Power equipment maintenance personnel scheduling and dispatching system based on big data
Through the big data-based power equipment maintenance personnel scheduling and allocation system, combined with the analysis of work, overtime and rest information, more reasonable and efficient scheduling and allocation are achieved, solving the problem of poor scheduling results in the existing system.
Patent Information
- Application Number
- CN202111012180.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-08-31
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-08-31
AI Technical Summary
The existing power equipment maintenance personnel scheduling system fails to effectively comprehensively analyze the working conditions, overtime and rest conditions of the maintenance personnel, resulting in poor scheduling results.
A power equipment maintenance personnel scheduling and allocation system based on big data is designed, including personnel modules, working modules, rest modules, data preprocessing modules, data calculation modules and control modules. By collecting and preprocessing the data information of maintenance personnel, After calculation and analysis, scheduling and deployment are carried out, and emergency personnel are set up to deal with emergencies.
It improves the rationality and efficiency of scheduling, ensures the reasonable allocation and flexible arrangement of maintenance personnel, can respond to emergencies in a timely manner, and overcomes the unreasonable scheduling problems caused by single data.
Smart Images

Figure CN113706026B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of big data technology, and in particular to a big data-based scheduling and dispatching system for power equipment maintenance personnel. Background Art
[0002] Shift scheduling is the arrangement of work shifts. Reasonable shift scheduling is conducive to improving work efficiency.
[0003] When the existing power equipment maintenance personnel scheduling and deployment system is used, it does not conduct comprehensive analysis and matching of the work conditions, overtime conditions and rest conditions of different maintenance personnel, resulting in poor scheduling and deployment effects for power equipment maintenance personnel. Summary of the invention
[0004] The purpose of the present invention is to provide a power equipment maintenance personnel scheduling and deployment system based on big data to solve the following technical problem: how to solve the technical problem that the scheduling and deployment of power equipment maintenance personnel in the existing solution is not effective.
[0005] The purpose of the present invention can be achieved through the following technical solutions:
[0006] The big data-based power equipment maintenance personnel scheduling and dispatching system comprises a personnel module, a work module, a rest module, a data preprocessing module, a data calculation module and a control module; the personnel module is used to collect data information of maintenance personnel; the work module comprises a normal working unit and an overtime working unit; the normal working unit is used to count the first working information of maintenance personnel; wherein the first working information comprises various data during normal working hours; the overtime working unit is used to count the second working information of maintenance personnel; wherein the second working information comprises various data during overtime work; the rest module is used to count the rest information of maintenance personnel; the data preprocessing module is used to preprocess the data information, the first working information, the second working information and the rest information to obtain a processing information set comprising data marking information, the first marking information, the second marking information and the rest marking information; the data calculation module is used to perform calculation and analysis on the processing information set to obtain the analysis result; the control module dispatches the scheduling of maintenance personnel according to the analysis result.
[0007] Furthermore, the data information includes the maintenance personnel's years of service, job position and job level; the first work information includes the maintenance type, number of maintenances, maintenance time and maintenance mileage of the maintenance personnel; the second work information includes the overtime hours and number of overtimes; the rest information includes the rest time and number of rests.
[0008] Further, the data information is preprocessed, and the working years, job positions and job levels in the data information are classified to obtain a first data class including working years and a second data class including job positions and job levels; the working years are valued and marked as B1; the job positions are marked as GG; different job positions are set to correspond to a different job association value, and the job positions in the second data class are matched with a preset job association table to obtain the corresponding job association value and marked as B2; the job level is marked as GJ; different job levels are set to correspond to a different level preset value, and the job levels in the second data class are matched with a preset level preset table to obtain the corresponding level preset value and marked as B3; the marked data categories are combined to obtain data marking information.
[0009] Further, the first work information and the second work information are preprocessed respectively, and the maintenance type, maintenance frequency, maintenance time and maintenance mileage in the first work information are obtained, and the maintenance type is marked as WL; different maintenance types are set to correspond to different maintenance weights, and the maintenance weight in the first work information is matched with the preset maintenance type weight table to obtain the corresponding maintenance weight and marked as C1; the maintenance frequency, maintenance time and maintenance mileage are respectively taken and marked, and the maintenance frequency table is marked as C2; the maintenance time is marked as C3; the maintenance mileage is marked as C4; the marked data are classified and combined to obtain the first marking information;
[0010] Obtain the overtime hours and the number of overtimes in the second work information, respectively take values and mark the overtime hours and the number of overtimes, mark the overtime hours as D1; mark the number of overtimes as D2; classify and combine the marked data to obtain the second marking information.
[0011] Further, the rest information is preprocessed to obtain the rest duration and the number of rests in the rest information, and the rest duration and the number of rests are respectively taken and marked, the rest duration is marked as E1; the number of rests is marked as E2; the marked data are classified and combined to obtain the rest marking information.
[0012] Furthermore, the specific steps of calculating and analyzing the processed information set include: receiving the data marked in the data marking information and performing normalization processing to obtain the value, and using the formula ZPX=μ×(a1×B1+a2×B2)×B3 to calculate and obtain the job matching coefficient of the maintenance personnel; wherein a1 and a2 represent different proportional coefficients, and μ represents the job compensation factor, and the value range is (0,1);
[0013] Receive the data marked in the first marking information and perform normalization processing to obtain values, and use the formula GZX=ZPX×C1×(b1×C2+b2×C3+b3×C4+0.1664) to calculate and obtain the work coefficient of the maintenance personnel; wherein b1, b2 and b3 represent different proportional coefficients;
[0014] Receive the data marked in the second marking information and perform normalization processing to obtain the value, and use the formula JBX=ZPX×(c1×D1+c2×D2+0.2337) to calculate and obtain the overtime coefficient of the maintenance personnel; wherein c1 and c2 represent different proportional coefficients;
[0015] Receive various data marked in the rest mark information and perform normalization processing to obtain values, and use the formula XXX=ZPX×(d1×E1+d2×E2+1.7821) to calculate and obtain the rest coefficient of the maintenance personnel; wherein d1 and d2 represent different proportional coefficients; combine the job matching coefficient, work coefficient, overtime coefficient and rest coefficient to obtain the scheduling value of the maintenance personnel; analyze the scheduling value to obtain the analysis result.
[0016] Furthermore, the formula PB=η×(f1×GZX+f2×JBX-f3×XXX+0.4557) is used to calculate the scheduling value of the maintenance personnel; wherein f1, f2 and f3 represent different proportional coefficients, and η represents the scheduling compensation factor, and the value range is (0,5).
[0017] Furthermore, the specific steps of analyzing the scheduling value include: matching the scheduling value with a preset scheduling threshold; if the scheduling value is not greater than the scheduling threshold, setting the maintenance personnel corresponding to the scheduling value as the scheduling personnel and generating a first scheduling signal; if the scheduling value is greater than the scheduling threshold, setting the maintenance personnel corresponding to the scheduling value as the emergency personnel and generating a second scheduling signal; arranging a number of scheduling values in descending order according to the first scheduling signal to obtain a first scheduling set, and dividing the first scheduling set according to the preset scheduling number of people to obtain a scheduling division set; arranging a number of scheduling values in descending order according to the second scheduling signal to obtain a second scheduling set, and dividing the second scheduling set according to the preset emergency number of people to obtain an emergency division set.
[0018] Furthermore, the control module arranges the maintenance personnel's shifts according to the analysis results. The specific steps include: obtaining the shift division set and the emergency division set in the analysis results, performing the first scheduling on the shift division set and the emergency division set according to the working hours to obtain the daily shift set; performing the second scheduling on the daily shift set according to the working hours to obtain the scheduling result.
[0019] Beneficial effects of the present invention:
[0020] 1. Data information, first work information, second work information and rest information of maintenance personnel can be collected through personnel module, work module and rest module; by collecting data from different aspects, the diversity of data is improved, so as to overcome the defect of unreasonable scheduling and deployment of maintenance personnel caused by single data collected and analyzed in existing solutions;
[0021] 2. The data information, the first working information, the second working information and the rest information are preprocessed by the data preprocessing module to obtain a processing information set including the data marking information, the first marking information, the second marking information and the rest marking information; the data calculation module is used to calculate and analyze the processing information set to obtain the analysis result; by preprocessing and calculating the collected data, the efficiency of data calculation can be improved, and the data in different aspects can be linked, and the maintenance personnel can be analyzed from different aspects, so as to facilitate reasonable scheduling and deployment;
[0022] 3. The control module adjusts the maintenance personnel's shifts according to the analysis results, and conducts secondary scheduling of the maintenance personnel based on the analysis results. The maintenance personnel can be flexibly arranged on different working days and working hours. Emergency personnel are also set up for scheduling and deployment. Emergency personnel can handle emergencies in a timely manner, which effectively improves the rationality and efficiency of the maintenance personnel's scheduling and deployment. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The present invention will be further described below in conjunction with the accompanying drawings.
[0024] Figure 1 This is a module block diagram of the big data-based power equipment maintenance personnel scheduling and deployment system of the present invention.
[0025] Figure 2 It is a unit block diagram of the working module in the present invention. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] See also Figure 1-Figure 2 , the present invention is a big data-based power equipment maintenance personnel scheduling and deployment system, including a personnel module, a work module, a rest module, a data preprocessing module, a data calculation module and a control module;
[0028] In this embodiment, by collecting data on the maintenance personnel's information, work and rest, effective data support is provided for the reasonable scheduling of maintenance personnel, and emergency personnel are also set up to deal with emergencies, so that the scheduling of power equipment maintenance personnel is more reasonable and effective, thereby achieving the purpose of improving the scheduling of power equipment maintenance personnel; among them, the power equipment maintenance personnel scheduling system is applied to weekly scheduling, which can improve the flexibility and effectiveness of scheduling.
[0029] The personnel module is used to collect data information of maintenance personnel, which includes the maintenance personnel's working years, job positions and job levels; the maintenance personnel's data information can be obtained based on the existing staff information database;
[0030] The work module includes a normal work unit and an overtime work unit; the normal work unit is used to count the first work information of the maintenance personnel, and the first work information includes the maintenance type, maintenance number, maintenance time and maintenance mileage of the maintenance personnel; the overtime work unit is used to count the second work information of the maintenance personnel, and the second work information includes the overtime time and the overtime number; wherein, the work module performs data statistics from two aspects of normal work and overtime work, which can effectively improve the accuracy of the work information; the maintenance type refers to the different types corresponding to the failures in different parts of the power equipment; the maintenance mileage refers to the total round trip distance of the maintenance personnel each time they go for maintenance;
[0031] The rest module is used to count the rest information of maintenance personnel, which includes rest duration and rest times;
[0032] The data preprocessing module is used to preprocess the data information, the first working information, the second working information and the rest information to obtain a processing information set including the data marking information, the first marking information, the second marking information and the rest marking information; including:
[0033] Preprocess the data information, classify the years of work, job positions and job levels in the data information, and obtain a first data class containing years of work and a second data class containing job positions and job levels; take a value for the years of work and mark it as B1; mark the job position as GG; set different job positions to correspond to a different job association value, match the job positions in the second data class with a preset job association table to obtain the corresponding job association value and mark it as B2; mark the job level as GJ; set different job levels to correspond to a different level preset value, match the job levels in the second data class with a preset level preset table to obtain the corresponding level preset value and mark it as B3; classify and combine the marked data to obtain data marking information; wherein, the job position may include but is not limited to weak current electrical maintenance positions and strong current electrical maintenance positions; the job level may include but is not limited to junior level, intermediate level and senior level; the job association table and the level preset table can be preset based on the existing job information database.
[0034] Preprocess the first work information and the second work information respectively, obtain the maintenance type, maintenance frequency, maintenance time and maintenance mileage in the first work information, and mark the maintenance type as WL; set different maintenance types to correspond to different maintenance weights, match the maintenance weight in the first work information with the preset maintenance type weight table to obtain the corresponding maintenance weight and mark it as C1; respectively take values and mark the maintenance frequency, maintenance time and maintenance mileage, and mark the maintenance frequency table as C2; mark the maintenance time as C3; mark the maintenance mileage as C4; classify and combine the marked data to obtain the first marking information; wherein the maintenance type weight table can be preset based on the existing power equipment maintenance big data;
[0035] Obtain the overtime hours and the number of overtimes in the second work information, respectively take values and mark the overtime hours and the number of overtimes, mark the overtime hours as D1; mark the number of overtimes as D2; classify and combine the marked data to obtain the second marking information.
[0036] Preprocess the rest information to obtain the rest duration and the number of rests in the rest information, respectively take values and mark the rest duration and the number of rests, mark the rest duration as E1; mark the number of rests as E2; classify and combine the marked data to obtain the rest marking information.
[0037] In this embodiment, the collected data of various types are preprocessed, the numerical data are directly taken and marked, and the corresponding numerical values of the text data are obtained according to the preset related table, so that the data can be easily calculated, thereby achieving the purpose of improving the accuracy of data calculation.
[0038] The data calculation module is used to calculate and analyze the processing information set to obtain the analysis results; the specific steps include:
[0039] Receive the data marked in the data marking information and perform normalization processing to obtain the value, and use the formula ZPX=μ×(a1×B1+a2×B2)×B3 to calculate and obtain the job matching coefficient of the maintenance personnel; where a1 and a2 represent different proportional coefficients, and μ represents the job compensation factor, which can be 0.78824;
[0040] Receive the data marked in the first marking information and perform normalization processing to obtain values, and use the formula GZX=ZPX×C1×(b1×C2+b2×C3+b3×C4+0.1664) to calculate and obtain the work coefficient of the maintenance personnel; wherein b1, b2 and b3 represent different proportional coefficients;
[0041] Receive the data marked in the second marking information and perform normalization processing to obtain the value, and use the formula JBX=ZPX×(c1×D1+c2×D2+0.2337) to calculate and obtain the overtime coefficient of the maintenance personnel; wherein c1 and c2 represent different proportional coefficients;
[0042] Receive the data marked in the rest mark information and perform normalization processing to obtain the value, and use the formula XXX=ZPX×(d1×E1+d2×E2+1.7821) to calculate and obtain the rest coefficient of the maintenance personnel; where d1 and d2 represent different proportional coefficients;
[0043] The job matching coefficient, work coefficient, overtime coefficient and rest coefficient are combined, and the formula PB=η×(f1×GZX+f2×JBX-f3×XXX+0.4557) is used to calculate the scheduling value of the maintenance personnel; among them, f1, f2 and f3 represent different proportional coefficients, and η represents the scheduling compensation factor, which can be taken as 0.42581.
[0044] In this embodiment, by performing joint calculations on various collected data, it is convenient to perform an overall analysis of various types of information. First, the various data in the data marking information are calculated to obtain the job matching coefficient of the maintenance personnel. The job matching coefficient can be used to perform an overall analysis of the maintenance personnel's job position. The work coefficient of the maintenance personnel is obtained by calculation based on the job matching coefficient and the first marking information. Based on the work coefficient, an overall analysis of the staff's work situation can be performed. The overtime coefficient of the maintenance personnel is obtained by calculation based on the job matching coefficient and the second marking information. Based on the overtime coefficient, an overall analysis of the staff's overtime situation can be performed. The rest coefficient of the maintenance personnel is obtained by calculation based on the job matching coefficient and the rest marking information. Based on the rest coefficient, an overall analysis of the staff's rest situation can be performed. Finally, the calculated coefficients are jointly calculated to achieve an overall analysis of the scheduling and allocation of maintenance personnel.
[0045] The shift value is analyzed to obtain an analysis result; the specific steps include: matching the shift value with a preset shift threshold; if the shift value is not greater than the shift threshold, setting the maintenance personnel corresponding to the shift value as the shift personnel and generating a first shift signal; if the shift value is greater than the shift threshold, setting the maintenance personnel corresponding to the shift value as the emergency personnel and generating a second shift signal; arranging a number of shift values in descending order according to the first shift signal to obtain a first shift set, and dividing the first shift set according to the preset number of shift persons to obtain a shift division set; wherein the preset number of shift persons may be four;
[0046] According to the second shift scheduling signal, several shift values are arranged in descending order to obtain a second shift scheduling set, and the second shift scheduling set is divided into groups according to a preset number of emergency people to obtain an emergency division set; the shift division set and the emergency division set constitute an analysis result; wherein, the number of emergency people can be preset based on different work scenarios, and can be two people.
[0047] The control module arranges the maintenance personnel's shifts according to the analysis results. The specific steps include: obtaining the shift division set and the emergency division set in the analysis results, and performing the first shift scheduling on the shift division set and the emergency division set according to the working hours to obtain the daily shift set; performing the second shift scheduling on the daily shift set according to the working period to obtain the scheduling result; wherein the working hours can be Monday to Sunday; the working period can be morning, afternoon and evening.
[0048] In this embodiment, the maintenance personnel are secondary scheduled according to the analysis results, and the maintenance personnel are flexibly arranged within different working days and working hours. Emergency personnel are also provided for scheduling and deployment. Emergency personnel can deal with emergencies in a timely manner, which effectively improves the rationality and efficiency of the scheduling and deployment of maintenance personnel.
[0049] The formulas in the present invention are all calculated by removing dimensions and taking numerical values. A formula closest to the actual situation is obtained by collecting a large amount of data and performing software simulation. The preset proportional coefficients and thresholds in the formulas are set by technicians in this field according to actual conditions or obtained through large-scale data simulation.
[0050] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in the corresponding field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. Power equipment maintenance personnel scheduling and dispatching system based on big data, It is characterized in that include: The personnel module is used to collect data information of maintenance personnel; The work module includes a normal work unit and an overtime work unit; the normal work unit is used to count the first work information of the maintenance personnel; the overtime work unit is used to count the second work information of the maintenance personnel; the rest module is used to count the rest information of the maintenance personnel; The data preprocessing module is used to preprocess the data information, the first working information, the second working information and the rest information to obtain a processing information set including the data marking information, the first marking information, the second marking information and the rest marking information; The data calculation module is used to perform calculation and analysis on the processing information set to obtain the analysis results; The control module adjusts the maintenance personnel's schedule based on the analysis results; The data information includes the maintenance personnel's years of service, job position and job level; the first work information includes the maintenance type, number of maintenance, maintenance time and maintenance mileage of the maintenance personnel; the second work information includes the overtime hours and number of overtime; the rest information includes the rest time and number of rest; Preprocess the data information, classify the working years, job positions and job levels in the data information, and obtain a first data class including working years and a second data class including job positions and job levels; take a value for the working years and mark it as B1; mark the job position as GG; set different job positions to correspond to a different job association value, match the job positions in the second data class with the preset job association table to obtain the corresponding job association value and mark it as B2; Mark the job level as GJ; set different job levels to correspond to different level preset values, match the job level in the second data class with the preset level preset table to obtain the corresponding level preset value and mark it as B3; Classify and combine the marked data to obtain data marking information; Preprocess the first work information and the second work information respectively, obtain the maintenance type, maintenance number, maintenance time and maintenance mileage in the first work information, and mark the maintenance type as WL; Different maintenance types are set to correspond to different maintenance weights, and the maintenance weight in the first work information is matched with the preset maintenance type weight table to obtain the corresponding maintenance weight and mark it as C1; the number of maintenance times, maintenance time and maintenance mileage are respectively taken and marked, and the number of maintenance times is marked as C2; Mark the maintenance time as C3; Mark the maintenance mileage as C4; classify and combine the marked data to obtain the first marking information; Obtain the overtime hours and the number of overtimes in the second work information, respectively take values and mark the overtime hours and the number of overtimes, and mark the overtime hours as D1; Mark the number of overtime as D2; classify and combine the marked data to obtain the second marking information; Preprocess the rest information, obtain the rest duration and the number of rests in the rest information, respectively take values and mark the rest duration and the number of rests, and mark the rest duration as E1; Label the rest period as E2; Classify and combine the marked data to obtain rest mark information; The specific steps of calculating and analyzing the processed information set include: receiving the data marked in the data marking information and performing normalization processing to obtain the value, and using the formula ZPX=μ×(a1×B1+a2×B2)×B3 to calculate and obtain the job matching coefficient of the maintenance personnel; wherein a1 and a2 represent different proportional coefficients, and μ represents the job compensation factor, and the value range is (0,1); Receive the data marked in the first marking information and perform normalization processing to obtain values, and use the formula GZX=ZPX×C1×(b1×C2+b2×C3+b3×C4+0.1664) to calculate and obtain the work coefficient of the maintenance personnel; wherein b1, b2 and b3 represent different proportional coefficients; Receive the data marked in the second marking information and perform normalization processing to obtain the value, and use the formula JBX=ZPX×(c1×D1+c2×D2+0.2337) to calculate and obtain the overtime coefficient of the maintenance personnel; wherein c1 and c2 represent different proportional coefficients; Receive various data marked in the rest mark information and perform normalization processing to obtain values, and use the formula XXX=ZPX×(d1×E1+d2×E2+1.7821) to calculate and obtain the rest coefficient of the maintenance personnel; where d1 and d2 represent different proportional coefficients; combine the job matching coefficient, work coefficient, overtime coefficient and rest coefficient to obtain the scheduling value of the maintenance personnel; analyze the scheduling value to obtain the analysis result; The maintenance personnel's shift schedule is calculated using the formula PB = η × (f1 × GZX + f2 × JBX - f3 × XXX + 0.4557); where f1, f2 and f3 represent different proportional coefficients, and η represents the shift schedule compensation factor, with a value range of (0,5); The step of analyzing the shift value includes: matching the shift value with a preset shift threshold; if the shift value is not greater than the shift threshold, setting the maintenance personnel corresponding to the shift value as the shift personnel and generating a first shift signal; if the shift value is greater than the shift threshold, setting the maintenance personnel corresponding to the shift value as the emergency personnel and generating a second shift signal; arranging a plurality of shift values in descending order according to the first shift signal to obtain a first shift set, and dividing the first shift set by the preset number of shift persons to obtain a shift division set; arranging a plurality of shift values in descending order according to the second shift signal to obtain a second shift set, and dividing the second shift set by the preset number of emergency persons to obtain an emergency division set; The control module adjusts the maintenance personnel's schedule according to the analysis results. The steps include: Obtain the shift division set and emergency division set in the analysis result, perform the first shift scheduling on the shift division set and emergency division set according to the working hours to obtain the daily shift division set; perform the second shift scheduling on the daily shift division set according to the working period to obtain the shift scheduling result.