drives the guide drill rod 7 to be pulled out from the formation, and then the guide drill rod 7 is removed from the first hydraulic motor 61; at this time, the piston rods of the two latch cylinders 31 contract, so that the latch pin 311 is pulled out from the latch pin hole 111, and then the stepping motor 53 drives the chain 51 to transmit between the two sprockets 52, and drives the movable frame 2 to slide forward quickly on the frame 1, so that the first hydraulic motor 61 is connected to the next guide drill rod 7, and then the previous operation is repeated until all the guide drill rods 7 are pulled out from the formation.

[0126] S5. Disassembly of auger rod 8:

[0127] The piston rods of the two latch cylinders 31 extend out, so that the latch pins 311 on the piston rods of the two latch cylinders 31 are respectively inserted into one of the latch pin holes 111 on the two guide rail cross beams 11, and the jacking cylinder 4 then drives the movable frame 2 to slide slowly backward on the frame 1, and the first hydraulic motor 61 drives the auger rod 8 to be pulled out of the pipeline, and then the auger rod 8 is removed from the first hydraulic motor 61; at this time, the piston rods of the two latch cylinders 31 contract, so that the latch pin 311 is pulled out of the latch pin hole 111, and then the stepping motor 53 drives the chain 51 to transmit between the two sprocket wheels 52, and drives the movable frame 2 to slide forward quickly on the frame 1, and the first hydraulic motor 61 is connected to the next auger rod 8, and the previous operation is repeated until all the auger rods 8 are pulled out of the pipeline. At this time, all the pipelines are laid in the formation, and the pipeline laying process is completed.

[0128] Example 2

[0129] The difference between this embodiment and embodiment 1 is that, after the jacking cylinder 4 slowly pushes the guide drill rod 7 or the spiral drill rod 8 into the formation, the hook 55 is hung on the hanging ring 56 at the end of the frame 1 away from the jacking direction, and then the piston rod of the latch cylinder 31 is contracted, and the latch 311 is driven to be taken out from the latch hole 111. At this time, the third hydraulic motor 542 drives the reel 541 to rotate on the positioning frame 3, and the reel 541 will continuously wind the pull rope 543, and drive the positioning frame 3 and the movable frame 2 to slide backward and reset quickly on the frame 1 at the same time, and then the next guide drill rod 7 or spiral drill rod 8 is pushed in, thereby effectively shortening the time for the movable frame 2 to withdraw during the jacking process of the guide drill rod 7 and the spiral drill rod 8, and improving the construction efficiency of the pipe jacking machine.

[0130] During the disassembly of the guide drill rod 7 or the spiral drill rod 8, after the jacking cylinder 4 slowly pulls the guide drill rod 7 or the spiral drill rod 8 out of the formation, the hook 55 is hung on the hanging ring 56 on the frame 1 near the end of the jacking direction, and then the piston rod of the latch cylinder 31 is contracted, and the latch 311 is driven to be taken out from the latch hole 111. At this time, the third hydraulic motor 542 drives the reel 541 to rotate on the positioning frame 3. The reel 541 will continuously wind the pull rope 543 and drive the positioning frame 3 and the movable frame 2 to slide quickly on the frame 1 toward the end near the jacking direction at the same time, and at the same time drive the movable frame 2 and the rotating power part 6 to slide forward quickly and connect with the next guide drill rod 7 or spiral drill rod 8 in the formation, and then pull out the next guide drill rod 7 or spiral drill rod 8, which effectively shortens the time for the movable frame 2 to slide forward during the pulling out process of the guide drill rod 7 and the spiral drill rod 8, thereby improving the construction efficiency of the pipe jacking machine.

[0131] Example 3

[0132] The difference between this embodiment and embodiment 1 is that during the construction process, the guide drill rod 7 or the spiral drill rod 8 is installed on the output end of the reduction box 62, so that the reduction box 62 drives the guide drill rod 7 or the spiral drill rod 8 to rotate.

[0133] Example 4

[0134] The difference between this embodiment and embodiment 2 is that, during the construction process, the guide drill rod 7 or the spiral drill rod 8 is installed on the output end of the reduction box 62, so that the reduction box 62 drives the guide drill rod 7 or the spiral drill rod 8 to rotate.

[0135] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A construction process of a pipe jacking machine under trenchless through-hole conditions, characterized in that: The pipe jacking machine comprises a frame (1), a movable frame (2) is slidably connected to the frame (1), a jacking cylinder (4) for driving the movable frame (2) to slide is arranged on the movable frame (2), a rotating power part (6) is arranged on the movable frame (2), a guide drill rod (7) or a spiral drill rod (8) is connected to the rotating power part (6), a hole protection wall steel pipe (81) is sleeved on the spiral drill rod (8), the rotating power part (6) is used to drive the guide drill rod (7) or the spiral drill rod (8) to rotate, and a driving component (5) for driving the movable frame (2) to slide is also arranged on the frame (1), the speed of driving the movable frame (2) to slide by the driving component (5) is greater than the speed of driving the movable frame (2) to slide by the jacking cylinder (4), and the construction process of the pipe jacking machine under the condition of non-excavation through hole comprises the following steps: S1. Construction preparation: Dig a jacking pit and a receiving pit at both ends of the pre-installed pipeline position in the stratum, and hang the pipe jacking machine in the jacking pit; S2, jacking of the guide drill rod (7): the guide drill rod (7) is installed on the rotating power member (6), and the jacking cylinder (4) drives the movable frame (2) to slowly slide forward on the frame (1), and the guide drill rod (7) is pushed into the formation. At the same time, the rotating power member (6) drives the guide drill rod (7) to rotate in the formation, so that the guide drill rod (7) is pushed into the formation. After a guide drill rod (7) is pushed into the formation, the driving assembly (5) drives the movable frame (2) to quickly slide backward on the frame (1) and reset. At this time, the next guide drill rod (7) is installed on the rotating power member (6), and the previous operation is repeated until the frontmost guide drill rod (7) enters the receiving pit; S3. Soil removal by spiral drill rod (8): The spiral drill rod (8) is installed on the rotating power member (6), so that the front end of the spiral drill rod (8) abuts against or is sleeved on the end of the guide drill rod (7), and then the hole protection wall steel pipe (81) is sleeved on the outside of the spiral drill rod (8), so that the hole protection wall steel pipe (81) abuts against the movable frame (2), and the jacking cylinder (4) drives the movable frame (2) to slide forward slowly on the frame (1), and the hole protection wall steel pipe (81) and the spiral drill rod (8) are pushed into the formation, and at the same time, the rotating power member (6) drives the spiral drill rod (8) to rotate in the formation, so that the spiral The drill rod (8) is pushed into the formation, and the slag in the borehole wall steel pipe (81) is discharged from the end close to the frame (1) through the spiral drill rod (8). After a spiral drill rod (8) and the borehole wall steel pipe (81) are pushed into the formation, the driving component (5) drives the movable frame (2) to slide backward quickly on the frame (1) and reset. At this time, the next spiral drill rod (8) and the borehole wall steel pipe (81) are installed on the rotating power part (6), and the two adjacent spiral drill rods (8) are abutted. Then the previous operation is repeated until the front end of the borehole wall steel pipe (81) and the spiral drill rod (8) enter the receiving pit; S4, disassembly of the guide drill rod (7): As the spiral drill rod (8) is pushed forward in the formation, the spiral drill rod (8) pushes the guide drill rod (7) forward and enters the receiving pit. At this time, the guide drill rod is lifted from the receiving pit and recovered. When the front end of the hole protection wall steel pipe (81) and the spiral drill rod (8) enter the receiving pit, the guide drill rod is completely recovered; S5, disassembly of the auger rod (8): after the front end of the borehole wall steel pipe (81) and the auger rod (8) enter the receiving pit, the jacking cylinder (4) drives the movable frame (2) to slowly slide backward on the frame (1), and the rotating power member (6) drives the auger rod (8) to be pulled out from the borehole wall steel pipe (81), and then the auger rod (8) is removed from the rotating power member (6), and the driving assembly (5) drives the movable frame (2) to quickly slide forward on the frame (1), and the rotating power member (6) is connected to the next auger rod (8), and the previous operation is repeated until all the auger rods (8) are pulled out from the borehole wall steel pipe (81); S6. Pipeline laying: The pipeline is placed between the movable frame (2) and the borehole wall steel pipe (81), so that the two ends of the pipeline are respectively in contact with the borehole wall steel pipe (81) and the movable frame (2). The jacking cylinder (4) drives the movable frame (2) to slowly slide forward on the frame (1) and push the pipeline into the formation. At the same time, the pushed-out borehole wall steel pipe is recovered in the receiving pit. Then the driving assembly (5) drives the movable frame (2) to quickly slide backward on the frame (1) and reset. At this time, the next pipeline is placed between the movable frame (2) and the borehole wall steel pipe (81), and the two adjacent pipelines are in contact. Then the previous operation is repeated until the front end of the pipeline enters the receiving pit.

2. The construction process of the pipe jacking machine under the condition of non-excavation through hole according to claim 1 is characterized in that: The driving assembly (5) comprises a chain (51), a sprocket (52) and a first driving member. Two sprockets (52) are provided. The two sprockets (52) are respectively rotatably connected to the two ends of the frame (1) along the sliding direction of the movable frame (2). The chain (51) is provided between the two sprockets (52) and is used in conjunction with the sprockets (52). The chain (51) is fixedly connected to the movable frame (2). The first driving member is connected to one of the sprockets and is used to drive the sprocket (52) connected thereto to rotate.

3. The construction process of the pipe jacking machine under the condition of non-excavation through hole according to claim 1 is characterized in that: The driving assembly (5) comprises a winch (54), a hook (55) and a hanging ring (56); the winch (54) is connected to the movable frame (2); the winch (54) comprises a drum (541) and a second driving member for driving the drum (541) to rotate; a pull rope (543) is wound around the drum (541); the hook (55) is fixedly arranged at one end of the pull rope (543); two hanging rings (56) are arranged; the two hanging rings (56) are respectively fixedly connected to two ends of the frame (1) along the sliding direction of the movable frame (2); the hook (55) and the hanging ring (56) are used in coordination.

4. The construction process of the pipe jacking machine under the condition of non-excavation through hole according to claim 1 is characterized in that: The rotating power component (6) is a first hydraulic motor (61), and a plurality of bearings for bearing axial forces and a plurality of bearings for bearing radial forces are installed on the output shaft (612) of the first hydraulic motor (61), and the plurality of bearings for bearing axial forces and the plurality of bearings for bearing radial forces are arranged alternately.

5. The construction process of the pipe jacking machine under the condition of non-excavation through hole according to claim 1 is characterized in that: The rotating power member (6) comprises a reduction box (62) and a plurality of second hydraulic motors (63) installed at the input end of the reduction box (62).

6. The construction process of the pipe jacking machine under the condition of non-excavation through hole according to claim 1 is characterized in that: The rotating power member (6) is slidably connected to the movable frame (2); the sliding direction of the rotating power member (6) is the same as the sliding direction of the movable frame (2); and a replacement oil cylinder (221) for driving the rotating power member (6) to slide is fixedly arranged on the rotating power member (6).

7. The construction process of the pipe jacking machine under the condition of non-excavation through hole according to claim 1 is characterized in that: The conveying direction of the spiral drill rod (8) is opposite to the jacking direction.

8. The construction process of the pipe jacking machine under the condition of non-excavation through hole according to claim 1 is characterized in that: The frame (1) is slidably connected with a positioning frame (3), the sliding direction of the positioning frame (3) is the same as the sliding direction of the movable frame (2), the two ends of the jacking cylinder (4) in the telescopic direction are respectively fixedly connected with the movable frame (2) and the positioning frame (3), a latch cylinder (31) is fixedly arranged on the positioning frame (3), a plurality of latch holes (111) are provided on the frame (1) along the sliding direction of the positioning frame (3), a latch (311) for being inserted into one of the latch holes (111) is fixedly arranged on the latch cylinder (31), an indicating groove (32) is provided on the positioning frame (3), the length direction of the indicating groove (32) is the same as the telescopic direction of the latch cylinder (31), an indicating bar (312) fixedly connected to the piston rod of the latch cylinder (31) is slidably connected in the indicating groove (32), and one end of the indicating bar (312) extends to the outside of the positioning frame (3).

9. A construction process of a pipe jacking machine under non-trench blind hole conditions, characterized in that: The pipe jacking machine comprises a frame (1), a movable frame (2) is slidably connected to the frame (1), a jacking cylinder (4) for driving the movable frame (2) to slide is arranged on the movable frame (2), a rotating power part (6) is arranged on the movable frame (2), a guide drill rod (7) or a spiral drill rod (8) is connected to the rotating power part (6), a hole protection wall steel pipe (81) is sleeved on the spiral drill rod (8), the rotating power part (6) is used to drive the guide drill rod (7) or the spiral drill rod (8) to rotate, and a driving component (5) for driving the movable frame (2) to slide is also arranged on the frame (1), and the speed at which the driving component (5) drives the movable frame (2) to slide is greater than the speed at which the jacking cylinder (4) drives the movable frame (2) to slide; The construction process of the pipe jacking machine under the condition of non-excavation blind hole includes the following steps: S1. Construction preparation: dig a jacking pit at one end of the pre-installed pipeline position in the stratum, and hang the pipe jacking machine in the jacking pit; S2, jacking of the guide drill rod (7): the guide drill rod (7) is installed on the rotating power member (6), and the jacking oil cylinder (4) drives the movable frame (2) to slowly slide forward on the frame (1), and the guide drill rod (7) is pushed into the formation. At the same time, the rotating power member (6) drives the guide drill rod (7) to rotate in the formation, so that the guide drill rod (7) is pushed into the formation. After a guide drill rod (7) is pushed into the formation, the driving assembly (5) drives the movable frame (2) to quickly slide backward on the frame (1) and reset. At this time, the next guide drill rod (7) is installed on the rotating power member (6), and the previous operation is repeated until the front end of the frontmost guide drill rod (7) is located at the end of the pre-installed pipeline position away from the jacking pit; S3, soil discharge of the auger rod (8): the auger rod (8) is installed on the rotating power member (6), and the pipeline is sleeved on the outside of the auger rod (8) so that the pipeline abuts against the movable frame (2). The jacking cylinder (4) drives the movable frame (2) to slowly slide forward on the frame (1), and the pipeline and the auger rod (8) are pushed into the formation. At the same time, the rotating power member (6) drives the auger rod (8) to rotate in the formation, so that the auger rod (8) is pushed into the formation, and the slag in the pipeline is discharged from the end close to the frame (1) through the auger rod (8). When a auger rod (8) and a pipeline are pushed into the formation, the driving assembly (5) drives the movable frame (2) to slide backward quickly on the frame (1) and reset. At this time, the next auger rod (8) is installed on the rotating power member (6), and two adjacent auger rods (8) are abutted. Then the previous operation is repeated until the auger rod is pushed into the front end position of the pre-laid pipeline. S4, disassembly of the guide drill rod (7): the jacking cylinder (4) drives the movable frame (2) to slide slowly backward on the frame (1), and causes the rotating power member (6) to drive the guide drill rod (7) to be pulled out from the formation, and then the guide drill rod (7) is removed from the rotating power member (6), and the driving assembly (5) drives the movable frame (2) to slide quickly forward on the frame (1), and causes the rotating power member (6) to be connected to the next guide drill rod (7), and the previous operation is repeated until all the guide drill rods (7) are pulled out from the formation; S5. Disassembly of the auger rod (8): The jacking cylinder (4) drives the movable frame (2) to slide slowly backward on the frame (1), and causes the rotating power member (6) to drive the auger rod (8) to be pulled out of the pipeline, and then the auger rod (8) is removed from the rotating power member (6). The driving assembly (5) drives the movable frame (2) to slide quickly forward on the frame (1), and causes the rotating power member (6) to be connected to the next auger rod (8), and the previous operation is repeated until all the auger rods (8) are pulled out of the pipeline. At this time, all the pipelines are laid in the formation, and the pipeline laying process is completed.