A network backup power automatic switching method based on intelligent control system

The intelligent control system detects charging and locking conditions and formulates an operation plan for automatic switching, which solves the problem that the automatic switching device cannot switch automatically during maintenance or failure, and realizes the automatic control of backup power supply and the safe and stable power supply of the power grid.

CN113922370BActive Publication Date: 2024-10-18STATE GRID SHANDONG ELECTRIC POWER CO
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111186996.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-12
Publication Date
2024-10-18
Estimated Expiration
2041-10-12

AI Technical Summary

Technical Problem

In the existing technology, the backup and automatic switching device cannot successfully switch during maintenance or failure, causing the backup and automatic switching to lose its function. Moreover, the local backup power automatic switching control strategy does not consider the thermal stability limit of the remote equipment or lines, which may cause the backup to fail. The power supply tripped due to overload and expanded the fault.

Method used

The network backup power automatic switching method based on the intelligent control system is adopted. By detecting charging and locking conditions, the backup and automatic switching operation plan is formulated and derived, and the intelligent dispatch control system is embedded to monitor and optimize the backup and automatic switching mode to ensure the safety and stability of the power grid.

Benefits of technology

It realizes the automation and flexible control of backup and automatic switching, reduces costs, improves the level of power grid operation and maintenance management and automation intelligence, and ensures the reliable power supply of backup power and the safety and stability of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113922370B_ABST
    Figure CN113922370B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for automatic switching of network standby power supply based on an intelligent control system, comprising the following steps: S101, charging condition judgment: when the standby power supply in the station fails, first detect whether the equipment meets the charging conditions, then detect whether the equipment is fully charged, and then judge whether the network standby power supply meets the discharge conditions. After the conditions are met, the network standby power supply is discharged. In the present invention, the implementation of the network standby power supply scheme reduces the secondary wiring cables and other links, and the function module of the network standby power supply can be flexibly added to the automation system to realize the standby power supply function, which greatly reduces the standby power supply cost at the station end. In particular, when the operating substation is undergoing standby power supply transformation, there is no need to shut down the power supply at corresponding intervals for construction wiring, which does not affect the power supply to users and improves the operation, maintenance and management level of the substation; improves the automation intelligence level of the substation, so that the dispatching and monitoring can be more timely and precisely grasp the operation status of the standby power supply function.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of automatic control of backup power supplies, and in particular to an automatic switching method for a network backup power supply based on an intelligent control system. Background Art

[0002] At present, due to the limitations of wiring form and communication conditions, some substations lack backup automatic switching. For example, in the three-station series wiring mode, the backup automatic switching function of two substations will be sacrificed, and the backup automatic switching device in the station often cannot play a role, and it is impossible to ensure that each substation is protected by the backup automatic switching. At the same time, the automatic switching control strategy of the local backup power supply only considers the bus voltage or incoming current of the local substation, and does not consider factors such as the thermal stability limit of the equipment or line on the remote backup power supply side, which may cause the backup power supply to trip overload, leading to further expansion of the fault.

[0003] In the maintenance mode, when a fault occurs, such as a power outage in the entire station, there is no automatic means to restore the load. The dispatcher needs to manually restore it according to the accident handling plan, which takes a long time and will cause a power grid incident. For example, when a main transformer of a 220kV substation is under maintenance, another main transformer fails and trips, and the 110kV bus loses power, it will constitute a level 6 or above power grid incident. At present, the load can only be manually removed through the accident handling channel afterwards. Summary of the invention

[0004] The purpose of the present invention is to provide a network backup power automatic switching method based on an intelligent control system to solve the technical problem that when the backup automatic switching device is under maintenance or fails, the automatic switching cannot be successful, resulting in the loss of the backup automatic switching function.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A method for automatically switching a network backup power supply based on an intelligent control system comprises the following steps:

[0007] S101, charging condition judgment: when the in-station standby fails, first detect whether the equipment meets the charging condition, then detect whether the equipment is fully charged, and then determine whether the network standby automatic switch meets the discharge condition. If the conditions are met, the network standby automatic switch performs a discharge action to supply power to the equipment;

[0008] The failure includes at least: failure of the automatic switching device in the station, maintenance, too low no-pressure setting value, and failure of the incoming line circuit breaker of the pressure-losing bus to trip within the delay time;

[0009] S102, formulate a standby automatic switch operation plan: after judging whether the network standby automatic switch meets the discharge conditions, the start condition and delay judgment are performed in sequence, and the locking condition judgment is performed again after the judgment passes;

[0010] When the blocking condition is met, the network standby is automatically discharged to supply power to the device;

[0011] When the blocking condition is not met, a solution is derived and it is determined whether the blocking is to be executed; if the blocking is executed, the network standby automatic switching performs a discharge action to supply power to the device;

[0012] If the execution is not locked, it is determined whether the start-up conditions are met. If the conditions are not met, the network standby is automatically discharged to supply power to the device;

[0013] If the conditions are met, it waits for execution, and after a timeout, the network backup self-starting performs a discharge action to supply power to the device.

[0014] Furthermore, in step S101, when the device is not fully charged, it is always in a state of detecting whether the charging condition is met.

[0015] Further, in step S101, the network equipment automatic switching is applied to one of the failure of the automatic switching of the backup in the multi-station series power supply station, the loss of pressure in the chain serial power supply intermediate substation and the failure of the automatic switching of the backup in the station.

[0016] Furthermore, in step S101, the network standby automatic switching is based on the in-station standby automatic switching action logic, defines automatic switching charging conditions, discharging conditions and action logic verification on the master station side, and constructs a standby automatic switching model according to the real-time operating status of the power grid. In the event that the in-station standby automatic switching fails, the network standby automatic switching is supplemented; when the in-station standby automatic switching is not configured, the network standby automatic switching is called.

[0017] Furthermore, the in-station terminals are all provided with system automatic monitoring terminals for monitoring power failure and the status of standby automatic operation, and sending the monitoring results to the intelligent dispatching control system.

[0018] Furthermore, in step S101, the network backup automatic switch is embedded in the intelligent dispatching control system and is electrically connected to the switch signal and voltage and current collection position of the substation.

[0019] Furthermore, in step S102, the derivation plan is based on the intelligent dispatching control system and the collection of switch signals and voltage and current information of the substation, and according to the written plan, the topology of the entire network is analyzed to determine the accident handling channel, select and derive the optimal action plan.

[0020] Furthermore, in step S102, when the locking is executed, the network standby automatic switching is automatically executed according to the derivation scheme to complete the discharge action.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] In the present invention, the implementation of the network standby automatic switch scheme reduces the secondary wiring cables and other links, and the function module of the network standby automatic switch can be flexibly added to the automation system to realize the standby switch function, which greatly reduces the standby automatic switch cost at the station end. In particular, when the operating substation is undergoing standby automatic switch transformation, there is no need to shut down the power at corresponding intervals for construction wiring, which does not affect the power supply to users and improves the operation, maintenance and management level of the substation; it improves the automation and intelligence level of the substation, so that the dispatching and monitoring can be more timely and precise to grasp the operation status of the standby automatic switch function. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 The present invention is a flow chart of a method for automatically switching network backup power supply based on an intelligent control system. DETAILED DESCRIPTION

[0024] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0025] See also Figure 1 , the present invention provides a technical solution:

[0026] A method for automatically switching a network backup power supply based on an intelligent control system comprises the following steps:

[0027] S101, charging condition judgment: when the in-station standby fails, first detect whether the equipment meets the charging condition, then detect whether the equipment is fully charged, and then determine whether the network standby automatic switch meets the discharge condition. If the conditions are met, the network standby automatic switch performs a discharge action to supply power to the equipment;

[0028] The failure includes at least: failure of the automatic switching device in the station, maintenance, too low no-pressure setting value, and failure of the incoming line circuit breaker of the pressure-losing bus to trip within the delay time;

[0029] S102, formulate a standby automatic switch operation plan: after judging whether the network standby automatic switch meets the discharge conditions, the start condition and delay judgment are performed in sequence, and the locking condition judgment is performed again after the judgment passes;

[0030] When the blocking condition is met, the network standby is automatically discharged to supply power to the device;

[0031] When the blocking condition is not met, a solution is derived and it is determined whether the blocking is to be executed; if the blocking is executed, the network standby automatic switching performs a discharge action to supply power to the device;

[0032] If the execution is not locked, it is determined whether the start-up conditions are met. If the conditions are not met, the network standby is automatically discharged to supply power to the device;

[0033] If the conditions are met, it waits for execution, and after a timeout, the network backup self-starting performs a discharge action to supply power to the device.

[0034] The implementation of the network standby automatic switch scheme reduces the secondary wiring cables and other links, and can flexibly add the network standby automatic switch function module in the automation system to realize the standby switch function, greatly reducing the standby automatic switch cost at the station end. In particular, when the operating substation is undergoing standby automatic switch transformation, there is no need to shut down the power at corresponding intervals for construction wiring, which does not affect the power supply to users and improves the operation, maintenance and management level of the substation; it improves the automation and intelligence level of the substation, so that the dispatching and monitoring can be more timely and precise to grasp the operation status of the standby automatic switch function.

[0035] In step S101, when the device is not fully charged, it is always in a detection state of whether the charging condition is met to ensure the power supply safety of the device.

[0036] In step S101, the network equipment automatic switching is applied to one of the following situations: failure of automatic switching of backup equipment in multi-station series power supply, voltage loss in intermediate substation of chain serial power supply, and failure of automatic switching of backup equipment in station.

[0037] The automatic backup switch is developed from the station area to the wide area, which can adapt to various usage modes and realize flexible control of the automatic backup switch. Since the wiring method is not restricted, it can restore the power supply of all substations without dead angles, and can make full use of the main station information to become a strong backup for the automatic backup switch device in the station.

[0038] In step S101, the network standby automatic switching is based on the in-station standby automatic switching action logic, defines the automatic switching charging conditions, discharging conditions and action logic verification on the master station side, and builds a standby automatic switching model according to the real-time operation status of the power grid. In the event that the in-station standby automatic switching fails, the network standby automatic switching is supplemented; when the in-station standby automatic switching is not configured, the network standby automatic switching is called.

[0039] It is able to analyze backup plans through deep learning, reinforcement learning and similar artificial intelligence methods, and automatically generate strategies while ensuring the safe operation of the power grid.

[0040] The in-station terminals are all equipped with system automatic monitoring terminals to monitor power failures and the status of standby automatic operation, and send the monitoring results to the intelligent dispatching and control system for accurate and efficient recovery control of the serial power supply network by the intelligent dispatching and control system.

[0041] In step S101, the network backup automatic switch is embedded in the intelligent dispatching control system and is electrically connected to the switch signal and voltage and current collection position of the substation. The collected information is used to optimize the backup automatic switch mode and overload load shedding control strategy, formulate the backup automatic switch operation switch sequence and load shedding control strategy, and realize the coordination of local backup automatic switch, stabilization control system and protection device.

[0042] In step S102, the derivation scheme is based on the intelligent dispatching control system and the collection of switch signals and voltage and current information of the substation, and according to the written scheme, the whole network topology is analyzed to determine the accident handling channel, select and derive the optimal action plan.

[0043] It ensures that in the event of an emergency power grid accident, the load removed by the safety and stability device will not be re-added by the regional power grid backup automatic transfer device, so that the use of network backup automatic transfer can ensure the safety and stability of the large power grid.

[0044] In step S102, when the locking is executed, the network standby automatic switching is automatically executed according to the derivation plan to complete the discharge action.

[0045] When the network backup automatic switching equipment automatically executes according to the derivation plan, the intelligent dispatching and control system executes the backup automatic switching operation switch sequence and load shedding control strategy according to the derivation plan to improve the reliability of power supply.

[0046] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention includes the following claims and their equivalents.

Claims

1. A method for automatically switching network backup power supply based on an intelligent control system, characterized in that: The following steps are involved: S101, charging condition judgment: when the in-station standby fails, first detect whether the equipment meets the charging condition, then detect whether the equipment is fully charged, and then determine whether the network standby automatic switch meets the discharge condition. If the conditions are met, the network standby automatic switch performs a discharge action to supply power to the equipment; The failures include at least: failure of the automatic switching device in the station, maintenance, too low no-pressure setting, and failure of the incoming line circuit breaker of the pressure-losing bus to trip within the delay time; S102, formulate a standby automatic switch operation plan: after judging whether the network standby automatic switch meets the discharge conditions, the start condition and delay judgment are performed in sequence, and the locking condition judgment is performed again after the judgment is passed; When the blocking condition is met, the network standby is automatically discharged to supply power to the device; When the blocking condition is not met, a solution is derived and it is determined whether the blocking is to be executed; if the blocking is executed, the network standby automatic switching performs a discharge action to supply power to the device; If the execution is not locked, it is determined whether the start-up conditions are met. If the conditions are not met, the network standby is automatically discharged to supply power to the device; If the conditions are met, the execution is waited for, and after the timeout, the network standby self-transfer performs a discharge action to supply power to the device; In step S102, the derivation scheme is based on the intelligent dispatching control system and the collection of switch signals and voltage and current information of the substation, and according to the written scheme, the whole network topology is analyzed to determine the accident handling channel, select and derive the optimal action plan.

2. According to claim 1, a method for automatically switching network backup power supply based on an intelligent control system is characterized in that: In step S101, when the device is not fully charged, it is always in a state of detecting whether the charging condition is met.

3. According to claim 1, a method for automatically switching network backup power supply based on an intelligent control system is characterized in that: In step S101, the network backup automatic transfer is applied to one of the following situations: failure of the backup automatic transfer in a multi-station series power supply station, voltage loss in a chain-type serial power supply intermediate substation, and failure of the backup automatic transfer in a station.

4. According to claim 1, a method for automatically switching network backup power supply based on an intelligent control system is characterized in that: In step S101, the network standby automatic switching is based on the in-station standby automatic switching action logic, defines the automatic switching charging conditions, discharging conditions and action logic verification on the master station side, and builds a standby automatic switching model according to the real-time operation status of the power grid. In the event that the in-station standby automatic switching fails, the network standby automatic switching is supplemented; when the in-station standby automatic switching is not configured, the network standby automatic switching is called.

5. The method for automatically switching network backup power supply based on intelligent control system according to claim 4 is characterized in that: The in-station terminals are all equipped with system automatic monitoring terminals for monitoring power failure and the status of standby automatic operation, and sending the monitoring results to the intelligent dispatching control system.

6. The method for automatically switching network backup power supply based on intelligent control system according to claim 5 is characterized in that: In step S101, the network backup automatic switch is embedded in the intelligent dispatching control system and is electrically connected to the switch signal and voltage and current collection position of the substation.

7. The method for automatically switching network backup power supply based on an intelligent control system according to claim 1, characterized in that: In step S102, when the locking is executed, the network standby automatic switching is automatically executed according to the derivation plan to complete the discharge action.