A load box and assembly method for pressure-maintaining synchronous jacking pile bearing capacity self-balancing method
By using hydraulic balance valve and hydraulic check valve in the load box to achieve synchronous lifting, and using hydraulic Y-shaped sealing ring and guide ring to improve sealing, the existing load box in the vertical ultimate bearing capacity detection of the foundation pile is solved. Synchronous lifting and insufficient sealing have achieved more authentic and reliable test data and simplified installation process.
Patent Information
- Application Number
- CN202110859926.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-28
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-07-28
AI Technical Summary
The existing load box has problems of synchronous lifting and insufficient sealing in the vertical ultimate bearing capacity detection of foundation piles, resulting in untrue and reliable test data, complex installation and low success rate.
A self-balancing load box for bearing capacity of the foundation pile is designed, and a hydraulic balance valve and hydraulic check valve are used to achieve synchronous lifting. The hydraulic jack uses hydraulic Y-shaped sealing ring and guide ring to improve sealing, and through Displacement wire connectors simplify the installation process and avoid welding of steel pipes.
The synchronous lifting and pressure holding effect of hydraulic jacks in the load box is realized, which improves the authenticity and reliability of the test data, simplifies the installation process, reduces cost and time consumption, and increases the test success rate.
Smart Images

Figure CN113482070B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction pile foundation engineering bearing capacity detection, in particular to a pressure-maintaining synchronous jacking pile bearing capacity self-balancing method load box and an assembly method. Background Art
[0002] Pile foundations are widely used in construction engineering, road and bridge engineering, port engineering, water conservancy engineering and other fields because of their good earthquake resistance, high bearing capacity, small settlement and ability to handle special geographical soils. However, the detection method for the vertical ultimate bearing capacity of foundation piles is relatively simple. The commonly used method is the static load test method. Although this test is relatively direct and reliable, it has a long test cycle, high cost and certain risks. Therefore, a self-balancing static load test is proposed. In this test, the load box is connected to the steel cage and placed at the balance point or neutral point of the pile body. The load box is loaded step by step, and the displacement wire is used to observe the upward and downward displacement of the pile body under the action of the load box, so as to obtain the vertical ultimate bearing capacity of the single pile by calculation.
[0003] At present, there are many types of load boxes developed in China, but the hydraulic jacks in most load boxes are connected in series, which cannot be lifted synchronously and cannot maintain pressure when loading. In addition, the hydraulic jacks use O-rings, which have poor sealing effects. In addition, when installing the load box, four separate steel pipes need to be welded to install the displacement wire during the test. This type of load box has design defects, is complex to install, and has a low test success rate. Therefore, it is necessary to design a more reasonable, reliable, and easy-to-install load box to solve the above problems. Summary of the invention
[0004] In view of the above problems, the purpose of the present invention is to provide a load box and an assembly method for the self-balancing method of pressure-maintaining and synchronously jacking pile bearing capacity. The load box has the characteristics of pressure maintenance, synchronous jacking, and easy installation. It provides reliable data for the detection of the vertical ultimate bearing capacity of the pile, and aims to overcome the various defects of the existing load boxes in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a load box of a self-balancing method for bearing capacity of a pressure-maintaining synchronous jacking pile foundation, comprising an upper displacement plate, a lower displacement plate, a hydraulic jack, a hydraulic balancing valve, a hydraulic one-way valve, a grouting pipe, a displacement wire connector, a displacement wire, a jack connecting screw and a high-pressure oil pipe, wherein the hydraulic jack is installed between the upper displacement plate and the lower displacement plate through the jack connecting screw, the hydraulic jack is provided with several, and the hydraulic jacks are connected in parallel, the hydraulic one-way valve and the hydraulic balancing valve are installed below the upper displacement plate, and the hydraulic one-way valve is connected to the high-pressure oil pipe, the grouting pipe is welded on the upper displacement plate, and the grouting pipe orifice is sealed with tape, two displacement wire connectors are welded on the top surface of the upper displacement plate and the top surface of the lower displacement plate, and the displacement wire is connected to the displacement wire connector by rotation, and the displacement wire adopts copper-plated steel wire;
[0006] The hydraulic jack comprises an oil cylinder, a piston, a hydraulic Y-shaped sealing ring, a guide ring, an oil inlet, a piston thread hole and an oil cylinder thread hole. A piston is installed in the oil cylinder, and a hydraulic Y-shaped sealing ring is installed on the top of the piston. A guide ring is installed inside the bottom of the oil cylinder, and a cylinder thread hole is opened in the center of the top surface of the oil cylinder. A piston thread hole is opened in the center of the bottom surface of the piston. An oil inlet is installed on one side of the upper part of the oil cylinder.
[0007] The displacement wire connector includes a round nut, a bolt and a displacement wire soft protection tube. Two round nuts are welded on the top surfaces of the upper displacement plate and the lower displacement plate respectively. One end of the displacement wire is squeezed into the center of the bolt head, and a displacement wire soft protection tube is sleeved on the outside of the displacement wire. One end of the displacement wire soft protection tube is bonded to the center of the bolt head.
[0008] Preferably, the upper displacement plate is provided with a lower displacement opening, a high-pressure oil pipe opening, a jack connecting thread hole, a grouting pipe opening and a filling conduit opening; the displacement wire on the lower displacement plate passes through the lower displacement opening; the hydraulic jack is connected to the upper displacement plate via the jack connecting thread hole, the cylinder thread hole and the jack connecting screw; the hydraulic jack is connected to the lower displacement plate via the jack connecting thread hole, the piston thread hole and the jack connecting screw; the grouting pipe is installed in the grouting pipe opening; and the filling conduit opening is located in the middle of the upper displacement plate.
[0009] Preferably, the size and quantity of the hydraulic jacks can be determined according to the size of the upper displacement plate and the lower displacement plate and the characteristic value of the designed vertical bearing capacity of the foundation piles.
[0010] Preferably, the upper displacement plate and the lower displacement plate are both steel plates, and the outer diameters of the upper displacement plate and the lower displacement plate are determined according to the size of the test pile foundation, and the thickness is determined according to the size of the characteristic value of the design bearing capacity of the pile foundation.
[0011] Preferably, the lower displacement plate is provided with a jack connection thread hole and a filling conduit opening corresponding to the upper displacement plate.
[0012] Preferably, the hydraulic balance valve has only one oil inlet, and the number of oil outlets is the same as the number of hydraulic jacks.
[0013] Preferably, the vertical center lines of the filling catheter openings on the upper displacement plate and the lower displacement plate coincide with each other, the vertical center lines of the jack connecting thread holes also coincide with each other, and the connecting line of the two round nuts on the top surface of the upper displacement plate is perpendicular to the connecting line of the two round nuts on the top surface of the lower displacement plate.
[0014] Compared with the prior art, the invention has the following beneficial effects: the pressure-maintaining synchronous jacking pile bearing capacity self-balancing method load box,
[0015] 1. A hydraulic balancing valve is installed to allow several jacks in the load box to be lifted synchronously, making the data of the static load test of the pile self-balancing method more real and reliable;
[0016] 2. A hydraulic one-way valve is installed on each hydraulic jack, so that the hydraulic jack can only lift but not compress, thereby achieving a pressure-maintaining effect, without the need to continuously replenish pressure during the static load test of the pile self-balancing method;
[0017] 3. The displacement wire is placed in the displacement wire soft protection tube, and the displacement wire is connected with the bolt and can be coiled for easy transportation. When the load box is installed on site, the connection between the displacement wire and the load box is realized after the bolt is rotated to connect the round nut, so there is no need to weld a separate steel pipe on the load box for installing the displacement wire in the later test; the outer diameter of the displacement wire soft protection tube is very small, and it will be cast in the pile foundation concrete together with the steel cage. In the later test, only the displacement wire soft protection tube above the ground needs to be cut off to expose the displacement wire, which is very convenient to connect with the test instrument; due to the displacement wire soft protection tube and the displacement wire connector, on the one hand, the connection between the displacement wire and the load box is more reliable, and on the other hand, it is easy to install, save time, and save the cost of welding the displacement wire steel pipe separately;
[0018] 4. A hydraulic Y-ring is installed on the piston of the hydraulic jack instead of an O-ring, which makes the hydraulic jack more sealed and has a longer storage time. A guide ring is installed on the hydraulic jack cylinder to make the piston easier to install without damaging the hydraulic Y-ring on the piston. In addition, when the hydraulic jack is installed, the piston contacts the lower displacement plate, the cylinder contacts the upper displacement plate, the hydraulic balance valve and the hydraulic check valve are both installed on the bottom surface of the upper displacement plate, and the high-pressure oil pipe is cast in the pile foundation concrete. When the load box is loaded, the ejection of the hydraulic jack piston becomes larger and does not affect the high-pressure oil pipe.
[0019] 5. There is a filling conduit opening between the upper displacement plate and the lower displacement plate. Whether the load box is installed at the bottom or the middle of the pile foundation, the integrity of the pile foundation concrete can be guaranteed. In addition, the load box is equipped with a grouting pipe. After the self-balancing static load test is completed, high-pressure grouting is injected into the grouting pipe to fill the gap between the upper displacement plate and the lower displacement plate of the load box and the gap generated by the test. If the load box is installed at the bottom of the pile foundation, high-pressure grouting can make the pile bottom denser, thereby improving the integrity of the pile foundation.
[0020] 6. Open jack connection holes on the upper displacement plate and the lower displacement plate, and then install the hydraulic jack between the upper displacement plate and the lower displacement plate through the jack connection screw. This form can make the installation of the hydraulic jack more accurate and the connection more reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a structural schematic diagram of the present invention;
[0022] Figure 2 It is a main cross-sectional view of the present invention;
[0023] Figure 3 It is a schematic diagram of the jack connecting screw of the present invention;
[0024] Figure 4 It is a schematic diagram of the structure of the displacement wire connector of the present invention;
[0025] Figure 5 It is a schematic diagram of the structure of the hydraulic jack of the present invention;
[0026] Figure 6 It is a cross-sectional view of the hydraulic jack of the present invention;
[0027] Figure 7 It is a top view of the upper displacement plate of the present invention;
[0028] Figure 8 It is a top view of the lower displacement plate of the present invention.
[0029] In the figure: upper displacement plate 1, lower displacement plate 2, hydraulic jack 3, hydraulic balance valve 4, hydraulic one-way valve 5, grouting pipe 6, displacement wire connector 7, displacement wire 8, jack connecting screw 9, high-pressure oil pipe 10, round nut 11, bolt 12, displacement wire soft protection tube 13, oil cylinder 14, piston 15, hydraulic Y-type sealing ring 16, guide ring 17, oil inlet 18, piston thread hole 19, oil cylinder thread hole 20, lower displacement opening 21, high-pressure oil pipe opening 22, jack connecting thread hole 23, grouting pipe opening 24, pile guide pipe opening 25. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] See also Figure 1-8 The present invention provides a technical solution: a pressure-maintaining synchronous jacking pile bearing capacity self-balancing method load box, including an upper displacement plate 1, a lower displacement plate 2, a hydraulic jack 3, a hydraulic balance valve 4, a hydraulic check valve 5, a grouting pipe 6, a displacement wire connector 7, a displacement wire 8, a jack connecting screw 9 and a high-pressure oil pipe 10. The hydraulic jack 3 is installed between the upper displacement plate 1 and the lower displacement plate 2 through the jack connecting screw 9. There are several hydraulic jacks 3, and the hydraulic jacks 3 are connected in parallel. The hydraulic check valve 5 and the hydraulic balance valve 4 are installed below the upper displacement plate 1. The hydraulic one-way valve 5 is connected to the high-pressure oil pipe 10. The strength of the high-pressure oil pipe 10 needs to be ≥60MPa. Its length can be determined according to the depth of the load box installation position from the ground. Generally, it can be 2m above the ground. The grouting pipe 6 is welded to the upper displacement plate 1, and the mouth of the grouting pipe 6 is sealed with tape to prevent concrete from entering, which is convenient for later grouting. Two displacement wire connectors 7 are welded on the top surface of the upper displacement plate 1 and the top surface of the lower displacement plate 2, and the displacement wire 8 is connected to the displacement wire connector 7 by rotation. The displacement wire 8 is made of copper-plated steel wire, and its length refers to the length of the high-pressure oil pipe 10.
[0032] The hydraulic jack 3 includes a cylinder 14, a piston 15, a hydraulic Y-shaped sealing ring 16, a guide ring 17, an oil inlet 18, a piston thread hole 19 and a cylinder thread hole 20. The piston 15 is installed in the cylinder 14, and a hydraulic Y-shaped sealing ring 16 is installed on the top of the piston 15. The guide ring 17 is installed inside the bottom end of the cylinder 14, and a cylinder thread hole 20 is opened in the center of the top surface of the cylinder 14. The piston thread hole 19 is opened in the center of the bottom surface of the piston 15. An oil inlet 18 is installed on one side of the upper part of the cylinder 14. When the hydraulic jack 3 is installed, the top surface of the cylinder 14 contacts the bottom surface of the upper displacement plate 1, and the bottom surface of the piston 15 contacts the top surface of the lower displacement plate 2. The hydraulic one-way valve 5 can only allow the hydraulic oil in the high-pressure oil pipe 10 to enter the hydraulic jack 3, so that the piston 15 of the hydraulic jack 3 can only be pushed out of the cylinder 14 to achieve pressure maintenance. Each hydraulic one-way valve 5 is connected to a hydraulic jack 3.
[0033] The displacement wire connector 7 includes a round nut 11, a bolt 12 and a displacement wire soft protection tube 13. Two round nuts 11 are welded on the top surfaces of the upper displacement plate 1 and the lower displacement plate 2, respectively. One end of the displacement wire 8 is squeezed at the center of the head of the bolt 12, and a displacement wire soft protection tube 13 is sleeved on the outside of the displacement wire 8. The displacement wire 8 is protected by the displacement wire soft protection tube 13. One end of the displacement wire soft protection tube 13 is bonded to the center of the head of the bolt 12, so that the displacement wire 8, the displacement wire soft protection tube 13 and the bolt 12 are connected as a whole. When installing the displacement wire 8 on the upper displacement plate 1 and the lower displacement plate 2, it is only necessary to rotate the bolt 12 so that the bolt 12 and the round nut 11 are in close contact to complete the installation of the displacement wire 8.
[0034] The upper displacement plate 1 is provided with a lower displacement opening 21, a high-pressure oil pipe opening 22, a jack connecting thread hole 23, a grouting pipe opening 24 and a pile-casting conduit opening 25. The displacement wire 8 on the lower displacement plate 2 passes through the lower displacement opening 21. The hydraulic jack 3 is connected to the upper displacement plate 1 via the jack connecting thread hole 23, the cylinder thread hole 20 and the jack connecting screw 9. The hydraulic jack 3 is connected to the lower displacement plate 2 via the jack connecting thread hole 23, the piston thread hole 19 and the jack connecting screw 9. The grouting pipe 6 is installed in the grouting pipe opening 24, and the pile-casting conduit opening 25 is located in the middle of the upper displacement plate 1.
[0035] The size and number of the hydraulic jacks 3 can be determined according to the size of the upper displacement plate 1 and the lower displacement plate 2 and the characteristic value of the vertical bearing capacity of the foundation pile design. Generally, the number of hydraulic jacks 3 is at least 3, and the effective stroke needs to be ≥15cm.
[0036] The upper displacement plate 1 and the lower displacement plate 2 are both steel plates, and the outer diameters of the upper displacement plate 1 and the lower displacement plate 2 are determined according to the size of the test pile foundation, and the thickness is determined according to the size of the characteristic value of the design bearing capacity of the pile foundation.
[0037] The lower displacement plate 2 is provided with a jack connection thread hole 23 and a pile guide pipe opening 25 corresponding to the upper displacement plate 1 .
[0038] The hydraulic balance valve 4 has only one oil inlet, and the number of oil outlets is the same as the number of hydraulic jacks 3. The hydraulic oil in the high-pressure oil pipe 10 first enters the hydraulic balance valve 4, and then the hydraulic balance valve 4 evenly distributes the hydraulic oil to each hydraulic check valve 5, so that several hydraulic jacks 3 are lifted synchronously.
[0039] The vertical center lines of the pile-casting guide openings 25 on the upper displacement plate 1 and the lower displacement plate 2 coincide, and the vertical center lines of the jack connecting thread holes 23 also coincide. The connecting line of the two round nuts 11 on the top surface of the upper displacement plate 1 is perpendicular to the connecting line of the two round nuts 11 on the top surface of the lower displacement plate 2.
[0040] A method for assembling a load box of a self-balancing method for the bearing capacity of a pressure-maintaining synchronous jacking pile: first, a hydraulic jack 3 is manufactured: according to the pile diameter and the bearing capacity design characteristic value of the pile, the tonnage of the hydraulic jack 3 is calculated, and the bottom thickness and wall thickness of the cylinder 14 and the outer diameter of the piston 15 are calculated according to the tonnage, and then the matching hydraulic Y-type sealing ring 16 and guide ring 17 are selected; first, the cylinder 14 and the piston 15 are processed according to the calculated dimensions, and the matching clearance between the two is less than 0.1mm, and then the guide ring 17 is installed in the cylinder 14, and the hydraulic Y-type sealing ring 16 is installed on the piston 15, and the cylinder thread hole 20 is drilled in the center of the top surface of the cylinder 14, and the piston thread hole 19 is drilled in the center of the bottom surface of the piston 15, and finally, the cylinder 14 and the piston 15 are assembled in a hydraulic oil environment to complete the manufacture of the hydraulic jack 3.
[0041] Secondly, the upper displacement plate 1 and the lower displacement plate 2 are manufactured: according to the size of the steel cage of the pile and the design characteristic value of the pile bearing capacity, the appropriate outer diameter and plate thickness of the upper displacement plate 1 and the lower displacement plate 2 are selected; according to the size of the filling conduit, the appropriate size of the pile filling conduit opening 25 is calculated; according to the number of hydraulic jacks 3, the number of jack connection thread holes 23 is determined; when manufacturing, firstly, the positions of various holes are designed on the upper displacement plate 1 and the lower displacement plate 2, and then the upper displacement plate 1 and the lower displacement plate 2 are cut off from the whole steel plate, and finally, the lower displacement opening 21, the high-pressure oil pipe opening 22, the jack connection thread hole 23, the grouting pipe opening 24, and the pile filling conduit opening 25 are drilled on the upper displacement plate 1, and the jack connection thread hole 23 and the pile filling conduit opening 25 are drilled on the upper and lower displacement plates 2.
[0042] Then the displacement wire 8 is made: according to the depth of the installation position of the load box in the foundation pile from the ground, the length of the displacement wire is calculated, and 4 displacement wires of this length are cut; when making it, first a small hole is opened in the head of the bolt 12, and one end of the displacement wire 8 is squeezed into the head of the bolt 12 by a press, so that the displacement wire 8 and the bolt 12 are connected as one, and then two different colors of displacement wire soft protection tubes 13 are selected and put on the displacement wire 8, and the end of the displacement wire soft protection tube 13 and the head of the bolt 12 are tightly bonded together, so that the displacement wire 8, the displacement wire soft protection tube 13 and the bolt 12 are connected as one, and the other end of the displacement wire soft protection tube 13 is sealed with tape, and the production of the displacement wire 8 is completed. Finally, the manufactured displacement wire 8 is coiled into a circle for easy transportation.
[0043] Install several manufactured hydraulic jacks 3 between the upper displacement plate 1 and the lower displacement plate 2 through the jack connecting screw 9, and then bond the hydraulic balance valve 4 and several hydraulic check valves 5 to the bottom surface of the upper displacement plate 1, and use the high-pressure oil pipe 10 to pass through the high-pressure oil pipe opening 22 on the upper displacement plate 1 to connect the oil inlet of the hydraulic balance valve 4, and then use the high-pressure oil pipe 10 to connect the hydraulic check valve 5 from the oil outlet of the hydraulic balance valve 4 respectively, and then connect the hydraulic jack 3, and then use a 0.5mm thick steel plate to seal the hydraulic balance valve 4, the hydraulic check valve 5 and the high-pressure oil pipe 10 on the bottom surface of the upper displacement plate 1, and finally weld the round nut 11 on the top surface of the lower displacement plate 2 just below the lower displacement opening 21, and weld the round nut 11 on the vertical position of the connection line of the two lower displacement openings 21 on the top surface of the upper displacement plate 1, and the assembly of the entire load box is completed;
[0044] Calibration: After the load box is assembled, it needs to be calibrated by a company that has the qualification to calibrate the load box and obtain the calibration report of the load box;
[0045] On-site installation: After the pile holes are drilled and the pile foundation steel cage is made, the load box and the steel cage are installed. If the load box is at the bottom of the pile, first weld all the main bars of the pile foundation steel cage to the top surface of the upper displacement plate 1, and then use L-shaped lap steel bars to strengthen the connection between the load box and the pile foundation steel cage. Then let the grouting pipe 6 pass through the grouting pipe opening 24 on the upper displacement plate 1 to make it contact with the top surface of the lower displacement plate 2, weld the grouting pipe 6 at the position of the grouting pipe opening 24 on the upper displacement plate 1, and then disassemble the 4 displacement wires 8, rotate the bolts 12 to make them tightly connected with the round nuts 11, install 2 displacement wires 8 of the same color on the upper displacement plate 1, and install 2 displacement wires 8 of another color on the lower displacement plate 2, so as to distinguish between upper displacement or lower displacement in the later test. Finally, when lowering the pile foundation steel cage in the pile hole, the 4 displacement wires 8, the high-pressure oil pipe 10 and the grouting The pipe 6 is tied to the main reinforcement of the pile foundation steel cage every 1.5m and connected to the ground, and the installation of the load box is completed; if the load box is installed in the middle displacement of the pile foundation, the pile foundation steel cage needs to be welded on the bottom surface of the displacement plate 2 under the load box, and the connection between the load box and the pile foundation steel cage needs to be strengthened with L-shaped overlapping steel bars, and the installation and binding of the grouting pipe 6, displacement wire 8 and high-pressure oil pipe are the same as the installation method of the load box at the bottom of the pile foundation; in the process of pouring pile foundation concrete, it is necessary to prevent the filling conduit from bumping and damaging the displacement wire soft protection pipe 13, high-pressure oil pipe 10 and grouting pipe 6, and to prevent cement slurry from entering the displacement wire soft protection pipe 13 and the grouting pipe 6. After the pouring of the pile foundation concrete is completed, the grouting pipe 6, high-pressure oil pipe 10 and displacement wire soft protection pipe 13 exposed on the ground need to be protected to prevent them from being damaged by machinery;
[0046] Self-balancing static load test: 28 days after the concrete is poured on the foundation pile, the self-balancing static load test can be carried out. First, install the test reference frame above the foundation pile ground, distinguish the upper displacement or lower displacement according to the color of the displacement wire soft protection tube 13, cut off the displacement wire soft protection tube 13 exposed on the ground, expose the displacement wire 8, install the displacement wire 8 exposed on the ground on the test reference frame, and then connect the high-pressure oil pipe 10 to the high-pressure oil pump used in the test. Finally, install other test equipment and start the self-balancing static load test; when the test is completed, high-pressure grouting is carried out in a grouting pipe 6 exposed on the ground. When the grouting liquid overflows from another grouting pipe 6, it proves that the grouting is completed. The content not described in detail in this description belongs to the existing technology known to professional and technical personnel in this field.
[0047] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pressure-maintaining synchronous jacking pile bearing capacity self-balancing method load box, comprising an upper displacement plate (1), a lower displacement plate (2), a hydraulic jack (3), a hydraulic balancing valve (4), a hydraulic check valve (5), a grouting pipe (6), a displacement wire connector (7), a displacement wire (8), a jack connecting screw (9) and a high-pressure oil pipe (10), characterized in that: The hydraulic jack (3) is installed between the upper displacement plate (1) and the lower displacement plate (2) via a jack connecting screw (9). The hydraulic jack (3) is provided in plurality, and the hydraulic jacks (3) are connected in parallel. The hydraulic one-way valve (5) and the hydraulic balance valve (4) are installed below the upper displacement plate (1), and the hydraulic one-way valve (5) is connected to the high-pressure oil pipe (10). The grouting pipe (6) is welded to the upper displacement plate (1), and the mouth of the grouting pipe (6) is sealed with an adhesive tape. Two displacement wire connectors (7) are welded to the top surfaces of the upper displacement plate (1) and the lower displacement plate (2), and the displacement wire (8) is connected to the displacement wire connector (7) by rotation. The displacement wire (8) is made of copper-plated steel wire. The hydraulic jack (3) comprises an oil cylinder (14), a piston (15), a hydraulic Y-shaped sealing ring (16), a guide ring (17), an oil inlet (18), a piston thread hole (19) and an oil cylinder thread hole (20); the oil cylinder (14) is provided with a piston (15), and the top of the piston (15) is provided with a hydraulic Y-shaped sealing ring (16); the bottom of the oil cylinder (14) is provided with a guide ring (17), and the center of the top surface of the oil cylinder (14) is provided with an oil cylinder thread hole (20); the center of the bottom surface of the piston (15) is provided with a piston thread hole (19); and an oil inlet (18) is provided on one side of the upper part of the oil cylinder (14); the size and quantity of the hydraulic jack (3) can be determined according to the size of the upper displacement plate (1) and the lower displacement plate (2) and the characteristic value of the designed vertical bearing capacity of the foundation pile; The displacement wire connector (7) comprises a round nut (11), a bolt (12) and a displacement wire soft protection tube (13), wherein two round nuts (11) are welded on the top surfaces of the upper displacement plate (1) and the lower displacement plate (2), respectively, one end of the displacement wire (8) is squeezed at the center of the head of the bolt (12), and the displacement wire (8) is sleeved with a displacement wire soft protection tube (13), and one end of the displacement wire soft protection tube (13) is bonded to the center of the head of the bolt (12); The upper displacement plate (1) is provided with a lower displacement opening (21), a high-pressure oil pipe opening (22), a jack connection thread hole (23), a grouting pipe opening (24) and a pile-casting conduit opening (25); the displacement thread (8) on the lower displacement plate (2) passes through the lower displacement opening (21); the hydraulic jack (3) is connected to the upper displacement plate (1) via the jack connection thread hole (23), the cylinder thread hole (20) and the jack connection screw (9); the hydraulic jack (3) is connected to the lower displacement plate (2) via the jack connection thread hole (23), the piston thread hole (19) and the jack connection screw (9); the grouting pipe (6) is installed in the grouting pipe opening (24); and the pile-casting conduit opening (25) is located in the middle of the upper displacement plate (1); The lower displacement plate (2) is provided with a jack connection thread hole (23) and a pile guide pipe opening (25) corresponding to the upper displacement plate (1); The hydraulic balance valve (4) has only one oil inlet, and the number of oil outlets is the same as the number of the hydraulic jack (3); The vertical center lines of the pile-casting guide openings (25) on the upper displacement plate (1) and the lower displacement plate (2) coincide with each other, the vertical center lines of the jack connection thread holes (23) also coincide with each other, and the connecting line of the two round nuts (11) on the top surface of the upper displacement plate (1) is perpendicular to the connecting line of the two round nuts (11) on the top surface of the lower displacement plate (2).
2. According to claim 1, a pressure-maintaining synchronous jacking pile bearing capacity self-balancing method load box is characterized by: The upper displacement plate (1) and the lower displacement plate (2) are both steel plates, and the outer diameters of the upper displacement plate (1) and the lower displacement plate (2) are determined according to the size of the test pile foundation, and the thickness is determined according to the size of the characteristic value of the pile foundation design bearing capacity.
3. A method for assembling a load box of a pressure-maintaining synchronous jacking pile bearing capacity self-balancing method according to claim 1, characterized in that: The specific method is as follows: firstly, the hydraulic jack (3) is manufactured: according to the pile diameter and the bearing capacity design characteristic value of the foundation pile, the tonnage of the hydraulic jack (3) is calculated, and the bottom thickness and wall thickness of the oil cylinder (14) and the outer diameter of the piston (15) are calculated according to the tonnage, and then the matching hydraulic Y-type sealing ring (16) and guide ring (17) are selected; firstly, the oil cylinder (14) and the piston (15) are processed according to the calculated dimensions, and the matching clearance between the two is less than 0.1mm, and then the guide ring (17) is installed in the oil cylinder (14), and the hydraulic Y-type sealing ring (16) is installed on the piston (15), and the oil cylinder thread hole (20) is drilled in the center of the top surface of the oil cylinder (14), and the piston thread hole (19) is drilled in the center of the bottom surface of the piston (15); finally, the oil cylinder (14) and the piston (15) are assembled in a hydraulic oil environment, and the manufacture of the hydraulic jack (3) is completed; Next, the upper displacement plate (1) and the lower displacement plate (2) are manufactured: according to the size of the steel cage of the foundation pile and the design characteristic value of the bearing capacity of the foundation pile, the outer diameter and plate thickness of the upper displacement plate (1) and the lower displacement plate (2) are selected appropriately; according to the size of the filling pipe, the size of the appropriate pile filling pipe opening (25) is calculated; according to the number of hydraulic jacks (3), the number of jack connection thread holes (23) is determined; during the manufacturing process, the positions of various holes are first designed on the upper displacement plate (1) and the lower displacement plate (2), and then the upper displacement plate (1) and the lower displacement plate (2) are cut off from the whole steel plate; finally, the lower displacement opening (21), the high-pressure oil pipe opening (22), the jack connection thread hole (23), the grouting pipe opening (24), and the pile filling pipe opening (25) are drilled on the upper displacement plate (1), and the jack connection thread hole (23) and the pile filling pipe opening (25) are drilled on the upper and lower displacement plates (2); Then, the displacement wire (8) is manufactured: the length of the displacement wire is calculated according to the depth of the installation position of the load box in the foundation pile from the ground, and four displacement wires of the length are cut; when manufacturing, a small hole is first opened in the head of the bolt (12), and one end of the displacement wire (8) is squeezed into the head of the bolt (12) by a press, so that the displacement wire (8) and the bolt (12) are connected as one, and then two different colors of displacement wire soft protection tubes (13) are selected and put on the displacement wire (8), and the end of the displacement wire soft protection tube (13) and the head of the bolt (12) are tightly bonded together, so that the displacement wire (8), the displacement wire soft protection tube (13) and the bolt (12) are connected as one, and the other end of the displacement wire soft protection tube (13) is sealed with tape, so that the manufacturing of the displacement wire (8) is completed, and finally the manufactured displacement wire (8) is coiled into a circle; The prepared hydraulic jacks (3) are installed between the upper displacement plate (1) and the lower displacement plate (2) through the jack connecting screws (9), and then the hydraulic balance valve (4) and several hydraulic check valves (5) are bonded to the bottom surface of the upper displacement plate (1). The high-pressure oil pipe (10) is passed through the high-pressure oil pipe opening (22) on the upper displacement plate (1) to connect the oil inlet of the hydraulic balance valve (4), and then the high-pressure oil pipe (10) is used to connect the oil outlet of the hydraulic balance valve (4) to the hydraulic check valve (5). 5), and then connect the hydraulic jack (3), and then use a 0.5 mm thick steel plate to seal the hydraulic balance valve (4), the hydraulic check valve (5) and the high-pressure oil pipe (10) on the bottom surface of the upper displacement plate (1), and finally weld a round nut (11) on the top surface of the lower displacement plate (2) just below the lower displacement opening (21), and weld a round nut (11) at a vertical position of the line connecting the two lower displacement openings (21) on the top surface of the upper displacement plate (1), thereby completing the assembly of the entire load box.
