Project processing method, device, electronic device and computer readable storage medium

By building a final assembly line system and carrying out iterative updates, the problem of poor project control in traditional software R&D methods has been solved, effective control and efficient delivery of digital transformation projects in the banking industry have been achieved, and the overall capabilities and management efficiency of the R&D team have been improved.

CN113553092BActive Publication Date: 2025-01-21CHINA CITIC BANK CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110833593.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-07-23
Publication Date
2025-01-21
Estimated Expiration
2041-07-23

AI Technical Summary

Technical Problem

During the digital transformation of the banking industry, when traditional software R&D methods turn to agile R&D methods, the software R&D team faces challenges such as complex processes, extensive personnel organization, inadequate management and control, and low delivery efficiency. How to achieve various projects under the premise of safe production The purpose of reasonable management and control has become a technical problem that needs to be solved urgently.

Method used

By building the general assembly line system, the projects to be processed are obtained and processed based on the preset general assembly line system to obtain the project processing results. The training and construction process of the general assembly line system includes defining the tasks of each stage of the project as models, building the general assembly line baseline based on the characteristics of the business category system, and building the general assembly line system based on the baseline. At the same time, the final assembly line system is updated iteratively to adjust and optimize the processing results.

Benefits of technology

It has achieved effective management and control of each project, improved the orderliness of the project implementation process, reduced low-level problems caused by missing steps, improved the overall capabilities and management efficiency of the project team, and ensured safe production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113553092B_ABST
    Figure CN113553092B_ABST
Patent Text Reader

Abstract

The present application relates to the field of application software technology, and in particular to a project processing method, device, electronic device and computer-readable storage medium. The project processing method comprises: obtaining a project to be processed; performing project processing on the project to be processed based on a preset final assembly line system to obtain a project processing result for the project to be processed. In the present application, effective control of each project is achieved through the constructed final assembly line system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of application software technology, and in particular to a project processing method, device, electronic device and computer-readable storage medium. Background Art

[0002] With the rapid development of Internet finance, the importance of banking technology has gradually increased. Under the background of digital transformation of the banking industry, the concept of software development has changed from function-oriented, plan-oriented, and quality-oriented to business value-oriented, user experience-oriented, and delivery speed-oriented. Traditional software development methods are also changing to agile development methods. In the process of transforming traditional software development methods to agile development methods, software development teams face many challenges such as complex processes, extensive personnel organization, inadequate management and control, and low delivery efficiency. How to complete the reasonable management and control of the above projects under the premise of safe production has become a technical problem that needs to be solved urgently. Summary of the invention

[0003] The present application provides a project processing method, device, electronic device and computer-readable storage medium to achieve effective management and control of various projects.

[0004] In a first aspect, a project processing method is provided, comprising:

[0005] Get pending items;

[0006] The project to be processed is processed based on a preset final assembly line system to obtain a project processing result for the project to be processed.

[0007] In a possible implementation, before the preset final assembly line system processes the to-be-processed item, the following steps are included:

[0008] Define each task in each phase of the project as a first model;

[0009] Building a final assembly line baseline corresponding to the business category system based on the characteristics of the corresponding business category system and the first model;

[0010] A corresponding final assembly line system is constructed according to the final assembly line baseline corresponding to each business category system.

[0011] In a possible implementation, constructing a corresponding final assembly line system according to the final assembly line baseline corresponding to each business category system includes:

[0012] Constructing a final assembly line corresponding to the business category system according to the final assembly line baseline and the corresponding business category system;

[0013] Build the corresponding final assembly line system according to the final assembly line corresponding to each business category system.

[0014] In a possible implementation, it also includes:

[0015] When the preset conditions are met, the final assembly line baseline or the final assembly line system is iteratively updated.

[0016] In a possible implementation, the preset condition includes any one of the following:

[0017] The project processing results are different from the actual results;

[0018] The number of times that the project processing result is different from the actual result meets a preset threshold;

[0019] Preset time period.

[0020] In a second aspect, a project processing device is provided, comprising:

[0021] The acquisition module is used to obtain the items to be processed;

[0022] The processing module is used to perform project processing on the project to be processed based on a preset final assembly line system to obtain a project processing result for the project to be processed.

[0023] In a possible implementation, it also includes:

[0024] A construction module is used to define each task in each stage of the project as a first model; construct a general assembly line baseline corresponding to the business category system based on the characteristics of the corresponding business category system and the first model; and construct a corresponding general assembly line system according to the general assembly line baseline corresponding to each business category system.

[0025] In a possible implementation, the construction module is used to construct a final assembly line corresponding to the business category system according to the final assembly line baseline and the corresponding business category system; and to construct a corresponding final assembly line system according to the final assembly line corresponding to each business category system.

[0026] In a possible implementation, it also includes:

[0027] The updating module is used to iteratively update the final assembly line baseline or the final assembly line system when a preset condition is met.

[0028] In a possible implementation, the preset condition includes any one of the following:

[0029] The project processing results are different from the actual results;

[0030] The number of times that the project processing result is different from the actual result meets a preset threshold;

[0031] Preset time period.

[0032] In a third aspect, an electronic device is provided, comprising: a processor and a memory;

[0033] The memory is used to store computer programs;

[0034] The processor is used to execute the above-mentioned project processing method by calling the computer program.

[0035] In a fourth aspect, a computer-readable storage medium is provided, wherein the computer-readable storage medium is used to store a computer program, which, when executed on a computer, enables the computer to execute the above-mentioned project processing method.

[0036] By means of the above technical solution, the technical solution provided by this application has at least the following advantages:

[0037] In this application, effective management and control of each project is achieved through the constructed final assembly line system. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the embodiments of the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0039] Figure 1 A schematic diagram of the process flow of the project processing method provided for this application;

[0040] Figure 2 A schematic diagram of the structure of a project processing device provided for this application;

[0041] Figure 3 A schematic diagram of the structure of an electronic device for the project processing method provided in this application. DETAILED DESCRIPTION

[0042] The present application proposes a project processing method, device, electronic device and computer-readable storage medium. The specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings.

[0043] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be interpreted as limiting the present application.

[0044] It will be understood by those skilled in the art that, unless expressly stated, the singular forms "one", "said", and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present application refers to the presence of the features, integers, steps, operations, elements, and / or component frameworks, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, component frameworks, and / or groups thereof. It should be understood that when we refer to an element as being "connected" or "coupled" to another element, it may be directly connected or coupled to the other element, or there may be an intermediate element. In addition, the "connection" or "coupling" used herein may include wireless connection or wireless coupling. The term "and / or" used herein includes all or any unit and all combinations of one or more associated listed items.

[0045] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in general dictionaries should be understood to have meanings consistent with those in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless specifically defined as here.

[0046] To make the purpose, technical solution and advantages of the present application clearer, the following will further describe the implementation mode of the present application in detail with reference to the accompanying drawings. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments.

[0047] like Figure 1 The figure is a schematic diagram of the process flow of the project processing method provided by the present application, and the method comprises the following steps:

[0048] Step S101, obtaining items to be processed;

[0049] Step S102: performing project processing on the project to be processed based on a preset final assembly line system to obtain a project processing result for the project to be processed.

[0050] In this application, effective management and control of each project is achieved through the constructed final assembly line system.

[0051] Based on the technical solution provided by the present application, the technical solution is explained in detail below.

[0052] In one possible implementation, before implementing project processing based on the final assembly line system, it is necessary to first conduct training and construction of the final assembly line system for project processing. The training and construction process can be carried out in electronic equipment. By continuously training with a large amount of sample project data, the processing results obtained when using the final assembly line system for project processing can be made more accurate, thereby improving the processing accuracy.

[0053] The training and construction of the final assembly line system can include the following processes:

[0054] S1. Get project sample data

[0055] For the embodiment of the present application, before conducting final assembly line system training, a large amount of project sample data will be obtained first. The project sample data can be manually input, or extracted from local storage, or obtained by sending a request to obtain the project sample data to the server. Of course, the way to obtain the project sample data is not limited to this.

[0056] S2. Training process of the final assembly line system

[0057] For the embodiment of the present application, each task in each stage of the project is defined as a first model;

[0058] Building a final assembly line baseline corresponding to the business category system based on the characteristics of the corresponding business category system and the first model;

[0059] A corresponding final assembly line system is constructed according to the final assembly line baseline corresponding to each business category system.

[0060] Wherein, the construction of the corresponding final assembly line system according to the final assembly line baseline corresponding to each business category system includes:

[0061] Constructing a final assembly line corresponding to the business category system according to the final assembly line baseline and the corresponding business category system;

[0062] Build the corresponding final assembly line system according to the final assembly line corresponding to each business category system.

[0063] In a specific implementation, the entire life cycle of a large amount of project sample data obtained is divided into eight stages, namely business requirements, requirements analysis, system design, development, testing, deployment, maintenance, and operation. The implementation tasks of each stage can also be divided into six dimensions, namely requirements management, project management, technical management, user experience, information visibility, and implementation process.

[0064] The implementation activities of each stage are defined, and each implementation activity is further divided into executable implementation tasks. Each implementation task is defined as an IPOSCT model, namely: input, processing steps, output, standards / specifications, quality checkpoints and tools, a total of 6 models.

[0065] Summarize each implementation task of each implementation stage of the project, define the IPOSCT model for each task, establish the system's final assembly line based on the above model, and then combine the implementation characteristics of similar systems to supplement, revise and improve the content of the final assembly line to form the final assembly line baseline.

[0066] Each system revises and improves the content of the final assembly line baseline based on the final assembly line baseline and in combination with the characteristics of its own system, and finally forms the final assembly line corresponding to each system and implements it. In the subsequent iterative execution of the final assembly line of each system, the final assembly line baseline and the final assembly line version of each system are continuously revised and improved.

[0067] In one possible implementation, in order to improve the user experience of the general assembly line and facilitate the inspection of the general assembly line process, an online general assembly line system is built, which can realize the online review of specifications, manuals and other documents related to the implementation of tasks at each stage, automatic generation of various inspection sheets of the general assembly line, execution process query management and other functions, thereby improving the user experience and efficiency of the general assembly line.

[0068] For the present application, in a possible implementation, the processing of the aforementioned step S101 specifically includes the following processing.

[0069] Get pending items.

[0070] In a possible implementation, the above-mentioned items to be processed may be items that are directly received by the electronic device as input by the user, or items that are carried in a request uploaded by the receiving terminal.

[0071] For the present application, in a possible implementation, the processing of the aforementioned step S102 specifically includes the following processing.

[0072] Perform project processing on pending projects.

[0073] In a possible implementation, for the obtained items to be processed, project processing is performed on the items to be processed according to a preset final assembly line system, so as to obtain corresponding project processing results.

[0074] For the embodiments of the present application, it is impossible to ensure that every processing result of the project is accurate, and the processing result may be different from the actual result. Therefore, in order to avoid such similar situations, the final assembly line system needs to be continuously trained to improve and optimize. Based on this, the final assembly line system needs to be iteratively updated when the preset conditions are met.

[0075] The preset conditions may include:

[0076] P1. Update the final assembly line system in real time.

[0077] Once it is determined that the project processing result is different from the actual result, it means that the project corresponding to the project processing result may not be stored in the final assembly line system. In this case, the project corresponding to the project processing result is directly used to iterate and update the final assembly line system.

[0078] P2. Update the final assembly line system at regular intervals.

[0079] At this time, it does not matter whether the project processing result is the same as the actual result. As long as the preset time period is reached, the projects obtained during this period are used to iterate and update the final assembly line system, thereby enriching and expanding the database of the final assembly line system.

[0080] The preset time period may be preset in advance.

[0081] P3. When the number of times that the project processing result and the actual result are different reaches a certain threshold, the general assembly line system is iteratively updated to enrich and expand the database of the general assembly line system.

[0082] Each time the project processing result is different from the actual result, a record is made. When the number of such occurrences reaches a preset threshold, the project corresponding to each project processing result of such occurrence is used to iteratively update the final assembly line system, thereby enriching and expanding the database of the final assembly line system.

[0083] In the embodiment of the present invention, the final assembly line system is updated online iteratively by obtaining the project for updating, and based on the obtained project. The project for updating may be the project corresponding to the project processing result different from the actual result mentioned above, or may be all the projects received within a period of time.

[0084] According to the embodiment of the present invention, when the final assembly line system is updated online based on the acquired project, there are two situations:

[0085] Scenario 1: If the electronic device is a terminal device, the online update process includes:

[0086] a. Perform online iterative updates on the final assembly line system based on locally stored projects.

[0087] During the processing, the project for updating may be stored in a local storage. When updating is required, the corresponding project data is directly extracted from the local storage for updating.

[0088] b. Perform online iterative update on the final assembly line system based on the project sample data for updating sent by the server.

[0089] In the processing, the final assembly line system is iteratively updated by receiving project sample data for updating the final assembly line system sent by the server.

[0090] Scenario 2: If the electronic device is a server, the online update process includes:

[0091] a. Update the project sample data in the final assembly line system online based on the locally stored projects.

[0092] During the processing, the project for updating may be stored in a local storage. When updating is required, the corresponding project data is directly extracted from the local storage for updating.

[0093] b. Perform online iterative updates on the final assembly line system based on the update items sent by the terminal.

[0094] In the processing, the final assembly line system is iteratively updated by receiving the update items for the final assembly line system sent by the terminal.

[0095] For the embodiments of the present application, whether the iterative update process of the final assembly line system is based on locally stored projects, or based on project sample data sent by the server, or based on projects uploaded by the terminal, it can be an iterative update process actively initiated by the terminal device or the server.

[0096] In the embodiment of the present application, through the construction of the general assembly line, effective control of each project is achieved. It makes the various tasks in the project implementation process change from disorder to order, reducing the low-level problems caused by the lack of steps; precipitates the excellent experience of the core members of the implementation project team, shares personal experience with the organization, drives the improvement of the individual ability of the entire team through the improvement of organizational ability, and forms a closed loop of ability improvement; as a management tool, it helps project team managers to sort out engineering activities and management activities, so that management work has rules to follow and reduces management risks; through the quality inspection form signature form, it enhances the sense of responsibility of project team members, which helps to maintain the bottom line of safe production; it facilitates the rapid integration of new members of the project team and adapts to the requirements of project work.

[0097] Based on the technical solution of the project processing method provided by the present application, the present application correspondingly provides a structural schematic diagram of a project processing device, such as Figure 2 As shown, the project processing device 20 of the present application may include:

[0098] An acquisition module 21 is used to acquire items to be processed;

[0099] The processing module 22 is used to perform project processing on the project to be processed based on a preset final assembly line system to obtain a project processing result for the project to be processed.

[0100] In a possible implementation, it also includes:

[0101] Construction module 23 is used to define each task in each stage of the project as a first model; construct the final assembly line baseline corresponding to the business category system based on the characteristics of the corresponding business category system and the first model; and construct the corresponding final assembly line system according to the final assembly line baseline corresponding to each business category system.

[0102] In a possible implementation, the construction module 23 is used to construct a final assembly line corresponding to the business category system according to the final assembly line baseline and the corresponding business category system; and to construct a corresponding final assembly line system according to the final assembly line corresponding to each business category system.

[0103] In a possible implementation, it also includes:

[0104] The updating module 24 is used to iteratively update the final assembly line baseline or the final assembly line system when a preset condition is met.

[0105] In a possible implementation, the preset condition includes any one of the following:

[0106] The project processing results are different from the actual results;

[0107] The number of times that the project processing result is different from the actual result meets a preset threshold;

[0108] Preset time period.

[0109] In this application, effective management and control of each project is achieved through the constructed final assembly line system.

[0110] Reference below Figure 3 , which shows an electronic device (eg Figure 1The terminal device in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 3 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0111] like Figure 3 As shown, the electronic device 300 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 301, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 302 or a program loaded from a storage device 308 into a random access memory (RAM) 303. In the RAM 303, various programs and data required for the operation of the electronic device 300 are also stored. The processing device 301, the ROM 302, and the RAM 303 are connected to each other via a bus 304. An input / output (I / O) interface 305 is also connected to the bus 304.

[0112] Typically, the following devices may be connected to the I / O interface 305: input devices 306 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; output devices 307 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 308 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 309. The communication devices 309 may allow the electronic device 300 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 3 The electronic device 300 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead.

[0113] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication device 309, or installed from the storage device 308, or installed from the ROM 302. When the computer program is executed by the processing device 301, the above-mentioned functions defined in the method of the embodiment of the present application are executed.

[0114] It should be noted that the computer-readable medium mentioned above in the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0115] The computer-readable medium may be included in the electronic device, or may exist independently without being incorporated into the electronic device.

[0116] The computer-readable medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device: obtains at least two Internet Protocol addresses; sends a node evaluation request including the at least two Internet Protocol addresses to a node evaluation device, wherein the node evaluation device selects an Internet Protocol address from the at least two Internet Protocol addresses and returns it; receives the Internet Protocol address returned by the node evaluation device; wherein the obtained Internet Protocol address indicates an edge node in a content distribution network.

[0117] Alternatively, the computer-readable medium carries one or more programs, and when the one or more programs are executed by the electronic device, the electronic device: receives a node evaluation request including at least two Internet Protocol addresses; selects an Internet Protocol address from the at least two Internet Protocol addresses; and returns the selected Internet Protocol address; wherein the received Internet Protocol address indicates an edge node in a content distribution network.

[0118] Computer program code for performing the operations of the present application may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or back-end server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0119] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0120] The units involved in the embodiments described in the present application may be implemented by software or hardware. The name of the unit does not limit the unit itself in some cases. For example, the first acquisition unit may also be described as a "unit for acquiring at least two Internet Protocol addresses".

[0121] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.

[0122] The electronic device provided in this application is applicable to any embodiment of the above-mentioned project processing method, which will not be described in detail here.

[0123] In this application, effective management and control of each project is achieved through the constructed final assembly line system.

[0124] The present application provides a computer-readable storage medium, which stores a computer program, and the computer program enables a computer to execute the project processing method shown in the above embodiment.

[0125] The computer-readable storage medium provided in this application is applicable to any embodiment of the above-mentioned project processing method and will not be described in detail here.

[0126] In this application, effective management and control of each project is achieved through the constructed final assembly line system.

[0127] Those skilled in the art will appreciate that each block in these structure diagrams and / or block diagrams and / or flow charts and combinations of blocks in these structure diagrams and / or block diagrams and / or flow charts can be implemented using computer program instructions. Those skilled in the art will appreciate that these computer program instructions can be provided to a general-purpose computer, a professional computer, or a processor of other programmable data processing methods to implement, thereby executing the scheme specified in the block or multiple blocks of the structure diagrams and / or block diagrams and / or flow charts disclosed in this application through the processor of the computer or other programmable data processing method.

[0128] The modules of the device of the present application may be integrated into one or deployed separately. The modules may be combined into one module or further divided into multiple sub-modules.

[0129] Those skilled in the art will appreciate that the accompanying drawings are merely schematic diagrams of a preferred embodiment, and the modules or processes in the accompanying drawings are not necessarily required for implementing the present application.

[0130] Those skilled in the art can understand that the modules in the device in the embodiment can be distributed in the device in the embodiment according to the description of the embodiment, or can be changed accordingly and located in one or more devices different from the present embodiment. The modules in the above embodiment can be combined into one module, or can be further divided into multiple sub-modules.

[0131] The above serial numbers of this application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0132] The above disclosures are only a few specific embodiments of the present application; however, the present application is not limited thereto, and any changes that can be conceived by those skilled in the art should fall within the protection scope of the present application.

Claims

1. A project processing method, characterized in that: include: Get pending items; Performing project processing on the project to be processed based on a preset final assembly line system to obtain a project processing result for the project to be processed; Before the preset final assembly line system processes the project to be processed, the method includes: Define each task in each phase of the project as a first model; Building a final assembly line baseline corresponding to the business category system based on the characteristics of the corresponding business category system and the first model; Constructing a corresponding final assembly line system according to the final assembly line baseline corresponding to each business category system; Before the project is processed, the training and construction of the final assembly line system for project processing is carried out, including: Obtain project sample data, and divide the entire life cycle of the acquired project sample data into 8 stages: business requirements, requirements analysis, system design, development, testing, deployment, maintenance, and operation. The implementation tasks of each stage are divided into 6 dimensions: requirements management, project management, technical management, user experience, information visibility, and implementation process. Define the implementation activities of each stage, and divide each implementation activity into executable implementation tasks. Each implementation task is defined as an IPOSCT model, namely: input, processing steps, output, standards / specifications, quality checkpoints, and tools, a total of 6 models; Summarize each implementation task in each implementation phase of the project, define the IPOSCT model for each task, establish the final assembly line of the system based on the above model, and then supplement, revise and improve the content of the final assembly line in combination with the implementation characteristics of similar systems, so as to form the baseline of the final assembly line; The constructing a corresponding final assembly line system according to the final assembly line baseline corresponding to each business category system includes: Constructing a final assembly line corresponding to the business category system according to the final assembly line baseline and the corresponding business category system; Build the corresponding final assembly line system according to the final assembly line corresponding to each business category system.

2. The method according to claim 1, characterized in that Also includes: When the preset conditions are met, the final assembly line baseline or the final assembly line system is iteratively updated.

3. The method according to claim 2, characterized in that The preset condition includes any one of the following: The project processing results are different from the actual results; The number of times that the project processing result is different from the actual result meets a preset threshold; Preset time period.

4. A project processing device, characterized in that: include: The acquisition module is used to obtain items to be processed; A processing module, used for performing project processing on the project to be processed based on a preset final assembly line system to obtain a project processing result for the project to be processed; A construction module is used to define each task in each stage of the project as a first model; construct a general assembly line baseline corresponding to the business category system based on the characteristics of the corresponding business category system and the first model; and construct a corresponding general assembly line system according to the general assembly line baseline corresponding to each business category system; The construction module is also used to construct a final assembly line corresponding to the business category system according to the final assembly line baseline and the corresponding business category system; and to construct a corresponding final assembly line system according to the final assembly line corresponding to each business category system; Before the project is processed, the training and construction of the final assembly line system for project processing is carried out, including: Obtain project sample data, and divide the entire life cycle of the acquired project sample data into 8 stages: business requirements, requirements analysis, system design, development, testing, deployment, maintenance, and operation. The implementation tasks of each stage are divided into 6 dimensions: requirements management, project management, technical management, user experience, information visibility, and implementation process. Define the implementation activities of each stage, and divide each implementation activity into executable implementation tasks. Each implementation task is defined as an IPOSCT model, namely: input, processing steps, output, standards / specifications, quality checkpoints, and tools, a total of 6 models; Summarize each implementation task of each implementation stage of the project, define the IPOSCT model for each task, establish the system's final assembly line based on the above model, and then combine the implementation characteristics of similar systems to supplement, revise and improve the content of the final assembly line to form the final assembly line baseline.

5. An electronic device, characterized in that: include: Processor and memory; The memory is used to store computer programs; The processor is used to execute the project processing method described in any one of claims 1 to 3 by calling the computer program.

6. A computer-readable storage medium, characterized in that: The computer-readable storage medium is used to store a computer program, which, when executed on a computer, enables the computer to execute the project processing method described in any one of claims 1 to 3.

Citation Information