Distribution network planning method, device and terminal driven by digital twin operation
Through the distribution network planning method driven by digital twin operation, real-time data is used to optimize distribution network planning, the problem of inadaptability and economicality of planning schemes in the traditional method is solved, and the load uniformity and economicality of the distribution network is achieved. Improvement.
Patent Information
- Application Number
- CN202111102033.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-18
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-09-18
AI Technical Summary
Traditional distribution network planning methods are difficult to adapt to the complex operating scenarios of diversified distribution networks, resulting in strong inadaptability in planning schemes and difficulty in ensuring economical and reliability.
Using the distribution network planning method driven by digital twin operation, by obtaining real-time grid data, building load, line loss and economic evaluation objective functions, combining constraints, determining the best planning scheme, and optimizing line planning to improve operational balance and economicality .
It has achieved the uniformity and economical load of distribution network lines, met the demand for future load growth, and improved the operational adaptability and economicality of distribution networks.
Smart Images

Figure CN113807705B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network planning, and in particular to a distribution network planning method, device and terminal driven by digital twin operation. Background Art
[0002] With the development of economy and technology, electric energy has become an indispensable secondary energy source in people's production and life, bringing endless convenience to people's production and life. With the diversification of sources, loads and storage equipment in the power grid and their interactions, the uncertainty and randomness of distribution network operation are becoming stronger and stronger, and the operation scenarios are becoming increasingly complex.
[0003] The traditional distribution network planning model is based on historical data, with economy as the planning goal and reliability as the constraint condition for network planning. It is a single-objective planning based on historical data. Under this situation, it is difficult to determine the best planning scheme that adapts to the actual operation if the traditional distribution network planning method is applied. Therefore, the planning problem of the distribution network strongly depends on the actual operation of the distribution network. The actual operation of the distribution network needs to drive the distribution network planning to ensure the adaptability and economy of the planning scheme to the operation. Summary of the invention
[0004] The embodiments of the present invention provide a distribution network planning method, device and terminal driven by digital twin operation to solve the problem that the traditional distribution network planning method is not applicable to the current diversified distribution networks.
[0005] In a first aspect, an embodiment of the present invention provides a distribution network planning method driven by digital twin operation, including:
[0006] Obtain real-time grid data from the data layer of the digital twin distribution network;
[0007] Constructing a line planning scheme set and an operation scenario data set of the digital twin distribution network according to the real-time power grid data;
[0008] According to the line planning scheme set and the operation scenario data set, construct a load evaluation objective function, a line loss evaluation objective function, an economic evaluation objective function and constraint conditions for the operation of the digital twin distribution network;
[0009] The best planning scheme in the line planning scheme set is determined according to the load evaluation objective function, the line loss evaluation objective function, the economic evaluation objective function and the constraint conditions.
[0010] In a possible implementation, determining the best planning scheme in the line planning scheme set according to the load evaluation objective function, the line loss evaluation objective function, the economic evaluation objective function and the constraint condition includes:
[0011] According to the load evaluation objective function, the line loss evaluation objective function and the economic evaluation objective function, calculate the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function and the initial value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network;
[0012] According to the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function, the initial value of the economic evaluation objective function and the constraint conditions, calculate the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network;
[0013] The best planning scheme in the line planning scheme set is determined according to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network.
[0014] In a possible implementation, determining the best planning scheme in the line planning scheme set according to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function, and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network includes:
[0015] According to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network, calculate the average value of the load evaluation objective function, the average value of the line loss evaluation objective function and the average value of the economic evaluation objective function;
[0016] Calculate the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set according to the average value of the load evaluation objective function and the average value of the line loss evaluation objective function;
[0017] Determine, according to the evaluation value of the operation balance of the digital twin distribution network, the evaluation level of the operation balance of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set;
[0018] According to the operation balance level of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set, the planning scheme with the smallest economic evaluation objective function among the N planning schemes with the best operation balance level of the digital twin distribution network is determined as the best planning scheme.
[0019] In a possible implementation, the load evaluation objective function is:
[0020]
[0021] Among them, F1 represents the load evaluation objective function, which characterizes the balance of the line load of the digital twin distribution network, N represents the total number of lines after the digital twin distribution network adds a new line planning scheme; l represents the current line after the digital twin distribution network adds a new line planning scheme, σ l.load represents the load rate of the lth line in the digital twin distribution network, where, P l,L represents the actual transmission power of the lth line, P l,max Indicates the maximum transmission power of the lth line.
[0022] In a possible implementation, the line loss evaluation objective function is:
[0023]
[0024] Among them, F2 represents the line loss evaluation objective function, which characterizes the balance of line loss of the digital twin distribution network, σ l,loss represents the network loss rate of the lth line, ΔP l,L Represents the line loss of the lth line.
[0025] In a possible implementation, the economic evaluation objective function is:
[0026]
[0027] Among them, F3 represents the economic evaluation objective function, which characterizes the economic efficiency of the operation of the digital twin distribution network, γ represents the discount rate, and N new represents the set of newly built lines of the digital twin distribution network, m represents the current line in the newly built lines of the digital twin distribution network, C in.m represents the unit length investment cost of the mth line, C m.m represents the maintenance cost per unit length of the mth line, L m represents the length of the mth line, T represents the service life of the line, N ab represents the node set of the digital twin distribution network, C BLrepresents the unit power blocking cost between node a and node b, P ab Indicates the line power between node a and node b.
[0028] In a possible implementation, the constraints include: power flow constraints, node voltage constraints, new line quantity constraints, line load rate constraints, line line loss rate constraints, and investment cost constraints of the digital twin distribution network;
[0029] The power flow constraint condition is
[0030]
[0031] Among them, P i represents the active power injected into the middle node i of the digital twin distribution network, Q i represents the reactive power injected by the middle node i of the digital twin distribution network, U i represents the voltage at node i, U j represents the voltage of node j, j∈i represents the node j connected to node i, G ij represents the conductance of the line between node i and node j, θ ij Represents the phase difference between the voltages at nodes i and j, B ij represents the susceptance of the line between node i and node j;
[0032] The node voltage constraint condition is:
[0033] U min ≤U i ≤U max ;
[0034] Among them, U min , U max Respectively represent the voltage upper limit and lower limit of node i;
[0035] The new line quantity constraint is
[0036] 0≤m≤m max ;
[0037] Among them, m max Indicates the maximum number of newly built lines of the digital twin distribution network;
[0038] The line load factor constraint is
[0039] σ j.load.min ≤σ j.load ≤σ j.load.max ;
[0040] Among them, σ j.load.min , σ j.load.maxRespectively represent the minimum and maximum values of the load rate of the lth line in the digital twin distribution network;
[0041] The line loss rate constraint is
[0042] σ j.loss.min ≤σ j.loss ≤σ j.loss.max ;
[0043] Among them, σ j.loss.min , σ j.loss.max Respectively represent the minimum and maximum values of the line loss rate of the lth line in the digital twin distribution network;
[0044] The investment cost constraint is
[0045]
[0046] Among them, C max Represents the maximum investment cost of newly built lines of the digital twin distribution network.
[0047] In a possible implementation, calculating the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set according to the average value of the load evaluation objective function and the average value of the line loss evaluation objective function includes:
[0048] according to Calculate the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set;
[0049] Wherein, F represents the operation balance evaluation value of the digital twin distribution network corresponding to a certain planning scheme in the line planning scheme set, represents the average value of the load evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, It represents the average value of the line loss evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, and k1 and k2 represent preset coefficients respectively.
[0050] In a second aspect, an embodiment of the present invention provides a distribution network planning device driven by digital twin operation, including:
[0051] An acquisition module is used to obtain real-time power grid data from the data layer of the digital twin distribution network;
[0052] A first construction module is used to construct a line planning scheme set and an operation scenario data set of the digital twin distribution network according to the real-time power grid data;
[0053] A second construction module is used to construct a load evaluation objective function, a line loss evaluation objective function, an economic evaluation objective function and constraint conditions for the operation of the digital twin distribution network according to the line planning scheme set and the operation scenario data set;
[0054] A determination module is used to determine the best planning scheme in the line planning scheme set according to the load evaluation objective function, the line loss evaluation objective function, the economic evaluation objective function and the constraint conditions.
[0055] In the third aspect, an embodiment of the present invention provides a terminal, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the distribution network planning method driven by the digital twin operation as described in the first aspect or any possible implementation method of the first aspect are implemented.
[0056] The embodiment of the present invention provides a distribution network planning method, device and terminal driven by digital twin operation. By utilizing the characteristics of the digital twin distribution network as an accurate mirror of the physical distribution network in the digital space, real-time data is obtained from the digital twin distribution network data layer, a digital twin distribution network planning scheme set and an operation scenario data set are constructed, and a load evaluation objective function, a line loss evaluation objective function, an economic evaluation objective function and constraints for the operation of the digital twin distribution network are constructed. According to the load evaluation objective function, the line loss evaluation objective function, the economic evaluation objective function and the constraints, an evaluation result of the digital twin distribution network planning scheme is given, and the best scheme is selected. The present application drives the planning of the distribution network with the actual operation data of the digital twin distribution network, and selects the distribution network planning scheme in the real-time operation environment of the digital twin distribution network, comprehensively considering the operation balance (i.e., the load evaluation objective function and the line loss evaluation objective function) and the economy (i.e., the economic evaluation objective function), so that the digital twin distribution network lines can bear the load evenly, improve the economy of the operation of the digital twin distribution network, and meet the needs of future load growth. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0058] Figure 1 This is an application scenario diagram of the distribution network planning method driven by digital twin operation provided in an embodiment of the present invention;
[0059] Figure 2It is a flowchart for implementing the method of determining the best planning scheme in a line planning scheme set provided by an embodiment of the present invention;
[0060] Figure 3 is a flowchart for implementing the method of determining the best planning scheme in a line planning scheme set provided by another embodiment of the present invention;
[0061] Figure 4 It is a schematic diagram of a digital twin power distribution system and node numbering in a certain region provided by an embodiment of the present invention;
[0062] Figure 5 It is a structural schematic diagram of a distribution network planning device driven by digital twin operation provided in an embodiment of the present invention;
[0063] Figure 6 is a schematic diagram of a terminal provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0064] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0065] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0066] Figure 1 A flow chart of a distribution network planning method driven by digital twin operation provided in an embodiment of the present invention is described in detail as follows:
[0067] Step 101, obtaining real-time power grid data from the data layer of the digital twin distribution network.
[0068] The digital twin distribution network is a virtual digital power grid constructed based on the actual distribution network. It has the characteristic of accurate mirroring of the actual distribution network in the digital space. That is to say, all data in the data layer of the digital twin distribution network are the same as the corresponding data in the actual distribution network and are real-time. Therefore, real-time power grid data can be obtained from the data layer of the digital twin distribution network.
[0069] Optionally, the real-time power grid data may include the number of nodes in the digital twin distribution network, node numbers, the starting node numbers and ending node numbers of existing lines, impedance parameters of each line, active power and reactive power of each node load, and other data.
[0070] Step 102: construct a line planning solution set and an operation scenario data set of the digital twin distribution network based on real-time power grid data.
[0071] Optionally, in this step, the line planning scheme set of the constructed digital twin distribution network includes the starting node number, the ending node number and the number of newly created lines of each line planning scheme. It can be understood that the line planning scheme set of the constructed digital twin distribution network is to add new lines at locations where the line load on the existing digital twin distribution network is greater than the preset load to reduce the line load on the existing digital twin distribution network. The preset load here can be set according to the implementation requirements, and the value of the preset load is not limited in this embodiment.
[0072] The route planning scheme set may include multiple different route planning schemes.
[0073] Optionally, in this step, an operation scenario data set of the digital twin distribution network is constructed based on the load data of each node of the digital twin distribution network. The operation scenario data set includes the active data and reactive data of each node in the peak, valley and flat periods of the distribution network. Each period is a period in which each 24 hours is divided into peak, valley and flat periods. The operation scenario is to apply loads corresponding to different periods on the newly built lines of the digital twin distribution network, verify the carrying capacity of the newly built lines, and obtain the optimal distribution network planning scheme.
[0074] Step 103, based on the line planning scheme set and the operation scenario data set, construct the load evaluation objective function, line loss evaluation objective function, economic evaluation objective function and constraint conditions of the digital twin distribution network operation.
[0075] Optionally, the load evaluation objective function is
[0076]
[0077] Among them, F1 represents the load evaluation objective function, which characterizes the balance of the line load of the digital twin distribution network. N represents the total number of lines after the digital twin distribution network adds a new line planning scheme; l represents the current line after the digital twin distribution network adds a new line planning scheme, σ l.load represents the load rate of the lth line in the digital twin distribution network, where P l,L represents the actual transmission power of the lth line, P l,max Indicates the maximum transmission power of the lth line.
[0078] The objective function F1 represents the balance of the line load of the entire digital twin distribution network. When the load rates of each line in the digital twin distribution network are the same, that is, the loads of each line are completely balanced, F1 reaches its maximum value, which can be 1.
[0079] Optionally, the line loss evaluation objective function is
[0080]
[0081] Among them, F2 represents the line loss evaluation objective function, which characterizes the balance of line loss in the digital twin distribution network, σ l,loss represents the network loss rate of the lth line, ΔP l,L Represents the line loss of the lth line.
[0082] The objective function F2 represents the balance of the line loss of the entire digital twin distribution network. When the line loss rates of each line in the digital twin distribution network are the same, that is, the line loss of each line reaches the maximum balance, F2 reaches its maximum value, and the maximum value of F2 can be 1.
[0083] Optionally, the economic evaluation objective function is
[0084]
[0085] Among them, F3 represents the economic evaluation objective function, which characterizes the economic efficiency of the operation of the digital twin distribution network, γ represents the discount rate, and N new represents the set of newly built lines of the digital twin distribution network, m represents the current line in the newly built lines of the digital twin distribution network, C in.m represents the unit length investment cost of the mth line, C m.m represents the maintenance cost per unit length of the mth line, L m represents the length of the mth line, T represents the service life of the line, N ab represents the node set of the digital twin distribution network, C BL represents the unit power blocking cost between node a and node b, P ab Indicates the line power between node a and node b.
[0086] in, E a is the electricity price of node a in the digital twin distribution network; E b is the electricity price of node b, P max is the maximum power transmitted by the line between node a and node b.
[0087] The objective function F3 represents the economic efficiency of the entire digital twin distribution network operation. The smaller the F3 value, the better the economic efficiency of the digital twin distribution network.
[0088] Optionally, the operation of the digital twin distribution network needs to comply with certain constraints, which may include: power flow constraints of the digital twin distribution network, node voltage constraints, new line quantity constraints, line load rate constraints, line line loss rate constraints, and investment cost constraints;
[0089] The power flow constraint is
[0090]
[0091] Among them, P i represents the active power injected into the middle node i of the digital twin distribution network, Q i represents the reactive power injected into the middle node i of the digital twin distribution network, U i represents the voltage at node i, U j represents the voltage of node j, j∈i represents the node j connected to node i, G ij represents the conductance of the line between node i and node j, θ ij Represents the phase difference between the voltages at nodes i and j, B ij represents the susceptance of the line between node i and node j;
[0092] The node voltage constraints are:
[0093] U min ≤U i ≤U max ;
[0094] Among them, U min , U max Respectively represent the voltage upper limit and lower limit of node i. min , U max It can be determined based on the limit voltage of the node when the digital twin distribution network is actually running.
[0095] The number of new lines is constrained to
[0096] 0≤m≤m max ;
[0097] Among them, m max Indicates the maximum number of new lines in the digital twin distribution network;
[0098] The line load factor constraint is
[0099] σ j.load.min ≤σ j.load ≤σ j.load.max ;
[0100] Among them, σ j.load.min , σ j.load.max They respectively represent the minimum and maximum values of the load rate of the lth line in the digital twin distribution network;
[0101] The line loss rate constraint is
[0102] σ j.loss.min ≤σ j.loss ≤σ j.loss.max ;
[0103] Among them, σ j.loss.min , σ j.loss.max They respectively represent the minimum and maximum values of the line loss rate of the lth line in the digital twin distribution network;
[0104] The investment cost constraint is
[0105]
[0106] Among them, C max Represents the maximum investment cost of new lines in the digital twin distribution network.
[0107] Step 104, determining the best planning scheme in the line planning scheme set according to the load evaluation objective function, the line loss evaluation objective function, the economic evaluation objective function and the constraint conditions.
[0108] Optionally, according to the load evaluation objective function, line loss evaluation objective function, economic evaluation objective function and constraint conditions, a particle swarm algorithm is used to solve each objective function, and then the best planning scheme in the line planning scheme set is determined according to the obtained objective function values. The best planning scheme is the one with the best balance and the lowest economy of the digital twin distribution network. Here, balance refers to line load balance and line line loss balance.
[0109] In one embodiment, if Figure 2 As shown, in this step, according to the load evaluation objective function, the line loss evaluation objective function, the economic evaluation objective function and the constraint conditions, the best planning scheme in the line planning scheme set is determined, which may include:
[0110] Step 201, based on the load evaluation objective function, the line loss evaluation objective function and the economic evaluation objective function, calculate the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function and the initial value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set for different time periods on the digital twin distribution network.
[0111] Optionally, different time periods refer to dividing 24 hours a day into multiple time periods such as peak, trough and flat periods. The corresponding initial values can be calculated according to the formulas corresponding to F1, F2 and F3.
[0112] Step 202, based on the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function, the initial value of the economic evaluation objective function and the constraints, calculate the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set for different time periods on the digital twin distribution network.
[0113] When calculating the final value corresponding to each objective function, a particle algorithm can be used for calculation. The specific steps are as follows:
[0114] S1, select the objective function values F1, F2, and F3 of a certain planning scheme in the digital twin distribution network planning scheme set as particles, and their initial values are calculated according to step 201;
[0115] S2. Set the initial number of iterations K = 1 and the maximum number of iterations K max =500;
[0116] S3, calculate the value of each particle according to the formula corresponding to F1, F2, and F3 and limit it so that it satisfies the above constraints;
[0117] S4. Update the particle's velocity and position:
[0118]
[0119] Where: K is the number of iterations, x K represents the spatial position of the particle when the number of iterations is K, x K+1 represents the spatial position of the particle when the number of iterations is K+1, v K represents the velocity of the particle when the number of iterations is K, v K+1 represents the speed of the particle when the number of iterations is K+1, c1 and c2 are learning factors, with values between 0 and 4, r1 and r2 are random numbers uniformly distributed between (0, 1), ω is the inertia factor, ω min ,ω max is the minimum and maximum value of the inertia factor, pbest K is the particle’s own optimal solution at the Kth iteration, gbest K is the global optimal solution of the particle at the Kth iteration;
[0120] S5. If K>K max , then output the calculation results of each objective function, that is, the final value; otherwise, set K=K+1 and return to step S4.
[0121] Step 203, determine the best planning scheme in the line planning scheme set according to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network.
[0122] Optionally, when determining the best planning scheme in the line planning scheme set, the optimal planning scheme for the operation balance of the digital twin distribution network can be determined according to the final value of the load evaluation objective function and the final value of the line loss evaluation objective function corresponding to each planning scheme, and then the economically optimal scheme among the optimal planning schemes for the operation balance of the digital twin distribution network can be determined according to the final value of the economic evaluation objective function corresponding to each planning scheme, so as to obtain the best planning scheme in the line planning scheme set.
[0123] Optional, such as Figure 3 As shown, according to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network, the best planning scheme in the line planning scheme set is determined, which may include:
[0124] Step 301, calculate the average value of the load evaluation objective function, the average value of the line loss evaluation objective function, and the average value of the economic evaluation objective function according to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function, and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set for different time periods on the digital twin distribution network.
[0125] Optionally, in this step, each planning scheme can obtain a corresponding final value of the load evaluation objective function, a final value of the line loss evaluation objective function, and a final value of the economic evaluation objective function. For example, the final value of the load evaluation objective function corresponding to the peak period of the first planning scheme is expressed as F 1峰 The final value of the line loss evaluation objective function is expressed as F 2峰 And the final value of the economic evaluation objective function is expressed as F 3峰 ; The final value of the load evaluation objective function corresponding to the trough period is expressed as F 1谷 The final value of the line loss evaluation objective function is expressed as F 2谷 And the final value of the economic evaluation objective function is expressed as F 3谷 ; The final value of the load evaluation objective function corresponding to the flat period is expressed as F 1平 The final value of the line loss evaluation objective function is expressed as F 2平 And the final value of the economic evaluation objective function is expressed as F 3平 .
[0126] according to Calculate the average value of the load evaluation objective function, the average value of the line loss evaluation objective function, and the average value of the economic evaluation objective function. Among them, represents the average value of the load evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, represents the average value of the line loss evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, represents the average value of the economic evaluation objective function corresponding to a certain planning scheme in the line planning scheme set.
[0127] Step 302: Calculate the digital twin distribution network operation balance evaluation value corresponding to each planning scheme in the line planning scheme set according to the average value of the load evaluation objective function and the average value of the line loss evaluation objective function.
[0128] Optionally, according to Calculate the digital twin distribution network operation balance evaluation value corresponding to each planning scheme in the line planning scheme set;
[0129] Among them, F represents the digital twin distribution network operation balance evaluation value corresponding to a certain planning scheme in the line planning scheme set, represents the average value of the load evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, represents the average value of the line loss evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, and k1 and k2 respectively represent preset coefficients. For example, k1 and k2 are respectively set to 0.4 and 0.6.
[0130] Step 303: Determine the evaluation grade of the digital twin distribution network operation balance corresponding to each planning scheme in the line planning scheme set according to the digital twin distribution network operation balance evaluation value.
[0131] Optionally, in this step, the range values of F in each grade can be set according to requirements. For example, when 0.8 < F ≤ 1, the evaluation grade of the digital twin distribution network operation balance is excellent; when 0.6 < F ≤ 0.8, the evaluation grade of the digital twin distribution network operation balance is good; when 0.4 < F ≤ 0.6, the evaluation grade of the digital twin distribution network operation balance is medium; when 0 < F ≤ 0.4, the evaluation grade of the digital twin distribution network operation balance is poor.
[0132] Step 304: Determine the planning scheme with the smallest economic evaluation objective function among the N planning schemes with the optimal digital twin distribution network operation balance grade as the best planning scheme according to the digital twin distribution network operation balance grade corresponding to each planning scheme in the line planning scheme set.
[0133] Optionally, when determining the N planning schemes with the best operating balance level of the digital twin distribution network, it can be determined based on the total number of centralized planning schemes of the digital twin distribution network planning schemes.
[0134] For example, according to Among them, N represents the number of optimal planning schemes, and M represents the total number of planning schemes.
[0135] Finally, among the determined N planning schemes, the final planning scheme is selected according to the principle of minimizing the economic evaluation objective function. For example, The smallest planning scheme is the optimal planning scheme.
[0136] Optionally, the optimal planning scheme can be visualized in the display layer of the digital twin distribution network to provide technical support for grid decision-making, promote the digitization and virtualization of all elements of the grid, and realize the coordinated interaction and parallel operation of the physical and digital grids.
[0137] The above-mentioned distribution network planning method driven by digital twin operation, by utilizing the characteristics that the digital twin distribution network is an accurate mirror image of the physical distribution network in the digital space, obtains real-time data from the digital twin distribution network data layer, constructs a digital twin distribution network planning scheme set and an operation scenario data set, calculates the initial values of the distribution network operation load evaluation objective function, line loss evaluation objective function and economic evaluation objective function of each planning scheme under different operation scenarios, and then establishes constraints, and applies the particle swarm algorithm to solve and obtain the final values of the distribution network operation load evaluation objective function, line loss evaluation objective function and economic evaluation objective function of each planning scheme, and gives the evaluation results of the digital twin distribution network planning scheme accordingly, and selects the best scheme. This application drives the planning of the distribution network with the actual operation data of the digital twin distribution network, and selects the distribution network planning scheme in the real-time operation environment of the digital twin distribution network, comprehensively considering the operation balance and economy, so that the digital twin distribution network lines can bear the load evenly, improve the economy of the operation of the digital twin distribution network, and meet the needs of future load growth.
[0138] The implementation process of this solution is described below with a specific embodiment.
[0139] like Figure 4The digital twin distribution system and node numbering diagram of a certain area are shown in Figure 1. There are 33 nodes and 32 lines in the system. The base voltage is 10kV, the base capacity is 10MVA, the line construction cost is 6,000 yuan / km, the service life T is 20 years, the total investment limit of the new line is 400,000 yuan, and the discount rate γ is 0.05. The length of lines 1-2, 2-3, 3-4, 4-5, and 5-6 is 2.8km, and the length of the remaining lines is 2km. The node load data of peak, valley, and flat periods in a day are obtained from the digital twin distribution network data layer. The load peak period is: 09:00-12:00, 14:30-17:30, 19:00-22:00; the valley period is: 22:00-24:00 and 00:00-06:00; the rest are flat periods. The digital twin distribution network planning scheme set is shown in Table 1. The data in Table 1 are only sample row data.
[0140] Table 1
[0141]
[0142]
[0143] Using the distribution network planning method proposed in this application, the objective function values of each scheme during the peak, valley and flat periods of the distribution network are shown in Table 2. Determine the average values of the load evaluation objective function, line loss evaluation objective function and economic evaluation objective function of the digital twin distribution network.
[0144] As shown in Table III, among the three schemes, Scheme 1 and Scheme 2 are rated as excellent, and then Scheme 2 is selected as the final distribution network planning scheme according to the principle of minimum economic objective function.
[0145] Table 2
[0146]
[0147] Table 3
[0148]
[0149]
[0150] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0151] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.
[0152] Figure 5A schematic diagram of the structure of a distribution network planning device driven by a digital twin operation provided by an embodiment of the present invention is shown. For the sake of convenience, only the parts related to the embodiment of the present invention are shown, which are described in detail as follows:
[0153] like Figure 5 As shown, the distribution network planning device driven by digital twin operation includes: an acquisition module 501, a first construction module 502, a second construction module 503 and a determination module 504.
[0154] An acquisition module 501 is used to acquire real-time power grid data from the data layer of the digital twin distribution network;
[0155] The first construction module 502 is used to construct a line planning scheme set and an operation scenario data set of the digital twin distribution network according to real-time power grid data;
[0156] The second construction module 503 is used to construct the load evaluation objective function, line loss evaluation objective function, economic evaluation objective function and constraint conditions of the operation of the digital twin distribution network according to the line planning scheme set and the operation scenario data set;
[0157] The determination module 504 is used to determine the best planning scheme in the line planning scheme set according to the load evaluation objective function, the line loss evaluation objective function, the economic evaluation objective function and the constraint conditions.
[0158] Optionally, when the determination module 504 determines the best planning scheme in the line planning scheme set according to the load evaluation objective function, the line loss evaluation objective function, the economic evaluation objective function and the constraint conditions, it can be used to:
[0159] According to the load evaluation objective function, the line loss evaluation objective function and the economic evaluation objective function, the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function and the initial value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network are calculated;
[0160] According to the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function, the initial value of the economic evaluation objective function and the constraint conditions, the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network are calculated;
[0161] According to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network, the optimal planning scheme in the line planning scheme set is determined.
[0162] Optionally, when the determination module 504 determines the best planning scheme in the line planning scheme set according to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network, it can be used to:
[0163] According to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network, the average value of the load evaluation objective function, the average value of the line loss evaluation objective function and the average value of the economic evaluation objective function are calculated;
[0164] According to the average value of the load evaluation objective function and the average value of the line loss evaluation objective function, the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set is calculated;
[0165] According to the evaluation value of the operation balance of the digital twin distribution network, determine the evaluation level of the operation balance of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set;
[0166] According to the operation balance level of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set, the planning scheme with the smallest economic evaluation objective function among the N planning schemes with the best operation balance level of the digital twin distribution network is determined as the best planning scheme.
[0167] Optionally, the load evaluation objective function is
[0168]
[0169] Among them, F1 represents the load evaluation objective function, which characterizes the balance of the line load of the digital twin distribution network. N represents the total number of lines after the digital twin distribution network adds a new line planning scheme; l represents the current line after the digital twin distribution network adds a new line planning scheme, σ l.load represents the load rate of the lth line in the digital twin distribution network, where P l,L represents the actual transmission power of the lth line, P l,max Indicates the maximum transmission power of the lth line.
[0170] Optionally, the line loss evaluation objective function is
[0171]
[0172] Among them, F2 represents the line loss evaluation objective function, which characterizes the balance of line loss in the digital twin distribution network, σ l,loss represents the network loss rate of the lth line, ΔPl,L Represents the line loss of the lth line.
[0173] Optionally, the economic evaluation objective function is
[0174]
[0175] Among them, F3 represents the economic evaluation objective function, which characterizes the economic efficiency of the operation of the digital twin distribution network, γ represents the discount rate, and N new represents the set of newly built lines of the digital twin distribution network, m represents the current line in the newly built lines of the digital twin distribution network, C in.m represents the unit length investment cost of the mth line, C m.m represents the maintenance cost per unit length of the mth line, L m represents the length of the mth line, T represents the service life of the line, N ab represents the node set of the digital twin distribution network, C BL represents the unit power blocking cost between node a and node b, P ab Indicates the line power between node a and node b.
[0176] Optionally, the constraints include: power flow constraints of the digital twin distribution network, node voltage constraints, new line quantity constraints, line load rate constraints, line line loss rate constraints, and investment cost constraints;
[0177] The power flow constraint is
[0178]
[0179] Among them, P i represents the active power injected into the middle node i of the digital twin distribution network, Q i represents the reactive power injected into the middle node i of the digital twin distribution network, U i represents the voltage at node i, U j represents the voltage of node j, j∈i represents the node j connected to node i, G ij represents the conductance of the line between node i and node j, θ ij Represents the phase difference between the voltages at nodes i and j, B ij represents the susceptance of the line between node i and node j;
[0180] The node voltage constraints are:
[0181] U min ≤U i ≤U max ;
[0182] Among them, U min , U maxRespectively represent the voltage upper limit and lower limit of node i;
[0183] The number of new lines is constrained to
[0184] 0≤m≤m max ;
[0185] Among them, m max Indicates the maximum number of new lines in the digital twin distribution network;
[0186] The line load factor constraint is
[0187] σ j.load.min ≤σ j.load ≤σ j.load.max ;
[0188] Among them, σ j.load.min , σ j.load.max They respectively represent the minimum and maximum values of the load rate of the lth line in the digital twin distribution network;
[0189] The line loss rate constraint is
[0190] σ j.loss.min ≤σ j.loss ≤σ j.loss.max ;
[0191] Among them, σ j.loss.min , σ j.loss.max They respectively represent the minimum and maximum values of the line loss rate of the lth line in the digital twin distribution network;
[0192] The investment cost constraint is
[0193]
[0194] Among them, C max Represents the maximum investment cost of new lines in the digital twin distribution network.
[0195] Optionally, when the determination module 504 calculates the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set according to the average value of the load evaluation objective function and the average value of the line loss evaluation objective function, it can be used to:
[0196] according to Calculate the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set;
[0197] Among them, F represents the operation balance evaluation value of the digital twin distribution network corresponding to a certain planning scheme in the line planning scheme set, It represents the average value of the load evaluation objective function corresponding to a certain planning scheme in the line planning scheme set. It represents the average value of the line loss evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, and k1 and k2 represent the preset coefficients respectively.
[0198] The distribution network planning device driven by the above-mentioned digital twin operation utilizes the characteristics that the digital twin distribution network is an accurate mirror image of the physical distribution network in the digital space. The acquisition module obtains real-time data from the digital twin distribution network data layer. The first construction module constructs a set of digital twin distribution network planning schemes and operation scenario data sets. The determination module calculates the initial values of the distribution network operation load evaluation objective function, line loss evaluation objective function and economic evaluation objective function of each planning scheme under different operation scenarios, and then establishes constraints. The particle swarm algorithm is used to solve and obtain the final values of the distribution network operation load evaluation objective function, line loss evaluation objective function and economic evaluation objective function of each planning scheme. Based on this, the evaluation results of the digital twin distribution network planning scheme are given, and the best scheme is selected. This application drives the planning of the distribution network with the actual operation data of the digital twin distribution network, and selects the distribution network planning scheme in the real-time operation environment of the digital twin distribution network. It comprehensively considers the operation balance and economy, which can make the digital twin distribution network lines evenly bear the load, improve the economy of the operation of the digital twin distribution network, and meet the needs of future load growth.
[0199] Figure 6 is a schematic diagram of a terminal provided by an embodiment of the present invention. Figure 6 As shown, the terminal 6 of this embodiment includes: a processor 60, a memory 61, and a computer program 62 stored in the memory 61 and executable on the processor 60. When the processor 60 executes the computer program 62, the steps in the above-mentioned distribution network planning method embodiments driven by the operation of the digital twin are implemented, for example Figure 1 Steps 101 to 104 are shown. Or Figure 2 or Figure 3 In the steps shown, the processor 60 implements the functions of each module / unit in the above-mentioned device embodiments when executing the computer program 62, for example Figure 5 Functionality of modules / units 501 to 504 is shown.
[0200] Exemplarily, the computer program 62 may be divided into one or more modules / units, which are stored in the memory 61 and executed by the processor 60 to implement the present invention. The one or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, which are used to describe the execution process of the computer program 62 in the terminal 6. For example, the computer program 62 may be divided into Figure 5 Modules / units 501 to 504 are shown.
[0201] The terminal 6 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The terminal 6 may include, but is not limited to, a processor 60 and a memory 61. Those skilled in the art will appreciate that Figure 6 It is only an example of terminal 6 and does not constitute a limitation on terminal 6. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the terminal may also include input and output devices, network access devices, buses, etc.
[0202] The processor 60 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0203] The memory 61 may be an internal storage unit of the terminal 6, such as a hard disk or memory of the terminal 6. The memory 61 may also be an external storage device of the terminal 6, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the terminal 6. Further, the memory 61 may also include both an internal storage unit of the terminal 6 and an external storage device. The memory 61 is used to store the computer program and other programs and data required by the terminal. The memory 61 may also be used to temporarily store data that has been output or is to be output.
[0204] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0205] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0206] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0207] In the embodiments provided by the present invention, it should be understood that the disclosed devices / terminals and methods can be implemented in other ways. For example, the device / terminal embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0208] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0209] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0210] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned distribution network planning method embodiments driven by the operation of each digital twin can be implemented. Among them, the computer program includes a computer program code, and the computer program code can be in the form of source code, object code, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, a recording medium, a U disk, a mobile hard disk, a disk, an optical disk, a computer memory, a read-only memory (ROM), a random access memory (RAM), an electrical carrier signal, a telecommunication signal, and a software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practices in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practices, computer-readable media does not include electrical carrier signals and telecommunication signals.
[0211] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.
Claims
1. A distribution network planning method driven by digital twin operation, It is characterized in that include: Obtain real-time grid data from the data layer of the digital twin distribution network; Constructing a line planning scheme set and an operation scenario data set of the digital twin distribution network according to the real-time power grid data; According to the line planning scheme set and the operation scenario data set, construct a load evaluation objective function, a line loss evaluation objective function, an economic evaluation objective function and constraint conditions for the operation of the digital twin distribution network; According to the load evaluation objective function, the line loss evaluation objective function and the economic evaluation objective function, calculate the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function and the initial value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network; According to the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function, the initial value of the economic evaluation objective function and the constraint conditions, calculate the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network; According to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network, calculate the average value of the load evaluation objective function, the average value of the line loss evaluation objective function and the average value of the economic evaluation objective function; Calculate the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set according to the average value of the load evaluation objective function and the average value of the line loss evaluation objective function; Determine, according to the evaluation value of the operation balance of the digital twin distribution network, the evaluation level of the operation balance of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set; According to the operation balance level of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set, the planning scheme with the smallest economic evaluation objective function among the N planning schemes with the best operation balance level of the digital twin distribution network is determined as the best planning scheme.
2. According to the distribution network planning method driven by digital twin operation described in claim 1, It is characterized in that The load evaluation objective function is: Among them, F 1 represents the load evaluation objective function, characterizing the balance of the line load of the digital twin distribution network, N represents the total number of lines after the digital twin distribution network adds a new line planning scheme; l represents the current line after the digital twin distribution network adds a new line planning scheme, σ l.load represents the load rate of the lth line in the digital twin distribution network, where, P l,L represents the actual transmission power of the lth line, P l,max Indicates the maximum transmission power of the lth line.
3. According to the distribution network planning method driven by digital twin operation as described in claim 1, It is characterized in that The line loss evaluation objective function is: Among them, F 2 represents the line loss evaluation objective function, characterizing the line loss balance of the digital twin distribution network line, σ l,loss represents the network loss rate of the lth line, ΔP l,L Represents the line loss of the lth line.
4. According to the distribution network planning method driven by digital twin operation as described in claim 1, It is characterized in that The economic evaluation objective function is: Among them, F 3 represents the economic evaluation objective function, characterizing the economic efficiency of the digital twin distribution network operation, γ represents the discount rate, N new represents the set of newly built lines of the digital twin distribution network, m represents the current line in the newly built lines of the digital twin distribution network, C in.m represents the unit length investment cost of the mth line, C m.m represents the maintenance cost per unit length of the mth line, L m represents the length of the mth line, T represents the service life of the line, N ab represents the node set of the digital twin distribution network, C BL represents the unit power blocking cost between node a and node b, P ab Indicates the line power between node a and node b.
5. According to the distribution network planning method driven by digital twin operation as described in claim 1, It is characterized in that The constraints include: power flow constraints, node voltage constraints, new line quantity constraints, line load rate constraints, line loss rate constraints and investment cost constraints of the digital twin distribution network; The power flow constraint condition is Among them, P i represents the active power injected into the middle node i of the digital twin distribution network, Q i represents the reactive power injected into the middle node i of the digital twin distribution network, U i represents the voltage at node i, U j represents the voltage of node j, j∈i represents the node j connected to node i, G ij represents the conductance of the line between node i and node j, θ ij Represents the phase difference between the voltages at nodes i and j, B ij represents the susceptance of the line between node i and node j; The node voltage constraint condition is: IN min ≤U i ≤U max ; Among them, U min , U max Respectively represent the voltage upper limit and lower limit of node i; The number of newly built lines is constrained to be 0≤m≤m max ; Among them, m max Indicates the maximum number of newly built lines of the digital twin distribution network; The line load factor constraint is s j.load.min ≤σ j.load ≤σ j.load.max ; Among them, σ j.load.min , σ j.load.max Respectively represent the minimum and maximum values of the load rate of the lth line in the digital twin distribution network; The line loss rate constraint is s j.loss.min ≤σ j.loss ≤σ j.loss.max ; Among them, σ j.loss.min , σ j.loss.max Respectively represent the minimum and maximum values of the line loss rate of the lth line in the digital twin distribution network; The investment cost constraint is Among them, C max Represents the maximum investment cost of newly built lines of the digital twin distribution network.
6. The distribution network planning method driven by digital twin operation according to claim 1, It is characterized in that The calculating, according to the average value of the load evaluation objective function and the average value of the line loss evaluation objective function, the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set comprises: according to Calculate the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set; Wherein, F represents the operation balance evaluation value of the digital twin distribution network corresponding to a certain planning scheme in the line planning scheme set, represents the average value of the load evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, represents the average value of the line loss evaluation objective function corresponding to a certain planning scheme in the line planning scheme set, k 1 , k 2 Respectively represent preset coefficients.
7. A distribution network planning device driven by digital twin operation, It is characterized in that include: An acquisition module is used to obtain real-time power grid data from the data layer of the digital twin distribution network; A first construction module is used to construct a line planning scheme set and an operation scenario data set of the digital twin distribution network according to the real-time power grid data; A second construction module is used to construct a load evaluation objective function, a line loss evaluation objective function, an economic evaluation objective function and constraint conditions for the operation of the digital twin distribution network according to the line planning scheme set and the operation scenario data set; A determination module, configured to calculate, according to the load evaluation objective function, the line loss evaluation objective function and the economic evaluation objective function, an initial value of the load evaluation objective function, an initial value of the line loss evaluation objective function and an initial value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network; The determination module is further used to calculate the final value of the load evaluation objective function, the final value of the line loss evaluation objective function and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set in different time periods on the digital twin distribution network according to the initial value of the load evaluation objective function, the initial value of the line loss evaluation objective function, the initial value of the economic evaluation objective function and the constraint condition; The determination module is further used to calculate the average value of the load evaluation objective function, the average value of the line loss evaluation objective function, and the average value of the economic evaluation objective function according to the final value of the load evaluation objective function, the final value of the line loss evaluation objective function, and the final value of the economic evaluation objective function corresponding to each planning scheme in the line planning scheme set at different time periods on the digital twin distribution network; The determination module is further used to calculate the operation balance evaluation value of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set according to the average value of the load evaluation objective function and the average value of the line loss evaluation objective function; The determination module is further used to determine the evaluation level of the operation balance of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set according to the evaluation value of the operation balance of the digital twin distribution network; The determination module is also used to determine the planning scheme with the smallest economic evaluation objective function among the planning schemes with the best operation balance level of the digital twin distribution network according to the operation balance level of the digital twin distribution network corresponding to each planning scheme in the line planning scheme set, as the optimal planning scheme.
8. A terminal comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Distributed energy management method based on analytic hierarchy process and membership
CN105391091A
Power grid planning scheme evaluation and optimization method and system based on full-cost electricity price
CN110070221A
Active power distribution network planning method
CN110619436A
Multi-process planning comprehensive evaluation system and method based on digital twinning and deep learning
CN111695734A