A quick maintenance platform and construction method thereof

By designing a quick inspection platform and using the overlapping method of the support base and the inspection plate, the step of building scaffolding is omitted, the problem of slow inspection speed of the furnace nose is solved, and the production efficiency and operation safety are improved.

CN113585702BActive Publication Date: 2024-10-01SHANGHAI SHENGCHANG IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110984716.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-26
Publication Date
2024-10-01
Estimated Expiration
2041-08-26

AI Technical Summary

Technical Problem

In the existing technology, the maintenance speed of the furnace nose is slow, which affects the production efficiency, mainly due to the need to build scaffolding, which makes the operation inconvenient.

Method used

A quick inspection platform is designed, which includes support bases fixed on both sides of the foundation pit and an access plate set at the bottom of the furnace nose. It is overlapped with the support base through connectors, eliminating the need to build scaffolding, and sliding the Move floors and fences to increase working area and safety.

Benefits of technology

It realizes rapid maintenance of the furnace nose, improves production efficiency, simplifies the maintenance process, increases operating safety, and facilitates the installation and disassembly of the platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113585702B_ABST
    Figure CN113585702B_ABST
Patent Text Reader

Abstract

The present application discloses a rapid maintenance platform, which comprises support bases fixedly arranged on opposite sides of a foundation pit, and a maintenance flat plate arranged at the bottom of a furnace nose, one side of the support base extends above the foundation pit, the maintenance flat plate is arranged horizontally, and connectors are arranged at both ends of the maintenance flat plate, and the connectors overlap and cooperate with the support base. The present application has the effect of facilitating rapid maintenance of the furnace nose and improving production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of maintenance platforms, and in particular to a rapid maintenance platform and a construction method thereof. Background Art

[0002] Hot-dip galvanizing is one of the most effective means to delay environmental corrosion of steel materials. It involves immersing the cleaned and activated steel products in molten zinc liquid. Through the reaction and diffusion between iron and zinc, a zinc alloy coating with good adhesion is plated on the surface of the steel products.

[0003] The process of hot-dip galvanizing is usually as follows: zinc is melted in a zinc boiler, and solid zinc is heated and melted to form zinc vapor. A furnace nose is connected above the zinc boiler, and the zinc vapor is transmitted to the processing equipment located above the furnace nose through the furnace nose.

[0004] Reference Figure 1 The zinc boiler 02 is generally arranged inside the foundation pit 01, the furnace nose 03 is arranged above the zinc boiler 02, and an equipment bracket 04 for supporting the furnace nose 03 is arranged on one side of the foundation pit 01.

[0005] When the furnace nose needs to be repaired, the boiler must be removed first, and a scaffolding must be built at the bottom of the furnace nose. Workers then climb up the scaffolding to perform the repair work. The inventor believes that repairing the furnace nose with the help of the built scaffolding will result in a slow repair speed for the furnace nose, affecting production efficiency. Summary of the invention

[0006] In order to facilitate the rapid maintenance of the furnace nose and improve production efficiency, the present application provides a rapid maintenance platform and a construction method thereof.

[0007] The present application provides a rapid maintenance platform and a construction method thereof using the following technical solutions:

[0008] In the first aspect, the present application provides a rapid maintenance platform, which adopts the following technical solutions:

[0009] A quick maintenance platform comprises support bases fixedly arranged on opposite sides of a foundation pit and a maintenance flat plate arranged at the bottom of a furnace nose. One side of the support base extends above the foundation pit. The maintenance flat plate is arranged horizontally. Connectors are fixedly arranged at both ends of the maintenance flat plate. The connectors overlap and cooperate with the support base.

[0010] By adopting the above technical solution, when the furnace nose needs to be overhauled, the zinc boiler inside the foundation pit is removed, the maintenance plate is hoisted to the bottom of the furnace nose, and the maintenance plate is overlapped with the supporting base using connecting parts to achieve the positioning of the maintenance plate. The maintenance personnel then use the maintenance plate to inspect the furnace nose, eliminating the process of building a scaffolding, facilitating rapid maintenance of the furnace nose, and improving production efficiency.

[0011] Optionally, the connecting member includes a vertically arranged connecting ladder and a connecting plate fixedly connected to the top of the connecting ladder, the connecting ladder is vertically arranged, the connecting plate is located above a supporting base, a plurality of plug-in blocks are arranged on the supporting base, a plurality of plug-in holes are opened on the connecting plate, and the plug-in blocks are plugged into and matched with the plug-in holes.

[0012] By adopting the above technical solution, the plug-in block is plugged into the plug-in hole to achieve stable positioning of the connecting plate. The plug-in method makes the installation of the maintenance plate more convenient and faster. At the same time, a connecting ladder is provided to facilitate maintenance personnel to enter the maintenance plate, further facilitating the maintenance of the furnace nose.

[0013] Optionally, the plug-in block extends out of the plug-in hole, and the plug-in block is arranged near the edge of the connecting plate.

[0014] By adopting the above technical solution, the plug-in block is extended out of the plug-in hole, which reduces the possibility of the connecting plate detaching from the plug-in block, making the connecting plate more stable. At the same time, the plug-in block is set near the edge of the connecting plate, which is convenient for workers to walk on the connecting plate and facilitate their maintenance work.

[0015] Optionally, an end of the plug-in block close to the support base is larger than an end away from the support base.

[0016] By adopting the above technical solution, the end of the plug-in block close to the support base is set larger than the end away from the support base. When the plug-in block is plugged into the plug-in hole, it plays a guiding role for the connecting plate, allowing a smaller deviation between the plug-in hole and the top of the plug-in block, further facilitating the installation of the mounting plate and increasing the speed of installation of the mounting plate.

[0017] Optionally, a sliding bottom plate is slidably connected to the inspection flat plate, the sliding bottom plate slides along the width direction of the inspection flat plate, and the sliding bottom plate is arranged parallel to the inspection flat plate.

[0018] By adopting the above technical solution, a sliding bottom plate is set up so that the working area of ​​the maintenance personnel can be expanded, further facilitating the maintenance work of the maintenance personnel. The sliding bottom plate is slidably connected to the maintenance flat plate, and the sliding bottom plate can be folded up during the installation process to reduce the volume of the rapid maintenance platform and facilitate the installation of the rapid maintenance platform.

[0019] Optionally, when the sliding base plate slides open, inspection fences are fixedly provided on all sides of the inspection plate except the side closest to the sliding base plate, fixed fences are provided at both ends of the sliding base plate in the length direction, and a movable fence is provided on the side of the sliding base plate away from the inspection plate. The bottom of the movable fence is hinged to the sliding base plate, and the movable fence is connected to the fixed fence by a U-shaped connector.

[0020] By adopting the above technical solution, maintenance fences, fixed fences and movable fences are used to protect the working area of ​​maintenance personnel, thereby improving the safety of maintenance work. At the same time, the movable fence is hinged to the sliding base plate, and the movable fence can be folded up during the installation and disassembly of the rapid maintenance platform, which facilitates the installation and disassembly of the rapid maintenance platform.

[0021] Optionally, a plug-in sleeve is provided on the side of the fixed fence and the movable fence close to each other, the opening of the U-shaped connector is arranged downward, and the two terminals of the U-shaped connector are plugged into and matched with the plug-in sleeve.

[0022] By adopting the above technical solution, the fixed fence and the movable fence are connected by using a U-shaped connector, which makes the positioning of the movable fence more convenient and quick.

[0023] Optionally, walking fences are provided on opposite sides of the connecting plate.

[0024] By adopting the above technical solution, when maintenance personnel pass through the connecting plate, the walking fence protects the maintenance personnel and reduces the possibility of the maintenance personnel falling into the foundation pit.

[0025] In the second aspect, the present application provides a construction method of a rapid maintenance platform, which adopts the following technical solution:

[0026] A construction method for a rapid maintenance platform comprises the following steps:

[0027] S1. Remove the zinc boiler inside the foundation pit and install support bases on opposite sides of the foundation pit;

[0028] S2. Check the status of the sliding base plate and the movable fence. The movable fence should be turned over to be parallel to the sliding base plate, and the sliding base plate should be slid to overlap with the inspection plate;

[0029] S3. After confirming the status of the sliding bottom plate and the movable fence, use the lifting equipment to lift the maintenance plate, insert the maintenance plate to the bottom of the furnace nose, and at the same time, plug the plug block into the plug hole;

[0030] S4. The maintenance personnel enter the maintenance platform through the connecting ladder, slide the sliding bottom plate to the position farthest from the maintenance platform, then flip the movable fence to a vertical state, and connect the movable fence and the fixed fence with a U-shaped connector;

[0031] S5. Check the position and status of the sliding bottom plate, check the position and status of the movable fence, and inspect the furnace nose after the inspection is completed.

[0032] By adopting the above technical solution, the status of the sliding base plate and the movable fence is checked before hoisting the maintenance plate, which can improve the safety and convenience of the hoisting operation. Maintenance personnel can enter the maintenance plate safely and quickly by connecting the ladder to the maintenance plate.

[0033] In summary, the present application includes at least one of the following beneficial technical effects:

[0034] 1. By setting up the maintenance platform, when the furnace nose needs maintenance, the zinc boiler inside the foundation pit is removed, the maintenance plate is hoisted to the bottom of the furnace nose, and the connecting piece is used to overlap with the support base to realize the positioning of the maintenance plate. Then the maintenance personnel use the maintenance plate to inspect the furnace nose, eliminating the process of building scaffolding, facilitating rapid maintenance of the furnace nose, and improving production efficiency;

[0035] 2. By setting up a sliding bottom plate, the operating area of ​​maintenance personnel can be expanded, which further facilitates the maintenance work of maintenance personnel. The sliding bottom plate is slidably connected with the maintenance flat plate. The sliding bottom plate can be retracted during the installation process to reduce the volume of the rapid maintenance platform and facilitate the installation of the rapid maintenance platform;

[0036] 3. By setting up maintenance fences, fixed fences and movable fences, the maintenance personnel's working area is protected by the maintenance fences, fixed fences and movable fences to improve the safety of maintenance work. At the same time, the movable fence is hinged to the sliding bottom plate, and the movable fence can be retracted during the installation and disassembly of the rapid maintenance platform, which facilitates the installation and disassembly of the rapid maintenance platform. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a structural schematic diagram showing the position of the furnace nose in the background technology of this application.

[0038] Figure 2 It is a schematic diagram of the overall structure of an embodiment of the present application.

[0039] Figure 3 It is a schematic diagram showing the connection relationship between the connecting member and the supporting base in the embodiment of the present application.

[0040] Figure 4 It is a schematic diagram showing the coordination relationship between the sliding base plate and the inspection plate in the embodiment of the present application.

[0041] Figure 5 It is a schematic diagram showing the connection relationship between the fixed fence and the movable fence in the embodiment of the present application.

[0042] Figure 6 It is a schematic diagram showing the position of the limit pin in the embodiment of the present application.

[0043] Description of reference numerals:

[0044] 01. Foundation pit; 02. Zinc boiler; 03. Furnace nose; 04. Equipment bracket; 1. Support base; 11. Plug-in block; 12. Walking fence; 2. Inspection plate; 21. Inspection fence; 3. Connector; 31. Connecting ladder; 311. Limit pin; 32. Connecting plate; 321. Plug-in hole; 4. Sliding bottom plate; 41. Fixed fence; 42. Movable fence; 43. Plug-in sleeve; 44. U-shaped connector; 45. Pulley; 5. Extension arm; 51. Limit block; 52. Limit groove. DETAILED DESCRIPTION

[0045] The following is combined with Figure 1-6 This application is described in further detail.

[0046] The present application embodiment discloses a rapid maintenance platform. Figure 1 and Figure 2 A rapid maintenance platform includes two support bases 1 and a maintenance plate 2. The two support bases 1 are respectively arranged on opposite sides of a foundation pit 01, and the support bases 1 are fixedly connected to the ground. The maintenance plate 2 is horizontally arranged at the bottom of a furnace nose 03, and the maintenance plate 2 is located between the two support bases 1. Connectors 3 are arranged at both ends of the maintenance plate 2 in the length direction, and the two ends of the maintenance plate 2 are connected to the support base 1 through the connectors 3.

[0047] Reference Figure 1 and Figure 2 When inspecting the furnace nose 03, the zinc boiler 02 inside the foundation pit 01 is removed, and the inspection plate 2 is hoisted to the bottom of the furnace nose 03. The inspection plate 2 is connected to the support base 1 through the connecting pieces 3 at both ends, and then the maintenance personnel enter the inspection plate 2 to inspect the furnace nose 03, eliminating the process of building a scaffolding and facilitating rapid inspection of the furnace nose 03.

[0048] Reference Figure 2 and Figure 3 The support base 1 is horizontally arranged, and one side of the support base 1 extends to the top of the foundation pit 01. Each connecting member 3 includes a connecting ladder 31 and a connecting plate 32. The connecting ladder 31 is vertically arranged, and the bottom end of the connecting ladder 31 is fixedly connected to one end of the maintenance plate 2 in the length direction, and the top end of the connecting ladder 31 is fixedly connected to one side of the connecting plate 32. The connecting plate 32 is horizontally arranged and located above the support base 1. Walking fences 12 are fixedly arranged on both sides of the connecting plate 32 close to the side of the support base 1 in the length direction.

[0049] Reference Figure 3, a plurality of plug-in blocks 11 are fixedly arranged on each support base 1. In this embodiment, two plug-in blocks 11 are taken as an example. The two plug-in blocks 11 are arranged along the width direction of the support base 1. The plug-in blocks 11 are located at the edge of the length direction of the support base 1, and the plug-in blocks 11 gradually decrease from bottom to top. A plurality of plug-in holes 321 are provided on each connection plate 32 along the width direction of the support base 1. In this embodiment, two plug-in blocks 11 are taken as an example. A single plug-in block 11 is plugged into a single plug-in hole 321, and the plug-in block 11 extends above the connection plate 32.

[0050] Reference Figure 2 and Figure 3 When installing the inspection plate 2, the inspection plate 2 is hoisted into the inside of the foundation pit 01, and the inspection plate 2 is inserted under the furnace nose 03, and then the plug-in block 11 is plugged into the plug-in hole 321 to achieve stable positioning of the connecting plate 32 and installation of the inspection plate 2. The maintenance personnel enter the inspection plate 2 by connecting the ladder 31, and the rapid construction of the rapid maintenance platform is realized, and the maintenance personnel can enter the rapid maintenance platform safely and quickly.

[0051] Reference Figure 2 and Figure 3 Since the inspection plate 2 needs to be hoisted into the foundation pit 01 and inserted under the furnace nose 03, the volume of the inspection plate 2 is limited by the opening of the foundation pit 01, but the inspection plate 2 is too small and it is inconvenient to inspect the furnace nose 03. Therefore, a sliding bottom plate 4 is slidably connected to the inspection plate 2, and the sliding bottom plate 4 slides along the width direction of the inspection plate 2. The sliding bottom plate 4 is horizontally arranged and is higher than the inspection plate 2. When the sliding bottom plate 4 slides in the direction away from the inspection plate 2, the area of ​​the maintenance personnel's working area can be enlarged, which is convenient for inspecting the furnace nose 03.

[0052] Reference Figure 4 In order to achieve the sliding fit between the sliding bottom plate 4 and the inspection plate 2, two extension arms 5 are integrally formed on one side of the length direction of the inspection plate 2. The extension arms 5 are arranged along the width direction of the inspection plate 2, and the two extension arms 5 are arranged along the length direction of the inspection plate 2. Two pulleys 45 are rotatably arranged at both ends of the sliding bottom plate 4 in the length direction. The two pulleys 45 are arranged along the length direction of the extension arms 5. The four pulleys 45 are all located at the bottom of the sliding bottom plate 4, and the pulleys 45 and the extension arms 5 are rollingly matched.

[0053] Reference Figure 4A limiting groove 52 is provided on the side of the two extension arms 5 away from each other. The limiting groove 52 is provided along the length direction of the extension arm 5. The two pulleys 45 at the same end of the sliding base plate 4 roll in a limiting groove 52. The pulley 45 rolls inside the limiting groove 52. The limiting groove 52 extends to the access plate 2 at one end close to the access plate 2. The limiting groove 52 is used to limit and guide the pulley 45 during its rolling process. At the same time, a limiting block 51 is integrally formed at one end of each extension arm 5 away from the access plate 2. The limiting block 51 is located on the upper surface of the extension arm 5. When the sliding base plate 4 needs to slide open, the limiting block 51 limits the pulley 45 to reduce the possibility of the sliding base plate 4 detaching from the extension arm 5.

[0054] Reference Figure 4 In order to improve the safety of maintenance work, maintenance fences 21 are fixedly set on the maintenance plate 2 except for the side closest to the extension arm 5. At the same time, fixed fences 41 are set at both ends of the length direction of the sliding base plate 4. A movable fence 42 is hinged on the side of the sliding base plate 4 close to the limit block 51. The bottom of the movable fence 42 is hinged to the sliding base plate 4. During the maintenance process, the movable fence 42 is flipped to a vertical state. When the sliding base plate 4 is not in use, the movable fence 42 can be flipped to the top of the sliding base plate 4 for folding.

[0055] Reference Figure 5 When the movable fence 42 is flipped to a vertical state, a plug-in sleeve 43 is provided on the side where the fixed fence 41 and the movable fence 42 are close to each other. The two plug-in sleeves 43 are connected by a U-shaped plug-in component 44. The opening of the U-shaped plug-in component 44 is set downward. The two terminals of the U-shaped plug-in component 44 are respectively plugged and matched with the two plug-in sleeves 43 to limit the vertical movable fence 42.

[0056] Reference Figure 4 and Figure 6 In order to prevent the sliding bottom plate 4 from sliding after it is opened, a limit pin 311 is inserted on the side of the two connecting ladders 31 close to the fixed fence 41, and the side of the fixed fence 41 away from the movable fence 42 conflicts with the limit pin 311 to limit the sliding bottom plate 4 after it is opened. The limit pin 311 cooperates with the limit block 51 to limit the sliding bottom plate 4 after it slides open.

[0057] The implementation principle of a quick maintenance platform in an embodiment of the present application is as follows: when the furnace nose 03 needs maintenance, first remove the zinc boiler 02 inside the foundation pit 01, and then hoist the maintenance plate 2 to the bottom of the furnace nose 03, so that the connecting plate 32 is above the supporting base 1, and then the plug-in block 11 is plugged into the plug-in hole 321 to position the connecting plate 32, and then the maintenance personnel enter the maintenance plate 2 through the connecting ladder 31, the maintenance personnel slide the sliding bottom plate 4 open, and insert the limit pin 311, then flip up the movable fence 42, insert the U-shaped connector 44, and then inspect the furnace nose 03.

[0058] The present application also discloses a method for constructing a rapid maintenance platform. The method for constructing a rapid maintenance platform includes the following steps:

[0059] S1, remove the zinc boiler 02 inside the foundation pit 01, and install support bases 1 on both opposite sides of the foundation pit 01;

[0060] S2. Check the status of the sliding base plate 4 and the movable fence 42. The movable fence 42 should be turned over to be parallel to the sliding base plate 4, and the sliding base plate 4 should slide to overlap with the inspection plate 2;

[0061] S3, after confirming the status of the sliding bottom plate 4 and the movable fence 42, the inspection plate 2 is lifted by the lifting equipment, and the inspection plate 2 is inserted into the bottom of the furnace nose 03, and the plug-in block 11 is plugged into the plug-in hole 321;

[0062] S4, the maintenance personnel enter the maintenance plate 2 by connecting the ladder 31, slide the sliding base plate 4 to the position farthest from the maintenance plate 2, then flip the movable fence 42 to a vertical state, and connect the movable fence 42 and the fixed fence 41 with the U-shaped connector 44;

[0063] S5. Check the position and state of the sliding bottom plate 4, check the position and state of the movable fence 42, and after the inspection is completed, repair the furnace nose 03.

[0064] The implementation principle of a construction method of a rapid maintenance platform in an embodiment of the present application is as follows: first install a support base 1 to provide a support point for the rapid maintenance platform, then confirm whether the sliding bottom plate 4 and the movable fence 42 are folded, and then hoist the rapid maintenance platform. After the hoisting is completed, enter the maintenance flat plate 2, open the sliding bottom plate 4 and the movable fence 42, and then perform maintenance work on the furnace nose 03, eliminating the process of building a scaffolding, which is faster and more convenient.

[0065] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A rapid maintenance platform, characterized in that: It comprises a support base (1) fixedly arranged on opposite sides of a foundation pit (01), and an inspection plate (2) arranged at the bottom of a furnace nose (03), one side of the support base (1) extends above the foundation pit (01), the inspection plate (2) is arranged horizontally, and connecting pieces (3) are fixedly arranged at both ends of the inspection plate (2), and the connecting pieces (3) overlap and cooperate with the support base (1); The connecting member (3) comprises a vertically arranged connecting ladder (31) and a connecting plate (32) fixedly connected to the top of the connecting ladder (31); the connecting ladder (31) is vertically arranged; the connecting plate (32) is located above the supporting base (1); a plurality of plug-in blocks (11) are arranged on the supporting base (1); a plurality of plug-in holes (321) are provided on the connecting plate (32); the plug-in blocks (11) are plugged into and matched with the plug-in holes (321); The inspection plate (2) is slidably connected to a sliding base plate (4), the sliding base plate (4) slides along the width direction of the inspection plate (2), and the sliding base plate (4) is arranged parallel to the inspection plate (2); Two extension arms (5) are integrally formed on one side of the inspection plate (2) in the length direction, and the extension arms (5) are arranged along the width direction of the inspection plate (2); two pulleys (45) are rotatably arranged at both ends of the sliding base plate (4) in the length direction, and the pulleys (45) roll with the extension arms (5); a limiting groove (52) is provided on the side away from each other of the two extension arms (5), and the limiting groove (52) is arranged along the length direction of the extension arm (5), and the pulley (45) rolls inside the limiting groove (52), and the limiting groove (52) extends from the end close to the inspection plate (2) to the inspection plate (2); a limiting block (51) is integrally formed on the end of the extension arm (5) away from the inspection plate (2), and the limiting block (51) limits the pulley (45); When the sliding base plate (4) slides open, the inspection fence (21) is fixedly provided on all sides of the inspection plate (2) except the side closest to the sliding base plate (4), fixed fences (41) are provided at both ends of the length direction of the sliding base plate (4), and a movable fence (42) is provided on the side of the sliding base plate (4) away from the inspection plate (2), the bottom of the movable fence (42) is hinged to the sliding base plate (4), and the movable fence (42) is connected to the fixed fence (41) via a U-shaped connector (44).

2. A rapid maintenance platform according to claim 1, characterized in that: The plug-in block (11) extends out of the plug-in hole (321), and the plug-in block (11) is arranged near the edge of the connecting plate (32).

3. A rapid maintenance platform according to claim 1, characterized in that: An end of the plug-in block (11) close to the support base (1) is larger than an end away from the support base (1).

4. A rapid maintenance platform according to claim 1, characterized in that: A plug-in sleeve (43) is provided on the side where the fixed fence (41) and the movable fence (42) are close to each other, and the opening of the U-shaped plug-in connector (44) is arranged downward, and two terminals of the U-shaped plug-in connector (44) are plug-fitted with the plug-in sleeve (43).

5. A rapid maintenance platform according to claim 1, characterized in that: Walking fences (12) are arranged on opposite sides of the connecting plate (32).

6. The construction method of a rapid maintenance platform according to claim 1, characterized in that: The following steps are included: S1. Remove the zinc boiler (02) inside the foundation pit (01), and install support bases (1) on opposite sides of the foundation pit (01); S2. Check the status of the sliding base plate (4) and the movable fence (42). The movable fence (42) should be turned over to be parallel to the sliding base plate (4), and the sliding base plate (4) should be slid to overlap with the inspection plate (2); S3, after confirming the status of the sliding bottom plate (4) and the movable fence (42), the inspection plate (2) is lifted by the lifting equipment, and the inspection plate (2) is inserted into the bottom of the furnace nose (03), and the plug-in block (11) is plugged into the plug-in hole (321); S4. The maintenance personnel enter the maintenance plate (2) by connecting the ladder (31), slide the sliding base plate (4) to the position farthest from the maintenance plate (2), then flip the movable fence (42) to a vertical state, and connect the movable fence (42) and the fixed fence (41) using a U-shaped connector (44); S5. Check the position and state of the sliding bottom plate (4), check the position and state of the movable fence (42), and after the inspection is completed, repair the furnace nose (03).