BIM platform based on multiple selection sets and its use method
Through the BIM platform based on multiple selection sets, the limitations of model file management methods and cumbersome operations in the existing technology are solved, the rapid positioning and batch association of engineering information models are realized, the efficiency of project management and information sharing are improved, and the Collaborative work in engineering construction.
Patent Information
- Application Number
- CN202110759493.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-07-06
AI Technical Summary
Existing BIM platforms have limitations in model file management in engineering project management, resulting in cumbersome model association operations and inability to quickly locate model units. There are a large number of repeated operations in association with schedule plans and safety and quality issues, making it difficult to achieve efficient sharing and collaboration of information. manage.
Using a BIM platform based on multiple selection sets, through lightweight engines and Web technology, the upload and online management of construction drawings to completed 3D design models can be achieved. Selection sets can be created for model decomposition and reconstruction, and model units can be quickly located, and through QR codes and extended attributes to implement associated management of schedules and safety and quality issues.
It achieves rapid positioning and batch association of engineering information models, reduces repeated operations, improves project management efficiency, promotes information sharing and collaborative work in engineering construction, and enhances the full life cycle management capabilities of engineering construction.
Smart Images

Figure CN113536422B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of three-dimensional digital technology, relates to the technical fields of digital handover and KKS coding, etc., is applied to three-dimensional digital handover of power transmission and transformation projects, and particularly relates to a BIM platform based on multiple selection sets and a use method thereof. Background Art
[0002] Terminology explanation:
[0003] Project object: A collection of physical entities such as buildings (structures), systems, facilities, equipment, parts, etc. that constitute the project.
[0004] Model unit: A collection of entities and their related attributes that carry engineering information in the engineering information model, which is a digital representation of the engineering object.
[0005] Model architecture: the composition and splitting relationships between model units at all levels that make up the engineering information model.
[0006] BIM: Abbreviation for Building Information Modeling.
[0007] As engineering construction management continues to develop in the direction of digitalization, informatization, and intelligence, traditional engineering project management has become fragmented due to the large number of units and departments involved in engineering project management, making it difficult to control the progress, quality, and risks of the project. In the construction process of the project, the design, construction, and operation processes are basically isolated from each other, lacking a common interactive platform, forming "information islands", resulting in disorderly information flow, information loss and distortion, and seriously hindering engineering construction. In addition, engineering construction management work is complicated and covers a wide range. At present, the progress of the project is mainly reflected in weekly and monthly reports expressed in text and charts. It is difficult to fully and intuitively reflect the on-site operation information, and it is difficult to easily obtain project investment, quality, safety and other information. Relying on manual tracking and inspection is also difficult to ensure that the information is processed in a timely and efficient manner, which seriously affects work efficiency.
[0008] As a multi-dimensional model information integration technology, BIM technology has the characteristics of visualization, coordination, simulation, optimization, and map-ability. Its application runs through the entire process of project decision-making, design, procurement, construction, and operation. It enables all participants in the project construction to operate information in a digital virtual real building model, and operate the model in the information, so that all professionals can share building information throughout the life cycle of the building, truly realize collaborative work, and ultimately achieve the goal of improving work efficiency and quality and reducing errors and risks throughout the life cycle of the project. To achieve this goal, it is necessary to build a BIM building information platform with information technology as the core and various professionals using tools such as graphic platforms for collaborative work.
[0009] The project collaborative management platform based on BIM technology is a model that contains a large amount of data information and then uploads it to the cloud platform online. All participants can browse the three-dimensional model conveniently without learning professional software. They can find problems by browsing the model and viewing the model data information, communicate and record in time, and assign tasks. The model containing data information can be used to the maximum extent among all participating parties, and the collaboration and close cooperation of all participating parties can be strengthened. Establishing a project collaborative management platform based on BIM technology can give full play to the advantages of BIM technology, promote the transformation of project construction and operation management working methods, and promote the development of engineering project construction in the direction of informatization.
[0010] Three-dimensional design is the source of engineering information model data. The model architecture of three-dimensional design generally splits the model into individual model files according to the dimensions of profession, functional area, system, etc. The existing BIM platform manages model files in the following way: upload the model source files for lightweight processing and then combine and integrate them into a full project combination model. The model architecture can only be formed according to the model files, and it is difficult to quickly select and locate the model unit; secondly, all model applications, schedule plans, safety and quality issues are based on a single model unit in this combination model. There are a lot of repeated operations in model association, and the details of the model association cannot be viewed. Summary of the invention
[0011] In view of the above problems, the present invention proposes a BIM platform based on multiple selection sets and a method for using it. Based on the above status quo, a lightweight engine and Web technology are applied to independently develop a digital full-process control platform based on three-dimensional design: 1) First, the uploading, online management and browsing functions of the three-dimensional design model from the construction drawing to the completed design are realized, and multi-professional models are collaboratively shared; 2) Secondly, by creating a selection set, the information model is decomposed and reconstructed, and the model units with the same classification attributes are selected and grouped; 3) The model unit is quickly located through the selection set again, the construction progress is associated with the engineering model, and a 4D dynamic simulation of the construction progress is performed; the business problem is associated with the engineering model, and the on-site photos and problem descriptions can be initiated based on the model components, and the problem data can be marked at the corresponding position of the model, and the safety and quality issues can be closed-loop managed and the responsibility traced; the engineering data and the engineering model are associated and checked, etc.; 4) Finally, the integrated management and collaborative work of engineering construction based on the information model are realized.
[0012] The present invention decomposes and reconstructs the engineering information model, breaks the limitation of the model file, and saves the model units selected by the user manually or by search by creating a selection set. The selection set can realize functions such as rapid positioning of model units, adding extended attributes, creating QR codes, quick batch association of schedules, association of safety and quality issues, etc., so as to better apply the engineering information model to project management, make full use of the value of the information carried by the model integration, and improve the efficiency of project management.
[0013] The specific technical solutions are as follows:
[0014] A BIM platform based on multiple selection sets, characterized by comprising: an upload module, a selection set creation module, an addition selection set module and an association schedule module;
[0015] The upload module is used to upload model files and schedules;
[0016] The selection set creation module is used to create a selection set according to a specific decomposition structure;
[0017] The adding selection set module is used to select the required model units and add them to the corresponding selection set;
[0018] The associated schedule module is used to associate the selection set with the schedule one by one, and judge the status of each schedule task by comparing and analyzing the actual progress with the planned progress.
[0019] Furthermore, the model units associated with the progress task are colored by corresponding each state to a color.
[0020] Furthermore, it also includes a QR code generation module; the QR code generation module is used to provide the generated QR code to the APP end, and select the selection set through the WEB end to quickly locate the model unit.
[0021] Furthermore, it also includes an extended attribute adding module for adding extended attributes to model units in batches through a selection set, including adding attachments to the selection set to realize associated engineering data.
[0022] And according to the above method for using the BIM platform based on multiple selection sets, it is characterized by comprising the following steps:
[0023] Step S1: Upload the model file and combine the models to create a selection set in the model space; then select the required model unit and add it to the corresponding selection set;
[0024] Step S2: Rapidly locate the model unit through the selection set;
[0025] Step S3: View the details of the model units in the selection set;
[0026] Step S4: Associating each schedule with the selection set of its corresponding model unit;
[0027] Step S5: quickly locate the model unit, create safety quality issues, and associate the issues with the model units in the selection set;
[0028] Step S6: Edit the selection set to add attachments and associate the selection set with the project data.
[0029] And, an electronic device, comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that when the processor executes the program, the steps of the method for using the BIM platform based on multiple selection sets as described above are implemented.
[0030] And, a non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that when the computer program is executed by a processor, the steps of the method for using the BIM platform based on multiple selection sets as described above are implemented.
[0031] The present invention and its preferred solution can realize functions such as rapid positioning of model units, adding extended attributes, creating QR codes, quickly associating batch schedules, associating safety and quality issues, etc. based on selection sets.
[0032] Compared with the existing technology, its advantage is that it can decompose and reconstruct the engineering information model, breaking the limitation of model files. Model units can be reorganized according to the set decomposition structure without worrying about which model file the model unit belongs to. Based on the selection set, model units can be quickly located, and batches can be quickly associated with schedules, safety and quality issues, etc., eliminating a lot of repeated operations, making full use of the value of model integration and carrying information, and improving project management efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments:
[0034] Figure 1 It is a schematic diagram of a basic workflow of a BIM platform based on multiple selection sets according to an embodiment of the present invention;
[0035] Figure 2 is a schematic diagram of creating a selection set according to an embodiment of the present invention;
[0036] Figure 3 is a schematic diagram of a rapid positioning model unit according to an embodiment of the present invention;
[0037] Figure 4 is a schematic diagram of viewing details of a model unit in a selection set according to an embodiment of the present invention;
[0038] Figure 5is a schematic diagram of association between a selection set and a schedule plan according to an embodiment of the present invention;
[0039] Figure 6 is a schematic diagram of association between selection sets and questions in an embodiment of the present invention;
[0040] Figure 7 It is a schematic diagram of adding extended attributes and associating engineering data in an embodiment of the present invention. DETAILED DESCRIPTION
[0041] In order to make the features and advantages of this patent more obvious and easy to understand, the following embodiments are specifically described in detail as follows:
[0042] The BIM platform based on multiple selection sets provided in this embodiment includes: an upload module, a selection set creation module, a selection set addition module and an association schedule module, as well as a QR code generation module and an extended attribute addition module;
[0043] Among them, the upload module is used to upload model files and schedules;
[0044] The Create Selection Set module is used to create selection sets according to a specific decomposition structure;
[0045] The Add Selection Set module is used to select the required model units and add them to the corresponding selection set;
[0046] The associated schedule module is used to associate the selection set with the schedule one by one, and to determine the status of each schedule task by comparing the actual progress with the planned progress.
[0047] The QR code generation module is used to provide the generated QR code to the APP end, and select the selection set through the WEB end to quickly locate the model unit.
[0048] The extended attribute adding module is used to add extended attributes to model units in batches through selection sets, including adding attachments to the selection set to associate engineering data.
[0049] Based on the above design, Figure 1 As shown, the BIM platform based on multiple selection sets provided in this embodiment has the following basic workflow:
[0050] First, upload the model file, schedule, etc.; second, create a selection set according to a specific breakdown structure (such as work breakdown structure);
[0051] Then open the model file, select the required model unit, and add it to the corresponding selection set;
[0052] Then, the selection set is associated with the schedule plan one by one. By comparing and analyzing the actual progress with the planned progress, the status of each schedule task (completed on time, completed ahead of schedule, completed late, etc.) is determined. Each status corresponds to a color, and finally the model unit associated with the schedule task is colored. Based on the model, the visualization of the project progress, the comparative analysis of the actual progress and the planned progress tracking, the progress warning, the progress deviation analysis, the progress plan adjustment and other functions are realized;
[0053] Furthermore, a QR code can be generated based on the selection set. The code can be directly scanned on site through the APP, or the selection set can be selected on the WEB to quickly locate the model unit, so as to propose the safety and quality issues found, create label issues based on the model unit, or create viewpoint issues based on the model view; realize the association between safety and quality issues and models, and conduct closed-loop management and responsibility traceability of safety and quality issues.
[0054] Finally, you can view the details of the model units in the selection set through the list, add extended attributes to the model units in batches through the selection set, add attachments to the selection set to realize the association of engineering data, etc.
[0055] The specific process may include the following steps:
[0056] Step 1: Upload the model file and combine the models, create a selection set in the model space. Then select the required model unit and add it to the corresponding selection set, such as Figure 2 As shown;
[0057] Step 2: Click the selection set to quickly locate the model unit; Figure 3 As shown;
[0058] Step 3: View the model unit details in the selection set; Figure 4 As shown;
[0059] Step 4: Associate each schedule with the selection set of its corresponding model unit, such as Figure 5 As shown;
[0060] Step 5: Quickly locate the model unit, create safety quality issues, and associate the issues with the model units in the selection set, such as Figure 6 As shown;
[0061] Step 6: Edit the selection set and add attachments to associate the selection set with the project data, such as Figure 7 As shown;
[0062] The above method provided in this embodiment can be stored in a computer-readable storage medium in a coded form and implemented in the form of a computer program, and the basic parameter information required for calculation is input through computer hardware, and the calculation result is output.
[0063] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0064] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0065] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0066] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0067] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
[0068] This patent is not limited to the above-mentioned optimal implementation mode. Anyone can derive other various forms of BIM platforms and usage methods based on multiple selection sets under the inspiration of this patent. All equal changes and modifications made according to the scope of the patent application of the present invention should be covered by this patent.
Claims
1. A BIM platform based on multiple selection sets, characterized in that: include: Upload module, create selection set module, add selection set module and associate schedule module; The upload module is used to upload model files and schedules; The selection set creation module is used to create a selection set according to a specific decomposition structure; The adding selection set module is used to select the required model units and add them to the corresponding selection set; The associated schedule module is used to associate the selection set with the schedule one by one, and judge the status of each schedule task by comparing and analyzing the actual progress with the planned progress; It also includes an extended attribute adding module, which is used to batch add extended attributes to model units through selection sets, including adding attachments to the selection set to realize associated engineering data; The method of use includes the following steps: Step S1: Upload the model file and combine the models to create a selection set in the model space; then select the required model unit and add it to the corresponding selection set; Step S2: Rapidly locate the model unit through the selection set; Step S3: View the details of the model units in the selection set; Step S4: Associating each schedule with the selection set of its corresponding model unit; Step S5: quickly locate the model unit, create safety quality issues, and associate the issues with the model units in the selection set; Step S6: Edit the selection set to add attachments and associate the selection set with the project data.
2. The BIM platform based on multiple selection sets according to claim 1, characterized in that: The model elements associated with the progress task are colored by assigning a color to each state.
3. The BIM platform based on multiple selection sets according to claim 1, characterized in that: It also includes a QR code generation module; the QR code generation module is used to provide the generated QR code to the APP end, and select the selection set through the WEB end to quickly locate the model unit.
4. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the method for using the BIM platform based on multiple selection sets as described in claim 1 are implemented.
5. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method for using a BIM platform based on multiple selection sets as claimed in claim 1 are implemented.
Citation Information
Patent Citations
Progress management method and device based on BIM
CN111062090A
