A device and method for pipe pile positioning and verticality correction
By using a detachable connecting rod device in pipe pile construction, combined with a line hammer assembly and a correction disk, the problem of vertical deviation of pipe piles is solved, convenient and accurate positioning correction is achieved, and construction efficiency and foundation engineering quality are improved. .
Patent Information
- Application Number
- CN202110683799.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-21
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-06-21
AI Technical Summary
It is difficult for existing technology to effectively solve the problem of vertical deviation of pipe piles during construction. Especially in underground projects, due to the complexity and unpredictability of the process, the construction period is extended, affecting the quality of foundation projects and the safety of above-ground structures.
Provides a device for pipe pile positioning and verticality correction, including upper and lower detection devices, connected through a detachable vertical connecting rod, combined with a line hammer assembly and a correction disc, to achieve pile foundation positioning and pile body verticality correction Convenient switching to adapt to pipe piles of different diameters.
It achieves the convenience and accuracy of pipe pile positioning and verticality correction, and can switch the measurement method at any time during the construction process to ensure that the verticality deviation is within the acceptable range, improving construction efficiency and foundation engineering quality.
Smart Images

Figure CN113322954B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of pipe pile positioning and calibration, and in particular to a device and method for pipe pile positioning and verticality correction. Background Art
[0002] With the development of urban construction, the construction scale and total investment of ordinary residential projects have reached the scope of large-scale projects. A huge amount of funds need to be invested in the construction process. The reasonable optimization and shortening of the construction period can effectively speed up the rate of capital recovery and thus reduce the project cost. Under the same project management model, the construction rate of ground projects has been basically fixed, and there is less room for optimization and improvement. Due to the logic, complexity, and unpredictability of the underground project process, the construction period is often longer, and because it is a foundation project, the quality of the foundation project directly affects the safety of the ground structure. Under this condition, concrete precast piles have the advantages of centralized factory production, simple construction equipment, convenient construction, fast construction speed, and high reliability of pile body quality. In particular, different pile end diameters and pile lengths can be considered according to different pile loads. Prestressed pipe pile foundations have been widely used in civil housing.
[0003] According to the Technical Specification for Building Pile Foundation (jgj94-2008), the verticality deviation of the first section of the pile should not be greater than 0.5% when it is pressed down; the verticality of the pile body should be measured during the pile pressing process. When the verticality deviation of the pile body is greater than 1%, the cause should be found and corrected, and the "Construction Quality Acceptance Standard for Building Foundation Engineering" (gb50202-2002) stipulates that the verticality of the pile should be checked during the pile pressing process. Therefore, there is an urgent need for a device and method for positioning and correcting the verticality of pipe piles that can solve the above problems. Summary of the invention
[0004] The present invention aims to provide a device and method for positioning and correcting the verticality of pipe piles, which can be used for pile foundation positioning and pile body verticality correction at the same time, and the switching of two measuring modes can be achieved by disassembling the vertical connecting rod; it is easy to use, convenient for use at any time during the process, and the degree is clear.
[0005] The embodiment of the present invention is achieved as follows:
[0006] A device for positioning and correcting the verticality of a pipe pile, comprising an upper detection device and a lower detection device, wherein the upper detection device is used to be vertically abutted against the pipe pile to be measured, a plumb bob assembly is suspended on the upper detection device, the lower detection device is used to abut against the pipe pile to be measured, and a correction disc for positioning the plumb bob assembly is provided on the lower detection device; the upper detection device and the lower detection device are connected by a detachable vertical connecting rod. It can be used for both pile foundation positioning and pile body verticality correction; it is convenient to use, and can be used at any time during the process, and the degree is clear. It can be used for both pile foundation positioning and pile body verticality correction, and the switching between the two measurement modes can be achieved by disassembling the vertical connecting rod; it is convenient to use, and can be used at any time during the process, and the degree is clear.
[0007] Preferably, the upper detection device comprises a first fixed jaw, a first fixed column and a second fixed jaw connected in sequence, the first fixed jaw and the second fixed jaw are located on the same vertical line and are both perpendicular to the first fixed column. The first fixed column is a Φ40 round tube.
[0008] Preferably, the first fixing clamp comprises a first fixing rod, a first fixing portion, a second fixing portion and a third fixing portion, one end of the first fixing rod is vertically connected to the first fixing column, and the other end is fixed at the center position of the first fixing portion, the two ends of the first fixing portion are respectively connected to the second fixing portion and the third fixing portion, and the first fixing portion, the second fixing portion and the third fixing portion are all used to abut against the surface of the measured pipe pile.
[0009] Preferably, the first fixing part, the second fixing part and the third fixing part are all rectangular tubes, and the first fixing part is detachably connected to the second fixing part and the third fixing part by bolts. The rectangular tube is 30*30*1.0 and can be adapted to pipe piles of different diameters by adjusting the bolts.
[0010] Preferably, the first fixing jaw and the second fixing jaw have the same structure.
[0011] Preferably, the plumb bob assembly includes a plumb bob and a sling, the first fixed jaw is arranged on the second fixed jaw, the second fixed jaw is provided with a plumb hole, one end of the sling is fixed to the first fixed jaw, and the other end passes through the plumb hole and is fixed to the plumb bob.
[0012] Preferably, the first fixing column is threadedly connected to the vertical connecting rod.
[0013] Preferably, the lower detection device comprises a second fixing column and a third fixing jaw which are perpendicular to each other, the second fixing column is threadedly connected to the vertical connecting rod, the third fixing jaw has the same structure as the first fixing jaw, and the correction disc is arranged on the third fixing jaw. The center of the correction disc corresponds to the plumb hanging point, and circular marking lines with a spacing of 10 mm are arranged on the disc for reading the verticality value.
[0014] A method for positioning a pipe pile is also provided, comprising the above-mentioned device, and further comprising the following steps:
[0015] S1: Draw two mutually perpendicular verification points at the center point of the theoretical pile position, and the distance between the composite point and the center point is 1 / 2 pile diameter + 300mm;
[0016] S2: Stand up the pile and lower it to a position where the bottom of the pile is 20 to 30 cm above the ground for pile positioning;
[0017] S3: The upper detection device is set at 1.0m above the pile bottom elevation to perform pile body positioning operation;
[0018] S4: Check the position of the pile body based on the derived composite points and the installed plumb bob assembly.
[0019] A method for correcting the verticality of a pipe pile is also provided, comprising the above-mentioned device and the following steps:
[0020] S1: After the pile is lowered and stabilized, the verticality of the pile body is corrected;
[0021] S2: The upper detection device and the lower detection device are connected and fixed into a whole through vertical connecting rods, and the distance between the upper and lower structures is 1.5m;
[0022] S3: Place the device against the bottom of the pile and fit it to the pile so that the device is parallel to the pile;
[0023] S4: Stabilize the plumb line. Check the verticality of the pile body by calibrating the scale on the disc and calibrate the pile body according to the position of the plumb line on the disc.
[0024] Due to the adoption of the above technical scheme, the beneficial effects of the present invention include: a device and method for positioning and correcting the verticality of a pipe pile of the present invention, comprising an upper detection device and a lower detection device, wherein the upper detection device is used to be vertically abutted against the measured pipe pile, a plumb bob assembly is suspended on the upper detection device, the lower detection device is used to abut against the measured pipe pile, and a correction disc for positioning the plumb bob assembly is provided on the lower detection device; the upper detection device and the lower detection device are connected by a detachable vertical connecting rod. It can be used for pile foundation positioning and pile body verticality correction at the same time; it is convenient to use, convenient to use at any time during the process, and the degree is clear. It can be used for pile foundation positioning and pile body verticality correction at the same time, and the switching of the two measurement methods can be achieved by disassembling the vertical connecting rod; it is convenient to use, convenient to use at any time during the process, and the degree is clear. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0026] Figure 1 It is a schematic diagram of the working state of the present invention;
[0027] Figure 2 It is a schematic diagram of the overall structure of the present invention;
[0028] Figure 3 It is a schematic diagram of the working state of the first fixed clamping jaw of the present invention;
[0029] Figure 4 It is a schematic diagram of the structure of the first fixed clamping jaw of the present invention.
[0030] Explanation of specific element symbols: 1 pipe pile; 2 upper detection device; 3 plumb bob assembly; 4 lower detection device; 5 vertical connecting rod; 21 first fixed jaw; 22 second fixed jaw; 23 first fixed column; 31 plumb; 32 sling; 41 third fixed jaw; 42 correction disc; 43 second fixed column; 211 first fixed part; 212 second fixed part; 213 third fixed part; 214 first fixed rod. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0032] The following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0034] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0035] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0036] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0037] Example 1: Please refer to Figures 1 to 4, a device for positioning and verticality correction of a pipe pile 1 in this embodiment comprises an upper detection device 2 and a lower detection device 4, the upper detection device 2 is used to be vertically abutted against the measured pipe pile 1, a plumb bob assembly 3 is suspended on the upper detection device 2, the lower detection device 4 is used to abut against the measured pipe pile 1, and a correction disc 42 for positioning the plumb bob assembly 3 is provided on the lower detection device 4; the upper detection device 2 and the lower detection device 4 are connected by a detachable vertical connecting rod 5. It can be used for pile foundation positioning and pile body verticality correction at the same time; it is convenient to use, convenient to use at any time during the process, and the degree is clear. It can be used for pile foundation positioning and pile body verticality correction at the same time, and the switching of the two measurement modes can be realized by disassembling the vertical connecting rod 5; it is convenient to use, convenient to use at any time during the process, and the degree is clear.
[0038] Embodiment 2: The upper detection device 2 of this embodiment includes a first fixed jaw 21, a first fixed column 23 and a second fixed jaw 22 connected in sequence. The first fixed jaw 21 and the second fixed jaw 22 are located on the same vertical line and are both perpendicular to the first fixed column 23. The first fixed column 23 is a Φ40 round tube. The first fixed jaw 21 of this embodiment includes a first fixed rod 214, a first fixed portion 211, a second fixed portion 212 and a third fixed portion 213. One end of the first fixed rod 214 is vertically connected to the first fixed column 23, and the other end is fixed at the center position of the first fixed portion 211. The two ends of the first fixed portion 211 are respectively connected to the second fixed portion 212 and the third fixed portion 213. The first fixed portion 211, the second fixed portion 212 and the third fixed portion 213 are all used to abut against the surface of the pipe pile 1 to be tested.
[0039] Embodiment 3: The first fixing part 211, the second fixing part 212 and the third prescribed part of this embodiment are all rectangular tubes, and the first fixing part 211 is detachably connected with the second fixing part 212 and the third fixing part 213 by bolts. The rectangular tube is 30*30*1.0. It can adapt to pipe piles 1 of different diameters by adjusting the bolts. The first fixing jaw 21 and the second fixing jaw 22 of this embodiment have the same structure. The plumb bob assembly 3 of this embodiment includes a plumb 31 and a sling 32, the first fixing jaw 21 is arranged on the second fixing jaw 22, and the second fixing jaw 22 is provided with a plumb hole, one end of the sling 32 is fixed on the first fixing jaw 21, and the other end passes through the plumb hole and is fixed to the plumb 31. The first fixing column 23 of this embodiment is threadedly connected to the vertical connecting rod 5. The lower detection device 4 of this embodiment includes a second fixing column 43 and a third fixing jaw 41 which are perpendicular to each other. The second fixing column 43 is threadedly connected to the vertical connecting rod 5. The third fixing jaw 41 has the same structure as the first fixing jaw 21. A correction disc 42 is arranged on the third fixing jaw 41. The center of the correction disc 42 corresponds to the hanging point of the plumb line 31. A circular marking line with a spacing of 10 mm is arranged on the disc for reading the verticality value.
[0040] Embodiment 4: This embodiment also provides a method for positioning a pipe pile 1, comprising the above-mentioned device, and also comprising the following steps: S1: deriving two mutually perpendicular verification points at the center point of the theoretical pile position, with the distance between the composite point and the center point being 1 / 2 the pile diameter + 300 mm; S2: erecting the pile body and lowering it to a position 20 to 30 cm above the ground at the bottom of the pile to position the pile body; S3: setting the upper detection device 2 at 1.0 m above the pile bottom elevation to perform pile body positioning operations; S4: performing a positioning verification on the pile body based on the derived composite points and the plumb bob assembly 3 of the device.
[0041] Embodiment 5: This embodiment also provides a method for correcting the verticality of a pipe pile 1, comprising the above-mentioned device, and further comprising the following steps: S1: after the pipe pile 1 is lowered and stabilized, the verticality of the pile body of the pipe pile 1 is corrected; S2: the upper detection device 2 and the lower detection device 4 are connected and fixed into a whole through a vertical connecting rod 5, and the spacing between the upper and lower structures is 1.5m; S3: the device is placed against the bottom of the pile body of the pipe pile 1, and fits with the pile body so that the device is parallel to the pile body; S4: stabilize the plumb 31, check the verticality of the pile body by the scale on the correction disk 42, and correct the pile body condition according to the position of the plumb 31 on the disk.
[0042] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for positioning a pipe pile, characterized in that: The invention discloses a device for positioning and correcting the verticality of a pipe pile, comprising an upper detection device and a lower detection device, wherein the upper detection device is used to be vertically abutted against the pipe pile to be measured, a plumb bob assembly is suspended on the upper detection device, the lower detection device is used to abut against the pipe pile to be measured, and a correction disc for positioning the plumb bob assembly is arranged on the lower detection device; the upper detection device and the lower detection device are connected by a detachable vertical connecting rod; The upper detection device comprises a first fixed jaw, a first fixed column and a second fixed jaw connected in sequence, wherein the first fixed jaw and the second fixed jaw are located on the same vertical line and are both perpendicular to the first fixed column; The first fixing clamp comprises a first fixing rod, a first fixing part, a second fixing part and a third fixing part, one end of the first fixing rod is vertically connected to the first fixing column, and the other end is fixed to the center position of the first fixing part, the two ends of the first fixing part are respectively connected to the second fixing part and the third fixing part, and the first fixing part, the second fixing part and the third fixing part are all used to abut against the surface of the measured pipe pile; The first fixing part, the second fixing part and the third fixing part are all rectangular tubes, and the first fixing part is detachably connected to the second fixing part and the third fixing part by bolts; The first fixed clamping jaw and the second fixed clamping jaw have the same structure; The plumb bob assembly includes a plumb bob and a sling, the first fixed jaw is arranged on the second fixed jaw, a plumb hole is arranged on the second fixed jaw, one end of the sling is fixed on the first fixed jaw, and the other end passes through the plumb hole and is fixed to the plumb bob; The first fixing column is threadedly connected to the vertical connecting rod; The lower detection device comprises a second fixing column and a third fixing jaw which are perpendicular to each other, the second fixing column is threadedly connected to the vertical connecting rod, the third fixing jaw has the same structure as the first fixing jaw, and the correction disc is arranged on the third fixing jaw; The method further comprises the following steps: S1: Draw two mutually perpendicular verification points at the center point of the theoretical pile position, and the distance between the composite point and the center point is 1 / 2 pile diameter + 300mm; S2: Stand up the pile and lower it to a position where the bottom of the pile is 20 to 30 cm above the ground for pile positioning; S3: The upper detection device is set at 1.0m above the pile bottom elevation to perform pile body positioning operation; S4: Check the position of the pile body based on the derived composite points and the installed plumb bob assembly.
2. A method for correcting the verticality of a pipe pile, characterized in that: The invention discloses a device for positioning and correcting the verticality of a pipe pile, comprising an upper detection device and a lower detection device, wherein the upper detection device is used to be vertically abutted against the pipe pile to be measured, a plumb bob assembly is suspended on the upper detection device, the lower detection device is used to abut against the pipe pile to be measured, and a correction disc for positioning the plumb bob assembly is arranged on the lower detection device; the upper detection device and the lower detection device are connected by a detachable vertical connecting rod; The upper detection device comprises a first fixed jaw, a first fixed column and a second fixed jaw connected in sequence, wherein the first fixed jaw and the second fixed jaw are located on the same vertical line and are both perpendicular to the first fixed column; The first fixing clamp comprises a first fixing rod, a first fixing part, a second fixing part and a third fixing part, one end of the first fixing rod is vertically connected to the first fixing column, and the other end is fixed to the center position of the first fixing part, the two ends of the first fixing part are respectively connected to the second fixing part and the third fixing part, and the first fixing part, the second fixing part and the third fixing part are all used to abut against the surface of the measured pipe pile; The first fixing part, the second fixing part and the third fixing part are all rectangular tubes, and the first fixing part is detachably connected to the second fixing part and the third fixing part by bolts; The first fixed clamping jaw and the second fixed clamping jaw have the same structure; The plumb bob assembly includes a plumb bob and a sling, the first fixed jaw is arranged on the second fixed jaw, a plumb hole is arranged on the second fixed jaw, one end of the sling is fixed on the first fixed jaw, and the other end passes through the plumb hole and is fixed to the plumb bob; The first fixing column is threadedly connected to the vertical connecting rod; The lower detection device comprises a second fixing column and a third fixing jaw which are perpendicular to each other, the second fixing column is threadedly connected to the vertical connecting rod, the third fixing jaw has the same structure as the first fixing jaw, and the correction disc is arranged on the third fixing jaw; The method further comprises the following steps: S1: After the pile is lowered and stabilized, the verticality of the pile body is corrected; S2: The upper detection device and the lower detection device are connected and fixed into a whole through vertical connecting rods, and the distance between the upper and lower structures is 1.5m; S3: Place the device against the bottom of the pile and fit it to the pile so that the device is parallel to the pile; S4: Stabilize the plumb line. Check the verticality of the pile body by calibrating the scale on the disc and calibrate the pile body according to the position of the plumb line on the disc.
Citation Information
Patent Citations
Device for positioning tubular pile and correcting perpendicularity
CN215759015U