A construction device based on synchronous drilling and prefabricated pile splicing

Through the construction equipment of synchronous drilling and splicing of prefabricated piles, the problems of too much equipment, large land occupation and low construction efficiency caused by the separation of drilling and pile planting in the existing technology are solved, achieving the effect of less equipment, small land occupation and high construction efficiency. , ensuring construction quality and progress.

CN113250193BActive Publication Date: 2024-10-11NINGBO ZHONGCHUN HIGH-TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110641709.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-09
Publication Date
2024-10-11
Estimated Expiration
2041-06-09

AI Technical Summary

Technical Problem

In the existing pile foundation construction technology, drilling and pile planting are carried out separately, which requires a lot of equipment, a large area, and low construction efficiency. The splicing and dismantling of drill pipes is complicated, resulting in low construction efficiency and equipment utilization.

Method used

Design a construction equipment based on simultaneous drilling and prefabricated pile splicing. It adopts a 360-degree rotating main mast and track plate system, realizes automatic splicing and disassembly of drill pipes and prefabricated piles through a hydraulically driven pile clamping device, and combines the traveling device and Lifting device enables simultaneous operations of drilling, bottom expansion, grouting and pile planting.

Benefits of technology

It reduces the number of construction equipment and floor space, improves construction efficiency, reduces the frequency of equipment movement during drilling and pile planting, ensures construction quality and progress, and reduces the solidification time of cement slurry.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113250193B_ABST
    Figure CN113250193B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction equipment based on synchronous drilling and prefabricated pile splicing and a construction method thereof. The equipment comprises an equipment main platform with drilled pile holes, and a lifting device and a main mast are arranged on the equipment main platform; six track plates are arranged on the main mast, wherein: a drilling rig is respectively arranged on the No. 1 track plate and the No. 2 track plate, and two pile clamping devices are respectively arranged on the No. 3 track plate and the No. 4 track plate. The two pile clamping devices on the No. 3 track plate are the No. 1 pile clamping device and the No. 2 pile clamping device, and the two pile clamping devices on the No. 4 track plate are the No. 3 pile clamping device and the No. 4 pile clamping device. The drilling rig on the No. 2 track plate drives the drill rod to drill holes while the two piles are spliced ​​on the No. 4 track plate; the drilling rig on the No. 1 track plate drives the drill rod to drill holes while the two piles are spliced ​​on the No. 3 track plate. The equipment construction method is simple and efficient, and can ensure the quality of the piles.