Adaptability test method and system for new energy units connected to dual-high power system
By constructing a full electromagnetic transient simulation model of the double-high power system and connecting new energy units according to the short-circuit ratio of new energy multi-site stations, the problem of difficulty in evaluating the operating characteristics of new energy units in the double-high power system is solved, and the unit is realized Adaptability testing and stability assessment ensure stable system operation and fault recovery capabilities.
Patent Information
- Application Number
- CN202110571533.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-25
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2041-05-25
AI Technical Summary
Existing technology is difficult to fully reflect the actual operating characteristics of new energy units in double-high power systems, especially in power systems with weak system strength, resulting in grid-connected test results that are insufficient to ensure stable operation of the system.
Construct a double-high power system test grid example with a system strength that meets the test requirements, and build a full electromagnetic transient simulation model. Based on this model, the new energy units to be tested are connected according to the short-circuit ratio of the new energy multi-site stations, and adaptability testing is performed to determine the allowable The short-circuit ratio ensures the steady-state operating conditions and fault ride-through capabilities of the unit at different access points.
Through the test of the full electromagnetic transient simulation model, the adaptability of new energy units in the double-high power system can be accurately evaluated, ensuring the stable operation and fault recovery capabilities of the system under different short-circuit ratios of new energy multi-site stations, and providing accurate network access. conditions to improve system stability.
Smart Images

Figure CN113378360B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of large power grid simulation, and more specifically, to a method and system for testing the adaptability of a new energy unit connected to a dual-high power system. Background Art
[0002] In recent years, the ultra-high / ultra-high voltage direct current transmission technology and flexible direct current transmission technology have developed rapidly, and the installation capacity of new energy units such as photovoltaics and wind turbines has increased rapidly, which has also led to a rapid increase in the proportion of new power electronic equipment in the power grid. my country's power system is forming a development trend of a high proportion of renewable energy and a high proportion of power electronic equipment, that is, a double-high power system. In this context, due to the essential difference between new energy units and traditional units, the response characteristics of new energy units such as photovoltaics and wind turbines under different system strengths and the recovery capabilities under various AC and DC disturbance faults will directly affect the stable operation of the entire system.
[0003] Therefore, it is necessary to study the operating characteristics of new energy units in dual-high power systems, especially those with weaker system strength, so that they can meet the grid access conditions to ensure the stable operation of the entire system after grid access. Before a single new energy unit is connected to the grid, it is usually connected to a simple equivalent grid without other new energy units for testing. However, as the proportion of new energy power generation in the system continues to increase, the test results of a single unit usually cannot fully reflect its operating characteristics when connected to the actual grid. Summary of the invention
[0004] The present invention proposes a method and system for testing the adaptability of a new energy generator set connected to a dual-high power system, so as to solve the problem of how to test the adaptability of a new energy generator set connected to a dual-high power system.
[0005] In order to solve the above problem, according to one aspect of the present invention, a method for testing the adaptability of a new energy unit connected to a dual-high power system is provided, the method comprising:
[0006] Construct a test grid example of a dual-high power system whose system strength meets the test requirements;
[0007] Building a full electromagnetic transient simulation model of the dual-high power system test grid example;
[0008] Based on the full electromagnetic transient simulation model, the new energy unit to be tested is connected to the dual-high power system according to the short-circuit ratio of the new energy multi-station, and the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios is tested to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0009] Preferably, the dual-high power system test grid example includes: a high proportion of new energy stations and a direct current transmission system; wherein the short-circuit ratios of the new energy multi-stations at the grid access points of each new energy unit are different.
[0010] Preferably, the full electromagnetic transient simulation model of the dual-high power system test grid example is constructed, including:
[0011] Based on the all-digital real-time simulator HYPERSIM power system digital-analog hybrid real-time simulation platform, a full electromagnetic transient simulation model of the dual-high power system test grid example was built;
[0012] The full electromagnetic transient simulation model includes: a traditional generator set sub-model, a new energy generator set sub-model, a UHV DC transmission system sub-model and a load sub-model;
[0013] The traditional generator set sub-model includes a water turbine set and a steam turbine set, both of which use a speed controller and an excitation controller consistent with actual characteristics;
[0014] The new energy unit sub-model includes a photovoltaic generator and a wind turbine generator; the photovoltaic generator adopts a classic photovoltaic structured model, and the wind turbine generator adopts a classic double-fed wind turbine model and a classic direct-drive wind turbine model;
[0015] The UHV DC transmission system sub-model is established according to the actual engineering main circuit structure and parameters, including converter transformer, converter valve, AC filter, DC filter, DC line, grounding electrode line, surge arrester, switch and lightning arrester;
[0016] The load sub-model includes a static load and a dynamic load. The static load includes a constant impedance load, a constant current load and a constant power load. The dynamic load is set by an induction motor.
[0017] Preferably, the method of connecting the new energy unit to be tested to the dual-high power system based on the full electromagnetic transient simulation model according to the new energy multi-station short-circuit ratio, and testing the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios, so as to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, includes:
[0018] Step 1, establishing a model of the new energy unit to be tested of the new energy unit to be tested, and multiplying the model of the new energy unit to be tested to make the installed capacity and active and reactive output match the access point of the dual-high power system;
[0019] Step 2: Based on the full electromagnetic transient simulation model, the model of the new energy unit to be tested is connected to the access point with the smallest short-circuit ratio of the new energy multi-station in the short-circuit ratio sequence of the new energy multi-station, and connected to the power grid after passing through the step-up transformer and the equivalent collection line. If the power grid can operate stably and meet the preset steady-state working condition establishment conditions after the new energy unit to be tested is connected to the power grid, it is determined that the short-circuit ratio of the new energy multi-station currently connected meets the steady-state working condition establishment requirements;
[0020] Step 3. When it is determined that the short-circuit ratio of the currently connected new energy multi-station meets the requirements for establishing a steady-state operating condition, a preset typical fault ride-through capability test is performed at the grid access point of the currently connected new energy multi-station short-circuit ratio. If the new energy unit to be tested can resume normal operation after the preset typical fault, it is determined that the new energy unit to be tested can enable the system to meet the fault ride-through characteristic requirements at the grid access point of the currently connected new energy multi-station short-circuit ratio, and the currently connected new energy multi-station short-circuit ratio is determined to be the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0021] Preferably, the method further comprises:
[0022] When it is determined that the short-circuit ratio of the currently connected new energy multi-station does not meet the requirements for establishing steady-state operating conditions, or when it is determined that the grid access point of the currently connected new energy multi-station short-circuit ratio cannot enable the system to meet the fault ride-through characteristic requirements, the new energy unit to be tested is connected to the grid access point with the next higher new energy multi-station short-circuit ratio selected according to the new energy multi-station short-circuit ratio sequence, and returns to step 2 to retest.
[0023] Preferably, the preset steady-state operating condition establishment conditions include: before and after the new energy unit to be tested is connected, the output of the new energy units in the network operates normally according to the set value, and the change amplitude of the key bus node voltage is within a preset first change amplitude range, and the change amplitude of the transmission power of the ultra-high voltage direct current transmission system is within a preset second change amplitude range.
[0024] According to another aspect of the present invention, a system for testing the adaptability of a new energy unit connected to a dual-high power system is provided, the system comprising:
[0025] A test grid calculation example construction unit, used to construct a double-high power system test grid calculation example whose system strength meets the test requirements;
[0026] A model building unit, used to build a full electromagnetic transient simulation model of the dual-high power system test grid calculation example;
[0027] The test unit is used to connect the new energy unit to be tested to the dual-high power system based on the full electromagnetic transient simulation model and the short-circuit ratio of the new energy multi-station, and to test the adaptability of the new energy unit to be connected to the dual-high power system under the conditions of different new energy multi-station short-circuit ratios, so as to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0028] Preferably, in the test grid example construction unit, the dual-high power system test grid example includes: a high proportion of new energy stations and a direct current transmission system; wherein the short-circuit ratios of the new energy multi-stations at the grid access points of each new energy unit are different.
[0029] Preferably, the model building unit builds a full electromagnetic transient simulation model of the dual-high power system test grid example, including:
[0030] Based on the all-digital real-time simulator HYPERSIM power system digital-analog hybrid real-time simulation platform, a full electromagnetic transient simulation model of the dual-high power system test grid example was built;
[0031] The full electromagnetic transient simulation model includes: a traditional generator set sub-model, a new energy generator set sub-model, a UHV DC transmission system sub-model and a load sub-model;
[0032] The traditional generator set sub-model includes a water turbine set and a steam turbine set, both of which use a speed controller and an excitation controller consistent with actual characteristics;
[0033] The new energy unit sub-model includes a photovoltaic generator and a wind turbine generator; the photovoltaic generator adopts a classic photovoltaic structured model, and the wind turbine generator adopts a classic double-fed wind turbine model and a classic direct-drive wind turbine model;
[0034] The UHV DC transmission system sub-model is established according to the actual engineering main circuit structure and parameters, including converter transformer, converter valve, AC filter, DC filter, DC line, grounding electrode line, surge arrester, switch and lightning arrester;
[0035] The load sub-model includes a static load and a dynamic load. The static load includes a constant impedance load, a constant current load and a constant power load. The dynamic load is set by an induction motor.
[0036] Preferably, the test unit, based on the full electromagnetic transient simulation model, connects the new energy unit to be tested to the dual-high power system according to the new energy multi-station short-circuit ratio, and tests the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios, so as to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, including:
[0037] A matching module, used for establishing a model of the new energy unit to be tested, and multiplying the model of the new energy unit to be tested to make the installed capacity and active and reactive output match the access point of the dual-high power system;
[0038] A steady-state operating condition establishment test module is used to connect the new energy unit model to be tested to the access point with the smallest new energy multi-station short-circuit ratio in the new energy multi-station short-circuit ratio sequence based on the full electromagnetic transient simulation model, and connect to the power grid after passing through a step-up transformer and an equivalent collection line. If the power grid can operate stably and meet the preset steady-state operating condition establishment conditions after the new energy unit to be tested is connected to the power grid, it is determined that the short-circuit ratio of the new energy multi-station currently connected meets the steady-state operating condition establishment requirements;
[0039] The fault ride-through characteristic testing module is used to perform a preset typical fault ride-through capability test at the grid access point of the currently connected new energy multi-station short-circuit ratio when it is determined that the short-circuit ratio of the currently connected new energy multi-station meets the requirements for establishing a steady-state operating condition. If the new energy unit to be tested can resume normal operation after the preset typical fault, it is determined that the grid access point of the currently connected new energy multi-station short-circuit ratio of the new energy unit to be tested can enable the system to meet the fault ride-through characteristic requirements, and the currently connected new energy multi-station short-circuit ratio is determined to be a new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0040] Preferably, the system further comprises:
[0041] The update module is used to connect the new energy unit to the next higher new energy multi-station short-circuit ratio selected according to the new energy multi-station short-circuit ratio sequence when it is determined that the short-circuit ratio of the currently connected new energy multi-station does not meet the requirements for establishing a steady-state operating condition, or when it is determined that the new energy unit to be tested cannot make the system meet the fault ride-through characteristic requirements at the grid access point of the currently connected new energy multi-station short-circuit ratio. The update module returns to the steady-state operating condition establishment test module for retesting.
[0042] Preferably, in the steady-state operating condition establishment test module, the preset steady-state operating condition establishment conditions include: before and after the connection of the new energy unit to be tested, the output of the new energy units in the network operates normally according to the set value, and the change amplitude of the key bus node voltage is within the preset first change amplitude range, and the change amplitude of the transmission power of the ultra-high voltage direct current transmission system is within the preset second change amplitude range.
[0043] The present invention provides an adaptability testing method and system for a new energy unit connected to a dual-high power system, constructs a full electromagnetic transient simulation model of a typical dual-high power system test grid example containing a high proportion of new energy stations and a direct current transmission system and with a relatively weak strength of the entire grid system, and according to the full electromagnetic transient simulation model, connects the new energy unit to be tested to a grid access point with different new energy multi-station short-circuit ratios, and performs a transient and steady-state characteristic test to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, thereby completing the study on the adaptability of the new energy unit to be tested after being connected to the dual-high power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:
[0045] Figure 1 It is a flow chart of an adaptability testing method 100 for connecting a new energy generator set to a dual-high power system according to an embodiment of the present invention;
[0046] Figure 2 It is a flow chart of the adaptability test after the new energy generating unit to be connected to the grid is connected to the dual-high system according to the implementation mode of the present invention;
[0047] Figure 3 It is a structural schematic diagram of an adaptability testing system 300 for connecting a new energy generator set to a dual-high power system according to an embodiment of the present invention. DETAILED DESCRIPTION
[0048] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.
[0049] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0050] Figure 1 FIG. 1 is a flow chart of a method 100 for testing the adaptability of a new energy generator set to access a dual-high power system according to an embodiment of the present invention. Figure 1As shown, the adaptability testing method for the access of new energy units to the dual-high power system provided by the embodiment of the present invention constructs a full electromagnetic transient simulation model of a typical dual-high power system test grid example containing a high proportion of new energy stations and a DC transmission system and a relatively weak overall grid system strength. According to the full electromagnetic transient simulation model, the new energy unit to be tested is connected to the access points of different new energy multi-station short-circuit ratios, and a transient and steady-state characteristic test is performed to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, and the adaptability of the new energy unit to be tested after being connected to the dual-high power system is studied. The adaptability testing method 100 for the access of new energy units to the dual-high power system provided by the embodiment of the present invention starts from step 101, and in step 101, a dual-high power system test grid example is constructed whose system strength meets the test requirements.
[0051] Preferably, the dual-high power system test grid example includes: a high proportion of new energy stations and a direct current transmission system; wherein the short-circuit ratios of the new energy multi-stations at the grid access points of each new energy unit are different.
[0052] In the present invention, in order to study the actual response characteristics of new energy units after being connected to the dual-high power system, it is necessary to construct a typical test power grid example with an overall weak system strength. The test power grid example needs to meet the following two conditions. First, the test power grid example should contain a high proportion of new energy power generation and DC transmission systems; second, the system strength corresponding to each new energy unit access point is different, which can meet the adaptability research and testing of new energy units under different system strengths.
[0053] In the present invention, based on the above conditions, a test grid example with a scale of 1000 three-phase nodes is constructed, which includes a complete grid with a voltage level of 110kV and above, 35 traditional generators, 97 new energy plant models, 41 detailed electromagnetic transient models of induction motors and a UHV DC transmission project. In the case of multiple new energy stations access, the short-circuit ratio of multiple new energy stations is a quantitative evaluation index that takes into account the mutual influence between multiple new energy stations. The short-circuit ratio of multiple new energy stations reflects the ability of the power grid to support the reactive voltage of the grid-side access point or the station grid connection point of the new energy power generation equipment. Under the condition of a large power grid, according to the definition and calculation formula of the short-circuit ratio of multiple new energy stations (MRSCR), the short-circuit ratio of multiple new energy stations corresponding to the grid-side access point (usually 690V / 400V) of each new energy station under the test example can be obtained, as shown in Table 1. As can be seen from Table 1, the short-circuit ratio of multiple new energy stations corresponding to all new energy grid-side access points in the test grid ranges from 1.578 to 2.878.
[0054] Table 1 Short-circuit ratios of multiple stations corresponding to each renewable energy machine end in the test grid
[0055]
[0056]
[0057]
[0058] In step 102, a full electromagnetic transient simulation model of the dual-high power system test grid example is constructed.
[0059] Preferably, the full electromagnetic transient simulation model of the dual-high power system test grid example is constructed, including:
[0060] Based on the all-digital real-time simulator HYPERSIM power system digital-analog hybrid real-time simulation platform, a full electromagnetic transient simulation model of the dual-high power system test grid example was built;
[0061] The full electromagnetic transient simulation model includes: a traditional generator set sub-model, a new energy generator set sub-model, a UHV DC transmission system sub-model and a load sub-model;
[0062] The traditional generator set sub-model includes a water turbine set and a steam turbine set, both of which use a speed controller and an excitation controller consistent with actual characteristics;
[0063] The new energy unit sub-model includes a photovoltaic generator and a wind turbine generator; the photovoltaic generator adopts a classic photovoltaic structured model, and the wind turbine generator adopts a classic double-fed wind turbine model and a classic direct-drive wind turbine model;
[0064] The UHV DC transmission system sub-model is established according to the actual engineering main circuit structure and parameters, including converter transformer, converter valve, AC filter, DC filter, DC line, grounding electrode line, surge arrester, switch and lightning arrester;
[0065] The load sub-model includes a static load and a dynamic load. The static load includes a constant impedance load, a constant current load and a constant power load. The dynamic load is set by an induction motor.
[0066] In the present invention, when conducting full electromagnetic transient simulation modeling of the test power grid example, a full electromagnetic transient simulation model of the test power grid example is built on the HYPERSIM power system digital-analog hybrid real-time simulation platform, and a 50us simulation step is used for calculation. In the model, the AC system, new energy power generation, and the primary part of the DC system all use detailed digital electromagnetic transient models to accurately reflect the regulation characteristics of the actual power grid. The control and protection system of the DC project is simulated using a DC project control and protection device that is consistent with the on-site characteristics.
[0067] In the present invention, the full electromagnetic transient simulation model of the test power grid includes the following parts:
[0068] (1) Traditional generator sets
[0069] Traditional generator sets include two categories: hydro turbine sets and steam turbine sets, both of which use speed controllers and excitation controllers that are consistent with actual characteristics.
[0070] (2) New energy units
[0071] New energy units include photovoltaic generators and wind turbines. The photovoltaic generator model adopts the classic photovoltaic structured model, and the wind turbine model adopts the classic double-fed wind turbine model and the classic direct-drive wind turbine model. The new energy primary main circuit model mainly includes the new energy unit model, transformer and equivalent collection line model. The control and protection system adopts the typical controller model and includes functions such as high and low penetration that are consistent with the actual regulation characteristics.
[0072] (3) UHV DC transmission system
[0073] The primary model of the UHV DC transmission system is established according to the actual main circuit structure and parameters of the project, mainly including the converter transformer model, converter valve model, AC filter model, DC filter model, DC line model and grounding line model, surge arrester model, switch model and lightning arrester model. The DC control and protection physical simulation system uses DC control and protection devices that are consistent with the actual characteristics.
[0074] (4) Load model
[0075] The load model includes a static load model and a dynamic load model. The static load model includes a constant impedance load, a constant current load and a constant power load. The dynamic load model adopts an induction motor model.
[0076] In step 103, based on the full electromagnetic transient simulation model, the new energy unit to be tested is connected to the dual-high power system according to the new energy multi-station short-circuit ratio, and the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios is tested to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0077] Preferably, the method of connecting the new energy unit to be tested to the dual-high power system based on the full electromagnetic transient simulation model according to the new energy multi-station short-circuit ratio, and testing the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios, so as to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, includes:
[0078] Step 1, establishing a model of the new energy unit to be tested of the new energy unit to be tested, and multiplying the model of the new energy unit to be tested to make the installed capacity and active and reactive output match the access point of the dual-high power system;
[0079] Step 2: Based on the full electromagnetic transient simulation model, the model of the new energy unit to be tested is connected to the access point with the smallest short-circuit ratio of the new energy multi-station in the short-circuit ratio sequence of the new energy multi-station, and connected to the power grid after passing through the step-up transformer and the equivalent collection line. If the power grid can operate stably and meet the preset steady-state working condition establishment conditions after the new energy unit to be tested is connected to the power grid, it is determined that the short-circuit ratio of the new energy multi-station currently connected meets the steady-state working condition establishment requirements;
[0080] Step 3. When it is determined that the short-circuit ratio of the currently connected new energy multi-station meets the requirements for establishing a steady-state operating condition, a preset typical fault ride-through capability test is performed at the grid access point of the currently connected new energy multi-station short-circuit ratio. If the new energy unit to be tested can resume normal operation after the preset typical fault, it is determined that the new energy unit to be tested can enable the system to meet the fault ride-through characteristic requirements at the grid access point of the currently connected new energy multi-station short-circuit ratio, and the currently connected new energy multi-station short-circuit ratio is determined to be the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0081] Preferably, the method further comprises:
[0082] When it is determined that the short-circuit ratio of the currently connected new energy multi-station does not meet the requirements for establishing steady-state operating conditions, or when it is determined that the grid access point of the currently connected new energy multi-station short-circuit ratio cannot enable the system to meet the fault ride-through characteristic requirements, the new energy unit to be tested is connected to the grid access point with the next higher new energy multi-station short-circuit ratio selected according to the new energy multi-station short-circuit ratio sequence, and returns to step 2 to retest.
[0083] Preferably, the preset steady-state operating condition establishment conditions include: before and after the new energy unit to be tested is connected, the output of the new energy units in the network operates normally according to the set value, and the change amplitude of the key bus node voltage is within a preset first change amplitude range, and the change amplitude of the transmission power of the ultra-high voltage direct current transmission system is within a preset second change amplitude range.
[0084] Combination Figure 2As shown, in the present invention, when testing, the new energy model to be tested is first built, and then the new energy model to be tested is connected to the dual-high power system according to the multi-station short-circuit ratio to determine whether the steady-state condition is satisfied. If satisfied, it is determined whether the fault ride-through test is passed to meet the fault ride-through characteristic requirements. If the fault ride-through characteristic requirements are met, the short-circuit ratio of the currently connected new energy multi-station is determined to be the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, and the adaptability test after the new energy unit to be tested is connected to the dual-high power system is completed. If the steady-state condition is not satisfied or the fault ride-through test is not passed, and the fault ride-through characteristic requirements are not met, then the access point with a more accurate multi-station short-circuit ratio is accessed and the test is re-performed.
[0085] In the present invention, during the test, the model of the new energy unit to be tested is connected to different positions of the dual-high power system (different positions correspond to different new energy multi-station short-circuit ratios), and connected to the plant-station equivalent collection line to test the network access performance of the new energy unit to be connected to the network at different positions (different new energy multi-station short-circuit ratios). Specifically, the test process includes:
[0086] S1, construction of new energy model to be tested.
[0087] The new energy units tested in the present invention include three categories: photovoltaic models from different manufacturers, double-fed wind turbines, and direct-drive wind turbine models.
[0088] First, the model of the new energy generator set to be tested is established, in which the primary circuit is built according to the actual unit structure and parameters, and the control and protection system adopts the digital packaging model provided by the manufacturer, and can also be connected to the controller device for semi-physical simulation. The new energy models in the power grid of this example all use the classic photovoltaic structured model and the classic wind turbine model, and the new energy model to be tested is built according to the actual parameters of each manufacturer. Taking the photovoltaic model of Sungrow as an example, its inverter model is SG1250UD, the DC bus capacitor is 4225uF (each unit), the AC side capacitor is 200uF (each unit, triangle connection), and the inductor is 50uH. The main circuit parameters of the inverter are shown in Table 2.
[0089] Table 2 Main circuit technical parameters of Sunshine Photovoltaic products
[0090]
[0091]
[0092] Secondly, the new energy single-machine model is multiplied to make the installed capacity and active and reactive output of the new energy generator set to be tested match the access point of the system. When performing the station equalization, it is necessary to consider the power loss of the station collection line and simulate the equivalent impedance of the plant station collection line.
[0093] S2, steady-state condition establishment test.
[0094] The new energy model to be tested is connected to the access point with the smallest short-circuit ratio of multiple stations in the test grid according to the short-circuit ratio of multiple stations at the new energy machine end, and then connected to the grid after passing through the step-up transformer and the equivalent collection line to conduct a test on the establishment of steady-state conditions. Among them, the capacity of the new energy unit to be tested is adjusted to the same as the original unit capacity by multiplication. To determine the stable operation of the test grid, the preset steady-state conditions must be met, including the following conditions:
[0095] 1. Before and after the new energy units to be tested are connected, the output of the new energy units in the network operates normally according to the set value;
[0096] 2. Before and after the new energy unit to be tested is connected, the voltage of the key bus node remains basically unchanged, and the change range of the voltage of the key bus node is within the preset first change range;
[0097] 3. Before and after the new energy unit to be tested is connected, the transmission power of the DC model remains basically unchanged, and the variation range of the transmission power of the UHV DC transmission system is within the preset second variation range. The first variation range and the second variation range can be set according to the test requirements.
[0098] If the new energy model to be tested can make the system run stably after being connected to the test grid and meets the above three conditions, the next step of fault ride-through characteristic test will be carried out. If the steady-state condition establishment test fails, it is necessary to connect to multiple access points with larger short-circuit ratios of stations and re-test the steady-state condition establishment.
[0099] S3, fault ride-through characteristics test.
[0100] After the new energy model to be tested passes the steady-state working condition establishment test, a typical fault (including single-phase, triple-phase, phase-to-phase faults, etc. of 330kV, 750kV and 35kV AC line) ride-through capability test is carried out at the grid access point. If the system can resume normal operation after the typical fault of the new energy unit to be tested, it is determined that the grid access point of the new energy multi-station short-circuit ratio currently connected to the new energy unit to be tested can enable the system to meet the fault ride-through characteristic requirements, indicating that the new energy model to be tested is adaptable under the system strength corresponding to the grid access point, thereby determining that the currently connected new energy multi-station short-circuit ratio is the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0101] In addition, if the new energy unit to be tested fails to pass the fault ride-through test at the current grid access point, it is necessary to connect the new energy unit to the grid access point with a higher multi-station short-circuit ratio, and return to S2 to re-perform the next round of testing until it finally passes the system adaptability test and determines that the currently connected new energy multi-station short-circuit ratio is the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0102] The Qinghai power grid is a typical dual-high power system containing large-scale renewable energy through the Qinghai-Henan DC transmission system, including 43 wind farms and 152 photovoltaic farms. With the help of the test grid and test method constructed by the present invention, the new energy field station models of each manufacturer to be connected to the Qinghai power grid can be connected to the test grid for adaptability testing. Through the test, it can be found that the new energy controllers of some manufacturers and models have poor adaptability to the large power grid. Therefore, it can be suggested to improve its adaptability to the large power grid by optimizing the controller parameters.
[0103] Figure 3 FIG. 3 is a schematic diagram of a structure of an adaptability test system 300 for connecting a new energy generator set to a dual-high power system according to an embodiment of the present invention. Figure 3 As shown, the adaptability testing system 300 for energy units connected to a dual-high power system provided in an embodiment of the present invention includes: a test grid calculation example building unit 301, a model building unit 302 and a testing unit 303.
[0104] Preferably, the test grid calculation example construction unit 301 is used to construct a dual-high power system test grid calculation example whose system strength meets the test requirements.
[0105] Preferably, in the test grid example construction unit 301, the dual-high power system test grid example includes: a high proportion of new energy stations and a direct current transmission system; wherein the short-circuit ratios of the new energy multi-stations at the grid access points of each new energy unit are different.
[0106] Preferably, the model building unit 302 is used to build a full electromagnetic transient simulation model of the dual-high power system test grid example.
[0107] Preferably, the model building unit 302 builds a full electromagnetic transient simulation model of the dual-high power system test grid example, including:
[0108] Based on the all-digital real-time simulator HYPERSIM power system digital-analog hybrid real-time simulation platform, a full electromagnetic transient simulation model of the dual-high power system test grid example was built;
[0109] The full electromagnetic transient simulation model includes: a traditional generator set sub-model, a new energy generator set sub-model, a UHV DC transmission system sub-model and a load sub-model;
[0110] The traditional generator set sub-model includes a water turbine set and a steam turbine set, both of which use a speed controller and an excitation controller consistent with actual characteristics;
[0111] The new energy unit sub-model includes a photovoltaic generator and a wind turbine generator; the photovoltaic generator adopts a classic photovoltaic structured model, and the wind turbine generator adopts a classic double-fed wind turbine model and a classic direct-drive wind turbine model;
[0112] The UHV DC transmission system sub-model is established according to the actual engineering main circuit structure and parameters, including converter transformer, converter valve, AC filter, DC filter, DC line, grounding electrode line, surge arrester, switch and lightning arrester;
[0113] The load sub-model includes a static load and a dynamic load. The static load includes a constant impedance load, a constant current load and a constant power load. The dynamic load is set by an induction motor.
[0114] Preferably, the test unit 303 is used to connect the new energy unit to be tested to the dual-high power system based on the full electromagnetic transient simulation model according to the new energy multi-station short-circuit ratio, and test the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios, so as to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0115] Preferably, the test unit 303, based on the full electromagnetic transient simulation model, connects the new energy unit to be tested to the dual-high power system according to the new energy multi-station short-circuit ratio, and tests the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios, so as to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, including:
[0116] A matching module, used for establishing a model of the new energy unit to be tested, and multiplying the model of the new energy unit to be tested to make the installed capacity and active and reactive output match the access point of the dual-high power system;
[0117] A steady-state operating condition establishment test module is used to connect the new energy unit model to be tested to the access point with the smallest new energy multi-station short-circuit ratio in the new energy multi-station short-circuit ratio sequence based on the full electromagnetic transient simulation model, and connect to the power grid after passing through a step-up transformer and an equivalent collection line. If the power grid can operate stably and meet the preset steady-state operating condition establishment conditions after the new energy unit to be tested is connected to the power grid, it is determined that the short-circuit ratio of the new energy multi-station currently connected meets the steady-state operating condition establishment requirements;
[0118] The fault ride-through characteristic testing module is used to perform a preset typical fault ride-through capability test at the grid access point of the currently connected new energy multi-station short-circuit ratio when it is determined that the short-circuit ratio of the currently connected new energy multi-station meets the requirements for establishing a steady-state operating condition. If the new energy unit to be tested can resume normal operation after the preset typical fault, it is determined that the grid access point of the currently connected new energy multi-station short-circuit ratio of the new energy unit to be tested can enable the system to meet the fault ride-through characteristic requirements, and the currently connected new energy multi-station short-circuit ratio is determined to be a new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
[0119] Preferably, the system further comprises:
[0120] The update module is used to connect the new energy unit to the next higher new energy multi-station short-circuit ratio selected according to the new energy multi-station short-circuit ratio sequence when it is determined that the short-circuit ratio of the currently connected new energy multi-station does not meet the requirements for establishing a steady-state operating condition, or when it is determined that the new energy unit to be tested cannot make the system meet the fault ride-through characteristic requirements at the grid access point of the currently connected new energy multi-station short-circuit ratio. The update module returns to the steady-state operating condition establishment test module for retesting.
[0121] Preferably, in the steady-state operating condition establishment test module, the preset steady-state operating condition establishment conditions include: before and after the connection of the new energy unit to be tested, the output of the new energy units in the network operates normally according to the set value, and the change amplitude of the key bus node voltage is within the preset first change amplitude range, and the change amplitude of the transmission power of the ultra-high voltage direct current transmission system is within the preset second change amplitude range.
[0122] The adaptability testing system 300 for connecting a new energy generator set to a dual-high power system in an embodiment of the present invention corresponds to the adaptability testing method 100 for connecting a new energy generator set to a dual-high power system in another embodiment of the present invention, and will not be described in detail here.
[0123] The invention has been described above with reference to a few embodiments. However, it is readily apparent to a person skilled in the art that other embodiments than the ones disclosed above are equally within the scope of the invention, as defined by the appended patent claims.
[0124] Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a / said / the [means, components, etc.]" are to be openly interpreted as at least one instance of the means, components, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not necessarily have to be performed in the exact order disclosed, unless explicitly stated otherwise.
[0125] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0126] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0127] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0128] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0129] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for testing the adaptability of new energy units connected to a dual-high power system. It is characterized in that The method comprises: Construct a test grid example of a dual-high power system whose system strength meets the test requirements; Build a full electromagnetic transient simulation model of the dual-high power system test grid example; Based on the full electromagnetic transient simulation model, the new energy unit to be tested is connected to the dual-high power system according to the short-circuit ratio of the new energy multi-station, and the adaptability of the new energy unit to be connected to the dual-high power system under different short-circuit ratios of the new energy multi-station is tested to determine the short-circuit ratio of the new energy multi-station that allows the new energy unit to be tested to be connected; The double-high power system test grid calculation example includes: a high proportion of new energy stations and a DC transmission system; wherein the short-circuit ratios of the new energy multi-stations at the grid access points of each new energy unit are different; The full electromagnetic transient simulation model of the dual-high power system test grid example is constructed, including: Based on the all-digital real-time simulator HYPERSIM power system digital-analog hybrid real-time simulation platform, a full electromagnetic transient simulation model of the dual-high power system test grid example was built; The full electromagnetic transient simulation model includes: a traditional generator set sub-model, a new energy generator set sub-model, a UHV DC transmission system sub-model and a load sub-model; The traditional generator set sub-model includes a water turbine set and a steam turbine set, both of which use a speed controller and an excitation controller consistent with actual characteristics; The new energy unit sub-model includes a photovoltaic generator and a wind turbine generator; the photovoltaic generator adopts a classic photovoltaic structured model, and the wind turbine generator adopts a classic double-fed wind turbine model and a classic direct-drive wind turbine model; The UHV DC transmission system sub-model is established according to the actual engineering main circuit structure and parameters, including converter transformer, converter valve, AC filter, DC filter, DC line, grounding electrode line, surge arrester, switch and lightning arrester; The load sub-model includes a static load and a dynamic load. The static load includes a constant impedance load, a constant current load and a constant power load. The dynamic load is set by an induction motor.
2. The method according to claim 1, It is characterized in that Based on the full electromagnetic transient simulation model, the new energy unit to be tested is connected to the dual-high power system according to the new energy multi-station short-circuit ratio, and the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios is tested to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, including: Step 1, establishing a model of the new energy unit to be tested of the new energy unit to be tested, and multiplying the model of the new energy unit to be tested to make the installed capacity and active and reactive output match the access point of the dual-high power system; Step 2: Based on the full electromagnetic transient simulation model, the model of the new energy unit to be tested is connected to the access point with the smallest short-circuit ratio of the new energy multi-station in the short-circuit ratio sequence of the new energy multi-station, and connected to the power grid after passing through the step-up transformer and the equivalent collection line. If the power grid can operate stably and meet the preset steady-state working condition establishment conditions after the new energy unit to be tested is connected to the power grid, it is determined that the short-circuit ratio of the new energy multi-station currently connected meets the steady-state working condition establishment requirements; Step 3. When it is determined that the short-circuit ratio of the currently connected new energy multi-station meets the requirements for establishing a steady-state operating condition, a preset typical fault ride-through capability test is performed at the grid access point of the currently connected new energy multi-station short-circuit ratio. If the new energy unit to be tested can resume normal operation after the preset typical fault, it is determined that the new energy unit to be tested can enable the system to meet the fault ride-through characteristic requirements at the grid access point of the currently connected new energy multi-station short-circuit ratio, and the currently connected new energy multi-station short-circuit ratio is determined to be the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
3. The method according to claim 2, It is characterized in that The method further comprises: When it is determined that the short-circuit ratio of the currently connected new energy multi-station does not meet the requirements for establishing steady-state operating conditions, or when it is determined that the grid access point of the currently connected new energy multi-station short-circuit ratio cannot enable the system to meet the fault ride-through characteristic requirements, the new energy unit to be tested is connected to the grid access point with the next higher new energy multi-station short-circuit ratio selected according to the new energy multi-station short-circuit ratio sequence, and returns to step 2 to retest.
4. The method according to claim 2, It is characterized in that The preset steady-state operating condition establishment conditions include: before and after the new energy unit to be tested is connected, the output of the new energy units in the grid operates normally according to the set value, and the change amplitude of the key bus node voltage is within a preset first change amplitude range, and the change amplitude of the transmission power of the ultra-high voltage direct current transmission system is within a preset second change amplitude range.
5. An adaptability test system for connecting new energy units to a dual-high power system. It is characterized in that The system comprises: A test grid calculation example construction unit, used to construct a double-high power system test grid calculation example whose system strength meets the test requirements; A model building unit, used to build a full electromagnetic transient simulation model of the dual-high power system test grid calculation example; A testing unit is used to connect the new energy unit to be tested to the dual-high power system based on the full electromagnetic transient simulation model and according to the new energy multi-station short-circuit ratio, and to test the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios, so as to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected; Wherein, in the test grid example construction unit, the double-high power system test grid example includes: a high proportion of new energy sites and a direct current transmission system; wherein the short-circuit ratios of the new energy multi-sites at the grid access points of each new energy unit are different; The model building unit builds a full electromagnetic transient simulation model of the dual-high power system test grid example, including: Based on the all-digital real-time simulator HYPERSIM power system digital-analog hybrid real-time simulation platform, a full electromagnetic transient simulation model of the dual-high power system test grid example was built; The full electromagnetic transient simulation model includes: a traditional generator set sub-model, a new energy generator set sub-model, a UHV DC transmission system sub-model and a load sub-model; The traditional generator set sub-model includes a water turbine set and a steam turbine set, both of which use a speed controller and an excitation controller consistent with actual characteristics; The new energy unit sub-model includes a photovoltaic generator and a wind turbine generator; the photovoltaic generator adopts a classic photovoltaic structured model, and the wind turbine generator adopts a classic double-fed wind turbine model and a classic direct-drive wind turbine model; The UHV DC transmission system sub-model is established according to the actual engineering main circuit structure and parameters, including converter transformer, converter valve, AC filter, DC filter, DC line, grounding electrode line, surge arrester, switch and lightning arrester; The load sub-model includes a static load and a dynamic load. The static load includes a constant impedance load, a constant current load and a constant power load. The dynamic load is set by an induction motor.
6. The system according to claim 5, It is characterized in that The test unit, based on the full electromagnetic transient simulation model, connects the new energy unit to be tested to the dual-high power system according to the new energy multi-station short-circuit ratio, and tests the adaptability of the new energy unit to be connected to the dual-high power system under different new energy multi-station short-circuit ratios, so as to determine the new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected, including: A matching module, used for establishing a model of the new energy unit to be tested, and multiplying the model of the new energy unit to be tested to make the installed capacity and active and reactive output match the access point of the dual-high power system; A steady-state operating condition establishment test module is used to connect the new energy unit model to be tested to the access point with the smallest new energy multi-station short-circuit ratio in the new energy multi-station short-circuit ratio sequence based on the full electromagnetic transient simulation model, and connect to the power grid after passing through a step-up transformer and an equivalent collection line. If the power grid can operate stably and meet the preset steady-state operating condition establishment conditions after the new energy unit to be tested is connected to the power grid, it is determined that the short-circuit ratio of the new energy multi-station currently connected meets the steady-state operating condition establishment requirements; The fault ride-through characteristic testing module is used to perform a preset typical fault ride-through capability test at the grid access point of the currently connected new energy multi-station short-circuit ratio when it is determined that the short-circuit ratio of the currently connected new energy multi-station meets the requirements for establishing a steady-state operating condition. If the new energy unit to be tested can resume normal operation after the preset typical fault, it is determined that the grid access point of the currently connected new energy multi-station short-circuit ratio of the new energy unit to be tested can enable the system to meet the fault ride-through characteristic requirements, and the currently connected new energy multi-station short-circuit ratio is determined to be a new energy multi-station short-circuit ratio that allows the new energy unit to be tested to be connected.
7. The system according to claim 6, It is characterized in that The system further comprises: The update module is used to connect the new energy unit to the next higher new energy multi-station short-circuit ratio selected according to the new energy multi-station short-circuit ratio sequence when it is determined that the short-circuit ratio of the currently connected new energy multi-station does not meet the requirements for establishing a steady-state operating condition, or when it is determined that the new energy unit to be tested cannot make the system meet the fault ride-through characteristic requirements at the grid access point of the currently connected new energy multi-station short-circuit ratio. The update module returns to the steady-state operating condition establishment test module for retesting.
8. The system according to claim 6, It is characterized in that In the steady-state operating condition establishment test module, the preset steady-state operating condition establishment conditions include: before and after the connection of the new energy unit to be tested, the output of the new energy units in the grid operates normally according to the set value, and the change amplitude of the key bus node voltage is within the preset first change amplitude range, and the change amplitude of the transmission power of the ultra-high voltage direct current transmission system is within the preset second change amplitude range.