Oil well productivity prediction method, device, electronic equipment and computer storage medium

By establishing a mathematical model of seepage and dimensionless analysis, and deriving a set of finite element integral equations, the problem of oil well productivity prediction in the existing technology being difficult to accurately reflect actual production has been solved, and accurate productivity prediction of reservoir contaminated areas and contaminated areas have been achieved. An objective reflection of the relationship.

CN113887110BActive Publication Date: 2024-10-15CHINA OILFIELD SERVICES LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111219918.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-20
Publication Date
2024-10-15
Estimated Expiration
2041-10-20

AI Technical Summary

Technical Problem

Existing oil well productivity prediction methods are difficult to accurately reflect the actual production in oil field development, especially when the boundaries of reservoir contaminated areas are irregular, and cannot effectively reflect the relationship between contaminated areas and non-contaminated areas.

Method used

By establishing a seepage mathematical model and performing dimensionless analysis, we determine the dimensionless pressure in the contaminated and non-polluted areas, and derive a set of finite element integral equations to predict the elastic production when the reservoir is subject to different degrees of pollution during the oilfield development process.

Benefits of technology

It achieves accurate calculation of oil well productivity when the boundaries of reservoir contaminated areas are irregular, which is closer to the actual situation of the formation, objectively reflects the relationship between contaminated areas and uncontaminated areas, and improves the accuracy of production prediction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113887110B_ABST
    Figure CN113887110B_ABST
Patent Text Reader

Abstract

The present invention discloses a method, device, electronic device and computer storage medium for predicting oil well productivity. The method includes: determining a mathematical model of seepage including polluted areas and non-polluted areas according to the pollution degree of the reservoir in the oil field development; performing dimensionless analysis on the mathematical model of seepage to determine the dimensionless pressure of each position point in the polluted area and the non-polluted area; deriving the mathematical model of seepage according to the dimensionless pressure of each position point to determine a finite element integral equation group; predicting the elastic production of the reservoir under different pollution degrees during the oil field development process according to the finite element integral equation group. This scheme can accurately calculate the oil well productivity when the boundary of the polluted area of ​​the reservoir is irregular by performing dimensionless analysis on the mathematical model of seepage in the polluted area and the non-polluted area to determine the finite element integral equation group, which is closer to the actual situation of the formation and objectively reflects the relationship between the polluted area and the non-polluted area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of oil well productivity prediction, and in particular to an oil well productivity prediction method, device, electronic equipment and computer storage medium. Background Art

[0002] Well dynamic analysis mainly includes transient pressure response (TPR) and production decline analysis (RDA), which has a research history of more than 30 years. Scholars have proposed a variety of horizontal well models to draw typical curves. At the same time, a large number of simplified formulas that can be used for field applications have been derived. In 1973, Gringarten and Ramey introduced source functions and Green's functions into petroleum literature. This oil well productivity prediction method has a strong advantage in solving non-steady flow problems such as horizontal wells.

[0003] After that, a number of studies were conducted to analyze the dynamic analysis of horizontal wells. In traditional methods, horizontal wells are usually simplified as line sources; then, Ezulike and Igbokoyi studied the method of using finite radius as rod source, making it more suitable for the dynamic analysis of horizontal wells. Ozkan and Raghavan proposed a new source function method to study the unstable pressure characteristics of horizontal wells in dual-zone composite reservoirs, which has been one of the main solution methods in the field of dynamic analysis.

[0004] In foreign countries, Chen et al. gave point source solutions and line source solutions for the contaminated and non-contaminated areas of composite reservoirs, and on this basis, gave the pressure dynamics of horizontal wells in composite reservoirs. Ambastha et al. proposed a model for simulating heavy oil steam injection thermal recovery using rectangular composite reservoirs, and used numerical methods to analyze the pressure dynamics of horizontal wells when they were completely in the contaminated area of ​​rectangular composite reservoirs, demonstrating that when the storage ratio and mobility ratio of the non-contaminated area are large, a quasi-steady-state stage reflecting the boundary of the contaminated area will appear.

[0005] Domestically, Wang Xiaodong et al. used the confluence superposition method to give the pressure dynamic characteristics of horizontal wells completely in the contaminated area of ​​composite reservoirs under different boundary conditions and drew typical curves. Shi Guoxin et al. used Laplace transform, separation of variables method, characteristic function and eigenvalue method to study the unstable well test problem of dual-zone composite reservoirs, gave the bottom hole pressure solution under different boundary conditions, and analyzed the examples.

[0006] However, the above methods cannot well reflect the actual output of oil field development. Summary of the invention

[0007] In view of the above problems, the present invention is proposed to provide an oil well productivity prediction method, device, electronic device and computer storage medium that overcome the above problems or at least partially solve the above problems.

[0008] According to one aspect of the present invention, there is provided a method for predicting oil well productivity, comprising:

[0009] Determine the mathematical model of seepage flow including polluted areas and non-polluted areas according to the pollution degree of the reservoir in the oil field development;

[0010] Performing dimensionless analysis on the seepage mathematical model to determine the dimensionless pressure at each location point in the contaminated area and the non-contaminated area;

[0011] Derivation of the seepage mathematical model according to the dimensionless pressure at each position point to determine a finite element integral equation group;

[0012] The elastic production of the reservoir when it is subjected to different pollution degrees during the oil field development process is predicted according to the finite element integral equation group.

[0013] According to another aspect of the present invention, there is provided an oil well productivity prediction device, comprising:

[0014] A seepage mathematical model determination module, used to determine the seepage mathematical model including the polluted area and the non-polluted area according to the pollution degree of the reservoir in the oil field development;

[0015] A dimensionless analysis module, used for performing dimensionless analysis on the seepage mathematical model to determine the dimensionless pressure at each position point in the contaminated area and the non-contaminated area;

[0016] An equation derivation module, used to derive the seepage mathematical model according to the dimensionless pressure at each position point to determine a finite element integral equation group;

[0017] The production prediction module is used to predict the elastic production of the reservoir when it is polluted to different degrees during the oil field development process according to the finite element integral equation group.

[0018] According to another aspect of the present invention, there is provided an electronic device, comprising: a processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface communicate with each other via the communication bus;

[0019] The memory is used to store at least one executable instruction, and the executable instruction enables the processor to execute operations corresponding to the oil well productivity prediction method described in the present invention.

[0020] According to another aspect of the present invention, a computer storage medium is provided, wherein the storage medium stores at least one executable instruction, and the executable instruction enables a processor to execute operations corresponding to the oil well productivity prediction method described in the present invention.

[0021] According to the oil well productivity prediction method, electronic device and computer storage medium disclosed in the present invention, by performing dimensionless analysis on the seepage mathematical models of the polluted area and the non-polluted area, a finite element integral equation group is determined, and the elastic production of the reservoir when it is polluted to different degrees during the oil field development process is predicted based on the finite element integral equation group. The oil well productivity can be accurately calculated when the boundary of the reservoir polluted area is irregular, which is closer to the actual situation of the formation and objectively reflects the relationship between the polluted area and the non-polluted area.

[0022] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0024] Figure 1 A schematic diagram of a process of predicting oil well productivity according to the first embodiment of the present invention is shown;

[0025] Figure 2 A schematic diagram of a vertical well contamination area in an oil well productivity prediction method provided according to the first embodiment of the present invention is shown;

[0026] Figure 3 A schematic diagram showing a horizontal well completely in a contaminated area in a method for predicting oil well productivity provided by Embodiment 1 of the present invention is shown;

[0027] Figure 4 A schematic diagram showing a horizontal well passing through a contaminated area in a method for predicting oil well productivity provided in accordance with the first embodiment of the present invention is shown;

[0028] Figure 5 A schematic diagram of a process of predicting oil well productivity according to a second embodiment of the present invention is shown;

[0029] Figure 6 It shows a front view of the radial flow state of a vertical well in a contaminated area in a method for predicting oil well productivity provided by the second embodiment of the present invention;

[0030] Figure 7 A top view of the radial flow state of a vertical well in a contaminated area in an oil well productivity prediction method provided according to the second embodiment of the present invention is shown;

[0031] Figure 8 A top view of the radial flow state of a vertical well in a non-contaminated area in an oil well productivity prediction method provided according to the second embodiment of the present invention is shown;

[0032] Fig. 9 A schematic diagram showing the influence of the radius of the vertical well contamination zone in an oil well productivity prediction method provided in accordance with the second embodiment of the present invention is shown;

[0033] Fig.10 A schematic diagram showing the influence of the permeability of the contaminated area of ​​a vertical well in an oil well productivity prediction method provided in accordance with the second embodiment of the present invention is shown;

[0034] Fig.11 A schematic flow chart of a method for predicting oil well productivity according to Embodiment 3 of the present invention is shown;

[0035] Fig.12 It shows a front view of the radial flow state when the horizontal well is completely in the contaminated area in a method for predicting oil well productivity provided by the third embodiment of the present invention;

[0036] Fig.13 A top view of a radial flow state when a horizontal well is completely in a contaminated area in an oil well productivity prediction method provided according to Embodiment 3 of the present invention is shown;

[0037] Fig.14 A top view of a radial flow state when a horizontal well is completely in a contaminated area in an oil well productivity prediction method provided according to Embodiment 3 of the present invention is shown;

[0038] Fig.15 A schematic diagram showing the influence of the radius of the contaminated area in a method for predicting oil well productivity provided by Embodiment 3 of the present invention when a horizontal well is completely in the contaminated area is shown;

[0039] Fig.16 A schematic diagram showing the influence of the permeability of the contaminated area in a method for predicting oil well productivity provided by Embodiment 3 of the present invention when the horizontal well is completely in the contaminated area is shown;

[0040] Fig.17 A schematic flow chart of a method for predicting oil well productivity provided according to a fourth embodiment of the present invention is shown.

[0041] Fig.18 A front view showing a radial flow state when a horizontal well passes through a contaminated area in an oil well productivity prediction method provided according to a fourth embodiment of the present invention;

[0042] Fig.19 A top view of a radial flow state when a horizontal well passes through a contaminated area in an oil well productivity prediction method provided according to a fourth embodiment of the present invention is shown;

[0043] Fig. 20 A schematic diagram showing the influence of the radius of a contaminated area when a horizontal well passes through a contaminated area in a method for predicting oil well productivity provided by a fourth embodiment of the present invention is shown;

[0044] Fig.21 A schematic diagram showing the influence of the permeability of a contaminated area when a horizontal well passes through a contaminated area in a method for predicting oil well productivity provided by a fourth embodiment of the present invention is shown;

[0045] Fig. 22 It shows a schematic structural diagram of an oil well productivity prediction device provided according to a fifth embodiment of the present invention;

[0046] Fig.23 A schematic structural diagram of an electronic device provided according to Embodiment 7 of the present invention is shown. DETAILED DESCRIPTION

[0047] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to enable the scope of the present invention to be fully communicated to those skilled in the art.

[0048] Embodiment 1

[0049] Figure 1 FIG. 1 is a flow chart of a method for predicting oil well productivity according to Embodiment 1 of the present invention. Figure 1 As shown, the method includes:

[0050] Step S11, determining a mathematical seepage model including polluted areas and non-polluted areas according to the pollution degree of the reservoir in the oil field development.

[0051] Among them, the pollution degree includes the permeability of the pollution area, the damage range of the pollution area, etc. Specifically, by analyzing the pollution degree of the reservoir in the oil field development, the damage range of the reservoir pollution area, i.e., the radius, can be determined, and the pollution area and the non-pollution area can be characterized, and the mathematical model of seepage of vertical wells and horizontal wells in the dual-zone composite oil reservoir considering the pollution area and the non-pollution area of ​​the reservoir can be established.

[0052] The contaminated area and the non-contaminated area have different reservoir properties. Before establishing the mathematical model of seepage, the following assumptions are made: (1) A circular non-contaminated area reservoir is infinite, and the radius of the contaminated area is r1; (2) The reservoir is horizontally distributed, with uniform thickness h and uniform original pressure Pi; (3) For the contaminated area, the horizontal permeability is k h1 , the vertical permeability is k v1 , pressure coefficient is c t1 and porosity φ1 ; For the non-polluted area, they are k h2 , k v2 、c t2 ,φ 2 ; (4) Ignore the influence of gravity and capillary force, and consider the wellbore storage effect and formation damage. Based on the above assumptions, the flow equations for the contaminated area and the non-contaminated area are established respectively.

[0053] For example, for different pollution areas, consider Figure 2 , Figure 3 and Figure 4 There are three situations shown. Among them, Figure 2 This is a schematic diagram of a vertical well. Figure 3 and Figure 4 is a schematic diagram of a horizontal well. Figure 3 The contaminated area is large and the horizontal well is completely within the contaminated area. Figure 4 , the contaminated area is small or the horizontal well is long, and the horizontal well passes through the contaminated area.

[0054] Taking the horizontal well as an example, two cases are considered: (1) the horizontal well is completely within the contaminated area; (2) the horizontal well passes through the contaminated area.

[0055] In the Cartesian coordinate system, the flow equations of the polluted area and the non-polluted area are established respectively, among which the flow equation of the polluted area can be expressed as:

[0056]

[0057] The flow equation in the non-polluted area is:

[0058]

[0059] The initial conditions are:

[0060] p(x,y,z,t) t=0 =p i (4)

[0061] The outer boundary conditions are:

[0062]

[0063] The boundary conditions are:

[0064] p 1 =p 2 ,x=y=r 1 (7)

[0065]

[0066]

[0067] Among them, x, y, z are the three coordinate directions of the Cartesian coordinate system; t is time, unit s; k h1 , k v1 are the horizontal permeability and vertical permeability of the contaminated area, in μm 2 ;k h2 , k v2 are the horizontal permeability and vertical permeability of the non-polluted area, in μm 2 ; μ is the formation fluid viscosity, unit is mPa·s; p 1 、p 2 The pressure of the polluted area and the pressure of the non-polluted area are respectively, in MPa; φ 1 ,φ 2 are the porosity of the polluted area and the non-polluted area, respectively, which are decimals; c t1 、c t2 are the comprehensive compression coefficients of the formation fluid in the polluted area and the non-polluted area, respectively, in 1 / MPa; Pi is the original reservoir pressure, in MPa; h is the reservoir thickness, in m; r 1 is the radius of the contaminated area, in meters.

[0068] Step S12: Perform dimensionless analysis on the seepage mathematical model to determine the dimensionless pressure at each location point in the contaminated area and the non-contaminated area.

[0069] Specifically, the polluted area and the non-polluted area are gridded, and a dimensionless analysis is performed on the seepage mathematical model for each grid, ie, a position point, to obtain the dimensionless pressure at each position point.

[0070] Step S13, deriving the seepage mathematical model according to the dimensionless pressure at each position point to determine the finite element integral equation group.

[0071] The mathematical model of seepage is derived for the dimensionless pressure at each position point to obtain the finite element integral equation at each position point, and the finite element integral equations of all the position points constitute a finite element integral equation group.

[0072] Step S14, predicting the elastic production of the reservoir under different pollution degrees during the oil field development process according to the finite element integral equation group.

[0073] Specifically, the finite element integral equations can be numerically solved by finite element method, and then the elastic production when the reservoir is subjected to different pollution degrees during the oil field development process can be predicted according to the solution results.

[0074] It can be seen that this embodiment determines the finite element integral equation group by performing dimensionless analysis on the seepage mathematical model of the contaminated area and the non-contaminated area, and predicts the elastic production of the reservoir when it is subject to different degrees of contamination during the oil field development process based on the finite element integral equation group. It can accurately calculate the oil well production capacity when the boundary of the reservoir contaminated area is irregular, which is closer to the actual situation of the formation and objectively reflects the relationship between the contaminated area and the uncontaminated area.

[0075] In an optional embodiment, step S13 specifically includes:

[0076] Step S131, determining the interpolation function of each position point.

[0077] The interpolation function can be a hypothetical shape function or a basic function, as shown below:

[0078] N=(N 1 ,N 2 ,...,N n ) (10)

[0079] Among them, N n is the difference function corresponding to the nth position point, and N is the set of difference functions of n position points.

[0080] In order to improve the calculation accuracy of the interpolation function, the interpolation polynomial can be a complete polynomial, but the number of terms in the complete polynomial and the number of degrees of freedom of the unit (calculation area) are sometimes not the same. The method of reducing the number of polynomial terms can be adopted while maintaining the symmetry of the polynomial.

[0081] Step S132, determining the displacement function of each position point according to the dimensionless pressure and the interpolation function of each position point.

[0082] The displacement function is as follows:

[0083]

[0084] Where n is the number of location points, p Dj is the dimensionless pressure at point j, N j is the difference function at position point j.

[0085] Step S133, obtaining the volume integral of each position point according to the displacement function of each position point and the seepage mathematical model.

[0086] For example, according to the displacement function of each location point and the mathematical model of seepage, the unit Ω e The volume integral of the contaminated area is obtained as:

[0087]

[0088] Volume integral of the non-contaminated area:

[0089]

[0090] Among them, p iD is the displacement function of the contaminated area, L iD is the dimensionless horizontal well half length in the contaminated area, h iD is the dimensionless reservoir thickness in the contaminated area, p oD is the displacement function of the non-polluted area, L oD is the dimensionless horizontal well half length in the non-contaminated area, h oD is the dimensionless reservoir thickness of the non-polluted area, t is the time, unit Ωe is the volume integration area.

[0091] Step S134, determining a finite element integral equation group according to the volume integral of each position point.

[0092] Specifically, by further processing the volume integral of each position point, a finite element integral equation group can be obtained.

[0093] In an optional embodiment, step S134 specifically includes:

[0094] Step S1341, using Green's function to process the volume integral of each position point, and removing the zero point and boundary point of the contaminated area, to obtain the finite element integral equation of each position point.

[0095] Specifically, taking the contaminated area as an example, the volume integral of each position point is processed using the Green function, and the following can be obtained:

[0096]

[0097] in,

[0098] in, Γe is the area integration region, and A is the area.

[0099] Then, the areas with radius 0 and r1 of the contaminated area are removed, and the finite element integral equation of the inner area of ​​the contaminated area is obtained as follows:

[0100]

[0101] Step S1342, determining a finite element integral equation group according to the finite element integral equation of each position point.

[0102] Specifically, the finite element integral equation group is composed of the finite element integral equations at each position point.

[0103] In an optional embodiment, step S1342 specifically includes: transforming the form of the finite element integral equation of each position point to obtain a simplified finite element integral equation group.

[0104] Specifically, according to the finite element integral equation of each position point, the following matrix is ​​determined:

[0105]

[0106] And define the following parameters:

[0107]

[0108] Then the finite element equation becomes:

[0109]

[0110] In order to facilitate the calculation of the output calculation software, it is further simplified as follows:

[0111] K e P m =F e (19)

[0112] in,

[0113]

[0114] In an optional embodiment, step S15 specifically includes:

[0115] Step S151, solving the finite element integral equation group to obtain the pressure value of each position in the reservoir at each time.

[0116] Specifically, by assembling the overall matrix and array, establishing the corresponding overall finite element equation group, selecting the two-dimensional triangular grid to discretize the calculation domain, numerically solving the equation group through the finite element method, and selecting any grid unit to perform unit characteristic analysis, the pressure value of each position in the composite reservoir at each time can be obtained, that is, p1(x, y, z, t) and p2(x, y, z, t).

[0117] Step S152, predicting the elastic production when the reservoir is subjected to different degrees of contamination during the oil field development process according to the pressure values ​​at various locations at various times.

[0118] Specifically, the elastic production calculation formula can be combined with the finite element numerical method to numerically solve and analyze the elastic production when the reservoir is subjected to different degrees of pollution during the oil field development process.

[0119] In an optional embodiment, step S152 includes:

[0120] Step S1521, determining a calculation method for elastic reserves according to the comprehensive compression coefficient, composite reservoir volume, reservoir original formation pressure and reservoir saturation pressure at each moment.

[0121] Specifically, the calculation method of elastic reserves driven by elastic energy can be obtained based on the comprehensive compression coefficient at each moment, the composite reservoir volume, the original reservoir formation pressure and the reservoir saturation pressure:

[0122] ΔV=C t V f (P i -P b ) (twenty two)

[0123] Where ΔV is the elastic reserve, C t is the comprehensive compression coefficient at time t, V f is the composite reservoir volume, P i is the original formation pressure of the reservoir, P b is the reservoir saturation pressure.

[0124] Step S1522, determining a calculation method for elastic production when the reservoir is subjected to different degrees of contamination according to a calculation method for elastic reserves and pressure values ​​at various locations at various times.

[0125] Specifically, the calculation method of elastic production when the reservoir is subjected to different degrees of pollution can be determined according to the calculation method of elastic reserves. For example, the calculation method of elastic production when the reservoir is subjected to different degrees of pollution can be determined according to the comprehensive compression coefficient at each moment, the composite reservoir volume, the pressure at each position at each moment, and the bottom hole pressure.

[0126] Specifically, by performing volume integration on the entire reservoir, the elastic production considering different degrees of reservoir contamination is obtained:

[0127]

[0128] Among them, N p is the elastic output, P t is the pressure at a certain position at time t, P w is the bottom hole pressure.

[0129] Embodiment 2

[0130] Figure 5 The flowchart of a method for predicting oil well productivity provided according to the second embodiment of the present invention is shown. Among them, this embodiment is an application scenario embodiment corresponding to a vertical well in a dual-zone composite oil reservoir considering the reservoir contamination zone. Figure 5 As shown, the method includes:

[0131] Step S21, determine the scope and related properties of the reservoir to be developed in the oil field, characterize the vertical well contamination area, and define parameters such as the contamination area radius and the contamination area permeability.

[0132] like Figure 2 This is a two-dimensional schematic diagram of a vertical well model of a dual-zone composite reservoir considering the reservoir contamination zone in this embodiment, in which the vertical well runs through the entire oil layer. The basic parameters are shown in Table 1:

[0133] Table 1

[0134]

[0135] Step S22, establishing a mathematical model of vertical well seepage in a dual-zone composite reservoir taking into account the contaminated zone and the non-contaminated zone of the reservoir.

[0136] The vertical well seepage mathematical model refers to formula (1) and formula (2). Figure 6 This is the main view of the radial flow state of a vertical well in the contaminated area. Figure 7 This is a top view of the radial flow state of a vertical well in the contaminated area. Figure 8 This is a top view of the radial flow state of a vertical well in the non-contaminated area.

[0137] Step S23, performing dimensionless analysis on the vertical well seepage mathematical model to determine the dimensionless pressure at each location point in the contaminated area and the non-contaminated area.

[0138] Step S24, deriving the mathematical model of seepage according to the dimensionless pressure at each position point, and establishing a finite element integral equation group of a vertical well in a dual-zone composite reservoir taking into account the contaminated zone and the non-contaminated zone of the reservoir.

[0139] Step S25, numerically solving the finite element integral equations.

[0140] The numerical solution method refers to formulas (10)-(21).

[0141] Step S26, combining the elastic production calculation formula, using the finite element numerical method to numerically solve and analyze the elastic production when the reservoir is subjected to different degrees of pollution during the oil field development process.

[0142] The solution method refers to formulas (22)-(23).

[0143] Based on the above elastic production calculation results, the influence of the size and permeability of the vertical well pollution zone on the oil well production in the dual-zone composite reservoir with reservoir pollution zone is analyzed. Fig. 9 It is a schematic diagram of the impact of the pollution area radius, such as Fig. 9As shown in the figure, it can be seen that the difference in production decline dynamics with the size of the contaminated area, where the permeability of the contaminated area is set at 0.002μm^2. From the production decline curve, it can be seen that the smaller the radius of the contaminated area and the smaller the contaminated area, the higher the daily oil production of the initial wells in the reservoir based on elastic reserves, but its production declines fastest. When the elastic production is in the slow decline stage, the larger the radius of the contaminated area, the higher the production. The size of the contaminated area in the later stage has almost no effect on the production.

[0144] Fig.10 The schematic diagram of the impact of the permeability of the polluted area is shown in Fig.10 As shown in the figure, it can be seen that the difference in production decline dynamics with the change of permeability in the contaminated area, where the radius of the contaminated area is set at 300m. From the production decline curve, it can be seen that the smaller the permeability of the contaminated area and the more serious the contamination, the higher the daily oil production of the initial wells in the reservoir relying on elastic energy production, but its production decline is the smallest. When the production tends to remain unchanged in the later period, the greater the permeability of the contaminated area, the higher the production.

[0145] Embodiment 3

[0146] Fig.11 The flowchart of a method for predicting oil well productivity provided by the third embodiment of the present invention is shown. The embodiment of the present invention takes into account the situation that the horizontal well is completely in the contaminated area, such as Fig.11 As shown, the method includes:

[0147] Step S31, determine the scope and related properties of the reservoir to be developed in the oil field, characterize the contaminated area of ​​the horizontal wells that are completely in the contaminated area, and define parameters such as the radius of the contaminated area and the permeability of the contaminated area.

[0148] like Figure 3 This is a two-dimensional schematic diagram of a vertical well model of a dual-zone composite reservoir considering the reservoir contamination zone in this embodiment, in which the horizontal well is completely in the contamination zone. The basic parameters are shown in Table 2:

[0149] Table 2

[0150]

[0151] Step S32, establishing a mathematical model of seepage flow of horizontal wells in a dual-zone composite oil reservoir that takes into account the polluted zone and the non-polluted zone of the reservoir and is completely in the polluted zone.

[0152] The mathematical model of seepage in horizontal wells completely in the contaminated area refers to formula (1) and formula (2). Fig.12 This is the main view of the radial flow state when the horizontal well and the vertical well are completely in the contaminated area. Fig.13 This is a top view of the radial flow state when the horizontal well and vertical well are completely in the contaminated area. Fig.14 This is a top view of the radial flow state when the horizontal well and the vertical well are completely in the contaminated area.

[0153] Step S33: Perform dimensionless analysis on the seepage mathematical model to determine the dimensionless pressure at each location point in the contaminated area and the non-contaminated area.

[0154] Step S34, deriving the mathematical model of seepage according to the dimensionless pressure at each position point, and establishing a finite element integral equation group of horizontal wells completely in the contaminated area of ​​the dual-zone composite oil reservoir taking into account the contaminated area and the non-contaminated area of ​​the reservoir.

[0155] Step S35, numerically solving the finite element integral equations.

[0156] The numerical solution method refers to formulas (10)-(21).

[0157] Step S36, combining the elastic production calculation formula, using the finite element numerical method to numerically solve and analyze the elastic production when the reservoir is subjected to different degrees of pollution during the oil field development process.

[0158] The solution method refers to formulas (22)-(23).

[0159] Based on the above elastic production calculation results, the influence of the contaminated zone size and permeability of the horizontal well completely in the contaminated zone on the oil well production in the dual-zone composite reservoir of the reservoir contaminated zone is analyzed. Fig.15 It is a schematic diagram of the impact of the pollution area radius, such as Fig.15 As shown in the figure, it can be seen that the difference in the dynamics of production decline with the size of the contaminated area, where the permeability of the contaminated area is set to 0.002μm 2 From the yield decline curve, we can see that when the yield is in the decline stage, the smaller the radius of the pollution area, the higher the yield. When the radius of the pollution area reaches a certain size, the impact on the yield is not obvious. In the later stage, the size of the pollution area has almost no effect on the yield.

[0160] Fig.16 The schematic diagram of the impact of the permeability of the polluted area is shown in Fig.16 As shown in the figure, we can see the difference in the dynamics of production decline with the change of the permeability of the pollution area, where the radius of the pollution area is set to 300m. From the production decline curve, we can see that when the production is in the declining stage, the greater the permeability of the pollution area, the higher the production. When the production tends to remain unchanged in the later stage, the permeability of the pollution area has almost no effect on the production.

[0161] Embodiment 4

[0162] Fig.17 The flowchart of a method for predicting oil well productivity according to the fourth embodiment of the present invention is shown. The embodiment of the present invention takes into account the scenario where a horizontal well passes through a contaminated area, such as Fig.17 As shown, the method includes:

[0163] Step S41, determining the scope and related properties of the reservoir to be developed in the oil field, and characterizing the contaminated area of ​​the horizontal wells that pass through the contaminated area, defining parameters such as the radius of the contaminated area and the permeability of the contaminated area.

[0164] like Figure 4 This is a two-dimensional schematic diagram of a vertical well model of a dual-zone composite reservoir considering the reservoir contamination zone in this embodiment, wherein the horizontal well passes through the contaminated zone. The basic parameters are shown in Table 3:

[0165] Table 3

[0166]

[0167] Step S42, establishing a mathematical model of horizontal well seepage through the contaminated area in a dual-zone composite oil reservoir taking into account the contaminated area and the non-contaminated area of ​​the reservoir.

[0168] The mathematical model of the seepage of the horizontal well passing through the contaminated area refers to formula (1) and formula (2). Fig.18 This is the main view of the radial flow state when the horizontal well passes through the contaminated area. Fig.19 A top view of the radial flow state when a horizontal well or vertical well passes through a contaminated area.

[0169] Step S43: Perform dimensionless analysis on the seepage mathematical model to determine the dimensionless pressure at each location point in the contaminated area and the non-contaminated area.

[0170] Step S44, deriving the mathematical model of seepage according to the dimensionless pressure at each position point, and establishing a finite element integral equation group of a horizontal well passing through the contaminated area in a dual-zone composite oil reservoir taking into account the contaminated area and the non-contaminated area of ​​the reservoir.

[0171] Step S45, numerically solving the finite element integral equations.

[0172] The numerical solution method refers to formulas (10)-(21).

[0173] Step S46, combining the elastic production calculation formula, using the finite element numerical method to numerically solve and analyze the elastic production when the reservoir is subjected to different degrees of pollution during the oil field development process.

[0174] The solution method refers to formulas (22)-(23).

[0175] Based on the above elastic production calculation results, the influence of the size of the contaminated area and the permeability of the horizontal well passing through the contaminated area in the dual-zone composite reservoir on the oil well production is analyzed. Fig. 20 It is a schematic diagram of the impact of the pollution area radius, such as Fig. 20As shown in the figure, we can see the difference in the dynamics of yield decline with the change of the size of the contaminated area, where the permeability of the contaminated area is set at 0.002μm^2. From the yield decline curve, we can see that the larger the radius of the contaminated area and the larger the contaminated area, the lower the yield. The size of the contaminated area in the later stage has almost no effect on the yield.

[0176] Fig.21 The schematic diagram of the impact of the permeability of the polluted area is shown in Fig.21 As shown in the figure, we can see the difference in the dynamics of production decline with the change of permeability in the pollution area. The radius of the pollution area is set at 150m. From the production decline curve, we can see that the smaller the permeability of the pollution area and the more serious the pollution, the lower the production. The permeability of the pollution area in the later stage has almost no effect on the production.

[0177] Embodiment 5

[0178] Fig. 22 The schematic diagram of the structure of an oil well productivity prediction device provided by the fifth embodiment of the present invention is shown. Fig. 22 As shown, the device includes: a seepage mathematical model determination module 51, a dimensionless analysis module 52, an equation derivation module 53 and a production prediction module 54; wherein,

[0179] The seepage mathematical model determination module 51 is used to determine the seepage mathematical model including the polluted area and the non-polluted area according to the pollution degree of the reservoir in the oil field development;

[0180] The dimensionless analysis module 52 is used to perform dimensionless analysis on the seepage mathematical model to determine the dimensionless pressure at each location point in the contaminated area and the non-contaminated area;

[0181] The equation derivation module 53 is used to derive the seepage mathematical model according to the dimensionless pressure at each position point to determine the finite element integral equation group;

[0182] The production prediction module 54 is used to predict the elastic production of the reservoir when it is subjected to different degrees of pollution during the oil field development process according to the finite element integral equation group.

[0183] Furthermore, the equation derivation module 53 includes:

[0184] The interpolation function determination unit 531 is used to determine the interpolation function of each position point;

[0185] The displacement function determination unit 532 is used to determine the displacement function of each position point according to the dimensionless pressure and the interpolation function of each position point;

[0186] The integration unit 533 is used to obtain the volume integral of each position point according to the displacement function of each position point and the seepage mathematical model;

[0187] The equation determination unit 534 is used to determine the finite element integral equation group according to the volume integral of each position point.

[0188] Furthermore, the equation determination unit 534 is specifically used to use the Green's function to process the volume integral of each position point, and remove the zero point and boundary point of the contaminated area to obtain the finite element integral equation of each position point; and determine the finite element integral equation group based on the finite element integral equation of each position point.

[0189] Furthermore, the equation determination unit 534 is specifically used to transform the form of the finite element integral equation of each position point to obtain a simplified finite element integral equation group.

[0190] The production prediction module 54 includes:

[0191] The solving unit 541 is used to solve the finite element integral equation group to obtain the pressure value of each position in the reservoir at each time;

[0192] The production prediction unit 542 is used to predict the elastic production of the reservoir when it is polluted to different degrees during the oil field development process according to the pressure values ​​at each position at each time.

[0193] Furthermore, the production prediction unit 542 is specifically used to determine the calculation method of the elastic reserve based on the comprehensive compression coefficient, the composite reservoir volume, the original formation pressure of the reservoir and the reservoir saturation pressure at each moment; and determine the calculation method of the elastic production when the reservoir is subject to different degrees of pollution based on the calculation method of the elastic reserve and the pressure values ​​at each position at each moment.

[0194] Furthermore, the production prediction unit 542 is specifically used to determine the calculation method of the elastic production when the reservoir is subjected to different degrees of pollution according to the comprehensive compression coefficient at each moment, the composite reservoir volume, the pressure at each position at each moment and the bottom hole pressure.

[0195] The oil well productivity prediction device described in this embodiment is used to execute the oil well productivity prediction method described in the above-mentioned embodiment 1. Its working principle and technical effect are similar and will not be repeated here.

[0196] Embodiment 6

[0197] Embodiment 6 of the present invention provides a non-volatile computer storage medium, wherein the computer storage medium stores at least one executable instruction, and the computer executable instruction can execute the oil well productivity prediction method in any of the above method embodiments.

[0198] Embodiment 7

[0199] Fig.23The figure shows a schematic diagram of the structure of an electronic device provided according to Embodiment 8 of the present invention. The specific embodiment of the present invention does not limit the specific implementation of the electronic device.

[0200] like Fig.23 As shown, the electronic device may include: a processor (processor) 602 , a communication interface (Communications Interface) 604 , a memory (memory) 606 , and a communication bus 608 .

[0201] The processor 602, the communication interface 604, and the memory 606 communicate with each other via the communication bus 608. The communication interface 604 is used to communicate with other devices such as a client or other server network elements. The processor 602 is used to execute the program 610, which can specifically execute the relevant steps in the above method embodiment.

[0202] Specifically, the program 610 may include program codes, which include computer operation instructions.

[0203] The processor 602 may be a central processing unit (CPU), or an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of the present invention. The one or more processors included in the electronic device may be processors of the same type, such as one or more CPUs; or processors of different types, such as one or more CPUs and one or more ASICs.

[0204] The memory 606 is used to store the program 610. The memory 606 may include a high-speed RAM memory, and may also include a non-volatile memory (non-volatile memory), such as at least one disk memory.

[0205] The program 610 can be specifically used to enable the processor 602 to execute the oil well productivity prediction method in any of the above method embodiments.

[0206] The algorithm or display provided herein is not inherently related to any particular computer, virtual system or other equipment. Various general purpose systems can also be used together with the teachings based on this. According to the above description, it is obvious to construct the structure required for this type of system. In addition, the embodiment of the present invention is not directed to any specific programming language yet. It should be understood that various programming languages ​​can be utilized to realize the content of the present invention described herein, and the description made to specific languages ​​above is for disclosing the best mode of the present invention.

[0207] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0208] Similarly, it should be understood that in order to streamline the present invention and aid in understanding one or more of the various inventive aspects, in the above description of exemplary embodiments of the present invention, the various features of the embodiments of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof. However, this disclosed method should not be interpreted as reflecting the following intention: that the claimed invention requires more features than the features explicitly recited in each claim. More specifically, as reflected in the claims below, inventive aspects lie in less than all the features of the individual embodiments disclosed above. Therefore, the claims that follow the specific embodiment are hereby expressly incorporated into the specific embodiment, with each claim itself serving as a separate embodiment of the present invention.

[0209] Those skilled in the art will appreciate that the modules in the devices in the embodiments may be adaptively changed and arranged in one or more devices different from the embodiments. The modules or units or components in the embodiments may be combined into one module or unit or component, and in addition they may be divided into a plurality of submodules or subunits or subcomponents. Except that at least some of such features and / or processes or units are mutually exclusive, all features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all processes or units of any method or device disclosed in this manner may be combined in any combination. Unless otherwise expressly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) may be replaced by an alternative feature providing the same, equivalent or similar purpose.

[0210] In addition, those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims below, any one of the claimed embodiments may be used in any combination.

[0211] The various component embodiments of the present invention can be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. It should be understood by those skilled in the art that a microprocessor or digital signal processor (DSP) can be used in practice to implement some or all functions of some or all components according to embodiments of the present invention. The present invention can also be implemented as a device or apparatus program (e.g., computer program and computer program product) for executing part or all of the methods described herein. Such a program implementing the present invention can be stored on a computer-readable medium, or can have the form of one or more signals. Such a signal can be downloaded from an Internet website, or provided on a carrier signal, or provided in any other form.

[0212] It should be noted that the above embodiments illustrate the present invention rather than limit it, and that those skilled in the art may devise alternative embodiments without departing from the scope of the appended claims. In the claims, any reference symbol between brackets shall not be construed as a limitation on the claims. The word "comprising" does not exclude the presence of elements or steps not listed in the claims. The word "one" or "an" preceding an element does not exclude the presence of a plurality of such elements. The present invention may be implemented by means of hardware comprising a number of different elements and by means of a suitably programmed computer. In a unit claim enumerating a number of devices, several of these devices may be embodied by the same hardware item. The use of the words first, second, and third, etc. does not indicate any order. These words may be interpreted as names. The steps in the above embodiments, unless otherwise specified, should not be understood as limitations on the order of execution.

Claims

1. A method for predicting oil well productivity, characterized in that: include: Determine the mathematical model of seepage flow including polluted areas and non-polluted areas according to the pollution degree of the reservoir in the oil field development; Performing dimensionless analysis on the seepage mathematical model to determine the dimensionless pressure at each location point in the contaminated area and the non-contaminated area; Determine the interpolation function of each position point; determine the displacement function of each position point according to the dimensionless pressure and the interpolation function of each position point; obtain the volume integral of each position point according to the displacement function of each position point and the seepage mathematical model, wherein the volume integral includes the volume integral of the contaminated area and the volume integral of the non-contaminated area; process the volume integral of each position point using the Green function, and remove the zero point and boundary point of the contaminated area to obtain the finite element integral equation of each position point; transform the finite element integral equation of each position point to obtain a simplified finite element integral equation group; The finite element integral equation group is solved to obtain the pressure value of each position in the reservoir at each time; the calculation method of the elastic reserve is determined according to the comprehensive compression coefficient, the composite reservoir volume, the original formation pressure of the reservoir and the reservoir saturation pressure at each time; the calculation method of the elastic production when the reservoir is subjected to different degrees of contamination is determined according to the calculation method of the elastic reserve and the pressure value of each position at each time; The mathematical model of seepage in the contaminated area is expressed as: The mathematical model of seepage in the non-polluted area is expressed as: Among them, x, y, z are the three coordinate directions of the Cartesian coordinate system; t is time; k h1 , k v1 are the horizontal permeability and vertical permeability of the contaminated area respectively; k h2 , k v2 are the horizontal permeability and vertical permeability of the non-contaminated area respectively; μ is the viscosity of the formation fluid; p1 and p2 are the pressure of the contaminated area and the pressure of the non-contaminated area respectively; φ1 and φ2 are the porosity of the contaminated area and the non-contaminated area respectively; c t1 、c t2 The comprehensive compressibility coefficients of the formation fluid in the contaminated area and the non-contaminated area are respectively; r1 is the radius of the contaminated area; The volume integral of the contaminated area is expressed as: The volume integral of the non-contaminated area is expressed as: Among them, p iD is the displacement function of the contaminated area, L iD is the dimensionless horizontal well half length in the contaminated area, h iD is the dimensionless reservoir thickness in the contaminated area, p oD is the displacement function of the non-polluted area, L oD is the dimensionless horizontal well half-length in the non-contaminated area, h oD is the dimensionless reservoir thickness in the non-contaminated area, t is time, and the unit is Ω e is the volume integration area; N j is the difference function at position point j; Among them, the finite element integral equation of the internal area of ​​the contaminated area is: Among them, according to the finite element integral equation of each position point, the following matrix is ​​determined, and then the simplified finite element integral equation group is obtained:

2. The method according to claim 1, characterized in that The method for calculating the elastic production when the reservoir is subjected to different degrees of pollution based on the calculation method of the elastic reserves and the pressure values ​​at each location at each time includes: determining the method for calculating the elastic production when the reservoir is subjected to different degrees of pollution based on the comprehensive compression coefficient at each time, the volume of the composite reservoir, the pressure at each location at each time and the bottom hole pressure.

3. An oil well productivity prediction device, characterized in that: include: A seepage mathematical model determination module, used to determine the seepage mathematical model including the polluted area and the non-polluted area according to the pollution degree of the reservoir in the oil field development; A dimensionless analysis module, used for performing dimensionless analysis on the seepage mathematical model to determine the dimensionless pressure at each position point in the contaminated area and the non-contaminated area; An equation derivation module is used to determine the interpolation function of each position point; determine the displacement function of each position point according to the dimensionless pressure and the interpolation function of each position point; obtain the volume integral of each position point according to the displacement function of each position point and the seepage mathematical model, wherein the volume integral includes the volume integral of the contaminated area and the volume integral of the non-contaminated area; process the volume integral of each position point using the Green's function, and remove the zero point and boundary point of the contaminated area to obtain the finite element integral equation of each position point; determine the finite element integral equation group according to the finite element integral equation of each position point; The production prediction module is used to solve the finite element integral equation group to obtain the pressure value of each position in the reservoir at each time; determine the calculation method of the elastic reserve according to the comprehensive compression coefficient, the composite reservoir volume, the original formation pressure of the reservoir and the reservoir saturation pressure at each time; determine the calculation method of the elastic production when the reservoir is polluted to different degrees according to the calculation method of the elastic reserve and the pressure value of each position at each time; The mathematical model of seepage in the contaminated area is expressed as: The mathematical model of seepage in the non-polluted area is expressed as: Among them, x, y, z are the three coordinate directions of the Cartesian coordinate system; t is time; k h1 , k v1 are the horizontal permeability and vertical permeability of the contaminated area respectively; k h2 , k v2 are the horizontal permeability and vertical permeability of the non-contaminated area respectively; μ is the viscosity of the formation fluid; p1 and p2 are the pressure of the contaminated area and the pressure of the non-contaminated area respectively; φ1 and φ2 are the porosity of the contaminated area and the non-contaminated area respectively; c t1 、c t2 The comprehensive compressibility coefficients of the formation fluid in the contaminated area and the non-contaminated area are respectively; r1 is the radius of the contaminated area; The volume integral of the contaminated area is expressed as: The volume integral of the non-contaminated area is expressed as: Among them, p iD is the displacement function of the contaminated area, L iD is the dimensionless horizontal well half length in the contaminated area, h iD is the dimensionless reservoir thickness in the contaminated area, p oD is the displacement function of the non-polluted area, L oD is the dimensionless horizontal well half-length in the non-contaminated area, h oD is the dimensionless reservoir thickness in the non-contaminated area, t is time, and the unit is Ω e is the volume integration area; N j is the difference function at position point j; Among them, the finite element integral equation of the internal area of ​​the contaminated area is: Among them, according to the finite element integral equation of each position point, the following matrix is ​​determined, and then the simplified finite element integral equation group is obtained:

4. An electronic device comprising: A processor, a memory, a communication interface and a communication bus, wherein the processor, the memory and the communication interface communicate with each other via the communication bus; The memory is used to store at least one executable instruction, and the executable instruction enables the processor to perform operations corresponding to the oil well productivity prediction method according to any one of claims 1-2.

5. A computer storage medium, wherein at least one executable instruction is stored in the storage medium, and the executable instruction enables a processor to execute operations corresponding to the oil well productivity prediction method according to any one of claims 1 to 2.

Citation Information

Patent Citations

  • Yield prediction method for carbonate rock fracture-hole type oil reservoir production well

    CN110656923A