Information processing device, information processing method, and recording medium

By using a wide-angle camera at the job site to monitor the status of the operator and the machine, and generating implementation data of the operation process, it solves the problems of high cost and low monitoring accuracy in the existing technology, and realizes the monitoring of the machine and the operator in the operation process. Effective monitoring and analysis.

CN113767407BActive Publication Date: 2024-10-18OMRON CORP
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN202080033138.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-02-26
Publication Date
2024-10-18
Estimated Expiration
2040-02-26

AI Technical Summary

Technical Problem

The existing technology requires multiple cameras when monitoring the implementation status of the work process, resulting in high costs and difficulty in effectively monitoring the correspondence between the operator and the machine.

Method used

A wide-angle camera is used to shoot the entire job site, and the status of the operator and the machine is determined through image analysis, and the implementation data of the operation process is generated, including the associated information of the machine operating period and the operator's presence period.

Benefits of technology

It reduces monitoring costs, accurately grasps the correspondence between machines and operators in the operation process, and improves analysis accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113767407B_ABST
    Figure CN113767407B_ABST
Patent Text Reader

Abstract

The present invention provides an information processing device, an information processing method, an information processing program and a recording medium, which can suppress the implementation cost and grasp the correspondence between the actual action of a machine used to implement a work process and the work performed by an operator. The information processing device (10) associates basic shooting data (BI) obtained by a ceiling camera (30) shooting the entire work site WS with the process information obtained from the PLC (20).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to an information processing device and the like for generating data that can be used for improving work processes, etc., from imaged data obtained by imaging implementation conditions of a plurality of work processes. Background Art

[0002] In the past, attempts have been known to use data obtained by photographing the implementation status of work processes at production sites such as factories to improve the work processes. For example, the following patent document 1 discloses a technology that analyzes work image data photographed by multiple cameras arranged at the work site, detects the time when the operator actually performed the work, that is, the actual work time, and uses the detected actual work time to determine the work process that becomes a bottleneck.

[0003] Prior art literature

[0004] Patent Literature

[0005] Patent Document 1: Japanese Patent Publication No. 2019-23803 Summary of the invention

[0006] Problems to be solved by the invention

[0007] However, the conventional technology described above has a problem in that a plurality of cameras are required to monitor the status of the work performed by the operator, and therefore the introduction cost is high when actually applied to existing production sites and the like.

[0008] An embodiment of the present invention has been made in view of the above-mentioned problems, and an object of the present invention is to grasp the correspondence between the actual operation of a machine used to implement a work process and the work performed by an operator while suppressing the implementation cost.

[0009] Technical means of solving problems

[0010] In order to solve the above-mentioned problem, an information processing device according to an embodiment of the present invention includes: a first acquisition unit, which acquires shooting data obtained by using a wide-angle camera to shoot the entire work site, wherein the work site includes multiple monitoring areas respectively associated with multiple work processes; an operator determination unit, which determines whether there is an operator for each of the multiple monitoring areas by analyzing the image of the shooting data acquired by the first acquisition unit; a second acquisition unit, which acquires process information generated by an action result, wherein the action result indicates the content and result of the action performed by a machine used to implement each of the multiple work processes; a machine determination unit, which uses the process information acquired by the second acquisition unit to determine whether the machine is running; and a generation unit, which generates data that associates, for each of the multiple work processes, (A) a time period during which the machine determined by the machine determination unit to be used for the implementation of the work process is running and (B) a time period during which the operator determined by the operator determination unit to be present in the monitoring area associated with the work process.

[0011] In order to solve the above-mentioned problem, a control method for an information processing device according to an embodiment of the present invention comprises: a first acquisition step of acquiring photographic data obtained by photographing the entire work site with a wide-angle camera, wherein the work site includes a plurality of monitoring areas respectively associated with a plurality of work processes; an operator determination step of determining whether an operator exists in each of the plurality of monitoring areas by image analysis of the photographic data acquired in the first acquisition step; a second acquisition step of acquiring process information generated by an action result, wherein the action result indicates the content and result of an action performed by a machine used for implementing each of the plurality of work processes; a machine determination step of determining whether the machine is running using the process information acquired in the second acquisition step; and a generation step of generating, for each of the plurality of work processes, data associating (A) a time period during which the machine determined in the machine determination step to be used for the implementation of the work process is running and (B) a time period during which the operator is determined in the operator determination step to be present in the monitoring area associated with the work process.

[0012] Effects of the Invention

[0013] According to an embodiment of the present invention, it is possible to grasp the correspondence between the actual operation of a machine used to implement a work process and the work performed by an operator while suppressing the implementation cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a block diagram showing a main part configuration of an information processing device, etc. according to Embodiment 1 of the present invention.

[0015] Figure 2 Yes means including Figure 1 A diagram showing an overall overview of a control system, etc. of an information processing device.

[0016] Figure 3 Yes means Figure 1 A diagram of an image of basic photographic data acquired by an information processing device.

[0017] Figure 4 Yes Description Figure 1 A flowchart outlining a process executed by an information processing apparatus.

[0018] Figure 5 Yes means Figure 1 A diagram of a method in which an information processing device uses basic imaging data (images) to identify a worker and a monitoring area.

[0019] Figure 6 This is a diagram showing an example of information showing the correspondence between the operation period of a machine and the stay period of an operator for each work process.

[0020] Figure 7 This is an example of a screen that displays the correspondence between the operation periods of machines and the stay periods of workers in a list format for a plurality of work steps.

[0021] Figure 8 This is a diagram showing an example of a work site in which a plurality of monitoring areas are arranged corresponding to the execution order of a plurality of work processes.

[0022] Fig. 9 This is a diagram showing an example of information indicating the movement history of workers at a work site.

[0023] [Explanation of Symbols]

[0024] 1: Control system

[0025] 10: Information processing device (Information processing device)

[0026] 20: PLC

[0027] 30: Ceiling camera (wide-angle camera)

[0028] 40: Machine (machine, slave)

[0029] 50: Control Network

[0030] 60: Event Management Device

[0031] 70: External devices

[0032] 110: First acquisition unit

[0033] 120: Operator determination unit

[0034] 130: Storage

[0035] 140: Second acquisition unit

[0036] 150: Machine judgment department

[0037] 160: Generation Department

[0038] 170: Display control unit

[0039] 180: Speculation Department

[0040] 190: Regional Setting Department

[0041] Aa: Analysis target area

[0042] Ac: Action

[0043] Ar: Monitoring area

[0044] BI: Basic shooting data (basic data)

[0045] Da: Operation period (the period when the machine is judged to be running)

[0046] Do: Stay period (the period when the operator is judged to be present)

[0047] La: Action result

[0048] Mi: Related information

[0049] Pr: Operation process

[0050] S110~S210: Steps DETAILED DESCRIPTION

[0051] [Implementation method 1]

[0052] The following is based on Figures 1 to 9 1 to illustrate an embodiment of one aspect of the present invention (hereinafter also referred to as "this embodiment"). In addition, the same or corresponding parts in the figures are marked with the same symbols and their descriptions are not repeated. In this embodiment, for example, an information processing device 10 is used as a typical example of an information processing device for description. In order to facilitate understanding of the information processing device 10 of one embodiment of the present invention, first use Figure 2 The outline of the control system 1 and the like including the information processing device 10 will be described. In the following description, "n" represents an "integer greater than or equal to 1" and "m" represents an "integer greater than or equal to 1 and less than or equal to n".

[0053] §1. Application examples

[0054] (About the work site and work process)

[0055] Figure 2 1 is a diagram showing an overall overview of a control system 1 including an information processing device 10 . Figure 2 The ceiling camera 30 shown is installed on the ceiling of the work site WS, and generates basic imaging data BI which is imaging data obtained by imaging the entire work site WS.

[0056] The work site WS is a production site such as a factory, and various products are produced at the work site WS through a plurality of work steps Pr(1), Pr(2), Pr(3), ... Pr(n), for example. The plurality of work steps Pr(1), Pr(2), Pr(3), ... Pr(n) performed at the work site WS are, for example, a "painting" step, a "main workpiece assembly" step, a "main workpiece assembly to a body" step, and an "inspection" step.

[0057] Regarding the operation process Pr, when it is necessary to distinguish a plurality of operation processes Pr, the symbols are distinguished by adding suffixes such as "(1)", "(2)", "(3)", ..., "(n)". For example, they are distinguished by recording "operation process Pr (1)", "operation process Pr (2)", "operation process Pr (3)", ..., "operation process Pr (n)". When it is not necessary to distinguish a plurality of operation processes Pr, they are simply referred to as "operation process Pr".

[0058] (About monitoring area)

[0059] The work site WS includes a plurality of monitoring areas Ar(1), Ar(2), Ar(3), ...Ar(n). The plurality of monitoring areas Ar(1), Ar(2), Ar(3), ...Ar(n) are respectively associated with a plurality of work steps Pr(1), Pr(2), Pr(3), ...Pr(n). That is, the monitoring area Ar(m) is an area where the operator Pe performs work Op(m) related to the implementation of the work step Pr(m), for example, an area where the machine 40(m) is configured. For example, the operator Pe uses the machine 40(m) in the monitoring area Ar(m) to perform work Op(m) related to the work step Pr(m).

[0060] Similar to the operation process Pr, when it is necessary to distinguish multiple monitoring areas Ar separately, the symbols are marked with suffixes such as "(1)", "(2)", "(3)", ..., "(n)" to distinguish them. When there is no need for special distinction, it is simply referred to as "monitoring area Ar".

[0061] (About basic shooting data)

[0062] A ceiling camera 30 serving as a wide-angle camera is installed on the ceiling of the work site WS. However, the ceiling camera 30 does not necessarily need to be installed on the ceiling of the work site WS. The ceiling camera 30 only needs to be installed at a position where the entire work site WS can be overlooked. The ceiling camera 30 overlooks the entire work site WS and generates basic photographic data BI, which is photographic data obtained by photographing the entire work site WS. In the basic photographic data BI, a plurality of analysis target areas Aa(1), Aa(2), Aa(3), ...Aa(n) corresponding to the plurality of monitoring areas Ar(1), Ar(2), Ar(3), ...Ar(n) are pre-set.

[0063] Similar to the monitoring area Ar, when it is necessary to distinguish multiple analysis object areas Aa separately, the symbols are marked with suffixes such as "(1)", "(2)", "(3)", ..., "(n)" to distinguish them. When there is no need for special distinction, they are simply referred to as "analysis object area Aa".

[0064] The analysis target area Aa is an object area for image analysis of the basic captured data BI by the information processing device 10. By setting the analysis target area Aa for the basic captured data BI, it is possible to efficiently perform image analysis of the basic captured data BI for identifying the status of the monitoring area Ar. However, it is not necessary to set the analysis target area Aa for the basic captured data BI. The analysis target area Aa may also be set for the basic captured data BI by the information processing device 10 according to a user operation.

[0065] (About the work and the operator)

[0066] When a plurality of operation steps Pr(1), Pr(2), Pr(3), ...Pr(n) are each implemented, an operator Pe performs each of a plurality of operations Op(1), Op(2), Op(3), ...Op(n). A plurality of standard operations Op(1), Op(2), Op(3), ...Op(n) are pre-associated with each of the plurality of operation steps Pr(1), Pr(2), Pr(3), ...Pr(n). However, among the operations Op performed by the operator Pe, there may be operations Op other than "standard operations Op pre-associated with the operation step Pr", that is, there may be non-standard operations Op that cannot be pre-associated with the operation step Pr. When it is necessary to distinguish a plurality of operations Op, the symbols are distinguished by suffixes such as "(1)", "(2)", "(3)", ..., "(n)", etc., and when it is not necessary to distinguish them, they are simply referred to as "operation Op".

[0067] Furthermore, at the work site WS, for example, there is one or more operators Pe who perform work Op(m) related to the implementation of the work process Pr(m), and the operators Pe are identified, for example, by an operator ID affixed to the top of the hat worn by the operator Pe. Specifically, the operators Pe(1) and Pe(2) at the work site WS are identified by the operator ID: Pe(1) affixed to the hat worn by the operator Pe(1) and the operator ID: Pe(2) affixed to the hat worn by the operator Pe(2). When it is necessary to distinguish a plurality of operators Pe, the symbols are distinguished by suffixes such as "(1)", "(2)", "(3)", ..., "(n)", etc. When it is not necessary to distinguish them, they are simply referred to as "operator Pe".

[0068] Figure 3 3 is a diagram showing an image of the basic imaging data BI acquired by the information processing device 10 from the ceiling camera 30. Figure 3 As shown, the information processing device 10 performs image analysis on the basic photographic data BI to determine whether there is an operator Pe at the work site WS. If it is determined that there is an operator Pe at the work site WS, the operator ID of the operator Pe at the work site WS is determined.

[0069] (About actions and machines)

[0070] When multiple work steps Pr(1), Pr(2), Pr(3), ... Pr(n) are each implemented, the machine 40 performs each of the multiple actions Ac(1), Ac(2), Ac(3), ... Ac(n). That is, for each of the multiple work steps Pr(1), Pr(2), Pr(3), ... Pr(n), each is associated with multiple actions Ac(1), Ac(2), Ac(3), ... Ac(n). When it is necessary to distinguish multiple actions Ac, the symbols are marked with suffixes such as "(1)", "(2)", "(3)", ..., "(n)" to distinguish them. When there is no need to distinguish them, they are simply referred to as "action Ac".

[0071] Furthermore, for the implementation of each of the plurality of work steps Pr, each of the plurality of machines 40 is used, that is, the work steps Pr are pre-associated with the machines 40. For example, for the implementation of the work step Pr(m), one or more machines 40(m) are used. That is, for the implementation of the work step Pr(1), one or more machines 40(1) are used. Specifically, three machines 40(1), namely machines 40(1-1), 40(1-2) and 40(1-3), may also be used. Similarly, for the implementation of the work step Pr(2), one or more machines 40(2) are used, and for the implementation of the work step Pr(3), one or more machines 40(3) are used. When it is necessary to distinguish between the plurality of machines 40 respectively associated with the plurality of work steps Pr, the symbols are distinguished by suffixes such as "(1)", "(2)", "(3)", ..., "(n)", etc., and when no special distinction is required, they are simply referred to as "machine 40".

[0072] Here, one machine 40 may be used to implement a plurality of work steps Pr. This can be expressed in another way as follows, where the variables "p", "q", "x", and "y" each represent an "integer greater than or equal to 1", "q" is different from "p", and "y" is different from "x". That is, the machine 40 (px) used to implement the work step Pr (p) and the machine 40 (qy) used to implement the work step Pr (q) may be the same machine 40.

[0073] (About Master-Slave Control System)

[0074] The multiple machines 40 used to implement the multiple work processes Pr at the work site WS are controlled by a programmable logic controller (PLC) 20 as a line controller. That is, a control system 1 is constructed as a master-slave control system in which the PLC 20 is set as a master and the multiple machines 40 are set as slaves, and the multiple machines 40 are each communicably connected to the PLC 20 via a network (control network 50). The PLC 20 is called a "master" in the sense of managing data transmission via the control network 50. "Master" and "slave" are defined with a focus on the control function of data transmission on the control network 50, and there is no particular limitation on what kind of information is sent and received between the devices.

[0075] PLC20 is a control device (controller) that controls the control system 1 as a whole, and is communicatively connected to a plurality of machines 40. PLC20 obtains information from each of the plurality of machines 40 as input devices (measuring devices) as input data. PLC20 performs arithmetic processing using the acquired input data according to a pre-installed user program. PLC20 performs the arithmetic processing to determine the control content of the control system 1, for example, determines the control content of each of the plurality of machines 40 as output devices such as actuators, and outputs control data corresponding to the control content to each of the plurality of machines 40. PLC20 repeatedly performs the acquisition of input data from each of the plurality of machines 40 and the acquisition of control data for each of the plurality of machines 40 in a predetermined cycle (control cycle). For example, a display unit and an operating unit not shown in the figure may also be connected to PLC20. The display unit includes a liquid crystal panel that can display images, and typically, the operating unit includes a touch panel, a keyboard, a mouse, and the like.

[0076] The machine 40 is a slave in the control system 1 as a master-slave control system in which the PLC 20 is set as the master. The machine 40 is an input device that repeatedly sends input data to the PLC 20 in each specified control cycle, or an output device that repeatedly receives control data from the PLC 20 in each specified control cycle and operates according to the received control data. The machine 40 can be, for example, a sensor (such as a photoelectric sensor) that is an input device that sends detection results, etc. as input data to the PLC 20, a barcode reader that sends reading results, or an inspection machine (tester) that sends inspection results. Moreover, the machine 40 can also be a programmable terminal (PT) connected to a plurality of input devices. Furthermore, the machine 40 can also be a robot or the like that is an output device that performs screw fastening, picking, etc.

[0077] The control network 50 transmits various data received by or sent by the PLC20. Typically, various industrial Ethernets (registered trademarks) can be used, which are sometimes referred to as field networks. As industrial Ethernets (registered trademarks), for example, EtherCAT (registered trademark), Profinet IRT, MECHATROLINK (registered trademark)-III, Powerlink, SERCOS (registered trademark)-III, CIP Motion, etc. are known, and any of these can be used. Furthermore, field networks other than industrial Ethernet (registered trademark) can also be used. For example, if motion control is not performed, DeviceNet, CompoNet / IP (registered trademark), etc. can also be used.

[0078] The following describes a control system 1 that transmits and receives data between a PLC 20 (host) and a machine 40 (slave) by sequentially transmitting data frames on a control network 50. That is, data frames are sequentially transmitted in a predetermined control cycle on the control network 50, thereby repeatedly transmitting and receiving data between the PLC 20 and the machine 40 in each control cycle. Data frames can also be sequentially transmitted on the control network 50 to transmit and receive data between a plurality of machines 40, that is, between a plurality of slaves.

[0079] (About process information)

[0080] In the master-slave control system, i.e., the control system 1, in which the machine 40 is set as a slave, the PLC 20 as the master repeatedly receives the action result La from the machine 40 as the slave, for example, in each predetermined control cycle, and the action result La indicates the content and result of the action Ac performed by the machine 40. That is, the machine 40 repeatedly sends the action result La indicating the content and result of the action Ac actually performed when the operation process Pr is implemented to the PLC 20 in the predetermined cycle. For example, the machine 40 (m) repeatedly sends the action result La (m) indicating the content and result of the action Ac (m) performed when the operation process Pr (m) is implemented to the PLC 20 in each control cycle.

[0081] For example, PLC20 obtains the result of the measurement action performed by the machine 40 as an input device (measuring device), that is, the measurement result, as the action result La of the machine 40. Moreover, when the machine 40 is an inspection machine, PLC20 obtains the result of the inspection action performed by the machine 40, such as the inspection result of "satisfying the inspection standard or not satisfying the inspection standard", as the action result La of the machine 40. Furthermore, PLC20 obtains the result of the output action performed by the machine 40 as an output device, for example, as the action result La of the machine 40. When the machine 40 is a robot that performs screw fastening, picking, etc., PLC20 obtains the action result La of the number of screw fastenings, picking results (picking success or picking error), etc., as the action result La of the machine 40.

[0082] The PLC 20 repeatedly receives the action result La indicating the content and result of the action Ac actually performed by the machine 40 when the operation process Pr is implemented from the machine 40 in a predetermined cycle, and sends (i.e., transmits) the received action result La as process information to the information processing device 10. Furthermore, the PLC 20 sends information generated using the action result La repeatedly received from the machine 40 in each predetermined cycle to the information processing device 10 as process information.

[0083] Furthermore, the PLC 20 may send the action result La repeatedly received from the machine 40 in each predetermined cycle as process information to the outside of the control system 1. For example, the PLC 20 may send the action result La repeatedly received from the machine 40 in each predetermined cycle as process information to a control system connected to a manufacturing execution system (MES) or the like. Figure 2 The Local Area Network (LAN) within the company is shown.

[0084] The following example is described, that is, the information processing device 10 that receives process information from the PLC 20 uses the action result La contained in the process information to calculate the action period Da of the action Ac executed by the machine 40, and determines whether the action Ac is an "automated action". The details will be described later, but in the example described below, the information processing device 10 calculates the action start time Tms, the action completion time Tme, and the action period Da of the action Ac executed by the machine 40 when the operation process Pr is implemented based on the process information, especially the action result La. Moreover, the information processing device 10 determines whether the action Ac executed by the machine 40 when the operation process Pr is implemented based on the process information, especially the action result La. Hereinafter, the operation of using the process information (especially the action result La) to calculate the action period Da of the action Ac executed by the machine 40 when the operation process Pr is implemented, and determining whether the action Ac is an "automated action" is also called "machine determination processing". In the following description, an example in which the information processing device 10 that receives the process information from the PLC 20 executes the “appliance determination process” will be described.

[0085] However, the “machine determination process” may be executed by the PLC 20 , and the PLC 20 may include the result of the “machine determination process” in the process information or send it to the information processing device 10 instead of the process information.

[0086] In the above description, the so-called action start time Tms refers to the time point when the machine 40 used for the operation process Pr starts to execute the action Ac when the operation process Pr is implemented, and the so-called action completion time Tme refers to the time point when the execution of the action Ac is completed. The action period Da is the period from the action start time Tms to the action completion time Tme.

[0087] (Regarding systems and devices other than master-slave control systems)

[0088] like Figure 2As shown, the control system 1 as a master-slave control system may also be connected to a company LAN system. The company LAN is connected to a process information database (Database, DB) also called MES. In the process information DB, information indicating "standard actions that the machine 40 used to implement the operation process Pr should perform" is stored.

[0089] Figure 2 Although not shown, the information processing device 10 may be connected to the process information DB via, for example, an in-house LAN, and the information processing device 10 may also obtain information indicating "standard actions that the machine 40 used to implement the work process Pr should perform" from the process information DB. The information processing device 10 may also use the information obtained from the process information DB to perform the "machine determination process". However, it is not necessary for the information processing device 10 to be connected to either the in-house LAN or the process information DB.

[0090] and, Figure 2 In the example shown, the process information DB as MES is connected to an event management device 60 via an in-house LAN, and the event management device 60 monitors and manages various events occurring at the work site WS. However, it is not necessary for the event management device 60 to be connected to the process information DB via the in-house LAN, and the event management device 60 may not be provided. Furthermore, the process information DB is connected to a PLC 20 via the in-house LAN. The PLC 20 may also send the action result La obtained from the machine 40 to the process information DB via the in-house LAN. In addition to the MES, the in-house LAN may also be connected to an Enterprise Resources Planning (ERP) and a Warehouse Management System (WMS) not shown in the figure.

[0091] Figure 2In the process information DB, a dynamic image storage server is connected via "another network" that is different from either the control network 50 or the company's internal LAN. The dynamic image storage server is connected to the information processing device 10 via another network, and the local shooting data OD and related information Mi sent from the information processing device 10 are stored in the dynamic image storage server. The local shooting data OD is shooting data obtained by extracting the basic shooting data BI generated by the ceiling camera 30 shooting the entire work site WS according to a prescribed standard by the information processing device 10. Although the details will be described later, the related information Mi is information indicating the correspondence between the stay period Do of the operator Pe in the monitoring area Ar corresponding to the work process Pr and the period during which the machine 40 is performing the action Ac corresponding to the work process Pr, that is, the action period Da.

[0092] The dynamic image storage server is further connected to an external device 70 implemented by a personal computer (PC). The external device 70 displays, for example, local shooting data OD and related information Mi, and performs visualization of process information. That is, the external device 70 displays at a glance the information required for improving the operation process Pr, and displays the operation process Pr that will become a bottleneck, the date and time indicating the error that occurred in the operation process Pr, and other information associated with the corresponding local shooting data OD. The details of the related information Mi displayed by the external device 70 will be described in detail using Figure 6 , Figure 7 as well as Fig. 9 To explain.

[0093] As described above, the ceiling camera 30 captures the entire work site WS to generate basic captured data BI, and transmits the generated basic captured data BI to the information processing device 10 via a communication cable such as a Universal Serial Bus (USB) cable.

[0094] The information processing device 10 is realized by, for example, a PC, and is an information processing device that can realize efficient use of both by combining the process information acquired from the PLC 20 with the basic imaging data BI acquired from the ceiling camera 30. The information processing device 10 can also be said to be a device that visualizes the process information including "the content of the actual actions Ac of the plurality of machines 40 at the work site WS and the action results La of the results" by combining them with the basic imaging data BI.

[0095] Although the conventional technology also has an operation of performing image analysis on the captured data obtained by capturing “the operation Op performed by the operator Pe at the operation site WS”, it is not associated with the process information of the multiple machines 40 at the operation site WS, so the accuracy of the inference related to the operation Op performed by image analysis is low. Moreover, in the conventional technology that configures sensors for each of the multiple operation processes Pr to visualize the process information of the machine 40, although the bottleneck of the operation process Pr can be visualized, it is difficult to understand the cause of the bottleneck by associating it with the operation Op performed by the operator Pe. Furthermore, if the captured data obtained by capturing “the operation Op performed by the operator Pe at the operation site WS” is associated with the process information of the machine 40 using a system that is higher than the master-slave control system, the scale of such a higher-level system will become very large and difficult to implement.

[0096] In contrast, the information processing device 10 obtains process information including the content of the action Ac of the machine 40 used to implement the work process Pr and the action result La of the result, and combines the obtained process information with the basic imaging data BI obtained from the one ceiling camera 30. The information processing device 10 can efficiently and accurately perform analysis related to each of the multiple work processes Pr by combining the process information including the action result La indicating the content of the action Ac of each of the multiple machines 40 and the basic imaging data BI obtained by imaging the entire work site WS.

[0097] That is, in addition to the visualization of process information, the information processing device 10 also extracts the operation process Pr that becomes a bottleneck, for example, and combines the photographing data ID (partial photographing data OD) obtained by photographing the implementation status of the extracted operation process Pr with the process information of the extracted operation process Pr. Therefore, for example, the user can easily identify the cause of the bottleneck and the failure factor for the operation process Pr that becomes a bottleneck, and can efficiently perform improvement work on the operation process Pr. In addition, the information processing device 10 can also be used for traceability when a defect occurs.

[0098] Furthermore, the information processing device 10 can improve the analysis accuracy of both the analysis of the basic imaging data BI and the analysis of the process information by combining the basic imaging data BI with the process information of each of the plurality of devices 40 .

[0099] Here, the conventional technology described in Patent Document 1 cited as the background technology about the information processing device 10 requires the introduction of very expensive equipment to the entire work site WS when it is implemented. In contrast, the information processing device 10 uses the PLC 20 that has been used in the work site WS and a ceiling camera 30 installed on the ceiling of the work site WS, so the implementation cost is low. In addition, the information processing device 10 can also use the ceiling camera 30 that only captures the desired work process Pr (that is, the desired monitoring area Ar), and it is easy to relocate the ceiling camera 30 used by the information processing device 10.

[0100] Furthermore, in the technology of Patent Document 1, the time during which the operator cannot perform the operation, i.e., the inoperability time, is calculated by analyzing the operation image data captured by a plurality of cameras. Furthermore, in the technology of Patent Document 1, the actual operation time during which the operation can actually be performed is calculated by subtracting the inoperability time calculated by analyzing the operation image data from the apparent operation time measured based on the operator's operation on the operation instruction terminal that displays the operation flow to the operator. That is, in the technology of Patent Document 1, in order to grasp the correspondence between the actual action Ac of the machine 40 used for the implementation of the operation process Pr and the operator Pe, the operator Pe needs to give an operation instruction to the machine 40 used for the implementation of the operation process Pr, specifically, the operation instruction terminal.

[0101] In contrast, the information processing device 10 uses the process information, specifically, the action result La of the machine 40, to determine the action start time Tms when the machine 40 starts the action Ac and the action completion time Tme when the action Ac is completed. That is, the information processing device 10 can determine the action start time Tms and the action completion time Tme of the machine 40 without the operator Pe having to operate the work instruction terminal that displays the work flow to the operator Pe.

[0102] Specifically, the information processing device 10 is connected to the PLC 20 in a communicative manner via a control network 50 that connects the PLC 20 as a host and the machine 40 as a slave. The information processing device 10 receives process information including an action result La from the PLC 20, wherein the action result La represents the content and result of "the actual action Ac performed by the machine 40 used to implement the operation process Pr". Here, the information processing device 10 must be connected to the PLC 20 in a communicative manner via the control network 50, but the information processing device 10 may not be a slave in the "master-slave control system in which the PLC 20 is set as the host and the machine 40 is set as the slave".

[0103] The information processing device 10 is connected to the ceiling camera 30 so as to be communicable, for example, via a Universal Serial Bus (USB) cable. The information processing device 10 acquires basic imaging data BI obtained by imaging the entire work site WS from the ceiling camera 30.

[0104] Furthermore, the information processing device 10 may also obtain the action reference Sa indicating the "standard action that the machine 40 used to implement the work process Pr should perform" from the process information DB. Furthermore, the information processing device 10 may also use the obtained action reference Sa to perform the "machine determination process". Furthermore, the information processing device 10 may also use the obtained action reference Sa to extract the desired partial imaging data OD from the basic imaging data BI.

[0105] Therefore, the information processing device 10 does not send the basic imaging data BI to the company's LAN connected to the MES, etc., so the communication in the company's LAN is not oppressed by the transmission of the basic imaging data BI with a large amount of data. In addition, the information processing device 10 uses the basic imaging data BI obtained from one ceiling camera 30 for efficient and accurate analysis of process information. Therefore, the information processing device 10 can suppress the implementation cost and enable the user to understand the correspondence between the actual action Ac of the machine 40 used to implement the operation process Pr and the operation Op performed by the operator Pe.

[0106] §2.Structure example

[0107] So far, using Figure 2 as well as Figure 3 The outline of the control system 1 etc. is described. Figure 1 Before describing the details of the information processing device 10 , in order to facilitate understanding of the information processing device 10 , an overview of the information processing device 10 is summarized as follows.

[0108] That is, the information processing device 10 (information processing device) includes: a first acquisition unit 110, which acquires basic shooting data BI (shooting data) obtained by shooting the entire work site WS using a ceiling camera 30 (wide-angle camera), wherein the work site WS includes a plurality of monitoring areas Ar respectively associated with a plurality of work processes Pr; an operator determination unit 120, which determines whether an operator Pe exists in each of the plurality of monitoring areas Ar by analyzing the image of the basic shooting data BI acquired by the first acquisition unit 110; and a second acquisition unit 140, which acquires process information generated by an action result La, wherein the action result La represents The content and result of the action Ac performed by the machine 40 used for implementing each of the multiple work processes Pr are shown; the machine determination unit 150 uses the process information obtained by the second acquisition unit to determine whether the machine 40 is running; and the generation unit 160 generates data (associated information Mi) for each of the multiple work processes Pr, which associates (A) the time period (action period Da) during which the machine 40 used for implementing the work process Pr is running as determined by the machine determination unit 150, and (B) the time period (retention period Do) during which the operator Pe is present in the monitoring area Ar associated with the work process Pr as determined by the operator determination unit 120.

[0109] According to the above structure, the information processing device 10 determines whether there is an operator Pe in the monitoring area Ar associated with the operation process Pr based on the basic shooting data BI shot by a ceiling camera 30. In addition, the information processing device 10 determines whether the machine 40 used to implement the operation process Pr is in operation based on the process information. In addition, the information processing device 10 generates, for each operation process Pr, association information Mi that associates the time period Da, which is the time period in which the machine 40 is determined to be in operation, with the time period Do, which is the time period in which the operator Pe is determined to be present in the monitoring area Ar associated with the operation process Pr.

[0110] That is, the information processing device 10 generates the associated information Mi representing the "correspondence between the action period Da during which the machine 40 is running and the stay period Do of the operator Pe in the monitoring area Ar" for each work process Pr by analyzing the image of the basic shooting data BI obtained by using a ceiling camera 30 to shoot the entire work site WS.

[0111] Therefore, the information processing device 10 has the following effect: by using a single ceiling camera 30 that can capture the entire work site WS, it is possible to suppress implementation costs while grasping the correspondence between the actual actions of the machine 40 used in the work process Pr and the operator Pe.

[0112] The information processing device 10 also includes an inference unit 180, which uses the action result La of the machine 40 used to implement the operation process Pr to infer the content of the operation Op performed by the operator Pe during the residence period Do in which the operator determination unit 120 determines that the operator Pe exists in the monitoring area Ar associated with the operation process Pr.

[0113] According to the above configuration, the information processing device 10 uses the operation result La of the machine 40 used to implement the operation process Pr to estimate the content of the operation Op performed by the operator Pe during the stay period Do when it is determined that the operator Pe exists in the monitoring area Ar associated with the operation process Pr.

[0114] Therefore, the information processing device 10 has an effect of being able to estimate the content of the work Op performed by the operator Pe in the monitoring area Ar associated with the work step Pr using the operation result La of the machine 40 for each work step Pr.

[0115] The information processing device 10 also includes a display control unit 170, which generates data that can display a Gantt chart (Gantt chart) in parallel, indicating the action period Da during which the machine 40 determined by the machine determination unit 150 to be used for the implementation of the operation process Pr is running, and a Gantt chart indicating the residence period Do during which the operator Pe is determined by the operator determination unit 120 to be present in the monitoring area Ar associated with the operation process Pr.

[0116] According to the structure, the information processing device 10 generates a data for each work process Pr, which can display the Gantt chart representing the action period Da during which the machine 40 is determined to be running and the Gantt chart representing the stay period Do during which the operator Pe is determined to be present in the monitoring area Ar in parallel.

[0117] Therefore, the information processing device 10 can display the correspondence between the operation period Da of the machine 40 and the stay period Do of the worker Pe in the monitoring area Ar to the user such as the manager in a form that can be understood at a glance for each work step Pr.

[0118] The information processing device 10 further includes a region setting unit 190 that sets an analysis target region Aa set as an image analysis target for the basic imaging data BI as a region for imaging the monitoring area Ar according to a user operation.

[0119] According to the above configuration, the information processing device 10 sets the analysis target area Aa for the basic image data BI according to the user operation. Therefore, the information processing device 10 can set the analysis target area Aa for the basic image data BI according to the user operation.

[0120] The information processing device 10 whose outline has been described so far will now be described. Figure 1 While explaining the details of its structure, then refer to Figure 4 The processing executed by the information processing device 10 will be described.

[0121] (Details of information processing device)

[0122] Figure 1 1 is a block diagram showing the main structure of the information processing device 10 and the like included in the control system 1. Figure 1 As shown, the information processing device 10 includes a first acquisition unit 110, an operator determination unit 120, a storage unit 130, a second acquisition unit 140, a machine determination unit 150, a generation unit 160, a display control unit 170, an estimation unit 180, and an area setting unit 190 as functional blocks. In addition to the above-mentioned functional blocks, the information processing device 10 may also include a control unit for transmitting the local imaging data OD extracted from the basic imaging data BI to the outside of the control system 1 (for example, Figure 2 However, in order to ensure the simplicity of the description, the structures that are not directly related to this embodiment are omitted from the description and block diagram. However, based on the actual implementation, the information processing device 10 may also include the omitted structures.

[0123] The first acquisition unit 110, the operator determination unit 120, the second acquisition unit 140, the device determination unit 150, the generation unit 160, the display control unit 170, the estimation unit 180, and the area setting unit 190 can be realized by, for example, a central processing unit (CPU) or the like reading a program stored in a storage device (storage unit 130) realized by a read-only memory (ROM), a non-volatile random access memory (NVRAM), etc., into a random access memory (RAM) or the like not shown, and executing the program. Hereinafter, the first acquisition unit 110, the operator determination unit 120, the second acquisition unit 140, the device determination unit 150, the generation unit 160, the display control unit 170, the estimation unit 180, and the area setting unit 190 in the information processing device 10 will be described first.

[0124] The first acquisition unit 110 acquires basic imaging data BI, which is imaging data obtained by the ceiling camera 30 when imaging the entire work site WS, from the ceiling camera 30 , and outputs the acquired basic imaging data BI to the operator determination unit 120 .

[0125] The operator determination unit 120 determines whether there is an operator Pe at the work site WS by analyzing the image of the basic shooting data BI. If it is determined that there is an operator Pe at the work site WS, the monitoring area Ar where the operator Pe is located is further determined. That is, the operator determination unit 120 refers to the analysis object area table 131 of the storage unit 130 to grasp the correspondence between the monitoring area Ar and the analysis object area Aa. In addition, when the operator determination unit 120 confirms that the analysis object area Aa(m) contains the shooting data of the operator Pe, it determines that the operator Pe is located in the monitoring area Ar(m) based on the correspondence between the monitoring area Ar and the analysis object area Aa. The operator determination unit 120 can also determine how many operators Pe exist in each monitoring area Ar.

[0126] Then, the operator determination unit 120 specifies the operator ID of the operator Pe located in the monitoring area Ar. For example, the operator determination unit 120 specifies the operator ID of the operator Pe(x) located in the monitoring area Ar(m) as “operator Pe(x)”.

[0127] The operator determination unit 120 calculates the retention period Do of the operator Pe(x) for each operation process Pr, that is, for each monitoring area Ar. Specifically, the operator determination unit 120 determines the time point (= retention start time point Tos(m)(x)) when it is confirmed that the operator Pe(x) who has not been in the monitoring area Ar(m) so far is in the monitoring area Ar(m). The operator determination unit 120 determines the time point (= retention end time point Toe(m)(x)) when it is confirmed that the operator Pe(x) who has not been in the monitoring area Ar(m) so far is no longer in the monitoring area Ar(m). The operator determination unit 120 calculates the retention period Do(m)(x) of the operator Pe(x) for the operation process Pr(m), that is, for the monitoring area Ar(m), which is the period from the retention start time point Tos(m)(x) to the retention end time point Toe(m)(x).

[0128] The operator determination unit 120 notifies the generation unit 160 of the stay start time Tos(x), stay end time Toe(x) and stay period Do(x) of the operator Pe(x) determined (calculated) for each work step Pr, that is, for each monitoring area Ar.

[0129] As an image analysis of the basic imaging data BI, the operator determination unit 120 may also perform an activity line analysis that can accurately grasp the existence and activities of the operator Pe, so as to detect the center coordinates of the operator Pe, the operator ID, and the like.

[0130] The second acquisition unit 140 acquires process information from PLC20, and outputs the acquired process information to the machine determination unit 150. The process information is "the 'action result La of machine 40' acquired by PLC20 from machine 40" and "the information generated by PLC20 using the acquired 'action result La of machine 40'". That is, the process information includes the action result La, and the action result La is information indicating the content and result of the action Ac actually performed by the machine 40 when the operation process Pr is implemented. When PLC20 uses the action result La of the machine 40 to perform the calculation of the action period Da of the action Ac performed by the machine 40 and the determination of whether the action Ac is an "automated action", the process information may also include information indicating the action period Da and the determination result.

[0131] The machine determination unit 150 uses the process information acquired from the second acquisition unit 140, in particular, the action result La of the machine 40, to determine the action start time Tms, which is "the time when the machine 40 used to implement the operation process Pr starts to execute the action Ac". In addition, the machine determination unit 150 uses the process information acquired from the second acquisition unit 140, in particular, the action result La of the machine 40, to determine the action completion time Tme, which is "the time when the machine 40 used to implement the operation process Pr completes the execution of the action Ac". In addition, the machine determination unit 150 calculates the time (period) from the action start time Tms(m) determined for the action Ac(m) to the action completion time Tme(m) as the action period Da(m). The action period Da(m) is "the period during which the machine 40(m) used to implement the operation process Pr(m) is executing the action Ac(m)". The machine determination unit 150 notifies the generation unit 160 of the action period Da(m) calculated for the action Ac(m) corresponding to the operation process Pr(m). That is, the machine determination unit 150 notifies the generation unit 160 of the operation period Da of the action Ac corresponding to the work step Pr (that is, the operation period Da of the action Ac actually performed by the machine 40 when the work step Pr is performed) for each work step Pr.

[0132] Furthermore, the machine determination unit 150 uses the process information acquired from the second acquisition unit 140, in particular, uses the action result La of the machine 40 to determine whether the "action Ac performed by the machine 40 used to implement the operation process Pr" is an "automated action". For example, the machine determination unit 150 uses the action result La(m) of the machine 40(m) used to implement the operation process Pr(m) to determine whether the "action Ac(m) performed by the machine 40(m) when implementing the operation process Pr(m)" is an "automated action". The machine determination unit 150 notifies the inference unit 180 of the determination result of whether the action Ac(m) is an "automated action" as information indicating the action content of the action Ac(m).

[0133] The generation unit 160 generates information that associates the “stay period Do(x) of the operator Pe(x) for each work step Pr” acquired from the operator determination unit 120 with the “action period Da of the action Ac corresponding to the work step Pr for each work step Pr” acquired from the machine determination unit 150. The information that associates the “stay period Do(x) of the operator Pe(x) for each work step Pr” with the “action period Da of the action Ac corresponding to the work step Pr for each work step Pr” is also referred to as “association information Mi”.

[0134] For example, the generation unit 160 generates the associated information Mi(m) that associates the "stay period Do(m)(x) of the operator Pe(x) with respect to the work process Pr(m) (i.e., the monitoring area Ar(m))" with the "action period Da(m) of the action Ac(m) with respect to the work process Pr(m)". In the "associated information Mi", for example, the time axis is made common, and the "stay period Do(x) of the operator Pe(x) for each work process Pr (i.e., the monitoring area Ar)" is associated with the "action period Da of the action Ac corresponding to the work process Pr for each work process Pr".

[0135] The generating unit 160 notifies the display control unit 170 of the generated association information Mi for each operation step Pr, for example, notifies the display control unit 170 of the association information Mi(m) of the operation step Pr(m). Furthermore, the generating unit 160 notifies the display control unit 170 of the generated association information Mi for each operation step Pr, for example, notifies the estimation unit 180 of the association information Mi(m) of the operation step Pr(m).

[0136] The generation unit 160 may also add “the work content of the work Op performed by the operator Pe during the stay period Do and the result of determination whether the work Op is a standard work” notified from the estimation unit 180 to the related information Mi generated for each work step Pr. The generation unit 160 may also notify the display control unit 170 of the related information Mi for each work step Pr to which “the work content of the work Op performed by the operator Pe during the stay period Do and the result of determination whether the work Op is a standard work” is added.

[0137] The display control unit 170 organizes the related information Mi and the like generated by the generating unit 160 into a data format that can be displayed to the user. The display control unit 170 sends the related information Mi and the like organized into a data format that can be displayed to the user to, for example, Figure 2 The display control unit 170 may also organize the related information Mi for each operation process Pr including "the operation content of the operation Op and the determination result of whether the operation Op is a standard operation" notified from the generation unit 160 into a data format that can be displayed to the user.

[0138] The estimation unit 180 estimates the work content of the "work Op performed by the operator Pe during the stay period Do" using the associated information Mi of each work process Pr notified from the generation unit 160, and determines whether it is a "standard work (standard work)". In particular, the estimation unit 180 estimates the work content of the "work Op performed by the operator Pe during the stay period Do" using the determination result of "whether the action Ac(m) is an 'automated action'" notified from the machine determination unit 150, and determines whether it is a "standard work (standard work)". That is, the estimation unit 180 estimates the work content of the work Op using the associated information Mi(m) generated by the generation unit 160 and the determination result of "whether the action Ac(m) is an 'automated action'", and determines whether the work Op is a "standard work (standard work)". The estimation unit 180 notifies the generation unit 160 of the estimated work content of the work Op and the determination result of whether the work Op is a standard work.

[0139] The region setting unit 190 receives a user operation, and updates the information stored in the analysis target region table 131 according to the received user operation.

[0140] The storage unit 130 is a storage device for storing various data used by the information processing device 10. In addition, the storage unit 130 may also non-temporarily store (1) control programs executed by the information processing device 10, (2) operating system (OS) programs, (3) application programs for executing various functions of the information processing device 10, and (4) various data read when the application programs are executed. The data (1) to (4) are stored in non-volatile storage devices such as read-only memory (ROM), flash memory, erasable programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM (registered trademark)), and hard disk drive (HDD). The information processing device 10 may also include a temporary storage unit (not shown). The temporary storage unit is a so-called working memory that temporarily stores data used in calculations and calculation results during various processing performed by the information processing device 10, and includes volatile storage devices such as random access memory (RAM). Which data is stored in which storage device is appropriately determined based on the purpose of use of the information processing device 10 , convenience, cost, physical limitations, etc. The storage unit 130 further stores an analysis target region table 131 .

[0141] The analysis target area table 131 stores a plurality of analysis target areas Aa corresponding to the plurality of monitoring areas Ar. For example, the analysis target area Aa for confirming the status of the monitoring area Ar(m) corresponding to the operation process Pr(m) is set with respect to the basic imaging data BI, and the monitoring area Ar(m) associated with the operation process Pr(m) is stored in the analysis target area table 131. The plurality of analysis target areas Aa stored in the analysis target area table 131 are updated by the area setting unit 190 according to the user operation.

[0142] §3. Action Examples

[0143] Figure 4 1 is a flowchart showing an outline of the processing executed by the information processing device 10. The second acquisition unit 140 acquires process information including the action result La indicating the content and result of the action Ac actually executed by the machine 40 when executing the work process Pr from the PLC 20 (S110).

[0144] The machine determination unit 150 analyzes the process information acquired from the second acquisition unit 140 (S120), and determines, for each operation process Pr, the action Ac actually performed by the machine 40 when the operation process Pr is implemented (S130). The machine determination unit 150 calculates the action period Da for the determined action Ac, and determines whether it is an "automated action". The machine determination unit 150 notifies the generation unit 160 of the calculated action period Da of the action Ac, and notifies the estimation unit 180 of the determination result of whether the action Ac(m) is an "automated action" as information indicating the action content of the action Ac(m).

[0145] Then, the first acquisition unit 110 acquires basic image data BI obtained by imaging the entire work site WS from a ceiling camera 30 installed on the ceiling of the work site WS (S140). The operator determination unit 120 performs image analysis on the basic image data BI, such as activity line analysis (S150).

[0146] The operator determination unit 120 determines the operation process Pr(m) corresponding to the monitoring area Ar(m) determined to have the operator Pe through image analysis (S160), and determines the operator ID of the operator Pe located in the monitoring area Ar(m) (S170). The operator determination unit 120 may further determine the number of operators Pe located in the work site WS, and in particular, determine the number of operators Pe existing in each analysis target area Aa, that is, for each monitoring area Ar. The operator determination unit 120 notifies the generation unit 160 of the residence period Do(x) of the operator Pe(x) determined (calculated) for each operation process Pr, that is, for each monitoring area Ar.

[0147] The generation unit 160 generates the associated information Mi (S180) that associates the work process Pr, the action Ac, and the operator Pe. Specifically, the generation unit 160 generates the associated information Mi (m) that associates the "stay period Do (m) (x) of the operator Pe (x) with respect to the work process Pr (m) (i.e., the monitoring area Ar (m))" obtained from the operator determination unit 120 with the "action period Da (m) of the action Ac (m) with respect to the work process Pr (m)" obtained from the machine determination unit 150.

[0148] The generation unit 160 notifies the estimation unit 180 of the “correlation information Mi(m) between the stay period Do(m)(x) of the operator Pe(x) and the action period Da(m) of the action Ac(m) regarding the work step Pr(m)” generated in S180.

[0149] The estimation unit 180 estimates the work content of the operation Op(m) performed within the retention period Do(m) based on the related information Mi(m) generated by the generation unit 160 and the determination result of "whether the action Ac(m) is an 'automated action'" made by the machine determination unit 150 (S190). The estimation unit 180 determines whether the operation Op(m) whose work content is estimated is a standard operation, for example, determines the operation process Pr that becomes a bottleneck (S200), and determines the abnormal activity line in the basic imaging data BI (S210). That is, the estimation unit 180 notifies the user that the operation process Pr(m) corresponding to the operation Op(m) determined as a non-standard operation may become a bottleneck. In addition, the estimation unit 180 notifies the user that the activity (activity line) of the operator Pe who performs the operation Op(m) determined as a non-standard operation may be different from the normal activity (activity line) seen when performing the operation Op(m) (that is, abnormal).

[0150] (About the summary of the processing executed by the information processing device)

[0151] So far, I have referred to Figure 4 The processing performed by the information processing device 10 described above (in other words, the control method performed by the information processing device 10) can be summarized as follows. That is, the processing (control method) performed by the information processing device 10 includes: a first acquisition step (S140), acquiring basic shooting data BI obtained by shooting the entire work site WS using a ceiling camera 30 (wide-angle camera), the work site WS includes multiple monitoring areas Ar respectively associated with multiple work processes Pr; an operator determination step (S170), by analyzing the image of the basic shooting data BI obtained in the first acquisition step, for each of the multiple monitoring areas Ar, determine whether an operator Pe exists; a second acquisition step (S110), acquiring process information generated by the action result La, the action result La represents The content and result of the action Ac performed by the machine 40 used for implementing each of the multiple work processes Pr are shown; a machine determination step (S130), using the process information obtained in the second acquisition step to determine whether the machine 40 is running; and a generation step (S180), for each of the multiple work processes Pr, generating data (associated information Mi) that associates (A) the time period (action period Da) during which the machine 40 used for implementing the work process Pr is running as determined in the machine determination step, and (B) the time period (retention period Do) during which the operator Pe is present in the monitoring area Ar associated with the work process Pr as determined in the operator determination step.

[0152] According to the above structure, in the information processing method, it is determined whether there is an operator Pe in the monitoring area Ar associated with the operation process Pr based on the basic shooting data BI shot by one ceiling camera 30. In addition, in the information processing method, it is determined whether the machine 40 used to implement the operation process Pr is in operation based on the process information. In addition, in the information processing method, for each operation process Pr, the associated information Mi is generated that associates the action period Da during which the machine 40 is determined to be in operation with the retention period Do during which the operator Pe is determined to be present in the monitoring area Ar associated with the operation process Pr.

[0153] That is, in the information processing method, by analyzing the image of the basic shooting data BI obtained by using a ceiling camera 30 to shoot the entire work site WS, the associated information Mi representing the "correspondence between the action period Da during which the machine 40 is running and the residence period Do of the operator Pe in the monitoring area Ar" is generated for each work process Pr.

[0154] Therefore, the information processing method has the following effect: by using a single ceiling camera 30 that can capture the entire work site WS, it is possible to suppress implementation costs while grasping the correspondence between the actual actions of the machine 40 used in the work process Pr and the operator Pe.

[0155] (Calculation of frequency during stay)

[0156] As described above, the operator determination unit 120 determines the time point when the operator Pe is determined to exist in the monitoring area Ar, which was previously determined to be free of the operator Pe, as the retention start time point Tos by analyzing the image of the analysis target area Aa. Furthermore, the operator determination unit 120 determines the time point when the operator Pe is determined to exist in the monitoring area Ar, which was previously determined to be free of the operator Pe, as the retention end time point Toe by analyzing the image of the analysis target area Aa.

[0157] The worker determination unit 120 specifies the time from the stay start time point Tos(m) to the stay end time point Toe(m) as the time when the worker Pe is present in the monitoring area Ar(m) associated with the work step Pr(m).

[0158] Here, the operator determination unit 120 may calculate the frequency of the stay period Do for each work step Pr (ie, each monitoring area Ar) in addition to specifying (measuring) the stay period Do for each work step Pr (ie, each monitoring area Ar).

[0159] The operator determination unit 120 recognizes the time from the stay start time point Tos(m) to the stay end time point Toe(m) as "one stay period Do(m)" for the monitoring area Ar(m). The time from "the time point when the operator Pe(1) who has not been in the monitoring area Ar(m) so far is confirmed to be in the monitoring area Ar(m) (= the stay start time point Tos(m)(1))" to "the time point when the operator Pe(1) who has been in the monitoring area Ar(m) so far is confirmed to be no longer in the monitoring area Ar(m) (= the stay end time point Toe(m)(1))" is "one stay period Do(m)(1)".

[0160] The operator determination unit 120 may also set "x+y+…+z=n", and for the "n" times of stay period Do(m)(1) of the operator Pe(1), calculate at every predetermined time interval the number of the stay period Do(m)(1) in the "n" times. For example, the operator determination unit 120 confirms that among the "n" times of stay periods Do(m)(1), there are "x" times of stay periods Do(m)(1) from 0 minutes to 4 minutes. Furthermore, the operator determination unit 120 confirms that there are "y" times of stay periods Do(m)(1) from 5 minutes to 9 minutes. Similarly, setting "p" to an integer greater than "1", the operator determination unit 120 confirms that there are "z" times of stay periods Do(m)(1) from "5(p-1)" minutes to "5p-1" minutes.

[0161] Furthermore, the operator determination unit 120 may also calculate, for the "n" times of stay Do(m)(1) of the operator Pe(1), the frequency of the stay period Do(m)(1) from 0 minutes to 4 minutes, the frequency of the stay period Do(m)(1) from 5 minutes to 9 minutes, ..., the frequency of the stay period Do(m)(1) from "5(p-1)" minutes to "5p-1" minutes.

[0162] The operator determination unit 120 may extract a residence period Do(m) with a frequency lower than a predetermined reference as a "non-standard" residence period Do(m) for the "n" residence periods Do(m), and may notify the estimation unit 180 of the extracted "non-standard" residence period Do(m). The estimation unit 180 may determine that "the operation Op performed by the operator Pe during the 'non-standard' residence period Do is not a 'standard operation' (is a non-standard operation)" for the "non-standard" residence period Do extracted by the operator determination unit 120.

[0163] (Details of the speculation and judgment on the work)

[0164] As described above, the estimation unit 180 estimates the work content of "the work Op performed by the operator Pe during the stay period Do" using the associated information Mi of each work process Pr generated by the generation unit 160, and determines whether it is a "standard work (standard work)". In particular, the estimation unit 180 estimates the work content of "the work Op (m) performed by the operator Pe during the stay period Do (m)" using the determination result of "whether the action Ac (m) is an 'automated action'" generated by the machine determination unit 150, and determines whether it is a "standard work (standard work)".

[0165] The following describes in detail the process of estimating the work content of “the work Op(m) performed by the worker Pe during the stay period Do(m)” and the process of determining whether it is a standard work, which is executed by the estimation unit 180 .

[0166] (1. About the work performed at the start time of the action)

[0167] Before the "machine 40(m) used to implement the operation process Pr(m)" starts to execute the action Ac(m), it is generally necessary for the operator Pe to instruct the machine 40(m) to start the action Ac(m). That is, at the action start time Tms(m) when the machine 40(m) starts to execute the action Ac(m), the operator Pe must generally be present in the monitoring area Ar(m) associated with the operation process Pr(m).

[0168] Therefore, when the inference unit 180 confirms that "at the action start time Tms(m), an operator Pe is located in the monitoring area Ar(m)", based on the associated information Mi(m) of the operation process Pr(m) generated by the generation unit 160, it performs the following inference and judgment. That is, the inference unit 180 infers that "at the action start time Tms(m), the operator Pe has performed the start instruction operation of the action Ac(m) on the machine 40(m)". The operation Op(m) performed by the operator Pe who is located in the monitoring area Ar(m) at the action start time Tms(m) is, for example, a preparatory operation for the implementation of the operation process Pr(m), a start instruction operation such as pressing the start button, and a confirmation operation of whether the machine 40(m) has successfully started the action Ac(m). The operation of placing the workpiece into the machine 40(m) is an example of a preparatory operation for the implementation of the operation process Pr(m). These operations are "normal operations performed by the operator Pe before and after the time when the machine 40(m) used to implement the operation process Pr(m) starts to execute the action Ac(m)", and are also called "standard operations".

[0169] That is, when confirming that the residence period Do(m) during which the operator Pe is in the monitoring area Ar(m) overlaps with the action start time Tms(m), the estimation unit 180 estimates that "the operation Op(m) performed by the operator Pe during the residence period Do(m) is a start instruction operation, etc.". Furthermore, the estimation unit 180 determines that "the start instruction operation, etc. performed by the operator Pe during the residence period Do(m) overlapping with the action start time Tms(m) is a standard operation."

[0170] (2. About the work performed at the time of action completion)

[0171] After the "machine 40(m) used to implement the operation process Pr(m)" completes the execution of the action Ac(m), it is generally necessary for the operator Pe to instruct the machine 40(m) to complete the action Ac(m). That is, at the action completion time Tme(m) when the machine 40(m) completes the execution of the action Ac(m), the operator Pe must generally be present in the monitoring area Ar(m) associated with the operation process Pr(m).

[0172] Therefore, when the inference unit 180 confirms that "at the time of action completion Tme(m), the operator Pe is located in the monitoring area Ar(m)", based on the related information Mi(m) of the operation process Pr(m) generated by the generation unit 160, it performs the following inference and judgment. That is, the inference unit 180 infers that "at the time of action completion Tme(m), the operator Pe performed the completion instruction operation of the action Ac(m) on the machine 40(m)". The operation Op(m) performed by the operator Pe who is located in the monitoring area Ar(m) at the time of action completion Tme(m) is, for example, a completion instruction operation such as pressing the end button, a post-operation after the operation process Pr(m) is completed, and a confirmation operation of whether the machine 40(m) has successfully completed the action Ac(m). The recovery operation of the workpiece for which the operation process Pr(m) has been completed, that is, the workpiece for which the action Ac(m) has been completed by the machine 40(m) used to implement the operation process Pr(m) is an example of a post-operation after the completion of the operation process Pr(m). These operations are "normal operations performed by the operator Pe before and after the time when the machine 40(m) used to implement the work process Pr(m) completes the execution of action Ac(m)", and are also called "standard operations".

[0173] That is, when confirming that the residence period Do(m) during which the operator Pe is in the monitoring area Ar(m) overlaps with the action completion time Tme(m), the estimation unit 180 estimates that "the operation Op(m) performed by the operator Pe during the residence period Do(m) is a completion instruction operation, etc.". Furthermore, the estimation unit 180 determines that "the completion instruction operation, etc. performed by the operator Pe during the residence period Do(m) overlapping with the action completion time Tme(m) is a standard operation."

[0174] (3. Regarding work performed at a time when no action is being performed)

[0175] After the "machine 40(m) used to implement the work process Pr(m)" completes the "p"th execution of the action Ac(m), it is considered that the operator Pe will act as follows until the "p+1"th execution begins. That is, it is considered that the operator Pe approaches the monitoring area Ar(m), performs the arrangement work for the start of the "p+1"th execution, temporarily leaves the monitoring area Ar(m) after this work, and then returns to the monitoring area Ar(m) soon to start the "p+1"th execution.

[0176] Therefore, when the estimation unit 180 confirms that there is a retention period Do(m) from the action completion time Tme(m)(p) of the "p"-th action Ac(m) to the action start time Tms(m)(p+1) of the "p+1"-th action Ac(m) based on the related information Mi(m) of the work process Pr(m) generated by the generation unit 160, the estimation unit 180 performs the following estimation and judgment. That is, the estimation unit 180 estimates that "the operator Pe performed the arrangement work, etc. during the retention period Do(m) from the action completion time Tme(m)(p) to the action start time Tms(m)(p+1)". And the arrangement work, etc. is "a normal work performed by the operator Pe during the period from the action completion time Tme(m)(p) to the action start time Tms(m)(p+1)", so the estimation unit 180 determines that "the arrangement work, etc. is a standard work".

[0177] In other words, the estimation unit 180 performs the following estimation for a stay period Do(m) that does not overlap with the operation period Da(m) of the machine 40(m) and in which the operation period Da(m) appears within a predetermined time after the stay period Do(m) ends. That is, the estimation unit 180 estimates that "the operator Pe performed the scheduled work, etc. during this stay period Do(m)" and determines that "the work Op(m) performed by the operator Pe during this stay period Do(m) is a standard work".

[0178] (4. Regarding work performed while the action is being executed)

[0179] The estimation unit 180 estimates the content of the operation Op(m) performed by the operator Pe located in the monitoring area Ar(m) while the "machine 40(m) used to implement the operation process Pr(m)" is performing the action Ac(m), and determines whether it is a standard operation. In particular, the estimation unit 180 estimates the content of the operation Op(m) performed by the operator Pe "located in the monitoring area Ar(m) during the operation period Da(m) of the action Ac(m)" using the determination result of "whether the action Ac(m) is an 'automated action'" notified from the machine determination unit 150, and determines whether it is a standard operation.

[0180] (4-1. Obtaining the result of determination whether the action is automated)

[0181] First, the estimation unit 180 obtains the determination result of “whether the action Ac(m) executed by the machine 40(m) during the execution of the work step Pr(m) is an “automated action” from the machine determination unit 150 .

[0182] Here, the so-called "automated action" refers to an action Ac(m) performed by the machine 40(m) when the operation process Pr(m) is implemented and has the following properties. In other words, the so-called "automated action" is an action Ac(m) that "usually does not require additional work Op(m) by the operator Pe during the process of the machine 40(m) performing the action (m), that is, within the action period Da(m)".

[0183] For example, the "automated inspection action" does not usually require additional work Op(m) by the operator Pe from the time the machine 40(m) as the automatic inspection machine starts the "automated inspection action" until the "automated inspection action" is completed. That is, the "automated inspection action" does not usually require additional work Op(m) by the operator Pe from the time the execution starts until the execution is completed, that is, the additional work Op(m) by the operator Pe is not usually required during the action period Da(m) of the "automated inspection action". Therefore, the "automated inspection action" is an "automated action".

[0184] In contrast, the action Ac(m) that is "the action Ac(m) performed by the machine 40(m) when the operation process Pr(m) is implemented" and is not an "automated action" is also called a "non-automatic action" or a "manual action", that is, an "unautomated action". The so-called "unautomated action" refers to the action Ac(m) performed by the machine 40(m) when the operation process Pr(m) is implemented and has the following properties. That is, the so-called "unautomated action" refers to the action Ac(m) that is performed by the machine 40(m) during the execution of the action (m), that is, the additional work Op(m) of the operator Pe within the action period Da(m) is usually required.

[0185] For example, an "assembly assisting action" is an action Ac(m) that assists the assembly work Op(m) of the operator Pe, and the assembly work Op(m) of the operator Pe is required from the time the machine 40(m) starts the "assembly assisting action" until the "assembly assisting action" is completed. That is, the "assembly assisting action" usually requires the additional work Op(m) of the operator Pe from the start of execution to the completion of execution, that is, the additional work Op(m) of the operator Pe is usually required within the action period Da(m) of the "assembly assisting action". Therefore, the "assembly assisting action" is an "action that is not automated".

[0186] (4-2. Regarding Work Performed During Execution of Automated Actions)

[0187] When the action Ac(m) performed by the machine 40(m) during the implementation of the work process Pr(m) is an "automated action", the estimation unit 180 checks whether the action period Da(m) and the residence period Do(m) do not overlap for more than a specified time.

[0188] As described above, the action Ac(m) as an "automated action" usually does not require additional work Op(m) by the operator Pe within the "action period Da(m), so the action period Da(m) and the retention period Do(m) usually do not overlap for more than a predetermined time.

[0189] Therefore, when the estimation unit 180 confirms that the action period Da(m) and the retention period Do(m) overlap for a predetermined time or longer in the associated information Mi(m) of the work process Pr(m), it is determined that "an unusual situation occurred during the implementation of the work process Pr(m)". That is, when the estimation unit 180 confirms that the retention period Do(m) and the action period Da(m) of the action Ac(m) which is an "automated action" overlap for a predetermined time or longer, it is determined that "the work Op(m) performed by the operator Pe during the retention period Do(m) is a non-standard work".

[0190] For example, when a retention period Do(m) of a shorter time than a predetermined time is repeated during the action period Da(m) of the action Ac(m) which is an "automated action", the estimation unit 180 makes the following judgment about the work Op(m) performed by the operator Pe during the retention period Do(m). That is, the estimation unit 180 estimates that "the operator Pe is performing maintenance work or repair work on the machine 40(m)", and judges that "the work Op(m) performed by the operator Pe during the retention period Do(m) is a non-standard work".

[0191] For example, when a retention period Do(m) of a predetermined time or longer is repeated during the action period Da(m) of the action Ac(m) which is an "automated action", the estimation unit 180 makes the following judgment about the work Op(m) performed by the operator Pe during the retention period Do(m). That is, the estimation unit 180 estimates that "the operator Pe may have wasted time until the action Ac(m) which is an "automated action" is completed", and determines that "the work Op(m) performed by the operator Pe during the retention period Do(m) is a non-standard work".

[0192] (4-3. Regarding work performed during the execution of non-automated actions)

[0193] When the action Ac(m) performed by the machine 40(m) during the implementation of the work process Pr(m) is a "non-automated action", the estimation unit 180 confirms whether the action period Da(m) of the action Ac(m) always overlaps with the residence period Do(m).

[0194] As described above, action Ac(m), which is a "non-automated action", "usually requires additional work Op(m) by the operator Pe within the action period Da(m)", so the action period Da(m) usually always overlaps with the retention period Do(m).

[0195] Therefore, when the estimation unit 180 confirms that there is an action period Da(m) that does not overlap with the residence period Do(m) in the associated information Mi(m) of the operation process Pr(m), it is determined that "an unusual situation has occurred in the action period Da(m) that does not overlap with the residence period Do(m)". That is, when the estimation unit 180 confirms that there is an action period Da(m) that does not overlap with the residence period Do(m), it is determined that "the operation Op(m) performed by the operator Pe in the residence period Do(m) before and after the action period Da(m) is a non-standard operation".

[0196] For example, in the action Ac(m) which is the “non-automated action” and does not overlap with the retention period Do(m), the action Ac(m) that should be executed may be interrupted for some reason.

[0197] (5. Arrangement of speculation and judgment on the work)

[0198] As described so far, the estimation unit 180 estimates "what kind of operation Op(m) the operator Pe performed during the stay period Do(m)" using the related information Mi(m) of the operation process Pr(m). Furthermore, the estimation unit 180 determines whether the estimated operation Op(m) is a standard operation (standard operation) to be performed when the operation process Pr(m) is performed.

[0199] That is, the estimation unit 180 uses the associated information Mi(m) of the operation process Pr(m) to determine the action start time Tms(m), action completion time Tme(m), and action period Da(m) of the machine 40(m). Furthermore, the estimation unit 180 confirms whether the determined action start time Tms, action completion time Tme, and action period Da overlap with the residence period Do, and performs estimation and determination of the operation Op performed by the operator Pe within the residence period Do based on the confirmation result.

[0200] Furthermore, the estimation unit 180 obtains the content of the action Ac(m) of the machine 40(m) within the action period Da(m) from the machine determination unit 150, specifically, the determination result of whether the action Ac(m) performed by the machine 40(m) within the action period Da(m) is an "automated action". Furthermore, when it is confirmed that there is a retention period Do that is repeated for more than a prescribed time within the action period Da, the estimation unit 180 uses the content of the action Ac of the machine 40 within the action period Da to perform estimation and determination of the operation Op performed by the operator Pe during the retention period Do. That is, the estimation unit 180 uses the content of the action Ac (the determination result of whether the action Ac is an "automated action") to estimate the operation content of the operation Op within the "retention period Do that is repeated for more than a prescribed time with the action period Da" and determines whether the operation Op is a standard operation.

[0201] Here, regarding the “operation Op performed by the operator Pe during the stay period Do”, it is also possible to consider an operation Op whose content cannot be estimated and determined as a “standard operation” or a “non-standard operation” by the estimation method or determination method described above. The estimation unit 180 may determine as a “non-standard operation” an operation Op whose content cannot be determined as a “standard operation” or a “non-standard operation” by the determination method described above.

[0202] (Specific example of estimation and determination of work contents)

[0203] Figure 5 1 is a diagram showing a method in which the operator determination unit 120 uses the basic imaging data BI to determine the operator Pe and the monitoring area Ar. Figure 5 As shown, the operator determination unit 120 determines whether an operator Pe exists in each of the plurality of monitoring areas Ar corresponding to the plurality of operation steps Pr by analyzing the image of the basic shooting data BI. Furthermore, for the monitoring area Ar determined to have the operator Pe, the operator ID of the operator Pe located in the monitoring area Ar is determined.

[0204] Figure 5 In the example shown, the operator determination unit 120 performs the following determination by image analysis of the basic shooting data BI, in particular, by image analysis of the plurality of analysis target areas Aa. That is, the operator determination unit 120 determines that the operator Pe exists in the monitoring area Ar(2) and the monitoring area Ar(4) among the monitoring areas Ar(1) to Ar(5). The operator determination unit 120 further determines that the operator ID of the operator Pe located in the monitoring area Ar(2) is "operator Pe(2)", and the operator ID of the operator Pe located in the monitoring area Ar(4) is "operator Pe(1)".

[0205] Figure 6 1 is a diagram showing an example of the associated information Mi that “associates the action period Da with the stay period Do for each work step Pr” generated by the generating unit 160. The generating unit 160 generates the associated information Mi(m) using the “stay period Do(m)(x) of the operator Pe(x) with respect to the work step Pr(m)” acquired from the operator determining unit 120 and the “action period Da(m) of the action Ac(m) with respect to the work step Pr(m)” acquired from the machine determining unit 150. Figure 6 In the illustrated related information Mi(m), "the stay period Do(m) of the operator Pe regarding the work process Pr(m)" and "the action period Da(m) of the action Ac(m) regarding the work process Pr(m)" are related by sharing the time axis.

[0206] The estimation unit 180 may also distinguish whether the action Ac(m) executed during the action period Da(m) is an "automated action" and generate information associating the residence period Do(m) with the action period Da(m). As described above, by distinguishing whether the action Ac(m) is an "automated action", the estimation unit 180 can more accurately determine whether the operation Op(m) performed by the operator Pe during the residence period Do(m) is a "standard operation".

[0207] Figure 6 (A) shows an example of the result of the estimation performed by the estimation unit 180 regarding the "operation Op(m) performed by the operator Pe during the stay period Do(m)" when the action Ac(m) is an "automated action".

[0208] about Figure 6 (A), the estimation unit 180 determines that the operation Op(m) performed by the operator Pe in the retention period Do(m) overlapping with the action start time Tms(m) is a "standard operation" such as a start instruction operation. The estimation unit 180 determines that the operation Op(m) performed by the operator Pe in the retention period Do(m) overlapping with the action completion time Tme(m) is a "standard operation" such as a completion instruction operation. The estimation unit 180 determines that the operation Op(m) performed by the operator Pe in the retention period Do(m) that does not overlap with the action period Da(m) and in which the action period Da(m) appears within a specified time after the end of the retention period Do(m) is a "standard operation" such as a scheduling operation.

[0209] When a short retention period Do(m) longer than a prescribed time is repeated within the action period Da(m) of action Ac(m) which is an "automated action", the estimation unit 180 determines that "operation Op(m) is a non-standard operation such as a repair operation".

[0210] When a long retention period Do(m) of a predetermined time or longer is repeated within the action period Da(m) of action Ac(m) which is an "automated action", the estimation unit 180 determines that "operation Op(m) is a non-standard operation such as inspection waiting".

[0211] Figure 6 (B) shows an example of the result of the estimation performed by the estimation unit 180 regarding the "operation Op(m) performed by the operator Pe during the stay period Do(m)" when the action Ac(m) is a "non-automated action (i.e., manual action)". The estimation unit 180 determines that the operation Op(m) performed by the operator Pe during the stay period Do(m) that overlaps with at least one of the action start time Tms(m) and the action completion time Tme(m) is a "standard operation" such as a start instruction operation or a completion instruction operation. The estimation unit 180 determines that the operation Op(m) performed by the operator Pe during the stay period Do(m) that does not overlap with the action period Da(m) and in which the action period Da(m) appears within a specified time after the end of the stay period Do(m) is a "standard operation" such as a scheduling operation.

[0212] When it is confirmed that an interruption of the action period Da(m) of the action Ac(m) which is a "non-automated action" has occurred during the stay period Do(m), the estimation unit 180 determines that "the operation Op performed by the operator Pe during the stay period Do(m) is a non-standard operation."

[0213] Figure 7 FIG. 1 shows an example of a screen showing the correspondence between the action period Da and the residence period Do in a list format for a plurality of operation steps Pr. Figure 7 As shown in the example, for a plurality of work steps Pr, the correspondence between the action period Da and the residence period Do is displayed in a list format on, for example, an external display device ( Figure 2 By displaying the correspondence between the action period Da and the retention period Do for a plurality of operation steps Pr in a list format, the information processing device 10 enables the user to easily find the operation step Pr that becomes a bottleneck and discuss improvements.

[0214] Figure 8 1 is a diagram showing an example of a work site WS in which a plurality of monitoring areas Ar are arranged corresponding to the order of implementation of a plurality of work processes Pr. The generation unit 160 or the estimation unit 180 may also generate information indicating the movement of the operator Pe in the work site WS by image analysis of the basic imaging data BI, in particular, by image analysis of each of the plurality of analysis target areas Aa corresponding to the plurality of work processes Pr. Such information indicating the movement of the operator Pe is particularly useful for finding the work process Pr that becomes a bottleneck in the work site WS in which a plurality of monitoring areas Ar are arranged corresponding to the order of implementation of the plurality of work processes Pr and for discussing improvements.

[0215] Fig. 9 1 is a diagram showing an example of information indicating the movement history of the worker Pe in the work site WS, which is generated by the generation unit 160 through image analysis of the basic imaging data BI. Fig. 9 The user can conduct the following examination on the illustrated “information indicating the movement history of the worker Pe in the work site WS”, for example.

[0216] That is, the user confirms that the operator Pe repeatedly moves from the monitoring area Ar(6) to the monitoring area Ar(7), from the monitoring area Ar(7) to the monitoring area Ar(8), from the monitoring area Ar(8) to the monitoring area Ar(7), and from the monitoring area Ar(7) to the monitoring area Ar(6). When the monitoring area Ar(6) corresponds to the operation process Pr(6): inspection process, the user confirms that the operator Pe repeatedly moves from the monitoring area Ar(6) to the monitoring area Ar(7), from the monitoring area Ar(8) to the monitoring area Ar(7), and from the monitoring area Ar(7) to the monitoring area Ar(6). Fig. 9The exemplified “information indicating the movement of the worker Pe in the work site WS” can, for example, infer the following situation. That is, it can be inferred that the worker Pe is performing the operations Op(7) and Op(8) in the work steps Pr(7) and Pr(8) in parallel with the operation Op(6) in the inspection process, during the waiting time or the like that occurs in the inspection process or the like.

[0217] Furthermore, the user can obtain information based on the "information indicating the movement history of the worker Pe at the work site WS", such as Fig. 9 As illustrated, for example, when the same movement process is repeated, a plurality of work steps Pr constituting "one cycle" can be identified. Similarly, the user can identify the "(cycle) switching process" based on the movement process of the worker Pe between cycles.

[0218] §4. Variations

[0219] (Integrating the information processing device and PLC)

[0220] So far, if Figure 2 As shown in the figure, the example in which the information processing device 10 and the PLC 20 are connected to each other so as to be communicable via the control network 50 is described. However, the information processing device 10 and the PLC 20 are not necessarily connected via the control network 50.

[0221] For example, the information processing device 10 and the PLC 20 may be connected to each other via an internal bus so as to be communicable with each other, or the information processing device 10 and the PLC 20 may be integrated. That is, the information processing device 10 may be configured as an industrial personal computer (IPC) in which the information processing device 10 and the PLC 20 are integrated.

[0222] (Analysis of process information by PLC)

[0223] In the description so far, the machine determination process for the action result La (especially the action Ac) included in the process information is performed by the information processing device 10 that receives the process information from the PLC 20. That is, in the example described so far, the machine determination unit 150 included in the information processing device 10 performs the calculation of the action start time Tms, the action completion time Tme, and the action period Da of the action Ac based on the action result La, and determines whether the action Ac is an "automated action".

[0224] However, the machine determination processing for the action result La (especially action Ac) contained in the process information may also be performed by PLC20, and PLC20 may also include the result of the machine determination processing in the process information, or send it to the information processing device 10 instead of the process information. For example, PLC20 may include a machine determination unit 150, and the information processing device 10 obtains the result of the machine determination processing for the action result La (especially action Ac) contained in the process information from PLC20. As long as the information processing device 10 can use the result of the machine determination processing for the action result La (especially action Ac) contained in the process information to generate the associated information Mi for each operation process Pr, the information processing device 10 does not have to perform the machine determination processing for the action result La.

[0225] 〔Example of implementation using software〕

[0226] The functional blocks of the information processing device 10 (specifically, the first acquisition unit 110, the operator determination unit 120, the second acquisition unit 140, the machine determination unit 150, the generation unit 160, the display control unit 170, the estimation unit 180 and the area setting unit 190) can be implemented by a logic circuit (hardware) formed on an integrated circuit (IC chip), etc., or can be implemented by software using a central processing unit (CPU).

[0227] In the latter case, the information processing device 10 includes a CPU that executes commands of the software, i.e., the program, that realizes each function, a read-only memory (ROM) or a storage device (these are referred to as "recording medium") that records the program and various data readable by a computer (or CPU), and a random access memory (RAM) that expands the program. In addition, the program is read and executed from the recording medium by a computer (or CPU), thereby achieving the purpose of the present invention. As the recording medium, a "non-temporary tangible medium" can be used, for example, a tape, a disk, a card, a semiconductor memory, a programmable logic circuit, etc. can be used. Moreover, the program can also be provided to the computer via any transmission medium (communication network or broadcast wave, etc.) that can transmit the program. In addition, the present invention can also be implemented in the form of a data signal embedded in a carrier wave that materializes the program through electronic transmission.

[0228] (Notes)

[0229] An information processing device according to an embodiment of the present invention comprises: a first acquisition unit, which acquires shooting data obtained by using a wide-angle camera to shoot an entire work site, wherein the work site includes multiple monitoring areas respectively associated with multiple work processes; an operator determination unit, which determines whether an operator exists in each of the multiple monitoring areas by analyzing the image of the shooting data acquired by the first acquisition unit; a second acquisition unit, which acquires process information generated by an action result, wherein the action result indicates the content and result of an action performed by a machine used to implement each of the multiple work processes; a machine determination unit, which uses the process information acquired by the second acquisition unit to determine whether the machine is running; and a generation unit, which generates data that associates, for each of the multiple work processes, (A) a time period during which the machine determined by the machine determination unit to be used for the implementation of the work process is running and (B) a time period during which the operator determined by the operator determination unit to be present in the monitoring area associated with the work process.

[0230] According to the above configuration, the information processing device determines whether there is an operator in the monitoring area associated with the operation process based on the shooting data shot by the one wide-angle camera, and determines whether the machine used to implement the operation process is operating based on the process information. In addition, the information processing device generates data associating the time period determined as the operation of the machine and the time period determined as the existence of the operator in the monitoring area associated with the operation process for each operation process.

[0231] That is, the information processing device generates data representing the "correspondence between the time period when the machine is running and the time period when the operator is in the monitoring area" for each work process by analyzing the image data obtained by using a wide-angle camera to capture the entire work site.

[0232] Therefore, the information processing device has the following effect: by using a wide-angle camera that can capture the entire work site, it is possible to suppress implementation costs and grasp the correspondence between the actual actions of the machines used in the work process and the operators.

[0233] The information processing device of one embodiment of the present invention may also include: an inference unit, which uses the action results of the machine used to implement the operation process to infer the content of the operation performed by the operator during the period when the operator determination unit determines that the operator is present in the monitoring area associated with the operation process.

[0234] According to the structure, when the information processing device determines that the operator is present in the monitoring area associated with the operation process, it uses the action results of the machine used to implement the operation process to infer the content of the operation performed by the operator.

[0235] Therefore, the information processing device has an effect of being able to infer the content of the work performed by the operator in the monitoring area associated with the work process using the operation result of the machine for each of the work processes.

[0236] The information processing device of one embodiment of the present invention may also include: a display control unit, which generates data that enables a Gantt chart representing the time period during which the machine determined by the machine determination unit to be used for the implementation of the operation process is running, and a Gantt chart representing the time period during which the operator is determined by the operator determination unit to be present in the monitoring area associated with the operation process to be displayed side by side.

[0237] According to the structure, the information processing device generates a data for each of the work steps, and the data can display a Gantt chart indicating the time period determined as the machine is operating and a Gantt chart indicating the time period determined as the operator is present in the monitoring area side by side.

[0238] Therefore, the information processing device has the effect of being able to display the correspondence between the operation time of the machine and the time the operator is in the monitoring area to the manager or the like in a form that can be grasped at a glance for each of the work steps.

[0239] The information processing device of one embodiment of the present invention may further include: a region setting unit that sets an analysis target region set as an image analysis target according to a user operation for the photographing data as a region for photographing the monitoring area.

[0240] According to the above configuration, the information processing device sets the analysis target region for the captured data in accordance with a user operation. Therefore, the information processing device can set the analysis target region for the captured data in accordance with a user operation.

[0241] A control method for an information processing device according to an embodiment of the present invention comprises: a first acquisition step of acquiring photographic data obtained by photographing an entire work site using a wide-angle camera, wherein the work site includes a plurality of monitoring areas respectively associated with a plurality of work processes; an operator determination step of determining whether an operator exists in each of the plurality of monitoring areas by image analysis of the photographic data acquired in the first acquisition step; a second acquisition step of acquiring process information generated by an action result, wherein the action result indicates the content and result of an action performed by a machine used to implement each of the plurality of work processes; a machine determination step of determining whether the machine is running using the process information acquired in the second acquisition step; and a generation step of generating data that associates, for each of the plurality of work processes, (A) a time period during which the machine determined in the machine determination step to be used for the implementation of the work process is running and (B) a time period during which the operator is determined in the operator determination step to be present in the monitoring area associated with the work process.

[0242] According to the above configuration, in the information processing method, it is determined whether there is an operator in the monitoring area associated with the operation process based on the shooting data shot by the one wide-angle camera, and it is determined whether the machine used to implement the operation process is operating based on the process information. In addition, in the information processing method, for each operation process, data is generated that associates the time period determined as the operation of the machine and the time period determined as the existence of an operator in the monitoring area associated with the operation process.

[0243] That is, in the information processing method, by analyzing the image data obtained by using a wide-angle camera to capture the entire work site, data representing the "correspondence between the time period when the machine is running and the time period when the operator is in the monitoring area" for each work process is generated.

[0244] Therefore, the information processing method has the following effect: by using a wide-angle camera that can capture the entire work site, it is possible to suppress implementation costs and grasp the correspondence between the actual actions of the machines used in the work process and the operators.

[0245] The present invention is not limited to the above-described embodiments, and various modifications can be made within the scope of the claims. Embodiments obtained by appropriately combining technical components disclosed in different embodiments are also included in the technical scope of the present invention.

Claims

1. An information processing device, comprising: A first acquisition unit acquires photographing data obtained by photographing the entire operation site using a wide-angle camera, wherein the operation site includes a plurality of monitoring areas respectively associated with a plurality of operation processes; an operator determination unit that determines whether an operator exists in each of the plurality of monitoring areas by analyzing the image of the photographing data acquired by the first acquisition unit; a second acquisition unit that acquires process information generated from an action result indicating content and results of an action performed by a machine used to implement each of the plurality of work processes; a machine determination unit that uses the process information acquired by the second acquisition unit to determine whether the machine is operating; a generating unit that generates, for each of the plurality of operating steps, data that associates (A) a time period during which the machine determined by the machine determining unit to be used for the implementation of the operating step is in operation and (B) a time period during which the operator determined by the operator determining unit is present in the monitoring area associated with the operating step, The data includes, for each of the operation steps, association information between the operator's stay period in the monitoring area corresponding to the operation step and the operation period of the machine operation corresponding to the operation step; as well as The inference unit, for each of the operation steps, uses the action result of the machine used to implement the operation step to infer the content of the operation performed by the operator in the monitoring area associated with the operation step based on the associated information, wherein for each of the operation steps: The inference unit obtains from the machine determination unit a determination result of whether the action performed by the machine during the implementation of the operation process is an automated action; When the action performed by the machine during the implementation of the operation process is an automated action, the estimation unit confirms whether the action period and the retention period do not overlap for more than a predetermined time; as well as The estimation unit determines that the work performed by the operator during the stay period is a non-standard work when confirming that the action period and the stay period overlap for more than the predetermined time.

2. The information processing device according to claim 1, further comprising: The display control unit generates data capable of displaying a Gantt chart showing a time period during which the machine determined by the machine determination unit to be used for the implementation of the operation process is in operation, and a Gantt chart showing a time period during which the operator determined by the operator determination unit is present in the monitoring area associated with the operation process.

3. The information processing device according to claim 1, further comprising: The area setting unit sets an analysis target area to be set as an image analysis target according to a user operation for the imaging data as an area for imaging the monitoring area.

4. An information processing method, comprising: A first acquisition step is to acquire photographic data obtained by photographing the entire operation site using a wide-angle camera, wherein the operation site includes a plurality of monitoring areas respectively associated with a plurality of operation processes; an operator determination step of determining whether an operator exists in each of the plurality of monitoring areas by analyzing the image of the photographed data acquired in the first acquisition step; A second acquisition step of acquiring process information generated from an action result indicating the content and result of an action performed by a machine used to implement each of the plurality of work processes; a machine determination step of using the process information acquired in the second acquisition step to determine whether the machine is operating; a generating step of generating, for each of the plurality of operating steps, data associating (A) a time period during which the machine determined in the machine determining step to be used for the implementation of the operating step is in operation and (B) a time period during which the operator is determined in the operator determining step to be present in the monitoring area associated with the operating step, The data includes, for each of the operation steps, association information between the operator's stay period in the monitoring area corresponding to the operation step and the operation period of the machine operation corresponding to the operation step; as well as an inference step, for each of the operation steps, using the action result of the machine used to implement the operation step according to the associated information, to infer the content of the operation performed by the operator in the monitoring area associated with the operation step, wherein for each of the operation steps: The inference step obtains the determination result of whether the action performed by the machine during the implementation of the operation process is an automated action from the machine determination step; When the action performed by the machine during the implementation of the operation process is an automated action, the estimation step confirms whether the action period and the retention period do not overlap for more than a predetermined time; as well as In the estimation step, when it is confirmed that the action period and the stay period overlap for more than the predetermined time, it is determined that the work performed by the operator during the stay period is a non-standard work.

5. A recording medium storing an information processing program for causing a computer to function as the information processing device according to claim 1, wherein: The information processing program is for causing the computer to function as each unit.

6. A recording medium having the information processing program according to claim 5 recorded thereon and being readable by a computer.

Citation Information

Patent Citations

  • Work improvement support system and method

    JP2019023803A

  • Work management system and work management method

    CN105103068A

  • Automatic industrial equipment work scheduling method

    CN105137925A

  • Worker management device

    CN109840672A

  • Production management device, method and system

    CN1945476A