A visual test device and test method for anchor plate pulling

By designing a visual test device to simulate extreme climate conditions of heavy rainfall and drought, and using a variety of sensors and simulation systems, the problem of the inability to analyze the weakening of the anchor plate's pull-out bearing capacity with existing technology has been solved, and in-depth research on the multi-directional pull-out of the anchor plate has been achieved. Research and pattern analysis.

CN113686666BActive Publication Date: 2024-10-11HUNAN UNIV OF SCI & TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110789347.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-07-13
Publication Date
2024-10-11
Estimated Expiration
2041-07-13

AI Technical Summary

Technical Problem

The existing test equipment cannot effectively simulate the weakening effect of the anchor plate's pull-out bearing capacity under extreme climate conditions of heavy rainfall and drought, and has not conducted multi-directional pull-out test research, making it impossible to analyze the bearing capacity rules of the anchor plate under these special conditions.

Method used

A visual test device including an anchor plate, a test box, a heavy rainfall-drought extreme climate simulation system, a loading system and a measurement system was designed. The dry-wet cycle was simulated through artificial rainfall devices and infrared baking lamps, and load displacement sensors, Multi-layer soil parameter detectors and high-pixel digital cameras were tested to realize multi-directional pull-out tests and data collection of anchor plates.

Benefits of technology

It achieves effective simulation and control of the dry-wet cycle weakening mode of the foundation, reduces soil disturbance, improves the spotting effect of red clay digital images, can accurately measure the deformation field of the soil around the anchor, and extract the characteristic quantities of the sliding surface. In-depth analysis of the multi-directional pull-out test rules of anchor plates under extreme climates of heavy rainfall and drought.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113686666B_ABST
    Figure CN113686666B_ABST
Patent Text Reader

Abstract

The invention discloses a visual test device for pulling out an anchor plate, comprising an anchor plate, a test box, a heavy rainfall-drought extreme climate simulation system, a loading system and a measuring system. The test box is a box structure whose front side can be flipped open and a drawable cover is arranged on the top. The heavy rainfall-drought extreme climate simulation system comprises an artificial rainfall device and an infrared baking lamp. The loading system comprises a loading frame, an electric actuator, a pulley block and a steel wire rope connected to the pulley block. The measuring system comprises a load displacement sensor, a data acquisition instrument, a multi-layer soil parameter detector, a high-pixel digital camera and a computer. The invention solves the problem that the weakening effect of the pull-out bearing capacity of the anchor plate cannot be accurately analyzed in the previous test device due to the failure to simulate the heavy rainfall-drought extreme climate, and realizes the multi-directional pulling test of the anchor plate under this special condition.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geotechnical model test devices, and in particular to a visual test device and a test method for pulling out an anchor plate. Background Art

[0002] As a foundation form that provides pull-out resistance, anchor plates have been widely used in slope projects such as communication towers, transmission towers, and anchor plate retaining walls because of their advantages such as simple construction, good economy, and strong bearing capacity.

[0003] my country has a vast territory and complex and diverse geological conditions. Under certain soil conditions, if heavy rainfall and drought alternate, the soil will often be in a dry-wet cycle state, resulting in a large number of cracks, which will lead to a decrease in its mechanical properties and easily cause cracking or sliding failure during engineering construction. The relationship between the anchor plate burial depth and the depth of soil dry-wet cycle influence determines the weakening mode of the foundation. The anchor plate burial inclination angle will also affect the ultimate bearing capacity of the anchor plate within a certain burial depth range. Therefore, it is necessary to conduct in-depth research on the multi-directional pull-out failure of the anchor plate foundation under the frequent alternation of heavy rainfall and drought extreme climate.

[0004] However, the current indoor research on the pull-out problem of anchor plates usually focuses on sandy soil, rarely involves clay, and has not yet simulated the extreme climate of heavy rainfall-drought. Therefore, the test device has not taken into account the dry-wet cycle effect of the soil. At the same time, there has been no experimental research on the multi-directional pull-out of the anchor plate under this special condition, so it is impossible to analyze the law of the pull-out bearing capacity of the anchor plate under the frequent alternation of heavy rainfall-drought extreme climate. Therefore, the present invention proposes a visual test device that can simulate the weakening effect of the multi-directional pull-out bearing of the anchor plate foundation under the frequent alternation of heavy rainfall-drought extreme climate, and proposes a specific test method to solve the above problems. Summary of the invention

[0005] 1. Technical issues to be resolved

[0006] A visual test device and test method for anchor plate pull-out are proposed to solve the problem that previous test devices cannot accurately analyze the weakening effect of the pull-out bearing capacity of the anchor plate due to the failure to simulate the extreme climate of heavy rainfall and drought, and to realize the multi-directional pull-out test of the anchor plate under this special condition.

[0007] (II) Technical solution

[0008] The present invention is implemented through the following technical scheme: The present invention proposes a visual test device for pulling out an anchor plate, comprising an anchor plate, a test box, a heavy rainfall-drought extreme climate simulation system, a loading system and a measuring system. The test box is a box structure whose front side can be flipped open and a pull-out cover is arranged on the top. A water storage tank is arranged on the left and right sides of the test box respectively, and a permeable geotextile is arranged on the inner side of the water storage tank. A water level control hole is arranged at the contact part between the side wall of the water storage tank and the permeable geotextile. The heavy rainfall-drought extreme climate simulation system comprises an artificial rainfall device and an infrared baking lamp. The loading system comprises a loading frame, an electric actuator, and a plurality of control holes. , a pulley block and a steel wire rope connected to the pulley block, one end of the steel wire rope is connected to the electric actuator and the other end is connected to the anchor plate, the measurement system includes a load displacement sensor, a data acquisition instrument, a multi-layer soil parameter detector, a high-pixel digital camera and a computer, one end of the load displacement sensor is connected to the electric actuator and the other end is connected to the data acquisition instrument, the multi-layer soil parameter detector is pre-buried in the test box, the high-pixel digital camera is used to automatically capture the image of the anchor plate pulling process, the load displacement sensor, the multi-layer soil parameter detector and the high-pixel digital camera are respectively connected to the data acquisition instrument, and the data acquisition instrument transmits the collected data to the computer.

[0009] Furthermore, the front and rear side panels of the test box are made of high-transparency, high-temperature-resistant organic glass panels.

[0010] Furthermore, the artificial rainfall device is formed by connecting a PVC water supply pipe and a plurality of right-angle elbows and a tee. Water supply is achieved through a main water supply pipe, and a rainfall effect is formed through small water outlet holes at the bottom of a plurality of water supply pipes.

[0011] Furthermore, the loading frame includes a loading column and a loading beam arranged on the loading column.

[0012] Furthermore, the pulley block includes a first fixed pulley and a second fixed pulley respectively fixed to the bottom of the loading beam, and the position of the first fixed pulley on the loading beam is adjustable.

[0013] A test method for carrying out a visual test device for anchor plate pulling comprises the following steps:

[0014] Step 1): sieve the soil sample, place the front side of the test box upwards, insert a cover plate on the upper part of the test box to facilitate the layered filling of the soil sample; then fix the permeable geotextile to the left and right side walls of the test box with adhesive tape, and then fill the soil sample in layers according to the compaction degree of 90%. When the soil sample is filled to half the width of the box, put in a multi-layer soil parameter monitor to monitor the moisture content; continue to fill in layers, and after the filling work is completed, use a push knife to smooth the soil on the side where the front side is removed;

[0015] Step 2): After completing step 1), the anchor plate is pre-buried. The anchor plate is placed in the middle of the front of the test box soil for positioning. A knife is used to draw the outline according to the specific shape of the anchor plate. Then, the soil is dug out according to the shape, size and outline of the anchor plate. After digging out the soil, the anchor plate is pressed into the pre-buried position of the excavated anchor plate. The anchor rod passes through the reserved hole, and the gap around the anchor rod is filled with the excavated soil. Then, sand mining is arranged at a fixed point according to the estimated sliding surface impact range, and then the front side of the test box is tightly covered;

[0016] Step 3): Return the test box to its original position, pull out the cover plate, determine the height of the loading beam according to the buried depth of the anchor plate, bolt it to the reserved drilled hole of the loading column with bolts, adjust the position of the first fixed pulley according to the loading direction, bolt the fixed pulley to the drilled hole at the bottom of the loading beam with the bolts on the fixed pulley bracket, move the loading frame so that the groove surface of the fixed pulley and the inner side of the front glass plate of the high-temperature resistant plexiglass test box are in the same plane, and the wire rope passes through the second fixed pulley fixed on the loading beam. One end is connected to the load displacement sensor and the electric actuator, and the other end is connected to the first fixed pulley and the anchor plate.

[0017] Step 4): Turn on the artificial rainfall device to saturate the soil with water, open the corresponding water level control holes to drain water according to the foundation weakening mode designed for the test, maintain a stable water level in the box for more than 24 hours, and monitor the stability of the water content with a multi-layer soil parameter monitor, turn on the infrared baking lamp to simulate the climate drought conditions, complete a heavy rainfall-drought alternation, that is, realize a dry-wet cycle process;

[0018] Step 5): Repeat step 4) to simulate the frequent alternation of heavy rainfall and drought extreme climate, fix the high-pixel digital camera on a tripod and place it in front of the test box, adjust its focal length and adjust it to a suitable height, set it to automatically take pictures every 30 seconds, then turn on the electric actuator to apply the load, and turn on the high-pixel digital camera to take pictures of the deformation of the soil around the anchor during the anchor plate pulling process;

[0019] Step 6): Obtain the anchor plate pull-out load-displacement curve, extract the ultimate bearing capacity, use the image processing software in the computer to analyze and process the photos collected in the test, obtain the displacement deformation field and maximum shear strain field of the soil around the anchor, identify the sliding surface, and extract the sliding surface feature quantity.

[0020] (III) Beneficial effects

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] 1 The present invention provides a visual test device that can simulate the weakening effect of the multi-directional pull-out bearing of the anchor plate foundation under the frequent alternation of heavy rainfall and drought extreme climate. Compared with the traditional test device, it can effectively simulate and control the weakening mode of the dry-wet cycle of the foundation, and realize the overall uniform weakening mode of the soil within the designed burial depth range.

[0023] 2 Compared with the traditional soil landfill method, this test method changes the initial placement direction of the test box, avoids the adverse effects of horizontal layered filling on the test, and greatly reduces the degree of disturbance to the soil.

[0024] 3 The present invention adopts a method of fixed-point arrangement of sand mining, which improves the red clay digital image spot tracing effect.

[0025] 4 Traditional test observation methods often make it difficult to accurately measure the true failure form of the soil around the anchor. This test uses cameras and digital image processing technology to quantitatively analyze the deformation field of the soil around the anchor and more intuitively extract the characteristic quantities of the sliding surface.

[0026] The present invention can realize the multi-directional pull-out test of the anchor plate under the frequent alternation of heavy rainfall and drought extreme climate. The test device is easy to operate and the method is simple. The test law of the multi-directional pull-out of the anchor plate under this special condition can be deeply analyzed. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of the test box cover, in which a is a reserved hole.

[0028] Figure 2 It is a schematic diagram of the structure of the present invention.

[0029] Figure 3 Schematic diagram for changing the initial position of the test chamber.

[0030] Figure 4 This is a schematic diagram of the connection between the artificial rainfall device and the test box.

[0031] 1- loading column, 2- loading beam, 3- load displacement sensor, 4- infrared baking lamp, 5- artificial rainfall device, 6- first fixed pulley, 7- second fixed pulley, 8- permeable geotextile, 9- water level control hole, 10- anchor plate, 11- multi-layer soil parameter monitor, 12- water storage tank, 14- electric actuator, 15- high pixel digital camera, 16- data acquisition instrument, 17- computer, 18- test box. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0033] like Figure 1 to Figure 4 A visual test device for pulling out an anchor plate is shown, comprising an anchor plate 10, a test box 18, a heavy rainfall-drought extreme climate simulation system, a loading system and a measuring system. The test box 18 is a box structure whose front side can be flipped open and a retractable cover is arranged on the top. A water storage tank 12 is arranged on the left and right sides of the test box, and a permeable geotextile 8 is arranged on the inner side of the water storage tank 12. A water level control hole 9 is arranged at the contact part between the side wall of the water storage tank 12 and the permeable geotextile 8. The heavy rainfall-drought extreme climate simulation system comprises an artificial rainfall device 5 and an infrared baking lamp 4. The loading system comprises a loading frame, an electric actuator 14, a pulley block and a steel wire rope connected to the pulley block. One end of the steel wire rope is connected to the electric actuator 14 and the other end is connected to the anchor plate 10. The measurement system includes a load displacement sensor 3, a data acquisition instrument 16, a multi-layer soil parameter detector 11, a high-pixel digital camera 15 and a computer 17. One end of the load displacement sensor 3 is connected to the electric actuator 14 and the other end is connected to the data acquisition instrument 16. The multi-layer soil parameter detector 11 is pre-buried in the test box 18. The high-pixel digital camera 15 is used to automatically capture the image of the anchor plate pulling process. The load displacement sensor 3, the multi-layer soil parameter detector 11 and the high-pixel digital camera 15 are respectively connected to the data acquisition instrument 16, and the data acquisition instrument 16 transmits the collected data to the computer 17.

[0034] Among them, the front and rear side panels of the test box 18 are made of high-transparency high-temperature resistant organic glass plates; the artificial rainfall device 5 is connected by a PVC water supply pipe and a plurality of right-angle elbows and a tee, and water supply is realized through a main water supply pipe, and a rainfall effect is formed through a plurality of small water outlet holes at the bottom of the water supply pipe; the loading frame includes a loading column 1 and a loading beam arranged on the loading column 1; the pulley group includes a first fixed pulley 6 and a second fixed pulley 7 respectively fixed at the bottom of the loading beam 2, and the position of the first fixed pulley 6 on the loading beam 2 is adjustable.

[0035] Specifically, the anchor plate 10 is made of steel plate, and the main frame of the test box 18 is welded by angle steel. The left and right sides and the bottom are welded with 2mm steel plates. A groove is provided on the inner side of the top angle steel. A 0.5m*0.25m cover plate is set on the top, and the cover plate can be pushed into the groove. A support rod pipe groove is left on the upper side of the top angle steel to facilitate the insertion of the artificial descending device bracket. The front and back of the test box 18 are fixed with a high-transparency, high-temperature resistant organic glass plate (heat deformation temperature greater than 100°C) on the inner side of the angle steel frame by glass glue to form a whole. The front and bottom of the test box 18 are connected by two hinges respectively, so that the front side can be flipped open to fill the soil after changing the initial placement direction of the test box 18. The thickness of the glass plate is 2cm, which ensures that it has sufficient lateral rigidity and meets the symmetry conditions. The size of the test box 18 is 0.5m*0.25m*0.75m. The front and back of the test box 18 are visible. The side wall consists of inner and outer sides, and the water storage tank 12 is in the middle. (The dimensions of the “front” and “rear” referred to in the present invention are both 0.5m*0.75m, the dimensions of the left and right sides are both 0.5m*0.25m, and the dimension of the bottom is 0.5m*0.25m).

[0036] Specific test method: First, sieve the soil sample, change the initial placement direction of the test box 18 (observation surface facing upward), insert the cover plate ( Figure 1) (to facilitate the layered filling of soil samples); then fix the permeable geotextile 8 to the left and right side walls of the test box 18 with adhesive tape, and then fill the soil samples in layers according to the compaction degree of 90%. When the soil is filled to half the width of the box, put in a multi-layer soil parameter monitor 11 to monitor the moisture content; continue to fill in layers, and after the filling work is completed, use a push knife to smooth the soil on the side of the removed front side. After completing the soil filling work, pre-embed the anchor plate 10, place the anchor plate 10 in the middle position in front of the soil in the test box 18 for positioning, use a knife to draw the outline according to the specific shape of the anchor plate, and then dig out the soil according to the shape, size and outline of the anchor plate 10. After digging out the soil, press the anchor plate 10 into the pre-embedded position of the excavated anchor plate, and use the excavated soil to fill the gap around the rod, and then arrange sand mining at a fixed point according to the estimated sliding surface impact range (note that the amount of colored sand should not be too much, otherwise it will affect the test results). The test box 18 is returned to its position, the cover is pulled out, the height of the loading beam 2 is determined according to the buried depth of the anchor plate 10, and it is bolted to the reserved drilling hole of the loading column 1 by bolts. According to the loading direction, the position of the first movable pulley 6 is adjusted, and the fixed pulley is bolted to the bottom drilling hole of the loading beam 2 by the bolts on the fixed pulley bracket. The loading frame is moved so that the groove surface of the fixed pulley and the inner side of the front glass plate of the high-temperature resistant organic glass test box 18 are located in the same plane. The steel wire rope passes through the second fixed pulley 7 fixed on the beam and is connected to the load displacement sensor 3 and the electric actuator 14 at one end, and is connected to the first fixed pulley 6 and the anchor plate 10 at the other end. The artificial rainfall device 5 is turned on to make the soil saturated with water. According to the foundation weakening mode designed for the test, the corresponding water level control hole 9 is opened for drainage, and the stable water level in the box is maintained for more than 24 hours. The water content is monitored by the multi-layer soil parameter monitor 11. The infrared baking lamp 4 is turned on to simulate the climate drought conditions, and a heavy rainfall-drought alternation is completed, that is, a dry-wet cycle process is realized. Repeatedly simulate the frequent alternation of heavy rainfall and drought extreme climate, fix the high-pixel digital camera 15 on the tripod and place it in front of the test box 18, adjust its focal length and adjust it to a suitable height, set it to automatically shoot every 30 seconds, then turn on the electric actuator 14 to apply the load, and turn on the high-pixel digital camera 15 to shoot the deformation of the soil around the anchor during the anchor plate pulling process. Obtain the anchor plate pulling load-displacement curve, extract the ultimate bearing capacity, use image processing software to analyze and process the photos collected in the test, obtain the displacement deformation field of the soil around the anchor, the maximum shear strain field, etc., identify the sliding surface, and extract the sliding surface feature quantity.

[0037] like Figure 4 As shown: a support rod is set below the artificial rainfall device 5, and a support rod pipe groove is left on the upper side of the angle steel at the top of the test box 18. The support rod is placed in the pipe groove to connect the artificial rainfall device 5 and the test box 18. A groove is provided inside the angle steel at the top of the test box, and a 0.5m*0.25m cover plate is set on the top. When the above-mentioned soil body is landfilled, the cover plate ( Figure 1) into the groove.

[0038] According to the operation method and operation steps described in the present invention, engineers and technicians in this field can use the red clay foundation anchor plate visualization multi-directional pull-out test device considering dry-wet cycles proposed in the present invention to perform anchor plate visualization pull-out tests to meet the engineering test accuracy requirements.

[0039] The above-described embodiments are merely descriptions of preferred implementations of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by ordinary persons in the art to the technical solution of the present invention should fall within the protection scope of the present invention, and the technical contents for which protection is sought in the present invention have been fully recorded in the claims.

Claims

1. A visual test device for anchor plate pulling, characterized in that: The invention comprises an anchor plate (10), a test box (18), a heavy rainfall-drought extreme climate simulation system, a loading system and a measuring system. The test box (18) is a box structure whose front side can be flipped open and whose top is provided with a retractable cover plate. A water storage tank (12) is provided on the left and right sides of the test box respectively. A permeable geotextile (8) is provided on the inner side of the water storage tank (12). A water level control hole (9) is provided at the contact portion between the side wall of the water storage tank (12) and the permeable geotextile (8). The heavy rainfall-drought extreme climate simulation system comprises an artificial rainfall device (5) and an infrared heating lamp (4). The loading system comprises a loading frame, an electric actuator (14), a pulley block and a steel wire rope connected to the pulley block. One end of the steel wire rope is connected to the electric actuator (14). 4) and the other end is connected to the anchor plate (10), the measurement system comprises a load displacement sensor (3), a data acquisition instrument (16), a multi-layer soil parameter detector (11), a high-pixel digital camera (15) and a computer (17), one end of the load displacement sensor (3) is connected to the electric actuator (14) and the other end is connected to the data acquisition instrument (16), the multi-layer soil parameter detector (11) is pre-buried in the test box (18), the high-pixel digital camera (15) is used to automatically capture images of the anchor plate pulling process, the load displacement sensor (3), the multi-layer soil parameter detector (11) and the high-pixel digital camera (15) are respectively connected to the data acquisition instrument (16), and the data acquisition instrument (16) transmits the collected data to the computer (17).

2. A visual test device for anchor plate pulling according to claim 1, characterized in that: The front and rear side panels of the test box (18) are made of high-transparency, high-temperature-resistant organic glass panels.

3. A visual test device for anchor plate pulling according to claim 1, characterized in that: The artificial rainfall device (5) is formed by connecting a PVC water supply pipe and a plurality of right-angle elbows and a tee. Water supply is achieved through a main water supply pipe, and a rainfall effect is formed through a plurality of fine water outlet holes at the bottom of the water supply pipe.

4. A visual test device for anchor plate pulling according to claim 1, characterized in that: The loading frame comprises a loading column (1) and a loading beam (2) arranged on the loading column (1).

5. A visual test device for anchor plate pulling according to claim 4, characterized in that: The pulley block comprises a first fixed pulley (6) and a second fixed pulley (7) respectively fixed to the bottom of the loading beam (2); the position of the first fixed pulley (6) on the loading beam (2) is adjustable.

6. A test method for carrying out a visual test device for anchor plate pulling according to any one of claims 1 to 5, characterized in that: The steps include: 1) sieve the soil sample, place the test box (18) with the front side facing upward, insert a cover plate on the upper part of the test box (18) to facilitate the layered filling of the soil sample; then fix the permeable geotextile (8) to the left and right side walls of the test box (18) with adhesive tape, and then fill the soil sample in layers according to the compaction degree of 90%. When the soil sample is filled to half the width of the box, place a multi-layer soil parameter monitor (11) to monitor the moisture content; continue to fill in layers, and after the filling work is completed, use a push knife to smooth the soil on the side where the front side is removed; 2) After completing step 1), the anchor plate (10) is pre-buried. The anchor plate (10) is placed in the middle position in front of the soil of the test box (18) for positioning. A contour line is drawn with a knife according to the specific shape of the anchor plate. Then, the soil is dug out according to the shape, size and contour line of the anchor plate (10). After the soil is dug out, the anchor plate (10) is pressed into the pre-buried position of the dug anchor plate (10). The anchor rod passes through the reserved hole. The gap around the anchor rod is filled with the dug soil. Then, sand mining is arranged at a fixed point according to the estimated sliding surface influence range, and then the front side of the test box (18) is tightly covered; 3) Return the test box (18) to its original position, remove the cover plate, determine the height of the loading beam (2) according to the buried depth of the anchor plate (10), bolt it to the reserved drilled hole of the loading column (1) by means of bolts, adjust the position of the first fixed pulley (6) according to the loading direction, bolt the fixed pulley to the drilled hole at the bottom of the loading beam (2) with the bolts on the fixed pulley bracket, move the loading frame so that the groove surface of the fixed pulley and the inner side of the front glass plate of the high-temperature resistant organic glass test box are located in the same plane, and the steel wire rope passes through the second fixed pulley (7) fixed on the loading beam (2) and is connected to the load displacement sensor (3) and the electric actuator (14) at one end, and is connected to the first fixed pulley (6) and the anchor plate (10) at the other end; 4) Turn on the artificial rainfall device to saturate the soil with water, open the corresponding water level control hole (9) to drain water according to the foundation weakening mode designed for the test, maintain a stable water level in the box for more than 24 hours, and monitor the stability of the water content by a multi-layer soil parameter monitor (11), turn on the infrared heating lamp (4) to simulate the climate drought conditions, complete a heavy rainfall-drought alternation, that is, realize a dry-wet cycle process; 5) Repeat step 4) to simulate the frequent alternation of heavy rainfall and drought extreme climate, fix the high-pixel digital camera (15) on a tripod and place it on the front side of the test box (18), adjust its focal length and adjust it to a suitable height, set it to automatically take pictures every 30 seconds, then turn on the electric actuator to apply the load, and turn on the high-pixel digital camera to take pictures of the deformation of the soil around the anchor during the anchor plate pulling process; 6) Obtain the anchor plate pull-out load-displacement curve, extract the ultimate bearing capacity, use the image processing software in the computer (17) to analyze and process the photos collected in the test, obtain the displacement deformation field and maximum shear strain field of the soil around the anchor, identify the sliding surface, and extract the sliding surface characteristic quantity.