Water conservancy project construction quality inspection method, device, electronic equipment and storage medium
By structuring and integrating the on-site indicator data of water conservancy projects, combined with fuzzy membership and analytic hierarchy process, target inspection data is generated, which solves the problem of lack of quantitative inspection in water conservancy project construction and achieves scientific and accurate quality inspection.
Patent Information
- Application Number
- CN202110450735.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-25
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-04-25
AI Technical Summary
Existing water conservancy project construction lacks a comprehensive and scientific quantitative inspection method, and mainly uses qualitative inspection, which cannot intuitively represent the construction quality level.
By obtaining the on-site indicator data of water conservancy projects, data structuring and fusion are carried out, and the fuzzy membership analysis method and the analytic hierarchy process are combined to calculate the single-person daily coefficient and the project grade coefficient, perform weighted operations, and generate target inspection data to avoid inspection days and No interference from the number of people to ensure the rationality and accuracy of the inspection results.
It achieves a comprehensive, scientific and quantitative inspection of the construction quality of water conservancy projects, improves the accuracy and comparability of inspection results, avoids subjectivity and errors in qualitative inspections, and provides intuitive quantitative indicators.
Smart Images

Figure CN113610333B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a method, device, electronic equipment and storage medium for inspecting the construction quality of a water conservancy project. Background Art
[0002] With the comprehensive advancement of water conservancy reform, the management level of water conservancy projects has been significantly improved, the construction of water conservancy infrastructure has been accelerated, the construction of people's livelihood water conservancy has achieved remarkable results, and water resources management has become more stringent, which has effectively guaranteed the healthy operation of the project and the full realization of its benefits. However, the current quality inspection of water conservancy project construction is mainly applied to the construction of the South-to-North Water Diversion Project. It mainly describes the problems in the construction of the South-to-North Water Diversion Project in a qualitative way, which cannot intuitively characterize the construction quality level of water conservancy projects. It can be seen that there is currently a lack of comprehensive and scientific quantitative inspection methods for the quality of water conservancy project construction. Summary of the invention
[0003] The purpose of the embodiments of the present application is to provide a method, device, electronic equipment and storage medium for inspecting the construction quality of a water conservancy project, aiming to solve the problem that there is currently a lack of comprehensive and scientific quantitative inspection methods for water conservancy projects.
[0004] In a first aspect, an embodiment of the present application provides a method for inspecting the quality of water conservancy project construction, comprising:
[0005] Obtaining on-site index data of the water conservancy project, which is the index inspection result of the water conservancy project during the engineering inspection;
[0006] Structuring the on-site indicator data to obtain indicator structured data corresponding to the on-site indicator data;
[0007] Retrieve the preset indicator weight values, perform data fusion on the indicator structured data, and obtain preliminary inspection data of the water conservancy project;
[0008] Based on the inspection days and number of inspectors of water conservancy projects, the fuzzy membership analysis method is used to analyze the single-person-per-day coefficient;
[0009] According to the single-person-per-day coefficient and the preset project grade coefficient, the preliminary inspection data is weighted to obtain the target inspection data of the water conservancy project.
[0010] In this embodiment, by acquiring the on-site indicator data of the water conservancy project and structuring the on-site indicator data, the indicator structured data corresponding to the on-site indicator data is obtained to realize the quantification of the quality indicators of the water conservancy project; then, by calling the preset indicator weight value, the indicator structured data is data fused to obtain the preliminary inspection data of the water conservancy project, so as to make the quantitative indicators of the water conservancy project more intuitive; finally, based on the engineering inspection days and the number of inspectors of the water conservancy project, the fuzzy membership analysis method is called to analyze the single-person single-day coefficient, and according to the single-person single-day coefficient and the preset engineering grade coefficient, the preliminary inspection data is weighted to obtain the target inspection data of the water conservancy project, so as to avoid the interference of different inspection days or numbers on the inspection results, ensure the rationality of the inspection results, and make the quantitative inspection method more comprehensive and scientific.
[0011] In one embodiment, based on the number of inspection days and the number of inspectors of the water conservancy project, the fuzzy membership analysis method is called to analyze the single-person-single-day coefficient, including:
[0012] Generate a quantitative score for a single person per day based on the structured data of water conservancy project indicators, project inspection days, and number of inspectors;
[0013] The first pre-established piecewise linear membership function is called to perform membership analysis on the single-person single-day quantitative scores to obtain the single-person single-day coefficients for each inspection.
[0014] In this embodiment, the single-person-per-day coefficient is analyzed through on-site indicator data, project inspection days and the number of inspectors, so as to avoid result errors caused by using the same inspection method in different projects or at different times, and make the inspection results more accurate and reasonable.
[0015] In one embodiment, after performing weighted calculation on the preliminary inspection data according to the single-person-per-day coefficient and the preset engineering grade coefficient to obtain the target inspection data of the water conservancy project, the following is further included:
[0016] Based on the preset outlier elimination conditions, the target inspection data that meets the outlier elimination conditions are eliminated from all the target inspection data, wherein one target inspection data is obtained for each inspection;
[0017] Perform mean calculation on all target inspection data after removing outliers to obtain standard inspection data.
[0018] In this embodiment, for some engineering inspection items, it is necessary to calculate multiple inspection results. In order to ensure the accuracy of the inspection results, the abnormal target inspection data is cleaned.
[0019] In one embodiment, the preset indicator weight values include a first weight value of the inspection content layer, a second weight value of the inspection object layer, and a third weight value of the inspection project layer. The inspection content layer, the inspection object layer, and the inspection project layer are in an ascending hierarchical relationship. The preset indicator weight values are retrieved, and the indicator structured data is fused to obtain preliminary inspection data of the water conservancy project, including:
[0020] Calling a preset second piecewise linear membership function to perform piecewise fusion on the indicator structured data to obtain a plurality of inspection content data of the inspection content layer, wherein the inspection content layer includes a plurality of inspection contents, and each inspection content includes one or more indicator structured data;
[0021] Retrieving a first weight value, fusing a plurality of inspection content data, and obtaining a plurality of inspection object data of an inspection object layer, wherein the inspection object layer includes a plurality of inspection objects, and each inspection object includes one or more inspection contents;
[0022] Retrieving a second weight value, fusing the plurality of inspection object data, and obtaining a plurality of inspection item data of an inspection item layer, wherein the inspection item layer includes a plurality of inspection items, and each inspection item includes one or more inspection objects;
[0023] The third weight value is retrieved and the data of multiple inspection items are integrated to obtain preliminary inspection data of the water conservancy project.
[0024] In this embodiment, the indicator structured data is fused and processed through the hierarchical analysis method, so that the inspection method is more comprehensive and scientific, and the inspection result is more reasonable and accurate.
[0025] Furthermore, the calculation formula of the second piecewise linear membership function is:
[0026]
[0027] A=10*N ser1 +6*N Rser1 +2*N gen1 ;
[0028] B=10*N ser2 +6*N Rser2 +2*N gen2 ;
[0029] Where SHD represents the preliminary inspection data, A represents the quantitative score of the first inspection content calculated based on the on-site indicator data, B represents the quantitative score of the second inspection content calculated based on the preset indicator list, and N ser1 Indicates the number of serious indicators in the on-site indicator data, N Rser1 Indicates the number of more serious indicators in the on-site indicator data, N gen1Indicates the number of general indicators in the field indicator data, N ser2 Indicates the number of serious indicators in the preset indicator list, N Rser2 Indicates the number of more serious indicators in the preset indicator list, N gen2 Indicates the number of general indicators in the preset indicator list.
[0030] In this implementation, by combining on-site indicator data with a preset indicator list for analysis and integrating the correlations between different indicators, the inspection content data is made more accurate and reasonable.
[0031] Furthermore, before retrieving the preset indicator weight values and fusing the indicator structured data to obtain the preliminary inspection data of the water conservancy project, the following steps are also included:
[0032] A judgment matrix is constructed by taking each inspection content in the inspection content layer or each inspection object in the inspection object layer as an element;
[0033] Determine the continuous product of the elements in each row of the judgment matrix, and based on the continuous product of the elements in each row, generate the relative weight value of each element relative to the previous level;
[0034] Based on the respective relative weight values, a first weight value of each inspection content in the inspection content layer or a second weight value of each inspection object in the inspection object layer is generated.
[0035] In this implementation, constructing a judgment matrix can avoid the influence of subjective factors caused by human scoring and improve the accuracy of the inspection results.
[0036] Furthermore, before generating the first weight value of each inspection content in the inspection content layer or the second weight value of each inspection object in the inspection object layer based on each relative weight value, the method further includes:
[0037] According to the maximum eigenvalue of the judgment matrix, the random consistency ratio of the judgment matrix is compared with the preset value;
[0038] If the random consistency ratio of the judgment matrix is less than the preset value, the relative weight value is judged to meet the reliability requirements.
[0039] In this implementation, the judgment matrix is the basis and key to determine the weights in the hierarchical analysis method. Therefore, the reliability of the relative weight values is guaranteed by verifying whether the judgment matrix meets the consistency requirements.
[0040] In a second aspect, an embodiment of the present application provides a water conservancy project construction quality inspection device, including:
[0041] The data acquisition module is used to acquire the on-site index data of the water conservancy project, and the on-site index data is the index inspection result of the water conservancy project during the engineering inspection;
[0042] A data structuring module is used to structure the on-site indicator data to obtain indicator structured data corresponding to the on-site indicator data;
[0043] The data fusion module is used to retrieve the preset indicator weight values, perform data fusion on the indicator structured data, and obtain the preliminary inspection data of the water conservancy project;
[0044] The data analysis module is used to analyze the single-person-per-day coefficient based on the number of engineering inspection days and the number of inspectors of the water conservancy project by calling the fuzzy membership analysis method;
[0045] The data operation module is used to perform weighted operation on the preliminary inspection data according to the single-person-day coefficient and the preset engineering grade coefficient to obtain the target inspection data of the water conservancy project.
[0046] In a third aspect, an embodiment of the present application provides an electronic device, including a memory and a processor, wherein the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the water conservancy project construction quality inspection method of the first aspect.
[0047] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the water conservancy project construction quality inspection method of the first aspect.
[0048] It should be noted that the beneficial effects of the second to fourth aspects mentioned above can be found in the relevant description of the first aspect mentioned above. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0050] Figure 1 A flow chart of a method for inspecting the quality of water conservancy project construction provided in an embodiment of the present application;
[0051] Figure 2 A schematic diagram of the structure of a water conservancy project construction quality inspection device provided in an embodiment of the present application;
[0052] Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0053] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application.
[0054] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. At the same time, in the description of this application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0055] As recorded in the background technology, the current quality inspection work of water conservancy project construction is mainly applied to the construction of the South-to-North Water Diversion Project. It mainly targets the problems arising in the construction of the South-to-North Water Diversion Project and describes the problems in a qualitative inspection manner, which cannot intuitively represent the construction quality level of the water conservancy project.
[0056] In response to the problems in the above-mentioned prior art, the present application provides a method for inspecting the construction quality of a water conservancy project, which obtains on-site indicator data of the water conservancy project and structures the on-site indicator data to obtain indicator structured data corresponding to the on-site indicator data, so as to quantify the quality indicators of the water conservancy project; then, by calling the preset indicator weight value, the indicator structured data is fused to obtain preliminary inspection data of the water conservancy project, so as to make the quantitative indicators of the water conservancy project more intuitive; finally, based on the number of engineering inspection days and the number of inspectors of the water conservancy project, the fuzzy membership analysis method is called to analyze the single-person single-day coefficient, and the preliminary inspection data is weighted according to the single-person single-day coefficient and the preset engineering grade coefficient to obtain the target inspection data of the water conservancy project, so as to avoid the interference of the inspection days and the number of inspectors on the inspection results, ensure the rationality of the inspection results, make the quantitative inspection method more comprehensive and scientific, and make the inspection results of different engineering grades more comparable.
[0057] See also Figure 1 , Figure 1 The following flowchart shows a method for inspecting the construction quality of a water conservancy project provided in an embodiment of the present application. The following method for inspecting the construction quality of a water conservancy project in an embodiment of the present application can be applied to electronic devices, including but not limited to smart phones, tablet computers, desktop computers, supercomputers, personal digital assistants and other computer devices. The method for inspecting the construction quality of a water conservancy project in an embodiment of the present application includes steps S101 to S105, which are described in detail as follows:
[0058] S101, obtaining on-site index data of a water conservancy project, where the on-site index data is an index inspection result of the water conservancy project during an engineering inspection.
[0059] In this embodiment, the field indicator data can be collected based on various indicators in the "Measures for Supervision and Inspection of Water Conservancy Project Construction and Quality and Safety in Production (Trial)". For example, if the indicator is whether the slope and size of the permanent drainage ditch meet the regulations or contract technical requirements, the specific data of the field indicator data can be whether the slope and size of the permanent drainage ditch meet the regulations, the slope and size of the permanent drainage ditch meet the contract technical requirements, and the slope and size of the permanent drainage ditch meet the regulations or contract technical requirements, etc. At the same time, the field indicator data can also determine the severity of the indicator, for example, the severity of "the slope and size of the permanent drainage ditch do not meet the regulations" is general, the severity of "the slope and size of the permanent drainage ditch do not meet the contract technical requirements" is relatively serious, and the slope and size of the permanent drainage ditch meet the regulations or contract technical requirements. The severity of "the slope and size of the permanent drainage ditch do not meet the regulations or contract technical requirements" is serious.
[0060] It is understandable that, generally speaking, each water conservancy project has multiple on-site inspectors, and the number of days for each inspection is also different. Each on-site inspector collects on-site indicator data based on the above indicators and inputs the collected on-site indicator data into electronic equipment for data processing and analysis.
[0061] S102, structuring the on-site indicator data to obtain indicator structured data corresponding to the on-site indicator data.
[0062] In this embodiment, illustratively, according to the severity of the on-site indicators, in accordance with the "Measures for the Supervision and Inspection of Water Conservancy Project Construction and Quality and Safety in Production (Trial)", the on-site indicator data is quantified by means of graded assignment to achieve data structuring. For example, the following groups of data are drawn up: 1, 3, 5; 1, 5, 8; 2, 4, 6; 2, 6, 10. According to the principle of mathematical scoring and quantitative analysis, the quantitative scores should meet the following conditions: Principle ① Keep the gaps between the three levels equal; Principle ② The value of "serious" should be greater than the sum of "general" and "heavy", the value of "serious" should be less than the sum of the two "heavy" values, and the value of "heavy" should be greater than the sum of the two "general" values.
[0063] Principles and plans 1、3、5 1、5、8 2、4、6 2、6、10 Principle 1 satisfy Dissatisfied satisfy satisfy Principle 2 satisfy satisfy Dissatisfied satisfy
[0064] From the table above, "1, 3, 5" and "2, 6, 10" all meet the above principles, but the difference between the three levels of "1, 3, 5" is small and cannot truly reflect the gap between the problems. In summary, the initial quantitative values of "2, 6, 10" are selected to correspond to the three levels of "general", "heavy" and "serious". In other words, when the on-site indicator data is general, the indicator structured data is 2, when the on-site indicator data is heavy, the indicator structured data is 6, and when the on-site indicator data is serious, the indicator structured data is 10.
[0065] S103, retrieve preset indicator weight values, perform data fusion on indicator structured data, and obtain preliminary inspection data of the water conservancy project.
[0066] In this embodiment, the hierarchical analysis method can be used to fuse the indicator structured data. Specifically, the preset indicator weight value corresponding to the data of each layer is called in each layer to weight the data of this layer, and then the result of this layer is used as the input of the next layer for fusion.
[0067] The layers can be divided into indicator layer, content layer, object layer, project layer and target layer. The indicator layer contains the indicator structured data of multiple on-site indicators. The content layer is the classification of the problems of each responsible unit in the quality management violations. For example, the quality management content of the survey and design unit mainly includes six indicators, namely quality management system, ready-made services, design documents and construction drawings (including design changes), survey and design quality problems and quality accidents, project acceptance and other indicators; the object layer is the classification of the project legal person (construction unit), survey and design unit, construction unit, supervision unit and other objects involved in the quality management violations, and the quality defects involve foundation treatment, earthwork engineering, concrete and reinforced concrete engineering, masonry drainage engineering, metal electromechanical engineering and other engineering quality supervision and inspection; the project layer is to supervise and inspect the quality management violations and engineering quality defects in a single water conservancy project. The target layer is to supervise and inspect the quality of a single water conservancy project with a single project as the basic unit.
[0068] In one embodiment, the preset indicator weight values include a first weight value of the inspection content layer, a second weight value of the inspection object layer, and a third weight value of the inspection project layer. The inspection content layer, the inspection object layer, and the inspection project layer are in an ascending hierarchical relationship. The preset indicator weight values are retrieved, and the indicator structured data is fused to obtain preliminary inspection data of the water conservancy project, including:
[0069] Call the preset second piecewise linear membership function to perform piecewise fusion on the indicator structured data to obtain multiple inspection content data of the inspection content layer, the inspection content layer includes multiple inspection contents, and each inspection content includes one or more indicator structured data; call the first weight value, fuse the multiple inspection content data, and obtain multiple inspection object data of the inspection object layer, the inspection object layer includes multiple inspection objects, and each inspection object includes one or more inspection contents; call the second weight value, fuse the multiple inspection object data, and obtain multiple inspection item data of the inspection project layer, the inspection project layer includes multiple inspection items, and each inspection item includes one or more inspection objects; call the third weight value, fuse the multiple inspection item data, and obtain preliminary inspection data of the water conservancy project.
[0070] In this embodiment, the calculation formula of the second piecewise linear membership function is:
[0071]
[0072] A=10*N ser1 +6*N Rser1 +2*N gen1 ;
[0073] B=10*N ser2 +6*N Rser2 +2*N gen2 ;
[0074] Where SHD represents the preliminary inspection data, A represents the quantitative score of the first inspection content calculated based on the on-site indicator data, B represents the quantitative score of the second inspection content calculated based on the preset indicator list, and N ser1 Indicates the number of serious indicators in the on-site indicator data, N Rser1 Indicates the number of more serious indicators in the on-site indicator data, N gen1 Indicates the number of general indicators in the field indicator data, N ser2 Indicates the number of serious indicators in the preset indicator list, N Rser2 Indicates the number of more serious indicators in the preset indicator list, N gen2 Indicates the number of general indicators in the preset indicator list.
[0075] After the calculation of the indicator layer is completed, according to the principle of "single indicator quantification-multiple indicator integration", the individual contents of each layer are weighted and integrated step by step, and finally the initial inspection data of the water conservancy project is obtained, which is calculated as follows:
[0076]
[0077]
[0078]
[0079] Among them, OHD, PHD, and HD represent the inspection data of the object layer, project layer, and target layer, respectively. i 、w j 、w k Respectively represent the weights corresponding to each inspection content, inspection object, and inspection item.
[0080] Through the above calculation, the inspection data HD of the target layer is a value of [0, 1]. In order to conform to people's cognitive habits, it is converted into a percentage value: HD HMs =HD*100;HD HMS Represents the initial inspection data of the water conservancy project.
[0081] Furthermore, before calling up the preset indicator weight values and performing data fusion on the indicator structured data to obtain the preliminary inspection data of the water conservancy project, it also includes: constructing a judgment matrix with the quantitative scores of each inspection content in the inspection content layer or each inspection object in the inspection object layer as elements; determining the continuous product of the elements in each row of the judgment matrix, and generating the relative weight value of each element relative to the previous level based on the continuous product of the elements in each row; and generating the first weight value of each inspection content in the inspection content layer or the second weight value of each inspection object in the inspection object layer based on each relative weight value.
[0082] In this implementation, the judgment matrix is constructed to avoid the influence of subjective factors caused by human scoring, so as to improve the accuracy of the inspection results. Specifically, the judgment matrix is for the inspection elements (inspection content or inspection object) of the previous layer, and is an m×m matrix (m represents the number of elements in this layer) that represents the relative importance of each element in this layer, where the matrix element A I,j It represents the importance scale of factor i relative to factor j, with values ranging from 1 to 9. The meaning and description of each scale are shown in the table below.
[0083]
[0084] The current inspection methods all use the expert scoring method to construct the judgment matrix. In order to reduce the impact of human operation on the weight determination, this embodiment constructs the judgment matrix according to the quantitative score of each factor. First, the elements on the main diagonal of the judgment matrix are marked as 1, and then the matrix elements with i>j are calculated, and finally the matrix elements with i<j are calculated.
[0085]
[0086] Wherein, round(·) means rounding, which is changed to 1 / 9 when Aij≤1 and to 9 when Aij≥9.
[0087] Exemplarily, the continuous product M of each row element is calculated according to the judgment matrix i : i=1,2,3,......m. Calculate M i The mth root of Calculate the relative weight of each element relative to the previous layer:
[0088] Furthermore, before generating the first weight value of each inspection content in the inspection content layer, or generating the second weight value of each inspection object in the inspection object layer based on each relative weight value, it also includes: comparing the random consistency ratio of the judgment matrix with a preset value based on the maximum eigenvalue of the judgment matrix; if the random consistency ratio of the judgment matrix is less than the preset value, it is determined that the relative weight value meets the reliability requirements.
[0089] In this implementation, the judgment matrix is the basis and key to determine the weights of the hierarchical analysis method. Therefore, the reliability of the relative weight values is guaranteed by verifying whether the judgment matrix meets the consistency requirements. For example, the consistency of the judgment matrix is measured by the random consistency ratio (CR). When CR < 0.1, the judgment matrix is considered to meet the consistency requirements. The calculation formula is as follows:
[0090] CR = CI / RI;
[0091] CI=(λ max -n) / (n-1);
[0092] Among them, α max Indicates the maximum eigenvalue corresponding to the judgment matrix. RI is obtained by querying the following table.
[0093] Matrix order 1 2 3 4 5 6 7 8 9 10 RI 0 0 0.52 0.89 1.12 1.26 1.36 1.41 1.46 1.49
[0094] S104, based on the number of inspection days and the number of inspectors of the water conservancy project, the fuzzy membership analysis method is called to analyze the single-person-day coefficient.
[0095] In this embodiment, due to different projects, different engineering levels, different numbers of potential problems, different inspection personnel, and different inspection times, in order to make the inspection results of water conservancy projects comparable, a single-day coefficient is introduced to adjust the calculation results. The fuzzy membership analysis method is used to establish a piecewise linear function, and the single-person single-day coefficient is obtained by finding the quantified value of the problem through a single-person single-day inspection.
[0096] In one embodiment, based on the number of engineering inspection days and the number of inspectors of the water conservancy project, a fuzzy membership analysis method is called to analyze the single-person single-day coefficient, including: generating a single-person single-day quantitative score for each inspection based on the indicator structured data of the water conservancy project, the number of engineering inspection days and the number of inspectors; calling a pre-established first piecewise linear membership function to perform membership analysis on the single-person single-day quantitative score to obtain the single-person single-day coefficient.
[0097] In this embodiment, for example, the single person single day coefficient (C TR ) is calculated as follows:
[0098]
[0099]
[0100] Among them, C TR Indicates the single-person-per-day coefficient, V TR It represents the quantitative score of a single person per day in a project, which is equal to the total quantitative score of the project divided by the number of inspectors and the number of days for project inspection. ser3 、N Rser3 、N gen3 They are the number of serious, relatively serious and general items in the on-site indicator data of the entire project. r and N t They respectively represent the number of inspectors and the number of inspection days for the project.
[0101] S105, performing weighted calculation on the preliminary inspection data according to the single-person-per-day coefficient and the preset engineering grade coefficient to obtain target inspection data for the water conservancy project.
[0102] In this embodiment, due to the different engineering grades of different water conservancy projects, there are also large differences in the on-site indicator data. Taking into account the scale, benefits and importance of water conservancy projects, the water conservancy projects are divided into five grades: I, II, III, IV and V, with reference to the "Classification of Water Conservancy and Hydropower Projects and Flood Standards", and the weight coefficients (C ed ): 1.000, 0.975, 0.950, 0.925, 0.900.
[0103] Exemplarily, the calculation formula of target inspection data is as follows:
[0104] WCHD=HD_HMS*C TR *C ed ;
[0105] Among them, WCHD represents the target inspection data of water conservancy projects.
[0106] In one embodiment, after a weighted operation is performed on the preliminary inspection data according to the single-person-day coefficient and the preset engineering grade coefficient to obtain the target inspection data of the water conservancy project, it also includes: based on a preset outlier elimination condition, eliminating the target inspection data that meets the outlier elimination condition from all the target inspection data, wherein one target inspection data is obtained for each inspection; and a mean operation is performed on all the target inspection data after eliminating the outliers to obtain standard inspection data.
[0107] In this embodiment, for some engineering inspection items, multiple inspection results need to be calculated. In order to ensure the accuracy of the inspection results, the abnormal target inspection data is cleaned. For example, the project whose target inspection data is significantly smaller than other inspection items is regarded as an abnormal project, and its target inspection data is regarded as an abnormal value.
[0108] Optionally, when the number of inspections is greater than or equal to 3, the mean of the data sample set is inspected according to the engineering single target. and standard deviation Remove outliers, specifically: HD_HMS i Represents the target inspection data of a single quality inspection of a water conservancy project obtained based on the i-th inspection result.
[0109] Optionally, when the number of checks is 2, the gap between the data samples is checked based on the two objectives, and whether there are any rejection items to remove outliers. Specifically: HD_HMS max and HD_HMS min They respectively show the results of two inspections of a water conservancy project, one with larger target inspection data and one with smaller target inspection data.
[0110] After outliers are removed, the mean of all target inspection data in the region is used as the standard inspection data: Q represents standard inspection data.
[0111] In order to execute the method corresponding to the above method embodiment and achieve the corresponding functions and technical effects, a water conservancy project construction quality inspection device is provided below. Figure 2 , Figure 2 1 is a structural block diagram of a water conservancy project construction quality inspection device provided in an embodiment of the present application. In this embodiment, the device includes various modules for executing Figure 1 For details of the steps in the corresponding embodiments, see Figure 1 as well as Figure 1 For the convenience of explanation, only the parts related to this embodiment are shown. The water conservancy project construction quality inspection device provided by the embodiment of the present application includes:
[0112] The data acquisition module 201 is used to acquire the on-site index data of the water conservancy project, wherein the on-site index data is the index inspection result of the water conservancy project during the engineering inspection;
[0113] The data structuring module 202 is used to perform data structuring on the field indicator data to obtain indicator structured data corresponding to the field indicator data;
[0114] The data fusion module 203 is used to retrieve the preset indicator weight value, perform data fusion on the indicator structured data, and obtain the preliminary inspection data of the water conservancy project;
[0115] The data analysis module 204 is used to call the fuzzy membership analysis method to analyze the single-person-single-day coefficient based on the engineering inspection days and the number of inspectors of the water conservancy project;
[0116] The data operation module 205 is used to perform weighted operation on the preliminary inspection data according to the single-person-per-day coefficient and the preset engineering grade coefficient to obtain the target inspection data of the water conservancy project.
[0117] In one embodiment, the data analysis module 204 is specifically configured to:
[0118] A generating unit, used for generating a quantitative score for a single person per day according to the structured data of the water conservancy project indicators, the number of project inspection days and the number of inspectors;
[0119] The analysis unit is used to call the pre-established first piecewise linear membership function to perform membership analysis on the single-person single-day quantitative score to obtain the single-person single-day coefficient.
[0120] In one embodiment, the inspection device further includes:
[0121] A rejection module is used to reject target inspection data that meets the abnormal value rejection condition from all target inspection data based on a preset abnormal value rejection condition, wherein one target inspection data is obtained for each inspection;
[0122] The calculation module is also used to perform mean calculation on all target inspection data after removing abnormal values to obtain standard inspection data.
[0123] In one embodiment, the preset indicator weight values include a first weight value of the inspection content layer, a second weight value of the inspection object layer, and a third weight value of the inspection project layer. The inspection content layer, the inspection object layer, and the inspection project layer are in an ascending hierarchical relationship. The data fusion module 203 includes:
[0124] A first fusion unit is used to call a preset second piecewise linear membership function to perform piecewise fusion on the indicator structured data to obtain a plurality of inspection content data of the inspection content layer, where the inspection content layer includes a plurality of inspection contents, and each inspection content includes one or more indicator structured data;
[0125] A second fusion unit is used to retrieve the first weight value, fuse the multiple inspection content data, and obtain multiple inspection object data of the inspection object layer, where the inspection object layer includes multiple inspection objects, and each inspection object includes one or more inspection contents;
[0126] A third fusion unit is used to retrieve the second weight value, fuse the multiple inspection object data, and obtain multiple inspection item data of the inspection item layer, where the inspection item layer includes multiple inspection items, and each inspection item includes one or more inspection objects;
[0127] The fourth fusion unit is used to retrieve the third weight value, fuse the data of multiple inspection items, and obtain preliminary inspection data of the water conservancy project.
[0128] Furthermore, the calculation formula of the second piecewise linear membership function is:
[0129]
[0130] A=10*N ser1 +6*N Rser1 +2*N gen1 ;
[0131] B=10*N ser2 +6*N Rser2 +2*N gen2 ;
[0132] Where SHD represents the preliminary inspection data, A represents the quantitative score of the first inspection content calculated based on the on-site indicator data, B represents the quantitative score of the second inspection content calculated based on the preset indicator list, and N ser1 Indicates the number of serious indicators in the on-site indicator data, N Rser1 Indicates the number of more serious indicators in the on-site indicator data, N gen1 Indicates the number of general indicators in the field indicator data, N ser2 Indicates the number of serious indicators in the preset indicator list, N Rser2 Indicates the number of more serious indicators in the preset indicator list, N gen2 Indicates the number of general indicators in the preset indicator list.
[0133] Furthermore, the above inspection device further includes:
[0134] A construction module, used to construct a judgment matrix using each inspection content in the inspection content layer or each inspection object in the inspection object layer as an element;
[0135] A determination module, used to determine the continuous product of the elements in each row of the judgment matrix, and based on the continuous product of the elements in each row, generate a relative weight value of each element relative to the previous level;
[0136] The generating module is used to generate a first weight value of each inspection content in the inspection content layer or a second weight value of each inspection object in the inspection object layer based on each relative weight value.
[0137] Furthermore, the above device further comprises:
[0138] A comparison module, used for comparing the random consistency ratio of the judgment matrix with a preset value according to the maximum eigenvalue of the judgment matrix;
[0139] The determination module is used to determine whether the relative weight value meets the reliability requirement if the random consistency ratio of the judgment matrix is less than a preset value.
[0140] Figure 3 This is a schematic diagram of the structure of an electronic device provided by an embodiment of the present application. Figure 3 As shown, the electronic device 3 of this embodiment includes: at least one processor 30 ( Figure 3 Only one is shown in the figure) a processor, a memory 31, and a computer program 32 stored in the memory 31 and executable on the at least one processor 30, and when the processor 30 executes the computer program 32, the steps in any of the above method embodiments are implemented.
[0141] The electronic device 3 may be a computing device such as a smart phone, a tablet computer, a desktop computer, a supercomputer, a personal digital assistant, a physical server, a cloud server, etc. The electronic device may include but is not limited to a processor 30 and a memory 31. Those skilled in the art will understand that Figure 3 It is only an example of the electronic device 3 and does not constitute a limitation on the electronic device 3. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.
[0142] The processor 30 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0143] In some embodiments, the memory 31 may be an internal storage unit of the electronic device 3, such as a hard disk or memory of the electronic device 3. In other embodiments, the memory 31 may also be an external storage device of the electronic device 3, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 3. Further, the memory 31 may also include both an internal storage unit of the electronic device 3 and an external storage device. The memory 31 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program, etc. The memory 31 may also be used to temporarily store data that has been output or is to be output.
[0144] In addition, an embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments can be implemented.
[0145] An embodiment of the present application provides a computer program product. When the computer program product runs on an electronic device, the electronic device can implement the steps in the above-mentioned method embodiments when executing the computer program product.
[0146] In several embodiments provided in the present application, it should be understood that the disclosed devices and methods can also be implemented in other ways. The device embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of the present application. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.
[0147] In addition, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
[0148] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0149] The above description is only an embodiment of the present application and is not intended to limit the scope of protection of the present application. For those skilled in the art, the present application may have various changes and variations. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.
[0150] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
[0151] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
Claims
1. A method for inspecting the construction quality of a water conservancy project, characterized in that: Used in electronic equipment, including: Acquiring on-site index data of a water conservancy project, wherein the on-site index data is an index inspection result of the water conservancy project during the engineering inspection; Structuring the on-site indicator data to obtain indicator structured data corresponding to the on-site indicator data; Retrieving preset indicator weight values, performing data fusion on the indicator structured data, and obtaining preliminary inspection data of the water conservancy project; Based on the engineering inspection days and the number of inspectors of the water conservancy project, the fuzzy membership analysis method is called to analyze the single-person-single-day coefficient; According to the single-person-per-day coefficient and the preset engineering grade coefficient, the preliminary inspection data is weighted according to the target inspection data calculation formula to obtain the target inspection data of the water conservancy project; the target inspection data calculation formula is: ; Among them, WCHD represents the target inspection data of water conservancy projects; for said preliminary inspection data; is the preset engineering grade coefficient; is the single-person-per-day coefficient; The preset indicator weight values include a first weight value of the inspection content layer, a second weight value of the inspection object layer, and a third weight value of the inspection project layer. The inspection content layer, the inspection object layer, and the inspection project layer are in an ascending hierarchical relationship. The preset indicator weight values are retrieved, and data fusion is performed on the indicator structured data to obtain preliminary inspection data of the water conservancy project, including: Calling a preset second piecewise linear membership function to perform piecewise fusion on the indicator structured data to obtain a plurality of inspection content data of the inspection content layer, wherein the inspection content layer includes a plurality of inspection contents, and each of the inspection contents includes one or more of the indicator structured data; Retrieving the first weight value, fusing the plurality of inspection content data, and obtaining a plurality of inspection object data of the inspection object layer, wherein the inspection object layer includes a plurality of inspection objects, and each of the inspection objects includes one or more inspection contents; Retrieving the second weight value, fusing the plurality of inspection object data, and obtaining the plurality of inspection item data of the inspection item layer, wherein the inspection item layer includes a plurality of inspection items, and each of the inspection items includes one or more inspection objects; The third weight value is retrieved, and the data of the plurality of inspection items are merged to obtain the preliminary inspection data of the water conservancy project; the calculation is as follows: ; ; ; in, , , Respectively represent the inspection data of the object layer, project layer, and target layer, , , Respectively represent the weights corresponding to each inspection content, inspection object, and inspection item, and obtain the inspection data HD of the target layer as a value of [0,1]. The inspection data HD of the target layer is converted into a percentage value, and the calculation is as follows: ; Wherein, the calculation formula of the second piecewise linear membership function is: ; ; ; Wherein, SHD represents the preliminary inspection data, A represents the quantitative score of the first inspection content calculated according to the on-site indicator data, and B represents the quantitative score of the second inspection content calculated according to the preset indicator list. Indicates the number of serious indicators in the on-site indicator data. Indicates the number of more serious indicators in the on-site indicator data, Indicates the number of general indicators in the field indicator data, Indicates the number of serious indicators in the preset indicator list. Indicates the number of more serious indicators in the preset indicator list. Indicates the number of general indicators in the preset indicator list.
2. The water conservancy project construction quality inspection method according to claim 1, characterized in that: The engineering inspection days and the number of inspectors of the water conservancy project are based on the fuzzy membership analysis method to analyze the single-person-single-day coefficient, including: Generate a quantitative score for a single person per day based on the indicator structured data of the water conservancy project, the number of project inspection days and the number of inspectors; A pre-established first piecewise linear membership function is called to perform membership analysis on the single-person single-day quantitative score to obtain the single-person single-day coefficient.
3. The water conservancy project construction quality inspection method according to claim 1, characterized in that: After performing weighted calculation on the preliminary inspection data according to the single-person-per-day coefficient and the preset engineering grade coefficient to obtain the target inspection data of the water conservancy project, the method further includes: Based on a preset outlier elimination condition, the target inspection data that meets the outlier elimination condition is eliminated from all the target inspection data, wherein one target inspection data is obtained for each inspection; A mean operation is performed on all the target inspection data after removing the abnormal values to obtain standard inspection data.
4. The water conservancy project construction quality inspection method according to claim 1 is characterized in that: Before retrieving the preset indicator weight value and fusing the indicator structured data to obtain the preliminary inspection data of the water conservancy project, the method further includes: Constructing a judgment matrix using each inspection content in the inspection content layer or each inspection object in the inspection object layer as an element; Determine the continuous product of the elements in each row of the judgment matrix, and generate a relative weight value of each element relative to the previous level based on the continuous product of the elements in each row; Based on the respective relative weight values, the first weight value of each inspection content in the inspection content layer is generated, or the second weight value of each inspection object in the inspection object layer is generated.
5. The water conservancy project construction quality inspection method according to claim 4 is characterized in that: Before generating the first weight value of each inspection content in the inspection content layer or generating the second weight value of each inspection object in the inspection object layer based on each relative weight value, the method further includes: According to the maximum eigenvalue of the judgment matrix, comparing the random consistency ratio of the judgment matrix with a preset value; If the random consistency ratio of the judgment matrix is less than the preset value, it is determined that the relative weight value meets the reliability requirement.
6. A water conservancy project construction quality inspection device, characterized in that: include: A data acquisition module, used to acquire on-site index data of a water conservancy project, wherein the on-site index data is an index inspection result of the water conservancy project during the engineering inspection; A data structuring module, used to perform data structuring on the on-site indicator data to obtain indicator structured data corresponding to the on-site indicator data; A data fusion module is used to retrieve preset indicator weight values, perform data fusion on the indicator structured data, and obtain preliminary inspection data of the water conservancy project; A data analysis module, for analyzing a single-person-per-day coefficient by calling a fuzzy membership analysis method based on the number of engineering inspection days and the number of inspectors of the water conservancy project; The data operation module is used to perform weighted operation on the preliminary inspection data according to the single-person single-day coefficient and the preset engineering grade coefficient according to the target inspection data calculation formula to obtain the target inspection data of the water conservancy project; the target inspection data calculation formula is: ; Among them, WCHD represents the target inspection data of water conservancy projects; for said preliminary inspection data; is the preset engineering grade coefficient; is the single-person-per-day coefficient; Wherein, the preset indicator weight value includes a first weight value of the inspection content layer, a second weight value of the inspection object layer and a third weight value of the inspection project layer, the inspection content layer, the inspection object layer and the inspection project layer are in an ascending hierarchical relationship, and the data fusion module is specifically used to call a preset second piecewise linear membership function to perform piecewise fusion on the indicator structured data to obtain multiple inspection content data of the inspection content layer, the inspection content layer includes multiple inspection contents, and each of the inspection contents includes one or more of the indicator structured data; Retrieving the first weight value, fusing the plurality of inspection content data, and obtaining a plurality of inspection object data of the inspection object layer, wherein the inspection object layer includes a plurality of inspection objects, and each of the inspection objects includes one or more inspection contents; Retrieving the second weight value, fusing the plurality of inspection object data, and obtaining the plurality of inspection item data of the inspection item layer, wherein the inspection item layer includes a plurality of inspection items, and each of the inspection items includes one or more inspection objects; The third weight value is retrieved, and the data of the plurality of inspection items are merged to obtain the preliminary inspection data of the water conservancy project; the calculation is as follows: ; ; ; in, , , Respectively represent the inspection data of the object layer, project layer, and target layer, , , Respectively represent the weights corresponding to each inspection content, inspection object, and inspection item, and obtain the inspection data HD of the target layer as a value of [0,1]. The inspection data HD of the target layer is converted into a percentage value, and the calculation is as follows: ; Wherein, the calculation formula of the second piecewise linear membership function is: ; ; ; Wherein, SHD represents the preliminary inspection data, A represents the quantitative score of the first inspection content calculated according to the on-site indicator data, and B represents the quantitative score of the second inspection content calculated according to the preset indicator list. Indicates the number of serious indicators in the on-site indicator data. Indicates the number of more serious indicators in the on-site indicator data, Indicates the number of general indicators in the field indicator data, Indicates the number of serious indicators in the preset indicator list. Indicates the number of more serious indicators in the preset indicator list. Indicates the number of general indicators in the preset indicator list.
7. An electronic device, characterized in that: It comprises a memory and a processor, the memory is used to store a computer program, and the processor runs the computer program to enable the electronic device to execute the water conservancy project construction quality inspection method according to any one of claims 1 to 5.
8. A computer-readable storage medium, characterized in that: It stores a computer program, which, when executed by a processor, implements the water conservancy project construction quality inspection method as described in any one of claims 1 to 5.