Energy-saving curtain wall hoisting equipment and curtain wall hoisting construction method

Through the design of reverse winding lifting rope and disassembly plate, the problem of low efficiency of existing curtain wall lifting equipment is solved, and the efficiency of curtain wall panel lifting and energy saving is improved, and the curtain wall panels of different sizes is adapted.

CN113530039BActive Publication Date: 2024-12-20WUHAN JIANGONG GRP DECORATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110888237.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-03
Publication Date
2024-12-20
Estimated Expiration
2041-08-03

AI Technical Summary

Technical Problem

The existing curtain wall hoisting equipment needs to be removed after lifting a curtain wall panel before the next piece is lifted, resulting in low working efficiency.

Method used

The design of the lifting rope and disassembly plate with reverse winding is adopted. Multiple rotating rollers are driven by a lifting motor to achieve the reverse movement of the lifting rope, allowing simultaneous lifting and downing, saving lifting time, and adapting to different sizes by adjusting the components. curtain wall panel.

Benefits of technology

It improves the working efficiency of curtain wall panel lifting, saves energy consumption, simplifies equipment disassembly and assembly and position adjustment, and reduces the probability of curtain wall panel falling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113530039B_ABST
    Figure CN113530039B_ABST
Patent Text Reader

Abstract

The present application relates to an energy-saving curtain wall hoisting device, including a base, the base is installed on the floor or roof above the curtain wall installation area, the base is provided with a mounting frame, the mounting frame is fixed with a mounting plate at one end away from the base, the mounting plate is provided with a hoisting mechanism, the hoisting mechanism includes a hoisting motor, a hoisting roller and a hoisting rope, the hoisting motor is detachably mounted on the mounting plate, there are several hoisting rollers, several hoisting rollers can be detachably mounted on the mounting plate and rotatably mounted on the mounting plate, there are several hoisting ropes, the hoisting ropes correspond to the hoisting rollers one by one and are wound around the hoisting rollers, the rotating shafts of several hoisting rollers are connected end to end and connected to the rotating shaft of the hoisting motor, and the hoisting ropes on adjacent hoisting rollers are wound in opposite directions. The present application has the effect of improving the working efficiency of curtain wall panel hoisting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of curtain wall installation equipment, and in particular to energy-saving curtain wall hoisting equipment and a curtain wall hoisting construction method. Background Art

[0002] Unitized curtain walls are widely used in building curtain walls due to their beautiful facade effects and fast construction speed. However, with the continuous development of construction technology, buildings with complex shapes emerge in an endless stream, which brings great challenges to curtain wall construction. In the installation and construction of unitized curtain walls, panel lifting is an important link.

[0003] The existing Chinese utility model patent with announcement number CN202245811U discloses a combined curtain wall hoisting equipment, which includes a track laid on the floor, two cranes, a crane cantilever, a sliding trolley, a hoisting beam, an electric hoist and a counterweight. Two tracks are laid on the floor, and the two cranes are arranged in parallel on the track at a certain interval. The two cranes are respectively provided with the crane cantilever, and the sliding trolley is provided on the crane cantilever. Both ends of the hoisting beam are fixed on the sliding trolley. The electric hoist is installed on the hoisting beam, and the counterweight is also provided at the rear of the two cranes. The electric hoist is also provided with an electric hoist chain, a hook and an electric hoist controller; the curtain wall panel is installed by the hook, and then the curtain wall panel is lifted by the electric hoist hook to be transported to the curtain wall installation area for installation of the curtain wall. After the installation is completed, the hook is lowered to the ground through the electric hoist to hoist the next curtain wall panel.

[0004] With respect to the above-mentioned related technologies, the inventor believes that when the existing lifting equipment is used to lift and install curtain wall panels, the curtain wall panels need to be dismantled after lifting, and then the lifting equipment needs to be transported to the ground before the next curtain wall panel can be lifted, and its working efficiency is low. Summary of the invention

[0005] In order to improve the working efficiency of curtain wall panel hoisting, the present application provides an energy-saving curtain wall hoisting equipment.

[0006] This application provides an energy-saving curtain wall hoisting equipment:

[0007] An energy-saving curtain wall hoisting device comprises a base, which is installed on the floor or roof above the curtain wall installation area. The base is provided with a mounting frame, and a mounting plate is fixedly provided at one end of the mounting frame away from the base. A hoisting mechanism is installed on the mounting plate, and the hoisting mechanism comprises a hoisting motor, a hoisting roller and a hoisting rope. The hoisting motor is detachably mounted on the mounting plate. There are several hoisting rollers, and the several hoisting rollers can be detachably mounted on the mounting plate and rotatably mounted on the mounting plate. There are several hoisting ropes, which correspond to the hoisting rollers one by one and are wound around the hoisting rollers. The rotating shafts of the several hoisting rollers are connected end to end and connected to the rotating shaft of the hoisting motor. The hoisting ropes on adjacent hoisting rollers are wound in opposite directions.

[0008] By adopting the above technical solution and using a hoisting rope wound in the opposite direction, when one hoisting roller rotates to lift the hoisting rope, the adjacent hoisting roller rotates to lower the hoisting rope, so that when one curtain wall panel is hoisted to the curtain wall panel installation location, another curtain wall panel can be installed on the ground, thereby saving the hoisting time of the curtain wall panels and improving the work efficiency of the curtain wall panel hoisting. The rotating shafts of all the hoisting rollers are connected end to end and connected to the hoisting motor. Using one hoisting motor to drive all the hoisting rollers can save energy consumption.

[0009] Optionally, a disassembly plate is provided between the lifting motor and the lifting roller and the mounting plate, and the disassembly plate is detachably provided on the mounting plate by mounting bolts, and the lifting motor and the lifting roller are detachably provided on the mounting plate by the disassembly plate, the lifting motor is fixed on the disassembly plate, and the lifting roller is rotatably provided on the disassembly plate.

[0010] By adopting the above technical solution, the provision of the disassembly plate can facilitate the disassembly and assembly of the hoisting motor and the hoisting roller.

[0011] Optionally, a sliding groove is provided on the mounting plate along the length direction of the plate body, a placement groove is provided at the bottom of the sliding groove, a mounting nut is slidably placed in the placement groove, and the mounting bolt is threadedly connected in the mounting nut.

[0012] By adopting the above technical solution, the mounting nuts cooperate with the mounting bolts to conveniently adjust the position of the disassembly plate, thereby facilitating the installation and position adjustment of the lifting mechanism.

[0013] Optionally, the mounting frame is slidably disposed on the base, and the mounting frame slides toward or away from the base.

[0014] By adopting the above technical solution, the sliding setting of the mounting frame can facilitate the adjustment of the position of the mounting frame and improve the application range of the lifting equipment.

[0015] Optionally, a guide rail is fixedly provided at one end of the mounting frame away from the base, and the mounting plate is slidably mounted on the guide rail, and the sliding direction of the mounting plate is perpendicular to the sliding direction of the mounting frame.

[0016] By adopting the above technical solution, when the curtain wall is installed over a wide area, it is usually necessary to move the position. The setting of the guide rail can facilitate the adjustment of the installation plate on the guide rail, thereby eliminating the need to move the base and facilitating the lifting of the curtain wall panel.

[0017] Optionally, a plurality of counterweights are placed on the base.

[0018] By adopting the above technical solution, the provision of the counterweight block can reduce the probability of the base falling.

[0019] Optionally, a lifting frame is installed at one end of the lifting rope away from the lifting roller, and the lifting frame includes corner frames and connecting rods. There are four corner frames and four connecting rods. The four corner frames and the four connecting rods are spliced ​​into a rectangular frame. The four corner frames are respectively arranged at the four corners of the rectangular frame. The two ends of the length of the four connecting rods are respectively inserted into adjacent corner frames and slidably arranged in the corner frames.

[0020] By adopting the above technical solution, the hanging frame is used to install the curtain wall panels, and the sliding of the connecting rod on the corner frame can realize the adjustment of the hanging frame, so that the hanging frame can adapt to curtain wall panels of different sizes.

[0021] Optionally, an adjustment component is arranged between the connecting rod and the corner frame, and the adjustment component includes an adjustment groove, an adjustment screw and an adjustment nut. The adjustment groove is opened on the corner frame, and the adjustment screw is slidably arranged in the adjustment groove. One end of the adjustment screw extends into the corner frame and is fixedly connected to the connecting rod, and the adjustment nut is threadedly connected to the adjustment screw at one end of the adjustment screw away from the connecting rod.

[0022] By adopting the above technical solution, the setting of the adjustment component can facilitate the adjustment of the connecting rod on the corner frame, and at the same time, the connecting rod can be fixed after the connection adjustment is completed.

[0023] Optionally, a fixing plate is fixedly provided at one end of the corner frame in the thickness direction of the hanging frame, and a reinforcement component is installed on the fixing plate, and the reinforcement component includes a reinforcement screw, a reinforcement nut and a reinforcement suction cup. The reinforcement screw is slidably set on the fixing plate along the thickness direction of the hanging frame, and the reinforcement nut is rotatably set on the fixing plate away from the corner frame. The reinforcement nut is threadedly connected to the reinforcement screw, and the reinforcement suction cup is fixed on the reinforcement screw on the side of the fixing plate facing the hanging frame.

[0024] By adopting the above technical solution, the fixing plate cooperates with the reinforcement assembly to reinforce the curtain wall panel, thereby reducing the probability of the curtain wall panel falling during the hoisting process.

[0025] A curtain wall hoisting construction method comprises the following steps:

[0026] Step 1: Install the base, install the base on the floor or roof, and press a number of counterweights on the base;

[0027] Step 2: Install the hoisting mechanism. Install the hoisting motor and appropriate hoisting rollers on the mounting plate according to the scale of the curtain wall, and install the hoisting frame on the hoisting rope;

[0028] Step 3: Adjust the mounting plate, adjust the position of the mounting bracket on the base, and adjust the position of the mounting plate on the mounting bracket;

[0029] Step 4: Adjust the hoisting frame according to the size of the curtain wall panel;

[0030] Step 5: Curtain wall hoisting: install the curtain wall panels on the hoisting frame for hoisting. When the hoisting frame for installing the curtain wall panels is transported to the curtain wall installation area, the adjacent hoisting frame is transported to the ground to install the curtain wall panels;

[0031] Step 6: Install the curtain wall and install the curtain wall panels hoisted to the curtain wall installation area. After the curtain wall panels are installed, the hoisting frame is transported to the ground, and the curtain wall panels in the adjacent hoisting frame are transported to the hoisting position.

[0032] By adopting the above technical solution, curtain wall panels can be installed on the ground while installing the curtain wall, thereby saving the time of curtain wall panel installation and improving the efficiency of curtain wall installation. When one hoisting frame is lifted, the adjacent hoisting frame is lowered, and the staggered transportation can save hoisting time and further improve the efficiency of curtain wall installation.

[0033] In summary, the present application includes at least one of the following beneficial technical effects:

[0034] By using the hoisting rope wound in the opposite direction, when one hoisting roller rotates to lift the hoisting rope, the adjacent hoisting roller rotates to lower the hoisting rope, so that when one curtain wall panel is hoisted to the installation location of the curtain wall panel, the other curtain wall panel can be installed on the ground, thereby saving the hoisting time of the curtain wall panel and improving the work efficiency of the curtain wall panel hoisting. The rotating shafts of all hoisting rollers are connected end to end and connected to the hoisting motor. Using one hoisting motor to drive all hoisting rollers can save energy consumption;

[0035] The disassembly and assembly plate can facilitate the disassembly and assembly of the hoisting motor and the hoisting roller;

[0036] The mounting nuts and mounting bolts can conveniently adjust the position of the disassembly plate, thereby facilitating the installation and position adjustment of the lifting mechanism;

[0037] The hanging frame is used to install curtain wall panels. The sliding of the connecting rod on the corner frame can adjust the hanging frame so that the hanging frame can adapt to curtain wall panels of different sizes.

[0038] The setting of the adjustment component can facilitate the adjustment of the connecting rod on the corner frame, and can also fix the connecting rod after the connection adjustment is completed;

[0039] The fixing plate and the reinforcement components can reinforce the curtain wall panels and reduce the probability of the curtain wall panels falling during the lifting process. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a schematic diagram of the overall structure of this embodiment.

[0041] Figure 2 It is a schematic diagram of the overall structure of this embodiment from another viewing angle.

[0042] Figure 3 It is a schematic diagram of the overall structure of this embodiment from other viewing angles.

[0043] Figure 4 yes Figure 3 Enlarged schematic diagram of part A in the middle.

[0044] Figure 5 yes Figure 2 Enlarged schematic diagram of part B in the middle.

[0045] Explanation of the accompanying drawings: 0, floor; 1, base; 2, mounting frame; 3, mounting plate; 4, lifting mechanism; 41, lifting motor; 42, lifting roller; 43, lifting rope; 5, spline; 6, connecting shaft; 7, sliding sleeve; 8, fixing bolt; 9, guide rail; 10, driving assembly; 101, driving platform; 102, driving roller; 103, driving motor; 11, counterweight; 12, disassembly and assembly plate; 13, mounting bolt; 14, sliding groove; 15, placement groove; 16, mounting nut; 17, lifting frame; 171, corner frame; 172, connecting rod; 18, adjustment assembly; 181, adjustment groove; 182, adjustment screw; 183, adjustment nut; 19, fixing plate; 20, reinforcement assembly; 201, reinforcement screw; 202, reinforcement nut; 203, reinforcement suction cup. DETAILED DESCRIPTION

[0046] The following is combined with Figure 1-5 This application is described in further detail.

[0047] The present application embodiment discloses an energy-saving curtain wall hoisting device, referring to Figure 1 and Figure 2, including a base 1, which is installed on the floor 0 or the roof above the curtain wall installation area, a mounting frame 2 is arranged on the base 1, a mounting plate 3 is fixedly arranged at one end of the mounting frame 2 away from the base 1, a lifting mechanism 4 is installed on the mounting plate 3, the lifting mechanism 4 includes a lifting motor 41 detachably mounted on the mounting plate 3, a plurality of lifting rollers 42 which are all detachably mounted on the mounting plate 3, and a lifting rope 43 which corresponds to the lifting rollers 42 one by one and is wound around the lifting rollers 42, the lifting rollers 42 are rotatably arranged on the mounting plate 3, the rotating shafts of all the lifting rollers 42 are connected end to end and connected to the rotating shaft of the lifting motor 41, splines 5 are fixedly arranged at both ends of the lifting rollers 42, and splines 5 are also fixedly arranged on the rotating shaft of the lifting motor 41, the lifting motor 41 and the lifting rollers 42 are coaxially connected through the splines 5, and a connecting shaft 6 can be arranged between the lifting rollers 42 according to actual needs to adjust the spacing between the lifting rollers 42. The lifting ropes 43 on adjacent lifting rollers 42 are wound in opposite directions, and the lifting motor 41 rotates to drive all the lifting rollers 42 to rotate. Since the adjacent lifting ropes 43 are wound in opposite directions and are coaxially arranged, the movement directions of the adjacent lifting ropes 43 are opposite. When the lifting rope 43 on one lifting roller is lifted, the lifting rope 43 on the adjacent lifting roller is lowered. Compared with the traditional lifting equipment that lifts the curtain wall panel to the installation position and completes the installation and then transports the lifting rope 43 to the ground to lift another curtain wall panel, in the present application, while lifting the curtain wall panel, the lifting ropes 43 on the adjacent lifting rollers 42 move in opposite directions, saving the lifting rope 43 lifting time. At the same time, when installing the curtain wall panel, another curtain wall panel can be fixed on the lifting rope 43 on the ground, thereby further saving the time of the entire lifting construction; at the same time, the present application adopts a single lifting motor 41 to drive all lifting rollers 42, which can be more energy-efficient.

[0048] Reference Figure 1 and Figure 2, the mounting frame 2 is slidably arranged on the base 1, the mounting frame 2 is a U-shaped frame, and a sliding sleeve 7 is arranged on the base 1. Both ends of the mounting frame 2 are slidably arranged in the sliding sleeve 7 of the base 1, and the sliding sleeve 7 is threadedly connected with a fixing bolt 8, and the mounting frame 2 is fixed by the fixing bolt 8. Tightening the bolt makes the bolt abut against the mounting frame 2. At this time, the mounting frame 2 is fixed, and loosening the bolt makes the bolt detach from the mounting frame 2. At this time, the mounting frame 2 can slide, and the mounting frame 2 slides in the direction close to or away from the base 1; a guide rail 9 is fixed at one end of the mounting frame 2 away from the base 1, and the guide rail 9 is a rectangular strip with sliding grooves at both ends in the width direction. The mounting plate 3 is slidably mounted on the guide rail 9, and the sliding direction of the mounting plate 3 is perpendicular to the sliding direction of the mounting frame 2. A driving assembly 10 is arranged between the mounting plate 3 and the guide rail 9, and the driving assembly 10 includes a driving platform 101, a driving roller 102 and a driving motor 103. The driving platform 101 is fixed on the mounting plate 3, and the driving roller 102 has four The drive platform 101 is rotatably arranged at both ends of the guide rail 9 in the width direction, and the drive rollers 102 rotate in the slide grooves at both ends of the guide rail 9 in the width direction. The drive motor 103 is fixed on the drive platform 101, and the drive motor 103 is connected to one of the drive rollers 102 and drives the drive roller 102 to rotate. The drive mechanism realizes the automatic adjustment of the mounting plate 3. During the hoisting construction, it is often necessary to adjust the position of the hoisting mechanism 4 to hoist the curtain wall panels to different areas. The driving mechanism cooperates with the sliding mounting plate 3 to facilitate the adjustment of the position of the driving mechanism, making the entire hoisting construction process more efficient and convenient; a number of counterweight blocks 11 are placed on the base 1. Since the mounting plate 3 and the hoisting mechanism 4 are all arranged at the end of the mounting frame 2 away from the base 1, the weight of the mounting frame 2 away from the base 1 is larger. The setting of the counterweight block 11 can make the overall weight of the base 1 greater than the weight of the mounting frame 2 away from the end of the base 1, thereby reducing the probability of the base 1 tipping over.

[0049] Reference Figure 3 and Figure 4A disassembly plate 12 is provided between the hoisting motor 41 and the hoisting roller 42 and the mounting plate 3. The disassembly plate 12 is detachably provided on the mounting plate 3 through mounting bolts 13. The hoisting motor 41 and the hoisting roller 42 are detachably provided on the mounting plate 3 through the disassembly plate 12. The hoisting motor 41 is fixedly provided on the disassembly plate 12. The hoisting roller 42 is rotatably provided on the disassembly plate 12. The provision of the disassembly plate 12 can facilitate the disassembly and assembly of the hoisting motor 41 and the hoisting roller 42, and also facilitates the setting of the number of hoisting rollers 42 according to actual needs. A sliding groove 14 is provided on the mounting plate 3 along the length direction of the plate body. A placement groove 15 is provided at the bottom of the displacement groove 14, and a mounting nut 16 is slidably placed in the placement groove 15. The sliding groove 14 and the placement groove 15 form a groove body with a T-shaped cross-section. The sliding groove 14 can allow the mounting bolt 13 to pass through and can limit the detachment of the mounting nut 16. The mounting bolt 13 is threadedly connected in the mounting nut 16. The mounting nut 16 cooperates with the mounting bolt 13 to facilitate the position of the disassembly plate 12. There is no need to install the disassembly plate 12 according to the bolt hole, so that the disassembly plate 12 can be installed at any position on the mounting plate 3 for fixation, thereby facilitating the installation and position adjustment of the lifting mechanism 4.

[0050] Reference Figure 1 A lifting frame 17 is installed at one end of the lifting rope 43 away from the lifting roller 42. The lifting frame 17 includes four corner frames 171 and four connecting rods 172. The corner frame 171 is an L-shaped rod body, and the connecting rod 172 is a straight rod. The four corner frames 171 and the four connecting rods 172 are spliced ​​into a rectangular frame body. The four corner frames 171 are respectively arranged at the four corners of the rectangular frame body. The length ends of the four connecting rods 172 are respectively inserted into the adjacent corner frames 171 and slidably arranged in the corner frames 171. The lifting frame 17 is used to install curtain wall panels. The sliding of the connecting rod 172 on the corner frame 171 can realize the adjustment of the lifting frame 17, so that the lifting frame 17 can adapt to curtain wall panels of different sizes; the connecting rod 172 and the corner frame 17 1 is provided with an adjustment component 18, the adjustment component 18 includes an adjustment slot 181 provided on the corner frame 171, an adjustment screw 182 slidably provided in the adjustment slot 181 and an adjustment nut 183 threadedly connected to the adjustment screw 182, one end of the adjustment screw 182 extends into the corner frame 171 and is fixedly connected to the connecting rod 172, the adjustment nut 183 is threadedly connected to the adjustment screw 182 at one end of the adjustment screw 182 away from the connecting rod 172, the adjustment nut 183 is tightened to fix the position of the adjustment screw 182 so that the connecting rod 172 is fixed on the corner frame 171, so as to reinforce the hanging frame 17 after the adjustment is completed, and reduce the probability of deformation of the hanging frame 17 due to external force.

[0051] Reference Figure 2 and Figure 5A fixing plate 19 is fixedly disposed at one end of the corner frame 171 in the thickness direction of the hanging frame 17, and a reinforcement component 20 is installed on the fixing plate 19. The reinforcement component 20 includes a reinforcement screw 201 that is slidably disposed on the fixing plate 19 along the thickness direction of the hanging frame 17, a reinforcement nut 202 that is rotatably disposed on the fixing plate 19 away from the corner frame 171, and a reinforcement suction cup 203 that is fixed on the reinforcement screw 201 on the side of the fixing plate 19 toward the hanging frame 17. The reinforcement nut 202 is threadedly connected with the reinforcement screw 201, and the reinforcement suction cup 203 is fixed on the reinforcement screw 201 on the side of the fixing plate 19 toward the hanging frame 17. The reinforcement nut 202 is rotated to adjust the position of the reinforcement screw 201 on the fixing plate 19. The reinforcement suction cup 203 is used to absorb the curtain wall panel to reduce the probability of the curtain wall panel falling. The adjustment of the reinforcement screw 201 can adjust the position of the reinforcement suction cup 203 according to the thickness of the curtain wall panel.

[0052] A curtain wall hoisting construction method, comprising the following steps: Step 1: Installing a base 1, installing the base 1 at a suitable position on the floor 0 or the roof, and estimating the gravity that the end of the mounting frame 2 away from the base 1 will receive, and pressing a plurality of counterweights 11 on the base 1, the weight of the counterweights 11 needs to be much greater than the estimated gravity that the end of the mounting frame 2 away from the base 1 will receive, so as to ensure that the base 1 will not tip over; Step 2: Installing a hoisting mechanism 4, installing a hoisting motor 41 and an appropriate number of hoisting rollers 42 on a mounting plate 3 according to the scale of the curtain wall, the number of hoisting rollers 42 being not less than two, and at the same time using a plurality of counterweights 11 to prevent the base 1 from tipping over; Step 3: Installing a hoisting mechanism 4, installing a hoisting motor 41 and an appropriate number of hoisting rollers 42 on a mounting plate 3 according to the scale of the curtain wall, the number of hoisting rollers 42 being not less than two, and Several are most suitable, and the lifting frame 17 is installed on the lifting rope 43. A mounting ring is fixed on the top of the lifting frame 17. The lifting rope 43 is tied to the mounting ring to achieve the installation and fixation of the lifting frame 17 on the lifting rope 43; Step 3: Adjust the mounting plate 3, adjust the position of the mounting frame 2 on the base 1, adjust the position of the mounting frame 2 by loosening the bolts, and tighten the bolts after the adjustment is completed; then adjust the position of the mounting plate 3 on the mounting frame 2 so that the mounting plate 3 is located at the starting position of the curtain wall installation; Step 4: Adjust the lifting frame 17, loosen the adjusting nut 183, and adjust according to the size of the curtain wall panel The size of the hoisting frame 17 is adjusted by tightening the adjusting nut 183 to fix the position of the connecting rod 172 on the corner frame 171; Step 5: Curtain wall hoisting, the curtain wall panel is installed on the hoisting frame 17, and then hoisting is performed. When the hoisting frame 17 with the curtain wall panel is transported to the curtain wall installation area, the adjacent hoisting frame 17 is transported to the ground. In order to ensure that the hoisting frame 17 with the curtain wall panel is transported to the curtain wall installation area, the adjacent hoisting frame 17 is transported to the ground, the length of the hoisting rope 43 on the hoisting roller 42 needs to be adjusted according to the actual construction height; Step 6: Install the curtain wall, The curtain wall panels hoisted to the curtain wall installation area are installed, and the curtain wall panels are fixedly installed in the hoisting frame 17 on the ground. After the curtain wall panels are installed, the hoisting frame 17 with the curtain wall panels fixedly installed on the ground is hoisted and lifted to the curtain wall installation area, and at the same time, the empty hoisting frame 17 in the curtain wall installation area is transported and lowered to the ground. While the curtain wall is being installed, the curtain wall panels can be installed on the ground, thereby saving the time for installing the curtain wall panels and improving the efficiency of the curtain wall installation. When one hoisting frame 17 is lifted, the adjacent hoisting frame 17 is lowered. The staggered transportation can save hoisting time and further improve the efficiency of the curtain wall installation.

[0053] The implementation principle of the embodiment of the present application is as follows: the base 1 is installed on the floor 0 above the area where the curtain wall needs to be installed, and the counterweight 11 is stacked on the base 1, and the mounting plate 3 is fixedly set on the mounting frame 2. According to the scale of the curtain wall, a hoisting motor 41 and an appropriate amount of hoisting rollers 42 are installed on the mounting plate 3, and a hoisting frame 17 is installed on the hoisting rope 43. Then, the mounting frame 2 is installed on the base 1, and the position of the mounting frame 2 on the base 1 is adjusted. After the position adjustment of the mounting frame 2 is completed, the bolts are tightened to fix the mounting frame 2, and then the driving component 10 is started to drive the mounting plate 3 to slide to the starting position of the curtain wall construction, and the hoisting motor 41 is started to transport the hoisting frame 17 to the ground. After the size of the hoisting frame 17 is adjusted according to the size of the curtain wall panel, the curtain wall panel is installed in the hoisting frame 17. , and then start the hoisting motor 41 to drive the hoisting frame 17 installed with the curtain wall panels to the curtain wall installation area. During this period, the hoisting rope 43 on the adjacent hoisting roller 42 drives another hoisting frame 17 to descend to the ground. While the curtain wall panels are installed in the curtain wall installation area, the size of another hoisting frame 17 on the ground is adjusted and the curtain wall panels are installed. When the curtain wall panels in the curtain wall installation area are installed and the curtain wall panels on the ground are installed in the hoisting frame 17, start the hoisting motor 41 to hoist the hoisting frame 17 on the ground to the curtain wall panel installation area. At the same time, the hoisting frame 17 in the curtain wall panel installation area is hoisted and descended to the ground. The curtain wall panels are reciprocated on the ground for installation in the hoisting frame 17, and the curtain wall installation area reciprocates to perform curtain wall installation construction until the hoisting construction of the entire curtain wall is completed.

[0054] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An energy-saving curtain wall hoisting device, comprising a base (1), the base (1) being installed on a floor (0) or a roof above a curtain wall installation area, the base (1) being provided with a mounting frame (2), the mounting frame (2) being fixedly provided with a mounting plate (3) at one end away from the base (1), the mounting plate (3) being provided with a hoisting mechanism (4), characterized in that: The hoisting mechanism (4) comprises a hoisting motor (41), a hoisting roller (42) and a hoisting rope (43); the hoisting motor (41) is detachably mounted on the mounting plate (3); there are a plurality of hoisting rollers (42), each of which is detachably mounted on the mounting plate (3) and rotatably arranged on the mounting plate (3); there are a plurality of hoisting ropes (43), each of which corresponds to the hoisting rollers (42) one by one and is wound around the hoisting rollers (42); the rotating shafts of the plurality of hoisting rollers (42) are connected end to end and connected to the rotating shaft of the hoisting motor (41); and the hoisting ropes (43) on adjacent hoisting rollers (42) are wound in opposite directions; A hoisting frame (17) is installed at one end of the hoisting rope (43) away from the hoisting roller (42), and the hoisting frame (17) comprises a corner frame (171) and a connecting rod (172). There are four corner frames (171) and four connecting rods (172). The four corner frames (171) and the four connecting rods (172) are spliced ​​into a rectangular frame body. The four corner frames (171) are respectively arranged at the four corners of the rectangular frame body. Both ends of the length of the four connecting rods (172) are respectively inserted into adjacent corner frames (171) and are slidably arranged in the corner frames (171); An adjustment component (18) is provided between the connecting rod (172) and the corner frame (171), the adjustment component (18) comprising an adjustment slot (181), an adjustment screw (182) and an adjustment nut (183); the adjustment slot (181) is provided on the corner frame (171); the adjustment screw (182) is slidably provided in the adjustment slot (181); one end of the adjustment screw (182) extends into the corner frame (171) and is fixedly connected to the connecting rod (172); the adjustment nut (183) is threadedly connected to the adjustment screw (182) at one end of the adjustment screw (182) away from the connecting rod (172); A fixing plate (19) is fixedly provided at one end of the corner frame (171) in the thickness direction of the hanging frame (17); a reinforcing assembly (20) is installed on the fixing plate (19); the reinforcing assembly (20) comprises a reinforcing screw (201), a reinforcing nut (202) and a reinforcing suction cup (203); the reinforcing screw (201) is slidably arranged on the fixing plate (19) along the thickness direction of the hanging frame (17); the reinforcing nut (202) is rotatably arranged on the fixing plate (19) away from the corner frame (171); the reinforcing nut (202) is threadedly connected to the reinforcing screw (201); and the reinforcing suction cup (203) is fixedly arranged on the reinforcing screw (201) on the side of the fixing plate (19) facing the hanging frame (17).

2. The energy-saving curtain wall hoisting equipment according to claim 1 is characterized in that: A disassembly plate (12) is provided between the hoisting motor (41) and the hoisting roller (42) and the mounting plate (3); the disassembly plate (12) is detachably mounted on the mounting plate (3) via mounting bolts (13); the hoisting motor (41) and the hoisting roller (42) are detachably mounted on the mounting plate (3) via the disassembly plate (12); the hoisting motor (41) is fixedly mounted on the disassembly plate (12); and the hoisting roller (42) is rotatably mounted on the disassembly plate (12).

3. The energy-saving curtain wall hoisting equipment according to claim 2 is characterized in that: The mounting plate (3) is provided with a sliding groove (14) along the length direction of the plate body, the bottom of the sliding groove (14) is provided with a placement groove (15), a mounting nut (16) is slidably placed in the placement groove (15), and the mounting bolt (13) is threadedly connected in the mounting nut (16).

4. The energy-saving curtain wall hoisting equipment according to claim 1 is characterized in that: The mounting frame (2) is slidably arranged on the base (1), and the mounting frame (2) slides in a direction approaching or moving away from the base (1).

5. The energy-saving curtain wall hoisting equipment according to claim 4 is characterized in that: A guide rail (9) is fixedly provided at one end of the mounting frame (2) away from the base (1), and the mounting plate (3) is slidably mounted on the guide rail (9), with the sliding direction of the mounting plate (3) being perpendicular to the sliding direction of the mounting frame (2).

6. The energy-saving curtain wall hoisting equipment according to claim 5 is characterized in that: A plurality of counterweight blocks (11) are placed on the base (1).

7. A curtain wall hoisting construction method, using the energy-saving curtain wall hoisting equipment according to claim 6, comprising the following steps: Step 1: Install the base (1), install the base (1) on the floor (0) or the roof, and press a plurality of counterweights (11) on the base (1); Step 2: Install the hoisting mechanism (4), install a hoisting motor (41) and an appropriate number of hoisting rollers (42) on the mounting plate (3) according to the scale of the curtain wall, and install a hoisting frame (17) on the hoisting rope (43); Step 3: Adjust the mounting plate (3), adjust the position of the mounting frame (2) on the base (1), and adjust the position of the mounting plate (3) on the mounting frame (2); Step 4: Adjust the hanging frame (17) according to the size of the curtain wall panel; Step 5: curtain wall hoisting, installing the curtain wall panel on the hoisting frame (17) for hoisting, when the hoisting frame (17) for installing the curtain wall panel is transported to the curtain wall installation area, the adjacent hoisting frame (17) is transported to the ground to install the curtain wall panel; Step 6: Install the curtain wall, install the curtain wall panels hoisted to the curtain wall installation area, and after the curtain wall panels are installed, when the hoisting frame (17) is transported to the ground, the curtain wall panels in the adjacent hoisting frames (17) are transported to the hoisting position.