Meeting scheduling method, device, equipment and storage medium
Through the automated meeting schedule method, intelligently arrange conference rooms based on project schedule information, solving the problems of waste of resources and unbalanced reservations of corporate conference rooms, and improving resource utilization and project quality.
Patent Information
- Application Number
- CN202111137116.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-27
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-09-27
AI Technical Summary
The company's conference room resources are tight, resulting in unbalanced conference room reservations and wasted resources, which affects demand communication and development progress, and the cost of manual reservations is high.
By obtaining project node information during project schedule, meeting schedules are automatically formed and updated according to the scheduled deadline, office space and number of personnel, monitoring the usage of conference rooms in real time, releasing idle resources in a timely manner, and intelligently arranging conference rooms.
Automated meeting schedules reduce human resources investment, improve the efficiency of conference rooms, ensure the progress of demand and project quality, and save the energy of project personnel.
Smart Images

Figure CN113850566B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of big data technology, and in particular relates to a conference scheduling method, device, equipment and storage medium. Background Art
[0002] The conference room resources of enterprises are relatively tight. It is often necessary to book a conference room on the conference booking platform one month in advance, sort out the requirements by yourself, and write a meeting item through Outlook to initiate a meeting invitation to the relevant stakeholders. If the meeting invitation is sent before the US document / test case document is completed, it can be sent again based on the meeting invitation after it is completed. Conference room resources are relatively tight, and many conference rooms are hard to find. Some conference rooms are often booked for a whole day, but the actual usage time is far less than a day, resulting in a serious waste of conference room resources. Demand communication is hindered because the conference room cannot be booked, and the subsequent demand development and testing progress are delayed, shortening IT time and affecting demand quality; the labor cost of conference room booking is too high. Summary of the invention
[0003] In view of the above, the present invention provides a conference scheduling method, device, equipment and storage medium, which aims to solve the technical problem in the prior art that conference room reservations cannot be effectively allocated.
[0004] To achieve the above object, the present invention provides a conference scheduling method, the method comprising:
[0005] Obtain the project node of each project in the project schedule, and extract the scheduled deadline, office space and number of personnel in the project node;
[0006] According to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration, a meeting schedule is formed for each of the projects;
[0007] When the project nodes in the meeting schedule are outdated or to be changed, the meeting schedule is re-formed.
[0008] Preferably, the forming of the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration includes:
[0009] Get the current time and the current scheduling period of the current time;
[0010] Get the start time of the next scheduling period of the current scheduling period;
[0011] Filter out the first target project node for which no meeting schedule has been set and whose scheduled deadline is in the next scheduling cycle from all the project nodes;
[0012] Sorting the first target project nodes in chronological order of the predetermined deadlines to obtain a first sorting result;
[0013] Obtain the meeting information of each conference room in the next scheduling period, the meeting information including: occupancy status, room number and office space, and the maximum number of people that the conference room can accommodate;
[0014] A meeting schedule for each of the first target project nodes is formed according to the first sorting result, the number of personnel at the first target project node, the preset meeting duration, and the meeting information of each conference room in the next scheduling period.
[0015] Preferably, the forming of the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration also includes:
[0016] If after planning the meeting schedule for all the first target project nodes, there is still a time point in the next scheduling cycle where the meeting room is not scheduled, then obtaining the start time of the next scheduling cycle of the current scheduling cycle;
[0017] Obtaining the meeting information of unscheduled time points and available conference rooms in the next scheduling period;
[0018] According to the scheduled deadline of the project node in the next scheduling cycle, the second target project node that matches the available meeting room in terms of preset deadline, office space, and number of personnel is screened out from the project nodes for which the meeting schedule has not been set in the next scheduling cycle, and the meeting schedule of the second target project node is formed.
[0019] Preferably, the forming of the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration also includes:
[0020] If after forming meeting schedules for all the first target project nodes, there are still unscheduled time points for the meeting rooms in the next scheduling cycle, then one of the meeting schedules corresponding to the first target project nodes is reserved at intervals of a second preset time.
[0021] Preferably, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the following steps are included:
[0022] After the meeting is scheduled, a meeting invitation is sent to the participants of the corresponding target project node at a third preset time before the meeting time.
[0023] Preferably, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the method further includes:
[0024] If no requirement document is obtained from the requirement inventory of the target project node, after the meeting invitation is issued, the corresponding participants are regularly reminded to upload the requirement document;
[0025] If the uploaded requirement document is received, the conference invitation is triggered to resend the requirement document to the participants.
[0026] Preferably, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the method further includes:
[0027] Monitor the access time of devices in the currently booked conference room;
[0028] If no communication signal is monitored within the fourth preset time period, a conference room use confirmation message is sent to the participants of the corresponding project node;
[0029] If the information of the unused conference room returned by the participants is received, the conference room resources are released and the conference schedule is used as an idle conference schedule.
[0030] To achieve the above object, the present invention further provides a conference scheduling device, the device comprising:
[0031] An acquisition module, used to acquire the project node of each project in the project schedule, and extract the scheduled deadline, office space and number of personnel in the project node;
[0032] A first forming module, for forming a meeting schedule for each of the projects according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration;
[0033] The second forming module is used to reform the meeting schedule when the project nodes in the meeting schedule are outdated or to be modified.
[0034] To achieve the above object, the present invention further provides an electronic device, the electronic device comprising:
[0035] at least one processor; and,
[0036] a memory communicatively connected to the at least one processor; wherein,
[0037] The memory stores a program that can be executed by the at least one processor. The program is executed by the at least one processor so that the at least one processor can execute the meeting scheduling method.
[0038] To achieve the above-mentioned purpose, the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a meeting scheduling program, and when the meeting scheduling program is executed by a processor, the steps of the meeting scheduling method are implemented.
[0039] This application can automatically schedule meetings for each project group according to the project schedule and project development progress, arrange meeting rooms and meeting times. Project personnel do not need to arrange meeting times and apply for meeting rooms by themselves, which saves the energy of project personnel and reduces the uneven or unbalanced distribution of meeting room reservations due to time conflicts. It can monitor the use of meeting rooms in real time, release occupied idle meeting rooms in a timely manner, release meeting room resources, and improve the efficiency of meeting room use. If the demand schedule changes, the demand changes can be notified to the participants in a timely manner, which is conducive to ensuring the normal progress of the demand progress, promoting project implementation, and improving project quality. Intelligent arrangement of meeting rooms frees product managers from the work of manually booking meeting rooms, saving human resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0041] Figure 1 A schematic diagram of a preferred embodiment of the electronic device of the present invention;
[0042] Figure 2 for Figure 1 A schematic diagram of the modules of a preferred embodiment of a conference scheduling device;
[0043] Figure 3 A flowchart of a preferred embodiment of the conference scheduling method of the present invention;
[0044] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0046] Reference Figure 1 FIG. 1 is a schematic diagram of a preferred embodiment of an electronic device 1 of the present invention.
[0047] The electronic device 1 includes but is not limited to: a memory 11, a processor 12, a display 13 and a network interface 14. The electronic device 1 is connected to a network through the network interface 14 to obtain raw data. The network may be a wireless or wired network such as an intranet, the Internet, a global system of mobile communication (GSM), a wideband code division multiple access (WCDMA), a 4G network, a 5G network, Bluetooth, a Wi-Fi calling network, etc.
[0048] The memory 11 includes at least one type of readable storage medium, and the readable storage medium includes flash memory, hard disk, multimedia card, card-type memory (e.g., SD or DX memory, etc.), random access memory (RAM), static random access memory (SRAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), programmable read-only memory (PROM), magnetic memory, magnetic disk, optical disk, etc. In some embodiments, the memory 11 may be an internal storage unit of the electronic device 1, such as a hard disk or memory of the electronic device 1. In other embodiments, the memory 11 may also be an external storage device of the electronic device 1, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card, etc. equipped with the electronic device 1.
[0049] Of course, the memory 11 may also include both the internal storage unit and the external storage device of the electronic device 1. In this embodiment, the memory 11 is generally used to store the operating system and various application software installed on the electronic device 1, such as the program code of the meeting scheduling program 10. In addition, the memory 11 may also be used to temporarily store various data that have been output or are to be output.
[0050] In some embodiments, the processor 12 may be a central processing unit (CPU), a controller, a microcontroller, a microprocessor, or other data processing chip. The processor 12 is generally used to control the overall operation of the electronic device 1, such as performing control and processing related to data interaction or communication. In this embodiment, the processor 12 is used to run the program code stored in the memory 11 or process data, such as running the program code of the meeting scheduling program 10.
[0051] The display 13 may be referred to as a display screen or a display unit. In some embodiments, the display 13 may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an organic light-emitting diode (OLED) touch device. The display 13 is used to display information processed in the electronic device 1 and to display a visual working interface, such as displaying the results of data statistics.
[0052] The network interface 14 may optionally include a standard wired interface, a wireless interface (such as a WI-FI interface), and the network interface 14 is generally used to establish a communication connection between the electronic device 1 and other electronic devices.
[0053] Figure 1 Only the electronic device 1 having the components 11 - 14 and the meeting scheduling program 10 is shown, but it should be understood that it is not required to implement all the components shown, and more or fewer components may be implemented instead.
[0054] Optionally, the electronic device 1 may further include a target user interface, which may include a display, an input unit such as a keyboard, and an optional target user interface may further include a standard wired interface and a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an organic light-emitting diode (OLED) touch device. The display may also be appropriately referred to as a display screen or a display unit, which is used to display information processed in the electronic device 1 and to display a visualized target user interface.
[0055] The electronic device 1 may further include a radio frequency (RF) circuit, a sensor, an audio circuit, etc., which will not be described in detail here.
[0056] In the above embodiment, the processor 12 can implement the following steps when executing the meeting scheduling program 10 stored in the memory 11:
[0057] Obtain the project node of each project in the project schedule, and extract the scheduled deadline, office space and number of personnel in the project node;
[0058] According to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration, a meeting schedule is formed for each of the projects;
[0059] When the project nodes in the meeting schedule are outdated or to be changed, the meeting schedule is re-formed.
[0060] For a detailed description of the above steps, please refer to the following Figure 2 Functional module diagram of the embodiment of the conference scheduling device 100 and Figure 3 Description of a flowchart of an embodiment of a conference scheduling method.
[0061] Reference Figure 2 , which is a functional module diagram of the conference scheduling device 100 of the present invention.
[0062] The conference scheduling device 100 of the present invention can be installed in an electronic device. According to the functions to be implemented, the conference scheduling device 100 can include: an acquisition module 110, a first formation module 120 and a second formation module 130. The module of the present invention can also be called a unit, which refers to a series of computer program segments that can be executed by a processor of an electronic device and can complete fixed functions, which are stored in the memory of the electronic device.
[0063] In this embodiment, the functions of each module / unit are as follows:
[0064] The acquisition module 110 is used to acquire the project node of each project in the project schedule, and extract the scheduled deadline, office space and number of personnel in the project node.
[0065] Specifically, there is at least one project, each project is used to achieve a certain business requirement, or some projects are part of all projects that achieve a certain business requirement. The project can be a software development project. Each software development project is equipped with responsible personnel involved in the project, such as: business personnel, product managers or project managers, technical developers, testers, etc. The project nodes include: demand stage, outline design stage, development stage, test release stage.
[0066] The demand stage is the stage in which the business personnel and product managers of the project sort out business requirements based on actual business communication. It is a project node in a project.
[0067] The outline design phase is the stage where the product manager and technical developers of the project analyze and clarify business requirements, such as planning required resources, determining functions and designing a framework. It is the next project node after the requirements phase.
[0068] The development phase is the stage where technical developers conduct detailed design, coding, and CI based on business analysis and clarification. It is the next project node after the outline design phase in a project.
[0069] The test release phase is the phase where testers conduct testing and release. This phase requires testers to check product functions with technical developers and product managers based on the test results. The test release phase can be broken down into the development handover completion phase, the review date phase, and the version date phase.
[0070] The project schedule can be specifically a project schedule table. Each project development process will have a corresponding project schedule, which stipulates the project nodes included in the corresponding project, the scheduled deadline of each project node, and may also stipulate the sub-project nodes under each project node and the scheduled deadline of each sub-project node. The scheduled deadline can be a deadline, a date range, or an intermediate date before the deadline.
[0071] Project scheduling can also include the participants and positions of each project node; the number of participants in each project node can be counted from the project scheduling.
[0072] Of course, the participants and positions of each project node can also be recorded through the project management table. The project scheduling table and the project management table are two tables. According to the project number in the project scheduling table, the corresponding project and the participants of each project node of the corresponding project can be found in the project management table, so as to count the number of people in each project node.
[0073] The first forming module 120 is used to form a meeting schedule for each of the projects according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration.
[0074] Specifically, the scheduled deadlines of project nodes of the same project are generally different, and the scheduled deadlines of project nodes of different projects may be the same, but it is unlikely that a conference room will be occupied by a project team on the same day. The meeting information includes the occupancy status of each conference room in a preset time period from now to the future, the conference room room number, the office location of the conference room (for example, office location A in Shanghai, office location B in Beijing, etc.), the maximum number of people that the conference room can accommodate, and the resource allocation of the conference room.
[0075] Since the scheduled deadline of a project node reflects the urgency of the project node to a certain extent, and the number of people involved in the project node reflects the size of the conference room required, based on this information, conference room scheduling can be performed for projects within the preset time period to arrange meeting schedules for each project or the project node corresponding to each project. That is, meeting scheduling can be achieved for the company's conference room.
[0076] The length of the meeting is generally determined by the content of the project node. The importance of different project stages and the level of responsibility of the matters discussed vary, so the length of the meeting will vary.
[0077] Meeting scheduling includes the scheduled meeting time and the meeting room occupied by the meeting.
[0078] Furthermore, the forming of a meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration includes:
[0079] Get the current time and the current scheduling period of the current time;
[0080] Get the start time of the next scheduling period of the current scheduling period;
[0081] Filter out the first target project node for which no meeting schedule has been set and whose scheduled deadline is in the next scheduling cycle from all the project nodes;
[0082] Sorting the first target project nodes in chronological order of the predetermined deadlines to obtain a first sorting result;
[0083] Obtain the meeting information of each conference room in the next scheduling period, the meeting information including: occupancy status, room number and office space, and the maximum number of people that the conference room can accommodate;
[0084] A meeting schedule for each of the first target project nodes is formed according to the first sorting result, the number of personnel at the first target project node, the preset meeting duration, and the meeting information of each conference room in the next scheduling period.
[0085] Specifically, meeting scheduling is to plan the use of meeting rooms in a preset time period in the future. You can plan the use of meeting rooms for the next month in the current month. You can also plan the use of meeting rooms every three months, or plan the use of meeting rooms for a year at a time according to project scheduling, etc., but it is not limited to this.
[0086] The principle of meeting scheduling is that the earlier the scheduled deadline, the higher the priority in arranging meeting times and booking conference rooms. Appropriate conference rooms are allocated according to the number of participants in the meeting, and the problem of a large mismatch between the number of meeting participants and the maximum number of people that the conference room can accommodate is minimized.
[0087] More specifically, the first target project nodes are divided according to the office locations of the people participating in the meeting, and the same office locations are divided into one group. The first target project nodes in the same office location are grouped according to the number of people participating in the meeting and the work locations according to the capacity of the meeting room, and finally allocated according to the first sorting result.
[0088] Furthermore, the forming of the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration also includes:
[0089] If after planning the meeting schedule for all the first target project nodes, there is still a time point in the next scheduling cycle where the meeting room is not scheduled, then obtaining the start time of the next scheduling cycle of the current scheduling cycle;
[0090] Obtaining the meeting information of unscheduled time points and available conference rooms in the next scheduling period;
[0091] According to the scheduled deadline of the project node in the next scheduling cycle, the second target project node that matches the available meeting room in terms of preset deadline, office space, and number of personnel is screened out from the project nodes for which the meeting schedule has not been set in the next scheduling cycle, and the meeting schedule of the second target project node is formed.
[0092] Specifically, in the project scheduling, there may be a period of time when project nodes are crowded and another period of time when there are few project nodes. Therefore, during the period when there are few project nodes, the conference room may not be fully scheduled. Therefore, the meetings of subsequent project nodes can be arranged in advance to make full use of the conference room resources as much as possible.
[0093] Furthermore, the forming of the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration also includes:
[0094] If after forming meeting schedules for all the first target project nodes, there are still unscheduled time points for the meeting rooms in the next scheduling cycle, then one of the meeting schedules corresponding to the first target project nodes is reserved at intervals of a second preset time.
[0095] Specifically, the reserved meeting schedule can be conveniently inserted when there is an emergency meeting, so as not to affect the entire meeting schedule.
[0096] Furthermore, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the following steps are included:
[0097] After the meeting is scheduled, a meeting invitation is sent to the participants of the corresponding target project node at a third preset time before the meeting time.
[0098] Specifically, obtain the contact information of the personnel involved in the target project node;
[0099] Read the requirements inventory of the target project node to obtain the requirement name, function point, and requirement document;
[0100] Generate meeting topics and content based on requirement names and functional points, and generate meeting attachments based on requirement documents;
[0101] A meeting invitation is generated according to the meeting theme, meeting content, meeting start time and meeting attachments, and the meeting invitation is sent to the participants of the target project node.
[0102] Meetings are usually scheduled one month or two months in advance, but there is no guarantee that the meeting schedule will not be changed in the middle. Therefore, the participants are usually notified of the meeting schedule one week or three days before the meeting time. This can avoid the interference caused by frequent changes in meeting schedules to the participants, and can also give participants a certain amount of time to fully prepare for the meeting content. At the same time, it is also convenient for participants to change the meeting time when they have objections to the meeting arrangement. In terms of time, there is enough time to improve the meeting schedule, which is more humane.
[0103] Furthermore, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the method further includes:
[0104] If no requirement document is obtained from the requirement inventory of the target project node, after the meeting invitation is issued, the corresponding participants are regularly reminded to upload the requirement document;
[0105] If the uploaded requirement document is received, the conference invitation is triggered to resend the requirement document to the participants.
[0106] Specifically, if the meeting invitation email sends regular reminders and the process is not routine, that is, if it is monitored that the attachment in 3 is not uploaded when sending the email, an email reminder will be sent to the product manager until he uploads the supplement; after the product manager uploads the US document, the meeting invitation email will be triggered to supplement the US document for clarification.
[0107] Furthermore, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the method further includes:
[0108] Monitor the access time of devices in the currently booked conference room;
[0109] If no communication signal is monitored within the fourth preset time period, a conference room use confirmation message is sent to the participants of the corresponding project node;
[0110] If the information of the unused conference room returned by the participants is received, the conference room resources are released and the conference schedule is used as an idle conference schedule.
[0111] The second forming module 130 is used to re-form the meeting schedule when there are outdated or to-be-changed project nodes in the meeting schedule.
[0112] Specifically, for outdated requirements that are waiting to be rescheduled, the status of the specific requirements on the platform can be changed to requeue, and free meeting rooms can be arranged first for meetings; the queued meetings are notified after the resources are released.
[0113] In addition, the present invention also provides a conference scheduling method. Figure 3 , which is a method flow chart of an embodiment of the conference scheduling method of the present invention. When the processor 12 of the electronic device 1 executes the conference scheduling program 10 stored in the memory 11, the conference scheduling method is implemented, including steps S101-S103.
[0114] S101, obtaining a project node of each project in the project schedule, and extracting a scheduled deadline, office space, and number of personnel in the project node.
[0115] Specifically, there is at least one project, each project is used to achieve a certain business requirement, or some projects are part of all projects that achieve a certain business requirement. The project can be a software development project. Each software development project is equipped with responsible personnel involved in the project, such as: business personnel, product managers or project managers, technical developers, testers, etc. The project nodes include: demand stage, outline design stage, development stage, test release stage.
[0116] The demand stage is the stage in which the business personnel and product managers of the project sort out business requirements based on actual business communication. It is a project node in a project.
[0117] The outline design phase is the stage where the product manager and technical developers of the project analyze and clarify business requirements, such as planning required resources, determining functions and designing a framework. It is the next project node after the requirements phase.
[0118] The development phase is the stage where technical developers conduct detailed design, coding, and CI based on business analysis and clarification. It is the next project node after the outline design phase in a project.
[0119] The test release phase is the phase where testers conduct testing and release. This phase requires testers to check product functions with technical developers and product managers based on the test results. The test release phase can be broken down into the development handover completion phase, the review date phase, and the version date phase.
[0120] The project schedule can be specifically a project schedule table. Each project development process will have a corresponding project schedule, which stipulates the project nodes included in the corresponding project, the scheduled deadline of each project node, and may also stipulate the sub-project nodes under each project node and the scheduled deadline of each sub-project node. The scheduled deadline can be a deadline, a date range, or an intermediate date before the deadline.
[0121] Project scheduling can also include the participants and positions of each project node; the number of participants in each project node can be counted from the project scheduling.
[0122] Of course, the participants and positions of each project node can also be recorded through the project management table. The project scheduling table and the project management table are two tables. According to the project number in the project scheduling table, the corresponding project and the participants of each project node of the corresponding project can be found in the project management table, so as to count the number of people in each project node.
[0123] S102, forming a meeting schedule for each of the projects according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration.
[0124] Specifically, the scheduled deadlines of project nodes of the same project are generally different, and the scheduled deadlines of project nodes of different projects may be the same, but it is unlikely that a conference room will be occupied by a project team on the same day. The meeting information includes the occupancy status of each conference room in a preset time period from now to the future, the conference room room number, the office location of the conference room (for example, office location A in Shanghai, office location B in Beijing, etc.), the maximum number of people that the conference room can accommodate, and the resource allocation of the conference room.
[0125] Since the scheduled deadline of a project node reflects the urgency of the project node to a certain extent, and the number of people involved in the project node reflects the size of the conference room required, based on this information, conference room scheduling can be performed for projects within the preset time period to arrange meeting schedules for each project or the project node corresponding to each project. That is, meeting scheduling can be achieved for the company's conference room.
[0126] The duration of the meeting is generally based on the project schedule.
[0127] The meeting time is determined by the content of the meeting. The importance of different project stages and the level of responsibility of the matters discussed are different, so the meeting time will be different.
[0128] Meeting scheduling includes the scheduled meeting time and the meeting room occupied by the meeting.
[0129] Furthermore, the forming of a meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration includes:
[0130] Get the current time and the current scheduling period of the current time;
[0131] Get the start time of the next scheduling period of the current scheduling period;
[0132] Filter out the first target project node for which no meeting schedule has been set and whose scheduled deadline is in the next scheduling cycle from all the project nodes;
[0133] Sorting the first target project nodes in chronological order of the predetermined deadlines to obtain a first sorting result;
[0134] Obtain the meeting information of each conference room in the next scheduling period, the meeting information including: occupancy status, room number and office space, and the maximum number of people that the conference room can accommodate;
[0135] A meeting schedule for each of the first target project nodes is formed according to the first sorting result, the number of personnel at the first target project node, the preset meeting duration, and the meeting information of each conference room in the next scheduling period.
[0136] Specifically, meeting scheduling is to plan the use of meeting rooms in a preset time period in the future. You can plan the use of meeting rooms for the next month in the current month. You can also plan the use of meeting rooms every three months, or plan the use of meeting rooms for a year at a time according to project scheduling, etc., but it is not limited to this.
[0137] The principle of meeting scheduling is that the earlier the scheduled deadline, the higher the priority in arranging meeting times and booking conference rooms. Appropriate conference rooms are allocated according to the number of participants in the meeting, and the problem of a large mismatch between the number of meeting participants and the maximum number of people that the conference room can accommodate is minimized.
[0138] More specifically, the first target project nodes are divided according to the office locations of the people participating in the meeting, and the same office locations are divided into one group. The first target project nodes in the same office location are grouped according to the number of people participating in the meeting and the work locations according to the capacity of the meeting room, and finally allocated according to the first sorting result.
[0139] Furthermore, the forming of the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration also includes:
[0140] If after planning the meeting schedule for all the first target project nodes, there is still a time point in the next scheduling cycle where the meeting room is not scheduled, then obtaining the start time of the next scheduling cycle of the current scheduling cycle;
[0141] Obtaining the meeting information of unscheduled time points and available conference rooms in the next scheduling period;
[0142] According to the scheduled deadline of the project node in the next scheduling cycle, the second target project node that matches the available meeting room in terms of preset deadline, office space, and number of personnel is screened out from the project nodes for which the meeting schedule has not been set in the next scheduling cycle, and the meeting schedule of the second target project node is formed.
[0143] Specifically, in the project scheduling, there may be a period of time when project nodes are crowded and another period of time when there are few project nodes. Therefore, during the period when there are few project nodes, the conference room may not be fully scheduled. Therefore, the meetings of subsequent project nodes can be arranged in advance to make full use of the conference room resources as much as possible.
[0144] Furthermore, the forming of the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration also includes:
[0145] If after forming meeting schedules for all the first target project nodes, there are still unscheduled time points for the meeting rooms in the next scheduling cycle, then one of the meeting schedules corresponding to the first target project nodes is reserved at intervals of a second preset time.
[0146] Specifically, the reserved meeting schedule can be conveniently inserted when there is an emergency meeting, so as not to affect the entire meeting schedule.
[0147] Furthermore, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the following steps are included:
[0148] After the meeting is scheduled, a meeting invitation is sent to the participants of the corresponding target project node at a third preset time before the meeting time.
[0149] Specifically, obtain the contact information of the personnel involved in the target project node;
[0150] Read the requirements inventory of the target project node to obtain the requirement name, function point, and requirement document;
[0151] Generate meeting topics and content based on requirement names and functional points, and generate meeting attachments based on requirement documents;
[0152] A meeting invitation is generated according to the meeting theme, meeting content, meeting start time and meeting attachments, and the meeting invitation is sent to the participants of the target project node.
[0153] Meetings are usually scheduled one month or two months in advance, but there is no guarantee that the meeting schedule will not be changed in the middle. Therefore, the participants are usually notified of the meeting schedule one week or three days before the meeting time. This can avoid the interference caused by frequent changes in meeting schedules to the participants, and can also give participants a certain amount of time to fully prepare for the meeting content. At the same time, it is also convenient for participants to change the meeting time when they have objections to the meeting arrangement. In terms of time, there is enough time to improve the meeting schedule, which is more humane.
[0154] Furthermore, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the method further includes:
[0155] If no requirement document is obtained from the requirement inventory of the target project node, after the meeting invitation is issued, the corresponding participants are regularly reminded to upload the requirement document;
[0156] If the uploaded requirement document is received, the conference invitation is triggered to resend the requirement document to the participants.
[0157] Specifically, if the meeting invitation email sends regular reminders and the process is not routine, that is, if it is monitored that the attachment in 3 is not uploaded when sending the email, an email reminder will be sent to the product manager until he uploads the supplement; after the product manager uploads the US document, the meeting invitation email will be triggered to supplement the US document for clarification.
[0158] Furthermore, after forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the method further includes:
[0159] Monitor the access time of devices in the currently booked conference room;
[0160] If no communication signal is monitored within the fourth preset time period, a conference room use confirmation message is sent to the participants of the corresponding project node;
[0161] If the information of the unused conference room returned by the participants is received, the conference room resources are released and the conference schedule is used as an idle conference schedule.
[0162] S103, when the project nodes in the meeting schedule are outdated or to be changed, re-forming the meeting schedule.
[0163] Specifically, for outdated requirements that are waiting to be rescheduled, the status of the specific requirements on the platform can be changed to requeue, and free meeting rooms can be arranged first for meetings; the queued meetings are notified after the resources are released.
[0164] This application can automatically schedule meetings for each project group according to the project schedule and project development progress, arrange meeting rooms and meeting times. Project personnel do not need to arrange meeting times and apply for meeting rooms by themselves, which saves the energy of project personnel and reduces the uneven or unbalanced distribution of meeting room reservations due to time conflicts. It can monitor the use of meeting rooms in real time, release occupied idle meeting rooms in a timely manner, release meeting room resources, and improve the efficiency of meeting room use. If the demand schedule changes, the demand changes can be notified to the participants in a timely manner, which is conducive to ensuring the normal progress of the demand progress, promoting project implementation, and improving project quality. Intelligent arrangement of meeting rooms frees product managers from the work of manually booking meeting rooms, saving human resources.
[0165] In addition, the embodiment of the present invention further proposes a computer-readable storage medium, which may be any one or any combination of a hard disk, a multimedia card, an SD card, a flash memory card, an SMC, a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a portable compact disk read-only memory (CD-ROM), a USB memory, etc. The computer-readable storage medium includes a data storage area and a program storage area, the data storage area stores data created according to the use of the blockchain node, and the program storage area stores a meeting scheduling program 10, and when the meeting scheduling program 10 is executed by the processor, the above-mentioned meeting scheduling method operation is implemented.
[0166] In another embodiment, the meeting scheduling method provided by the present invention can further ensure the privacy and security of all the above data, and all the above data can also be stored in a node of a blockchain.
[0167] It should be noted that the blockchain referred to in the present invention is a new application model of computer technologies such as distributed data storage, peer-to-peer transmission, consensus mechanism, encryption algorithm, etc. Blockchain is essentially a decentralized database, a string of data blocks generated by cryptographic methods. Each data block contains a batch of network transaction information, which is used to verify the validity of its information (anti-counterfeiting) and generate the next block. Blockchain can include the blockchain underlying platform, platform product service layer, and application service layer.
[0168] The specific implementation of the computer-readable storage medium of the present invention is substantially the same as the specific implementation of the above-mentioned conference scheduling method, and will not be described in detail herein.
[0169] It should be noted that the serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages and disadvantages of the embodiments. And the terms "including", "comprising" or any other variants thereof herein are intended to cover non-exclusive inclusion, so that a process, device, article or method including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, device, article or method. In the absence of further restrictions, an element defined by the sentence "including a ..." does not exclude the existence of other identical elements in the process, device, article or method including the element.
[0170] It should be noted that the above embodiments of the present invention can acquire and process relevant data based on artificial intelligence technology. Artificial Intelligence (AI) is the theory, method, technology and application system that uses digital computers or machines controlled by digital computers to simulate, extend and expand human intelligence, perceive the environment, acquire knowledge and use knowledge to obtain the best results.
[0171] AI basic technologies generally include sensors, dedicated AI chips, cloud computing, distributed storage, big data processing technology, operation / interaction systems, mechatronics, etc. AI software technologies mainly include computer vision technology, robotics technology, biometrics technology, speech processing technology, natural language processing technology, and machine learning / deep learning.
[0172] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes a number of instructions for enabling an electronic device (which can be a mobile phone, a computer, an electronic device, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0173] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A conference scheduling method, characterized in that: The method comprises: Obtaining the project nodes of each project in the project schedule, and extracting the scheduled deadline, office space and number of personnel in the project node; wherein the project schedule is a project schedule table, including the project nodes of the project, the scheduled deadline of the project node, and the participants of the project node; According to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration, a meeting schedule is formed for each of the projects; When the project nodes in the meeting schedule are outdated or to be changed, the meeting schedule is re-formed; The forming of a meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration includes: Get the current time and the current scheduling period of the current time; Get the start time of the next scheduling period of the current scheduling period; Filter out the first target project node for which no meeting schedule has been set and whose scheduled deadline is in the next scheduling cycle from all the project nodes; Sorting the first target project nodes in chronological order of the predetermined deadlines to obtain a first sorting result; Obtain the meeting information of each conference room in the next scheduling period, the meeting information including: occupancy status, room number and office space, and the maximum number of people that the conference room can accommodate; Forming a meeting schedule for each of the first target project nodes according to the first sorting result, the number of personnel at the first target project node, the preset meeting duration, and the meeting information of each conference room in the next scheduling period; The step of forming a meeting schedule for each project based on the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration may further include: If after planning the meeting schedule for all the first target project nodes, there is still a time point in the next scheduling cycle where the meeting room is not scheduled, then obtaining the start time of the next scheduling cycle of the current scheduling cycle; Obtaining the meeting information of unscheduled time points and available conference rooms in the next scheduling period; According to the scheduled deadline of the project node in the next scheduling cycle, the second target project node that matches the available meeting room in terms of preset deadline, office space, and number of personnel is screened out from the project nodes for which the meeting schedule has not been set in the next scheduling cycle, and the meeting schedule of the second target project node is formed.
2. The conference scheduling method according to claim 1, characterized in that: The step of forming a meeting schedule for each project based on the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration may further include: If after forming meeting schedules for all the first target project nodes, there are still unscheduled time points for the meeting rooms in the next scheduling cycle, then one of the meeting schedules corresponding to the first target project nodes is reserved at intervals of a second preset time.
3. The conference scheduling method according to claim 1, characterized in that: After forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the following steps are included: After the meeting is scheduled, a meeting invitation is sent to the participants of the corresponding target project node at a third preset time before the meeting time.
4. The conference scheduling method according to claim 3, characterized in that: After forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the method further includes: If no requirement document is obtained from the requirement inventory of the target project node, after the meeting invitation is issued, the corresponding participants are regularly reminded to upload the requirement document; If the uploaded requirement document is received, the conference invitation is triggered to resend the requirement document to the participants.
5. The conference scheduling method according to claim 1, characterized in that: After forming the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration, the method further includes: Monitor the access time of devices in the currently booked conference room; If no communication signal is monitored within the fourth preset time period, a conference room use confirmation message is sent to the participants of the corresponding project node; If the information of the unused conference room returned by the participants is received, the conference room resources are released and the conference schedule is used as an idle conference schedule.
6. A conference scheduling device, characterized in that: The device comprises: An acquisition module is used to acquire the project nodes of each project in the project schedule, and extract the scheduled deadline, office space and number of personnel in the project node; wherein the project schedule is a project schedule table, including the project nodes of the project, the scheduled deadline of the project node, and the participants of the project node; A first forming module, used to form a meeting schedule for each of the projects according to the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration; The second forming module is used to re-form the meeting schedule when the project nodes in the meeting schedule are outdated or to be changed; The forming of the meeting schedule for each project according to the meeting information, the scheduled deadline, the office space, the number of personnel and the preset meeting duration includes: Get the current time and the current scheduling period of the current time; Get the start time of the next scheduling period of the current scheduling period; Filter out the first target project node for which no meeting schedule has been set and whose scheduled deadline is in the next scheduling cycle from all the project nodes; Sorting the first target project nodes in chronological order of the predetermined deadlines to obtain a first sorting result; Obtain the meeting information of each conference room in the next scheduling period, the meeting information including: occupancy status, room number and office space, and the maximum number of people that the conference room can accommodate; Forming a meeting schedule for each of the first target project nodes according to the first sorting result, the number of personnel at the first target project node, the preset meeting duration, and the meeting information of each conference room in the next scheduling period; The step of forming a meeting schedule for each project based on the meeting information, the scheduled deadline, the office space, the number of personnel, and the preset meeting duration may further include: If after planning the meeting schedule for all the first target project nodes, there is still a time point in the next scheduling cycle where the meeting room is not scheduled, then obtaining the start time of the next scheduling cycle of the current scheduling cycle; Obtaining the meeting information of unscheduled time points and available conference rooms in the next scheduling period; According to the scheduled deadline of the project node in the next scheduling cycle, the second target project node that matches the available meeting room in terms of preset deadline, office space, and number of personnel is screened out from the project nodes for which the meeting schedule has not been set in the next scheduling cycle, and the meeting schedule of the second target project node is formed.
7. An electronic device, characterized in that: The electronic device comprises: at least one processor; and, a memory communicatively connected to the at least one processor; wherein, The memory stores a program executable by the at least one processor, and the program is executed by the at least one processor so that the at least one processor can execute the conference scheduling method according to any one of claims 1 to 5.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a meeting scheduling program, and when the meeting scheduling program is executed by a processor, the steps of the meeting scheduling method according to any one of claims 1 to 5 are implemented.